W912J2-19-B-6003-0001.pdf

PDF 145 KB Posted

Attached to
MSA Cold Storage - XGFG162010 Federal contract opportunity
Solicitation number
W912J2-19-B-6004
Issued by
Department of the Army Wisconsin Army National Guard

About this file

The purpose of this amendment is to amend clarifications for drawings. See summary of changes. The bid opening remains 14 February 2019.

View the file

Other files for this federal contract opportunity

Other files attached to MSA Cold Storage - XGFG162010, newest first.
File Type Posted
Attendance_Sheet_for_Bid_Opening.pdf PDF
Abstract_of_Offers_1419_MSA_Cold_Storage.pdf PDF
Bid_Opening_FBO_Instructions.docx DOCX document
Q&A_35-42.docx DOCX document
B.08.Q&A_33-34.docx DOCX document
B.08.W912J2-19-B-6004-0005.pdf PDF
B.08.W912J2-19-B-6004_Conform_Through_Amenement_5.pdf PDF
XGFG162010_MSA_ACCESS_PLAN.pdf PDF
W912J2-19-B-6004-0004.pdf PDF
XGFG162010_Amendment-1_Drawing.pdf PDF
B.08.Q&A_20-32.docx DOCX document
W912J2-19-B-6004-0003.pdf PDF
W912J2-19-B-6004-0002.pdf PDF
B.08.Q&A_14-19.docx DOCX document
B.08.Q&A_4-13_Clarifications.docx DOCX document
Overall_Site_2.PNG PNG image
Overall_Site_PIC.PNG PNG image
Q&A_4-12.docx DOCX document
Overall_Site_1.PNG PNG image
W912J2-19-B-6004-0001.pdf PDF
Site_Visit_Attendance_Sheet.pdf PDF
Q&A_1-3.docx DOCX document
XGFG162010_-_Project_Drawings_DEC_2018.pdf PDF
W912J2-19-B-6004.pdf PDF
XGFG162010_Project_Specs_DEC_2018.pdf PDF
XGFG162010_Addendum-1.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XGFG 152004

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to amend clarif ications for draw ings. See summary of changes. The bid opening remains 14 February 2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912J219B6003

X 9B. DATED (SEE ITEM 11)

14-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jan-2019

CODE

USPFO FOR WISCONSIN CONTRACTING OFFICE

3110 MITCHELL STREET

MADISON WI 53704-2591

W912J2 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912J219B6003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

The following specifications and drawings are amended as follows:

BID OPENING REMAINS UNCHANGED.

AMENDMENT -1 To Drawings For XGFG 152004 Renovate FM Area, B500

PROJECT: XGFG152004 Renovate FM Area, B500 Facility Number: 00500

The Amendment herein modifies and clarifies the Drawings for the above project. This amendment only applies to the item(s) specifically as stated herein and shall be incorporated as superseding:

1. Refer to project Drawing Sheet A7: “General Remodel Notes” number 1 in the approximate middle of the sheet; Reference to phase A & B. This note relates back to the Phasing Plan on sheet A1. Phase 2 was shown in an earlier release as having parts A & B, but no longer. Omit all references that may indicate phases or parts A & B. Phases 1, 2 & 3 remain.

2. Refer to project Drawing Sheet A7 & A8: Notice doors labeled ‘A’, ‘B’ & ‘C’ on the A7 detail 1 Remodel

Plan; these are the CC conference room doors and the CC office door respectively. In detail 2 “Interior Elevation Keyed Note” number 1; it notes, Door & Frame shall remain. On sheet A8 detail number 1 “Wall Build-Out Section”; the detail notes the door is “UNALTERED.” These are both incorrect.

- Drawing Sheet A7 “General Remodel Notes” number 5; doors A-B-C. This note applies in full effect and replaces ambiguous notes as mentioned above or elsewhere that indicate existing doors shall be reused, unaltered or remain. The three doors shall be new, furnished and installed by the contractor with veneer and finish matching the new wainscot. Door frames shall remain, repaired and painted as detailed. New door hinging shall match existing frames.

* * * End of Amendment – 1 * * *

(End of Summary of Changes)