10 DEC 2018
ADDENDUM -1
To Specifications and Drawings For
XGFG 162010
Construct MSA Cold Storage
PROJECT: XGFG162010 Construct MSA Cold Storage Facility Number: 00722
The Addendum herein modifies the Specifications and Drawings for the above project. This addendum only applies to the item(s) specifically as stated herein and shall be incorporated as superseding:
1. Refer to project drawing sheets C-041 and C-101 and “Site related Notes on both sheets; Note 1 shall read: “CONTRACTOR SHALL
COORDINATE WITH LOCAL UTILITY FOR RELOCATION OF
THE GAS, WATER AND ELECTRICAL UTILITIES AND BEAR ALL
COSTS AS REQUIRED FOR EXCAVATION, RELOCATION,
SIZING, CAPS, TAPS, VALVES, CONNECTIONS AND
ADDITIONAL MATERIALS AS MAY BE REQUIRED TO
ACCOMPLISH THE WORK AS SHOWN.”
2. Note 2 shall read: “RELOCATION OF UTILITY LINES MAY BE
ACCOMPLISHED EITHER BY SUBCONTRACTOR OR THE
UTILITY COMPANY IN WHICH CASE THE UTILITY COMPANY
SHALL BECOME A SUBCONTRACTOR TO THE GC FOR THE
PURPOSES OF THIS PROJECT.”
For Madison Gas & Elec:
Matt Matenaer Senior Account Manager
(608) 252 4704 MMatenaer@mge.com
For Madison Water:
Jeff Belshaw Construction Supervisor
(608) 261-9835 Jbelshaw@madisonwater.org
To Specifications and Drawings For
XGFG 162010
3. Add Note 3 to read: “CONTRACTOR SHALL PERFORM LIVE
WATER TAPS SO AS NOT TO INTERUPT EXISTING SERVICE.
FURNISH AND INSTALL NEW CORPORATION STOPS AND
RISERS AT EACH TAP.” RISER CAPS SHALL BE FLUSH TO
FINISH GRADE WITH SQUARE CONCRETE TOP NOT LESS
THAN 12” X 12” BY 3” THICK. FURNISH AND INSTALL THRUST
BLOCKS AT EACH TAP AND AT EACH CHANGE IN DIRECTION.
NEW WATER PIPING SHALL BE AT ELEVATION OF EXISTING
LINE OR NOT-LESS-THAN 6’ BURY MINIMUM.
4. DELETE: All references on the drawings and in the specifications to ABIs (Additive Bid Items) and Allowances.
5. DELETE: Specification section 012100 Allowances.
6. Refer to project drawing sheets C-021, C-041 and C-101 Telephone Line shown. Government Records show this to be 25pr copper cables, single and multi-mode fiber optic cables, DDC control cable, Supervised Intrusion Detection circuit and electric gate & keypad circuit all in 2-4” PVC conduits below finish grade. Symbols labeled E1 through E7 are the connecting hand-holes for the ducts.
Add Note 4 to read:
A. “INTERCEPT TWO EXIST. PVC CONDUITS BETWEEN E1
AND E2 AS SHOWN ON SHEET C-041 AND CONNECT NEW
PVC CONDUITS. ALL BENDS SHALL BE HEAT FORMED
SWEEPS OR SWEEP FITTINGS. ALL PVC CONNECTIONS
SHALL BE GLUED. ALL PVC SHALL BE EMBEDDED IN
CLEAN COMPACTED SAND FILL NOT LESS THAN 6” ALL
AROUND. REMOVE AND DISPOSE OF EXIST. PVC
CONDUITS.”
B. FURNISH AND INSTALL ALL NEW CONDUCTORS BOTH
COPPER AND FIBER OPTIC AS REPLACEMENT IN-KIND.
To Specifications and Drawings For
XGFG 162010
FIBER OPTIC AND SUPERVISED CIRCUITS SHALL BE
CONNECTED AT THE SERVICE CONNECTION BLOCK IN
BLDG. 700 AND CONTINUE UNINTERUPTED TO EACH
DOWNLINE MULTIPLE SERVICE CONNECTION POINT
(NOT DISTRIBUTION PANELS).
C. CONDUCTORS THAT ARE NOT FIBER-OPTIC AND NOT
PART OF A SUPERVISED CIRCUIT, MAY BE SPLICED WITH
CRIMP CONNECTORS, SEALED FROM MOISTURE AND
NEATELY ARRANGED WITHIN HANDHOLES OR
JUNCTION BOXES I.A.W. WITH NEC AND GOOD
PRACTICE AS APPROVED BY COR.
D. EVERY CIRCUIT SHALL BE TESTED AND VERIFIED FOR
PROPER OPERATION AND RESTORED TO “AS-GOOD” OR
“BETTER-THAN” CONDITION PRIOR TO START OF THIS
WORK.
E. REMOVE AND DISPOSE OF ALL UNUSED CABLES AND
CLEAN HANDHOLES E1- THROUGH E7 REMOVING ALL
EARTHEN MATERIAL, DEBRIS AND MISC. MATERIALS.
F. SUPERVISED SYSTEMS FOR INTRUSION AND DETECTION
CIRCUITS AS AFFECTED BY THIS WORK SHALL BE
UNDER THE DIRECT SUPERVISION OF, AND WORK
PERFORMED BY:
ADVANTOR SYSTEMS
12612 Challenger Parkway, Suite 300 Orlando, FL 32826
(800) 238-2686 Sandra Kinney ext. 6937 MSgt. Anthony L. Rook
TRUAX FIELD (608) 245-4451
To Specifications and Drawings For
XGFG 162010
G. THIS WORK SHALL BE SCHEDULED AND COORDINATED
WITH THE COR AND OCCUPANTS OF BUILDING 700 NOT-
LESS-THAN 21 CALANDER DAYS PRIOR TO START. ONCE
BEGUN, THE WORK SHALL BE COMPLETED WITH ALL
AREAS BACK IN SERVICE, IN NOT-MORE-THAN 14
CONTINUOUS CALENDAR DAYS.
7. Refer to project drawing sheets C-021, C-041, C-101 and E-101 Telephone Line shown. Add Note 5 to read: “FURNISH AND
INSTALL ONE NEW 3” SHEDULE 40 PVC CONDUIT TO THE
NEW BUILDING (SWEEP UP THROUGH FLOOR 12” A.F.F.).
CORE DRILL EXISTING HANDHOLE BELOW GRADE AND
ADJACENT TO EXIST. PVC CONDUITS. FURNISH AND
INSTALL FRICTION-FIT RUBBER PLUG IN EACH END OF THE
NEW CONDUIT.
8. Refer to project drawing sheets C-101and C-121: DELETE requirement for 4 - RipRap storm drainage spillways from downspouts. Furnish and install perforated underdrain with sock from downspout straight to daylight at swale. Install drain in trench with 4” (min.) all-around clean drainable aggregate bedding similar to Detail 6 sheet C-501 Watermain Bedding, all in-lieu-of RipRap waterways shown. Cover top of trench with geotextile fabric and 4” of topsoil and seed-to-lawn. Cut daylight end of underdrain flush to side-slope of swale.
* * * End of Addendum – 1 * * *