(2) 6" CONDUITS STUB THRU FLOOR FOR SERVICE TO �J
COMM CLOSET HUB, N.I.C.
(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT W\(1)
25 PAIR 24AWG COPPER, (2) 6 PAIR #18 COPPER, (1)
12 STRAND MULTI & SINGLE MODE 50 MICRON MM (OM3)
FIBER, (3) 6 STRAND MULTI & SINGLE MODE 50 MICRON
MM (OM.3) CABLES AND INTERCOM CONDUCTORS. REMOVE (\
AND REPLACE WITH NEW FROM B700 HUB TO SERVICE
G V
'"" rn"cc,rn,c("""m' /\ x- x-
(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT W\(1)
25 PAIR 24AWG COPPER, (2) 6 PAIR #18 COPPER, (1)
12 STRAND MULTI & SINGLE MODE 50 MICRON MM (OM.3)
FIBER, (.3) 6 STRAND MULTI & SINGLE MODE 50 MICRON
MM (OM3) CABLES AND INTERCOM CONDUCTORS. REMOVE
AND REPLACE WITH NEW FROM 6700 HUB.
x- x- x- x- x- x- x-
E3 x- x- x-
(2) 4" PVC CONDUITS-1 SPARE AND 1
CONDUIT W\(2) 6 PAIR # 18 COPPER AND
(2) 6 STRAND MULTI & SINGLE MODE 50
MICRON MM (OM3) FIBER CABLES AND
INTERCOM CONDUCTORS. REMOVE AND
REPLACE WITH NEW FROM B700 TO B71 6
x-
FENCE
(2) 4" PVC CONDUITS-1 SPARE AND 1
x--x- x- x-
CONDUIT W\(2) 6 PAIR # 18 COPPER AND
MICRON MM (OM3) FIBER CABLES AND W\(2) 6 PAIR #18 COPPER, GATE CONTROL AND
INTERCOM CONDUCTORS REMOVE AND INTERCOM CONDUCTORS REMOVE AND REPLACE
REPLACE WITH NEW FROM B700 TO B71 6 WITH NEW FROM B700 TO ES
-----------v,------- -- C
(2) 6 STRAND MULTI & SINGLE MODE 50
(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT
E4
ES \
-------<fp-------- --y I I I I
PROJECT ACCESS TO B700
--�-- THE HUB FOR THIS WORK IS IN
6700 COMM CLOSET WITH EXISTING
PVC RACEWAY TO E1 ALL NEW
WORK UNLESS STATED OTHERWISE
SHALL ORIGINATE FROM THIS POINT.
l![I F
705 .------'
(2) 4" PVC CONDUITS-1 SPARE AND 1
CONDUIT W\(1) 25 PAIR 24AWG COPPER
AND (1) 12 STRAND MULTI & SINGLE
MODE 50 MICRON MM (OM.3) FIBER CABLES
AND INTERCOM CONDUCTORS. REMOVE AND
REPLACE WITH NEW FROM 6700 COMM.
CLOSET TO B705 COMM ROOM.
0 ------'
(2) 4" PVC CONDUITS-1 SP E AND 1
CONDUIT W\(1) 6 PAIR #18
(1) 6 STRAND MULTI & SI E MODE 50
CABLES AND
INTERCOM CONDUCTORS. REMOVE AND
REPLACE WITH NEW FROM B700.
E6�
(! 4" PVC CONDUITS TO SERVICE
CONNECTION ENCLOSURE ON OUTSIDE
WALL OF B716. REMOVE AND REPLACE
WITH NEW, (2) 6 PAIR # 18 COPPER
CABLE AND (1) 6 STRAND MULTI &
SINGLE MODE 50 MICRON MM (OM.3)
CABLES.
I I
I I I
(2) 4" PVC CONDUITS-1 SPARE AND 1
CONDUIT W\(2) 6 PAIR #18 COPPER,
INTERCOM & CONTROL CONDUCTORS
SHALL REMAIN. THESE WIRES SHALL BE
INTERRUPTED AND SPLICED AT ES.
