XGFG162010_Amendment-1_Drawing.pdf

PDF 222 KB Posted

Attached to
MSA Cold Storage - XGFG162010 Federal contract opportunity
Solicitation number
W912J2-19-B-6004
Issued by
Department of the Army Wisconsin Army National Guard

About this file

Amendment 1 Drawing

View the file

Other files for this federal contract opportunity

Other files attached to MSA Cold Storage - XGFG162010, newest first.
File Type Posted
Abstract_of_Offers_1419_MSA_Cold_Storage.pdf PDF
Attendance_Sheet_for_Bid_Opening.pdf PDF
Q&A_35-42.docx DOCX document
Bid_Opening_FBO_Instructions.docx DOCX document
B.08.Q&A_33-34.docx DOCX document
B.08.W912J2-19-B-6004_Conform_Through_Amenement_5.pdf PDF
B.08.W912J2-19-B-6004-0005.pdf PDF
W912J2-19-B-6004-0004.pdf PDF
XGFG162010_MSA_ACCESS_PLAN.pdf PDF
B.08.Q&A_20-32.docx DOCX document
W912J2-19-B-6004-0002.pdf PDF
W912J2-19-B-6004-0003.pdf PDF
B.08.Q&A_14-19.docx DOCX document
B.08.Q&A_4-13_Clarifications.docx DOCX document
Overall_Site_2.PNG PNG image
Overall_Site_PIC.PNG PNG image
Q&A_4-12.docx DOCX document
Overall_Site_1.PNG PNG image
W912J2-19-B-6004-0001.pdf PDF
W912J2-19-B-6003-0001.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Q&A_1-3.docx DOCX document
W912J2-19-B-6004.pdf PDF
XGFG162010_Project_Specs_DEC_2018.pdf PDF
XGFG162010_Addendum-1.pdf PDF
XGFG162010_-_Project_Drawings_DEC_2018.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(2) 6" CONDUITS STUB THRU FLOOR FOR SERVICE TO �J

COMM CLOSET HUB, N.I.C.

(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT W\(1)

25 PAIR 24AWG COPPER, (2) 6 PAIR #18 COPPER, (1)

12 STRAND MULTI & SINGLE MODE 50 MICRON MM (OM3)

FIBER, (3) 6 STRAND MULTI & SINGLE MODE 50 MICRON

MM (OM.3) CABLES AND INTERCOM CONDUCTORS. REMOVE (\

AND REPLACE WITH NEW FROM B700 HUB TO SERVICE

G V

'"" rn"cc,rn,c("""m' /\ x- x-

(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT W\(1)

25 PAIR 24AWG COPPER, (2) 6 PAIR #18 COPPER, (1)

12 STRAND MULTI & SINGLE MODE 50 MICRON MM (OM.3)

FIBER, (.3) 6 STRAND MULTI & SINGLE MODE 50 MICRON

MM (OM3) CABLES AND INTERCOM CONDUCTORS. REMOVE

AND REPLACE WITH NEW FROM 6700 HUB.

x- x- x- x- x- x- x-

E3 x- x- x-

(2) 4" PVC CONDUITS-1 SPARE AND 1

CONDUIT W\(2) 6 PAIR # 18 COPPER AND

(2) 6 STRAND MULTI & SINGLE MODE 50

MICRON MM (OM3) FIBER CABLES AND

INTERCOM CONDUCTORS. REMOVE AND

REPLACE WITH NEW FROM B700 TO B71 6

x-

FENCE

(2) 4" PVC CONDUITS-1 SPARE AND 1

x--x- x- x-

CONDUIT W\(2) 6 PAIR # 18 COPPER AND

MICRON MM (OM3) FIBER CABLES AND W\(2) 6 PAIR #18 COPPER, GATE CONTROL AND

INTERCOM CONDUCTORS REMOVE AND INTERCOM CONDUCTORS REMOVE AND REPLACE

REPLACE WITH NEW FROM B700 TO B71 6 WITH NEW FROM B700 TO ES

-----------v,------- -- C

(2) 6 STRAND MULTI & SINGLE MODE 50

(2) 4" PVC CONDUITS-1 SPARE AND 1 CONDUIT

E4

ES \

-------<fp-------- --y I I I I

PROJECT ACCESS TO B700

--�-- THE HUB FOR THIS WORK IS IN

6700 COMM CLOSET WITH EXISTING

PVC RACEWAY TO E1 ALL NEW

WORK UNLESS STATED OTHERWISE

SHALL ORIGINATE FROM THIS POINT.

l![I F

705 .------'

(2) 4" PVC CONDUITS-1 SPARE AND 1

CONDUIT W\(1) 25 PAIR 24AWG COPPER

AND (1) 12 STRAND MULTI & SINGLE

MODE 50 MICRON MM (OM.3) FIBER CABLES

AND INTERCOM CONDUCTORS. REMOVE AND

REPLACE WITH NEW FROM 6700 COMM.

CLOSET TO B705 COMM ROOM.

