W9128F25R0014_SPECS_ARS01.pdf
PDF 19 MB Posted
- Solicitation number
- W9128F25R0014
About this file
This document appears to be a set of technical specifications for the construction of a new Dairy Forage Research Center (DFRC) for the USDA-ARS in Prairie du Sac, Wisconsin. The project involves constructing approximately 254,003 Building Gross Square Feet (BGSF) of new production, research, operations, and maintenance facilities and supporting infrastructure. The facility will accommodate up to 452 lactating cows, 144 calves, 1,300 acres of crop production, and 900 acres of pasture and perennials, as well as housing for up to 12 permanent researchers and staff, 12 operations and maintenance personnel, and 10 student researchers. The construction will primarily utilize pre-framed, pre-engineered metal buildings supported on concrete spread footings, except for the Lab and Administration Building which will have a laminated wood structure. The overall combined gross square footage of the new construction is approximately 642,000 GSF. The project is being managed by the U.S. Army Corps of Engineers, Omaha District, on behalf of the USDA-ARS.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR
CONSTRUCTION
Solicitation Number W9128F25R0014
ARS DAIRY FORAGE
RESEARCH CENTER
PRAIRIE DU SAC, WI
NOVEMBER 2024
This page was intentionally left blank for duplex printing.
00 01 00 - 1 PROJECT TABLE OF CONTENTS
SPECIFICATIONS FOR CONSTRUCTION OF
ARS DAIRY FORAGE RESEARCH CENTER
PROJECT TABLE OF CONTENTS
NOTE: WHERE CONFLICTS EXIST WITHIN THESE SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENTS GOVERN.
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINSTRATIVE REQUIREMENTS
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
PROJSIGN PROJECT SIGN DETAILS
01 31 12 MECHANICAL AND ELECTRICAL COORDINATOR
01 31 33 MECHANICAL AND ELECTRICAL SUBMITTAL COORDINATION
01 32 01.00 10 PROJECT SCHEDULE
01 32 34.00 23 CONSTRUCTION CAMERA SYSTEM
01 33 00 SUBMITTAL PROCEDURES
REGISTER SUBMITTAL REGISTER
E4025 SAMPLE TRANSMITTAL FORM
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 41 26.03 24 (WISCONSIN) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES FROM CONSTRUCTION SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00AT1 SAMPLE QUALITY CONTROL REPORTS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED / RECOVERED MATERIALS
01 71 21 SPECIALTY ENGINEERING REQUIREMENTS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 78 36.00 24 WARRANTY OF CONSTRUCTION
01 78 39.00 24 AS-BUILT DRAWINGS
01 78 39.00 24AT TITLE BLOCK INFORMATION KEY
01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
00 01 00 - 2 PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 56 13.16 CLAY WASTE CONTAINMENT
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 35 43 POLISHED CONCRETE FINISHING PC1
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 33 PRECAST STRUCTURAL CONCRETE
DIVISION 05 - METALS
05 05 20 POST-INSTALLED CONCRETE ANCHORS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 51 33 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 17 19 CROSS-LAMINATED TIMBER
06 18 00 GLUED-LAMINATED CONSTRUCTION
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 42 00 GRILLE SLAT ACOUSTIC WOOD PANELING WD1
06 61 16 SOLID SURFACING FABRICATIONS SSF1
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 17 00 BENTONITE WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 42 13 METAL WALL PANELS MP-2, MP-3, MP-4 and MP-5
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING AND WALL PANELS MP1
07 72 20 GRAVITY-TYPE ROOF VENTILATORS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
00 01 00 - 3 PROJECT TABLE OF CONTENTS
DIVISION 08 - OPENINGS (CONTINUED)
08 34 16.10 HORIZONTAL ROLLING STEEL DOORS
08 34 16.20 VERTICAL LIFT FABRIC DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 41 26 ALL-GLASS ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 56 00 SPECIAL FUNCTION WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 PORCELAIN TILING PT1, PT2, PT2A, and PT3
09 51 00 ACOUSTICAL CEILINGS (ACT-1, ACT-2)
09 62 00 SPECIALTY FLOORING
09 62 38 STATIC-CONTROL FLOORING SDFT1
09 65 00 RESILIENT FLOORING HS1, CF1, INT, RB1, and RB2
09 67 83 CONCRETE FLOOR SEALER AND HARDENER (CFSH)
09 68 00 CARPETING CPT1
09 77 10 PREFINISHED WALL PANELS