I
-;L
-;L
'---x
FENCE
-x X -x -x -x -x -x -x -x E7 ®
-x -x -x -x •
LOW VOLTAGE CONDUCTORS, COMMUNICATION & FIBER OPTIC CABLE REPLACEMENT NOTES PLAN NORTH
PVC CONDUIT RACEWAY, HAND-HOLES AND ENCLOSURES THROUGHOUT SHALL REMAIN
AND BE REUSED EXCEPT WHERE NEW CONDUIT IS SHOWN BETWEEN E1 & E2.
2. ALL CONNECTIONS AND SPLICES SHALL BE ACCOMPLISHED USING BEST PRACTICE FOR
BOTH MECHANICAL AND ELECTRICAL INTEGRITY. ALL CONNECTIONS IN HAND-HOLES
SHALL BE SEALED, WATER-TIGHT, ARRANGED NEATELY WITHIN THE SPACE AND IN SUCH
A WAY AS TO MINIMIZE OBSTRUCTING OTHER CABLES PASSING THROUGH THE SAME
SPACE.
3. ALL CONNECTIONS AND SPLICES SHALL BE WITHIN HAND-HOLES, PANELS OR
ENCLOSURES. ALL INDIVIDUAL CONDUCTORS, CABLES, FIBER STRANDS AND FIBER
CABLES SHALL BE NEATLY ARRANGED, BUNDLED, TIED AND LABELED
4. ALL CONNECTIONS\RECONNECTIONS SHALL BE AT TERMINATION POINTS (SERVICE
CONNECTIONS) IN EXISTING ARRANGEMENTS AT TERMINAL BLOCKS\PATCH PANELS OR
FIBER CONVERTERS. ALL CIRCUITS ARE EXISTING OR SPARE AND REPLACEMENT IN-KIND
SHALL INCLUDE RE-ACCOMPLISHMENT OF ALL CONNECTIONS AT EXISTING CONNECTION
POINTS EXCEPT WHERE SPLICES ARE ALLOWED.
5. ADVANTOR AS A SOLE-SOURCE CONTRACTOR FOR THIS WORK DOES NOT APPLY. ALL
WORK SHOWN OR DESCRIBED IS INFRASTRUCTURE WORK THAT SHALL TERMINATE AT
THE SERVICE SIDE OF PATCH PANELS. WORK BEYOND THE SERVICE SIDE SHALL BE BY
OTHERS. HOWEVER; THE INSTALLING CONTRACTOR(S) SHALL COORDINATE WITH THE
GOV'T TO CONFIRM RECONNECTED CIRCUITS ARE FUNCTIONING IN "AS-GOOD" OR
"BEDER-THAN" THE CONDITION PRIOR TO THE START OF THIS WORK.
6. SERVICE INTERRUPTIONS: THE CONTRACTOR SHALL WORK WITH GOVERNMENT PERSONNEL
TO SCHEDULE ALL SERVICE INTERRUPTIONS WITH AS MUCH ADVANCED PLANNING NOTICE
AS POSSIBLE. ONCE AN INTERRUPTION OCCURS THE CONTRACTOR SHALL HAVE ALL
MATERIAL, LABOR, EQUIPMENT AND INCIDENTAL ITEMS ON-HAND AVAILABLE ON SITE AND
PERFORM CONTINUOUS SCHEDULED PROGRESS OF THE WORK. EACH SYSTEM
INTERRUPTION SHALL BE MINIMIZED TO THE GREATEST EXTENT POSSIBLE. WORK SHALL
BE PERFORMED IN SEQUENCE WITH EACH FACILITY AS A UNIT DISCONNECTED AND
RECONNECTED.
7. ALL ITEMS REQUIRED TO MAKE CONNECTIONS SUCH AS WIRE NUTS, CRIMP
CONNECTORS AND FIBER OPTIC CABLE CONNECTORS, SHALL BE CONSIDERED
INCIDENTAL TO THE WORK. ALL FIBER OPTIC CABLES SHALL BE IN CONTINUOUS
LENGTHS WITHOUT SPLICING.
XGFG162010 CONSTRUCT MSA COLD STORAGE -AMENDMENT-2