Attachment_1.A_COST_ESTIMATE_SUMMARY_SHEET.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
MATOC DPW - USAG Hawaii Federal contract opportunity
Solicitation number
W912CN18R0012
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Hawaii 413th CSB

About this file

This document contains a cost estimate template and instructions for a federal contract opportunity to provide real property repair, maintenance, and minor construction services for Army installations on the islands of Oahu and Hawaii. The cost estimate template requires the offeror to provide pricing details for labor, materials, equipment, subcontracts, overhead rates, and profit to arrive at a total proposed cost. It instructs offerors to use Davis Bacon prevailing wage rates and break out pricing by labor class. The template automatically calculates subtotals and totals. The related federal contract opportunity is a Multiple Award Task Order Contract (MATOC) set aside for women-owned small businesses to acquire construction and facility support services over a five-year period. The minimum guarantee per contractor is $20,000 annually and the total value of all task orders cannot exceed $92.4 million to any one awardee. The solicitation number is W912CN18R0012 and is issued by the Department of the Army Materiel Command Expeditionary Contracting Command Regional Contracting Office Hawaii.

Attachment 1.A Cost Estimate Summary

View the file

Other files for this federal contract opportunity

Other files attached to MATOC DPW - USAG Hawaii, newest first.
File Type Posted
18-R-0012__0005__SF30__Amendment.pdf PDF
18-R-0012__0005__Conformed_Solicitation.pdf PDF
Floor_mount_receptacle_cover.pptx PPTX presentation
ATTACHMENT_4a_COVER_LETTER_REVISED.pdf PDF
18-R-0012__0004__Conformed_Solicitation.pdf PDF
18-R-0012__0004__SF30__Amendment.pdf PDF
SB_488_LBP_lab_analysis.pdf PDF
Question__26_SIGNA_cut-sheet.pdf PDF
18-R-0012__0003__Conformed_Solicitation.pdf PDF
SIGNA_Floor.docx DOCX document
Question__26_HERCULAN_MF_7+2_Specs.pdf PDF
85532017_-_As_Builts.pdf PDF
Drain_Cover_Specification.pdf PDF
Question__26_Comparison_of_listed_properties.pdf PDF
87279002_-_As_Builts.pdf PDF
SB_488_ASB_lab_analysis.pdf PDF
2a_-_Exh_2_Revised_SOW__Bldg_488_SB.PPT PPT presentation
Window_Supplier_BLDG_488_Weight_Room.pdf PDF
Question__26_HERCULAN_MF_System_cut-sheet.pdf PDF
DPW_Design_guidelines_for_AC.DOC DOC document
Question__26_SIGNA_Floor.pdf PDF
18-R-0012__0003__SF30__Amendment.pdf PDF
ATTACHMENT_4a_COVER_LETTER.pdf PDF
18-R-0012__0001__Conformed_Solicitation.pdf PDF
18-R-0012__0002__Conformed_Solicitation.pdf PDF
18-R-0012__0001__SF30__Amendment.pdf PDF
18-R-0012__0002__SF30__Amendment.pdf PDF
18-R-0012.pdf PDF
ATTACHMENT_4._PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE.docx DOCX document
ATTACHMENT_1.__PROPOSAL_COST_BREAKDOWN_INSTRUCTIONS.docx DOCX document
Attachment_2_SOW_Bldg_488_SB_(Seed_Project).PPT PPT presentation
ATTACHMENT_3_PAST_PERFORMANCE_INFORMATION.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

Instructions

The offeror shall submit a cost proposal in the format enclosed. The offeror may modify the spreadsheet or use their own form with all the information stated.

Summary Sheet
This is a summary of all direct and indirect costs of the prime contractor and subcontractor(s) leading to the total cost of the project.
Insert your organization's name in cell A2 and the RFP No. in cell A3.
Some of the totals from each cost element page are automatically carried forward to the Summary worksheet.
Cost Breakdown of Direct Costs
The cost breakdown for direct costs shall be filled out for the prime work and all subcontractor(s) work. Breakdown should be in sufficient detail to permit itemizing of all direct costs. If the offeror is using a cost estimating tool (RSMeans, UPB, etc.) indicate what tool you are using and if any indirect costs such as overhead, profit, tax, etc. are included in the unit cost.
Work Schedule
Provide a work schedule for the project. This is an estimated time line showing events from estimated award date to completion date. See Block 11 of the solicitation and 52.211.10 for the period of performance.