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
09 97 13.00 40 STEEL COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 88 00 SCALES
DIVISION 11 - EQUIPMENT
11 13 19.13 LOADING DOCK LEVELERS
11 24 26 SAFETY TIE-BACK
11 53 01 LABORATORY EQUIPMENT
11 53 13 LABORATORY FUME HOODS AND EXHAUST DEVICES
11 53 43 LABORATORY SERVICE FITTINGS AND FIXTURES
11 53 53 BIOLOGICAL SAFETY CABINETS AND LAMINAR FLOW BENCHES
11 53 63 LABORATORY STERILIZERS
11 92 13 DAIRY MILKING EQUIPMENT
11 92 16 LIVESTOCK FEEDING SYSTEMS
11 92 23 LIVESTOCK WASTE HANDLING EQUIPMENT
00 01 00 - 4 PROJECT TABLE OF CONTENTS
DIVISION 11 – EQUIPMENT (CONTINUED)
11 92 25 PEN AND STALL AND CAGE EQUIPMENT
11 92 27 LIVESTOCK FLOORING
11 92 79 LIVESTOCK WATERERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES RS1, RS1A, RS2, RS3
12 31 00 MANUFACTURED METAL CASEWORK
12 35 53 LABORATORY CASEWORK AND OTHER FURNISHINGS
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES EG-1
DIVISION 13 - SPECIAL CONSTRUCTION
13 21 00 CONTROLLED ENVIRONMENT ROOMS
13 21 26 COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE)
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 19 METERS AND GAUGES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 07 19.00 40 PLUMBING PIPING INSULATION
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 14 29.00 40 MANURE AND WASTEWATER PUMPS
22 30 00 PLUMBING EQUIPMENT
22 60 70 GAS AND VACUUM SYSTEMS
22 70 00 COOLING AND WASH SYSTEMS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 20 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
00 01 00 - 5 PROJECT TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) (CONTINUED)
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 36 00 AIR TERMINALS
23 34 23.00 40 HVAC POWER VENTILATORS
23 52 00 HEATING BOILERS
23 84 13 HUMIDIFIERS
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 25 - INTEGRATED AUTOMATION
25 00 00 INTEGRATED AUTOMATION CONTROL
25 05 11.00 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
BUILDING CONTROL SYSTEM (BCS)
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
FIRE AND LIFE SAFETY (FLS)
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
FACILITY OPERATIONS SYSTEMS (FOS)
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -
ELECTRONIC SECURITY SYSTEMS (ESS)
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES (Applicable to Buildings B1-B15) 26 09 23.01 40 LIGHTING CONTROL DEVICES (Applicable to Building "A" Only)
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 18 23.00 40 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 24 16.00 40 PANELBOARDS
26 27 13.10 30 ELECTRIC METERS
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES
26 41 00 LIGHTNING PROTECTION SYSTEM
00 01 00 - 6 PROJECT TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL (CONTINUED)
26 51 00 INTERIOR LIGHTING (Applicable to Buildings B1-B15) 26 51 01 INTERIOR LIGHTING (Applicable to Building "A" Only) 26 56 00 EXTERIOR LIGHTING (Applicable to Buildings B1-B15) 26 56 01 EXTERIOR LIGHTING (Applicable to Building "A" Only)
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
27 22 42 DATA COMMUNICATIONS WIRELESS ACCESS POINTS
27 53 19.13 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEMS (DAS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 10 05AT USDA DEPARTMENTAL MANUAL 4620-002
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 32 19.13 GEOSYNTHETIC DRAINAGE
31 32 19.16 GEOTEXTILE SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
32 11 20 BASE COURSE FOR RIGID AND FLEXIBLE PAVING
32 11 26 HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND STREETS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 26 WIRE FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 05 23 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 15 WATER STORAGE STEEL TANKS
00 01 00 - 7 PROJECT TABLE OF CONTENTS
DIVISION 33 – UTILITIES (CONTINUED)
33 21 14 WELL REHABILITATION
33 30 00 SANITARY SEWERAGE
33 31 00.13 ABANDONMENT OF SEWER MAINS
33 40 00 STORMWATER UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR
STRUCTURES
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 52 MISCELLANEOUS VALVES
40 05 81 INDUSTRIAL HOSE REELS
40 72 00 LEVEL INSTRUMENTATION
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 12 00 BULK MATERIAL CONVEYING EQUIPMENT
41 14 00 BATCHING EQUIPMENT
41 52 00 BULK STORAGE SYSTEMS