0 ------'

(2) 4" PVC CONDUITS-1 SP E AND 1

CONDUIT W\(1) 6 PAIR #18

(1) 6 STRAND MULTI & SI E MODE 50

CABLES AND

INTERCOM CONDUCTORS. REMOVE AND

REPLACE WITH NEW FROM B700.

E6�

(! 4" PVC CONDUITS TO SERVICE

CONNECTION ENCLOSURE ON OUTSIDE

WALL OF B716. REMOVE AND REPLACE

WITH NEW, (2) 6 PAIR # 18 COPPER

CABLE AND (1) 6 STRAND MULTI &

SINGLE MODE 50 MICRON MM (OM.3)

CABLES.

I I

I I I

(2) 4" PVC CONDUITS-1 SPARE AND 1

CONDUIT W\(2) 6 PAIR #18 COPPER,

INTERCOM & CONTROL CONDUCTORS

SHALL REMAIN. THESE WIRES SHALL BE

INTERRUPTED AND SPLICED AT ES.

I

-;L

-;L

'---x

FENCE

-x X -x -x -x -x -x -x -x E7 ®

-x -x -x -x •

LOW VOLTAGE CONDUCTORS, COMMUNICATION & FIBER OPTIC CABLE REPLACEMENT NOTES PLAN NORTH

PVC CONDUIT RACEWAY, HAND-HOLES AND ENCLOSURES THROUGHOUT SHALL REMAIN

AND BE REUSED EXCEPT WHERE NEW CONDUIT IS SHOWN BETWEEN E1 & E2.

2. ALL CONNECTIONS AND SPLICES SHALL BE ACCOMPLISHED USING BEST PRACTICE FOR

BOTH MECHANICAL AND ELECTRICAL INTEGRITY. ALL CONNECTIONS IN HAND-HOLES

SHALL BE SEALED, WATER-TIGHT, ARRANGED NEATELY WITHIN THE SPACE AND IN SUCH

A WAY AS TO MINIMIZE OBSTRUCTING OTHER CABLES PASSING THROUGH THE SAME

SPACE.

3. ALL CONNECTIONS AND SPLICES SHALL BE WITHIN HAND-HOLES, PANELS OR

ENCLOSURES. ALL INDIVIDUAL CONDUCTORS, CABLES, FIBER STRANDS AND FIBER

CABLES SHALL BE NEATLY ARRANGED, BUNDLED, TIED AND LABELED

4. ALL CONNECTIONS\RECONNECTIONS SHALL BE AT TERMINATION POINTS (SERVICE

CONNECTIONS) IN EXISTING ARRANGEMENTS AT TERMINAL BLOCKS\PATCH PANELS OR

FIBER CONVERTERS. ALL CIRCUITS ARE EXISTING OR SPARE AND REPLACEMENT IN-KIND

SHALL INCLUDE RE-ACCOMPLISHMENT OF ALL CONNECTIONS AT EXISTING CONNECTION

POINTS EXCEPT WHERE SPLICES ARE ALLOWED.

5. ADVANTOR AS A SOLE-SOURCE CONTRACTOR FOR THIS WORK DOES NOT APPLY. ALL

WORK SHOWN OR DESCRIBED IS INFRASTRUCTURE WORK THAT SHALL TERMINATE AT

THE SERVICE SIDE OF PATCH PANELS. WORK BEYOND THE SERVICE SIDE SHALL BE BY

OTHERS. HOWEVER; THE INSTALLING CONTRACTOR(S) SHALL COORDINATE WITH THE

GOV'T TO CONFIRM RECONNECTED CIRCUITS ARE FUNCTIONING IN "AS-GOOD" OR

"BEDER-THAN" THE CONDITION PRIOR TO THE START OF THIS WORK.

6. SERVICE INTERRUPTIONS: THE CONTRACTOR SHALL WORK WITH GOVERNMENT PERSONNEL

TO SCHEDULE ALL SERVICE INTERRUPTIONS WITH AS MUCH ADVANCED PLANNING NOTICE

AS POSSIBLE. ONCE AN INTERRUPTION OCCURS THE CONTRACTOR SHALL HAVE ALL

MATERIAL, LABOR, EQUIPMENT AND INCIDENTAL ITEMS ON-HAND AVAILABLE ON SITE AND

PERFORM CONTINUOUS SCHEDULED PROGRESS OF THE WORK. EACH SYSTEM

INTERRUPTION SHALL BE MINIMIZED TO THE GREATEST EXTENT POSSIBLE. WORK SHALL

BE PERFORMED IN SEQUENCE WITH EACH FACILITY AS A UNIT DISCONNECTED AND

RECONNECTED.

7. ALL ITEMS REQUIRED TO MAKE CONNECTIONS SUCH AS WIRE NUTS, CRIMP

CONNECTORS AND FIBER OPTIC CABLE CONNECTORS, SHALL BE CONSIDERED

INCIDENTAL TO THE WORK. ALL FIBER OPTIC CABLES SHALL BE IN CONTINUOUS

LENGTHS WITHOUT SPLICING.

XGFG162010 CONSTRUCT MSA COLD STORAGE -AMENDMENT-2

12 FEBRUARY 2019