SUMMARY

SUMMARY OF PROPOSED COSTS
Contractor's Name**
RFP NO.**
PercentageDollar ValueSubtotal
LABOR$0.00
MATERIAL$0.00
EQUIPMENT$0.00
OTHER DIRECT$0.00
TOTAL DIRECT$0.00
OVERHEAD0.00%$0.00
Subtotal$0.00

PRIME PROFIT 0.00% $0.00

PRIME SUBTOTAL $0.00

SUBCONTRACTOR
LABOR$0.00
MATERIAL$0.00
EQUIPMENT$0.00
OTHER DIRECT$0.00
TOTAL DIRECT$0.00
OVERHEAD0.00%$0.00
Subtotal$0.00
SUBCTR PROFIT0.00%$0.00
Subtotal$0.00
SUBCTR HI STATE TAX0.00%$0.00$0.00

SUBCTR SUBTOTAL $0.00

PRIME O/H ON SUBCTR 0.00% $0.00

SUBTOTAL (SUBCTR COST) $0.00

BONDING AND TAX

SUBTOTAL (line 16 and 35) $0.00

BOND PREMIUM0.00%0.00
Subtotal$0.00
HI STATE TAX0.00%$0.00$0.00
GRAND TOTAL PROJECT COST$0.00

LABOR - Hourly

COST BREAKDOWN OF LABOR AND PAYROLL TAX

Contractor's Name**
RFP NO.**
TOTAL
HOURLYTOTAL# OFNUMBERMANTOTALFICAFUTASUTAW/COTHERTOTAL
LABOR CLASSRATEFRINGE(C) + (D)MENHOURSHOURS(E) + (H)% of E% of E% of E% of E% OF EPayrollTax
1$0.00$0.00$0.000.000$0.00ERROR:#VALUE!
2$0.00$0.00$0.000.000$0.000.00%
3$0.00$0.00$0.000.000$0.000.00%
4$0.00$0.00$0.000.000$0.000.00%
5$0.00$0.00$0.000.000$0.000.00%
6$0.00$0.00$0.000.000$0.000.00%
7$0.00$0.00$0.000.000$0.000.00%
8$0.00$0.00$0.000.000$0.000.00%
9$0.00$0.00$0.000.000$0.000.00%
10$0.00$0.00$0.000.000$0.000.00%
11$0.00$0.00$0.000.000$0.000.00%
12$0.00$0.00$0.000.000$0.000.00%
13$0.00$0.00$0.000.000$0.000.00%
14$0.00$0.00$0.000.000$0.000.00%
$0.00
Column B. List all the labor class you will be using for this project
Column C & D. Must be in compliance with the current Davis Bacon Rates (see solicitation or http://www.wdol.gov/dba.aspx )
Column K - O. List the percentage of payroll taxes.
Column O. If column O is used, need to identify what it is.
Total man hours should correspond with hours stated on the estimated work schedule.

Materials

SUMMARY OF MATERIALS AND SUPPLIES
Contractor's Name**
RFP NO.**
Unit ofUnitUnit
ITEMMeasurePriceQuantitySubtotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including brand name, model no., size, etc.
Supporting documentation may be requested at a later date

&24&USUMMARY OF MATERIALS AND SUPPLIES

Equipment

SUMMARY OF EQUIPMENT COSTS
Contractor's Name**
RFP NO.**
UnitUnit
ITEMPriceQuantityTotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including make, model no., size, etc.
Supporting documentation may be requested at a later date.

&24&USUMMARY OF EQUIPMENT COSTS

Other Direct

SUMMARY OF OTHER DIRECT COSTS
Contractor's Name**
RFP NO.**
UnitUnit
ITEMPriceQuantityTotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including make, model no., size, etc., and justification.
Supporting documentation may be requested at a later date.

&24&USUMMARY OF OTHER DIRECT COSTS

Subcontracts

SUMMARY OF SUBCONTRACTOR COSTS
Contractor's Name**
RFP NO.**
SUBCONTRACTORDESCRIPTION OF WORKTOTAL
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
TOTAL =
A complete breakdown and summary sheet for each proposed subcontractor must
be included with the prime proposal. The same format should be used for both
the prime and subcontractor proposals.

Work Schedule

ESTIMATED WORK SCHEDULE
Contractor's Name**
RFP NO.**
Period of Performance:
EstimateEstimate
EVENTStart DateEnd Date
Bonds
Insurance
APP
QC Plan
Each element of work should be scheduled to insure the required completion date can be met.
Column A. List events starting from Award date to Project Completion.
Coumn B. List the start date (or due date) from award date. See solicitation for the following:
Bonds, Material Submittals, Notice to Proceed, etc.
Column C & D. List the start date and end date of each event.

File details come from the government source that posted it. Updated .