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 24 25 PUMPING EQUIPMENT - VERTICAL TURBINE (SUBMERSIBLE)
-- End of Project Table of Contents --
New Dai r y For age Resear ch Cent er , Pr ai r i e du Sac, WI ARS01
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
1. 1. 2 Locat i on
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The US Dai r y For age Resear ch Cent er i s l ocat ed on an appr oxi mat el y 75 acr e s i t e of t he r ecent l y acqui r ed Badger Ar my Ammuni t i on Pl ant ( BAAP) i n Pr ai r i e Du Sac, Wi sconsi n. The Cent er i ncl udes 18 bui l di ngs and suppor t st r uct ur es i nt er connect ed by manur e col l ect i on, t r anspor t and di gest er syst em, t he appr oxi mat e combi ned gr oss squar e f oot age of const r uct i on i s 642, 000 GSF. The maj or i t y of cent er ' s const r uct i on wi l l compr i sed of pr e- f r amed pr e- engi neer ed met al bui l di ngs suppor t ed on concr et e spr ead f oot i ngs wi t h t he except i on of t he Lab and Admi ni st r at i on Bui l di ng whi ch wi l l have a l ami nat ed wood bui l di ng st r uct ur e suppor t ed on spr ead f oot i ngs wi t h pr ef or med met al panel ext er i or encl osur e.
1. 1. 2 Locat i on
The wor k i s l ocat ed at t he 58046 US HWY 12, Pr ai r i e Du Sac, WI 53578, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be as i ndi cat ed on t he Const r uct i on Document s.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 CONTRACT COST BREAKDOWN
1. 3 UNI T PRI CE PAYMENT I TEMS
1. 3. 1 Excavat i on
1. 3. 1. 1 Payment
1. 3. 1. 2 Measur ement
1. 3. 1. 3 Uni t of Measur e
1. 4 CONTAMI NATED SOI L REMOVAL
1. 4. 1 Uni t of Measur e
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 20 00 Page 1
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Pr i ces; G
1. 2 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
1. 3 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act on whi ch t he Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE OF PRI CES and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3. 1 Excavat i on
1. 3. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h excavat i on f or t he st r uct ur e, whi ch i ncl udes per f or mi ng r equi r ed excavat i on and ot her oper at i ons i nci dent al t her et o, Cont r act or - f ur ni shed di sposal ar ea( s) and di sposi t i on of excess excavat ed mat er i al and unsui t abl e and f r ozen mat er i al s.
1. 3. 1. 2 Measur ement
The t ot al quant i t y of excavat ed mat er i al f or whi ch payment wi l l be made wi l l be t he t heor et i cal quant i t y bet ween t he gr ound sur f ace as det er mi ned by a sur vey and t he gr ade and sl ope of t he t heor et i cal cr oss sect i ons
SECTI ON 01 20 00 Page 2 i ndi cat ed. No al l owance wi l l be made f or over dept h excavat i on or f or t he r emoval of any mat er i al out s i de t he r equi r ed sl ope l i nes unl ess aut hor i zed.
1. 3. 1. 3 Uni t of Measur e
Uni t of measur e: cubi c yar d.
1. 4 CONTAMI NATED SOI L REMOVAL
Payment i t ems f or t he wor k of t hi s Cont r act on whi ch t he Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed must const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 4. 1 Uni t of Measur e
Uni t of measur e: cubi c yar d.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 20 00 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 VI EW LOCATI ON MAP
1. 3 PROGRESS AND COMPLETI ON PI CTURES
1. 4 PHOTOGRAPHI C DOCUMENTATI ON
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
1. 6 PRECONSTRUCTI ON CONFERENCE
1. 6. 1 At t endees
1. 7 PARTNERI NG
1. 8 ACCOMMODATI ONS FOR GOVERNMENT PERSONNEL
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 30 00 Page 1
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map
Pr ogr ess and Compl et i on Pi ct ur es
1. 2 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r st di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
1. 3 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. I ncl ude aer i al phot ogr aphs. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en di f f er ent v i ewpoi nt s sel ect ed by t he Cont r act or unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he vi ew l ocat i on sket ch. Al so pr ovi de t he vi ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e. I ncl ude a dat e desi gnat or i n f i l e names.
Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
1. 4 PHOTOGRAPHI C DOCUMENTATI ON
Dur i ng t he const r uct i on per i od and t hr ough compl et i on, pr ovi de phot ogr aphi c document at i on of const r uct i on pr ogr ess and at sel ect ed mi l est ones i ncl udi ng el ect r oni c i ndexi ng, navi gat i on, st or age, and r emot e access t o t he document at i on, as per t hese speci f i cat i ons. The commer ci al phot ogr apher or t he subcont r act or used f or t hi s wor k shal l meet t he f ol l owi ng qual i f i cat i ons:
a. Demonst r abl e mi ni mum exper i ence of t hr ee ( 3) year s i n oper at i on pr ovi di ng document at i on and advanced i ndexi ng/ navi gat i on syst ems.
SECTI ON 01 30 00 Page 2
b. Pr ovi de a r epr esent at i ve por t f ol i o of const r uct i on pr oj ect s of s i mi l ar t ype, s i ze, dur at i on, and compl exi t y as t he pr oj ect .
Phot ogr aphi c Document at i on El ement s
a. Take each di gi t al i mage wi t h a pr of essi onal gr ade camer a wi t h mi ni mum si ze of 6 megapi xel s ( MP) capabl e of pr oduci ng ( 8 x 10 i nch) pr i nt s wi t h a mi ni mum of 2272 x 1704 pi xel s and ( 16 x 20 i nch) pr i nt s wi t h a mi ni mum 2592 x 1944 pi xel s.
b. Make t he i ndexi ng and navi gat i on syst em ut i l i ze act ual CAD const r uct i on dr awi ngs and BI M, maki ng such dr awi ngs and BI M i nt er act i ve on an on- l i ne i nt er f ace. For al l document at i on r ef er enced her ei n, i ndexi ng and navi gat i on must be or gani zed by bot h t i me ( dat e- st amped) and l ocat i on t hr oughout t he pr oj ect . Rest r i ct al l di gi t al phot ogr aphy and do not r el ease di gi t al phot ogr aphy out si de t he Gover nment / pr oj ect t eam wi t hout per mi ssi on f r om t he Gover nment .
Phot ogr aphy of i t ems or el ement s desi gnat ed as c l assi f i ed i s not per mi t t ed.
c. Make document at i on combi ne i ndexi ng and navi gat i on syst em wi t h i nspect i on- gr ade di gi t al phot ogr aphy desi gned t o capt ur e act ual condi t i ons t hr oughout const r uct i on and at cr i t i cal mi l est ones. Make document at i on accessi bl e on- l i ne t hr ough use of t he CPW. Make document at i on al l ow f or secur e mul t i pl e- user access, s i mul t aneousl y, on- l i ne.
d. Bef or e const r uct i on; document t he bui l di ng pad, adj acent st r eet s, r oadways, par kways, dr i veways, cur bs, s i dewal ks, l andscapi ng, adj acent ut i l i t i es, and adj acent st r uct ur es sur r oundi ng t he bui l di ng pad and si t e. Over l appi ng phot ogr aphi c t echni ques shal l be used t o ensur e maxi mum cover age. Accompl i sh i ndexi ng and navi gat i on t hr ough i nt er act i ve ar chi t ect ur al dr awi ngs. I f s i t e wor k or pad pr epar at i on i s ext ensi ve, t hi s document at i on may be r equi r ed i mmedi at el y bef or e const r uct i on and at sever al pr e- det er mi ned i nt er val s bef or e bui l di ng wor k commences.
e. Tr ack const r uct i on pr ogr ess f or al l t r ades at pr e- det er mi ned i nt er val s, but not l ess t han once ever y t hi r t y ( 30) cal endar days ( " Pr ogr essi ons" ) . Tr ack pr ogr essi on document at i on f or bot h t he ext er i or and i nt er i or const r uct i on of t he bui l di ng( s) . For ext er i or pr ogr essi ons, t r ack 360 degr ees ar ound t he si t e and each bui l di ng. For i nt er i or pr ogr essi ons, t r ack i nt er i or i mpr ovement s begi nni ng when st ud wor k commences and cont i nui ng unt i l Pr oj ect compl et i on.
f . Document as- bui l t condi t i ons of pr e- f oundat i on ut i l i t i es and si t e ut i l i t i es pr i or t o pl aci ng concr et e and/ or backf i l l i ng. For t hi s pr ocess, i ncl ude al l under gr ound and i n- s l ab ut i l i t i es wi t hi n t he bui l di ng( s) envel ope( s) and ut i l i t y r uns i n t he i mmedi at e v i c i ni t y of t he bui l di ng( s) envel ope( s) . Thi s may al so i ncl ude ut i l i t i es encl osed i n s l ab- on- deck i n mul t i - st or y bui l di ngs. Use over l appi ng phot ogr aphi c t echni ques t o ensur e maxi mum cover age. Pr i or t o phot ogr aphy of ut i l i t i es, coor di nat e wi t h Cont r act i ng Of f i cer t o ensur e t hat i t ems or el ement s of t he ut i l i t y ar e not desi gnat ed as c l assi f i ed. I ndexi ng and navi gat i on i s t o be accompl i shed t hr ough i nt er act i ve s i t e ut i l i t y pl ans.
g. Document as- bui l t condi t i ons of mechani cal , el ect r i cal , pl umbi ng
SECTI ON 01 30 00 Page 3 and al l ot her syst ems post - i nspect i on and pr e- i nsul at i on, sheet r ock or dr y wal l i nst al l at i on. For t hi s pr ocess i ncl ude al l f i ni shed syst ems l ocat ed i n t he wal l s and cei l i ngs of al l bui l di ngs at t he Pr oj ect . Use over l appi ng phot ogr aphi c t echni ques t o ensur e maxi mum cover age. I ndexi ng and navi gat i on i s t o be accompl i shed t hr ough i nt er act i ve ar chi t ect ur al dr awi ngs.
h. Document as- bui l t condi t i ons of ext er i or ski n and el evat i ons wi t h an i ncr eased concent r at i on of di gi t al phot ogr aphs as di r ect ed by t he Cont r act i ng Of f i cer i n or der t o capt ur e pr e- det er mi ned f ocal poi nt s, such as wat er pr oof i ng, wi ndow f l ashi ng, r adi used st eel wor k, ar chi t ect ur al or Ext er i or I nsul at i on and Fi ni sh Syst ems ( EI FS) det ai l i ng. Use over l appi ng phot ogr aphi c t echni ques t o ensur e maxi mum cover age. Accompl i sh i ndexi ng and navi gat i on t hr ough i nt er act i ve el evat i ons or el evat i on det ai l s.
i . Document as- bui l t f i ni shed condi t i ons of t he i nt er i or of each bui l di ng i ncl udi ng f l oor s, cei l i ngs, and wal l s at cer t i f i cat e of occupancy or equi val ent , or j ust pr i or t o occupancy, or bot h, as di r ect ed by t he Cont r act i ng Of f i cer . Use over l appi ng phot ogr aphi c t echni ques t o ensur e maxi mum cover age. Accompl i sh i ndexi ng and navi gat i on t hr ough i nt er act i ve ar chi t ect ur al dr awi ngs.
j . Dat e, l abel and i nser t mi scel l aneous event s t hat occur dur i ng any Cont r act or s i t e v i s i t , or event s capt ur ed by t he Gover nment i ndependent l y, i nt o a Sect i on i n t he navi gat i on st r uct ur e ent i t l ed " Sl i deshows, " al l owi ng t hi s i nf or mat i on t o be st or ed i n t he same " pl ace" as t he f or mal scope.
k. Cust omi zabl e pr oj ect - speci f i c di gi t al phot ogr aphi c document at i on of ot her det ai l s or mi l est ones. Accompl i sh i ndexi ng and navi gat i on t hr ough i nt er act i ve ar chi t ect ur al pl ans.
l . Mont hl y ext er i or pr ogr essi ons ( 360 degr ees ar ound t he pr oj ect ) and sl i deshows ( al l el evat i ons and bui l di ng envel ope) . The sl i deshows al l ow f or t he i ncl usi on of Gover nment pi ct ur es, aer i al phot ogr aphs, and t i mel y i mages whi ch do not f i t i nt o any r egul ar mont hl y phot ogr aph.
m. Weekl y Si t e Pr ogr essi ons - Phot ogr aphi c document at i on capt ur i ng t he pr oj ect at di f f er ent st ages of const r uct i on. For t hese pr ogr essi ons capt ur e under gr ound ut i l i t i es, excavat i on, gr adi ng, backf i l l , l andscapi ng and r oad const r uct i on t hr oughout t he dur at i on of t he pr oj ect .
n. Regul ar i nt er i or pr ogr essi ons of al l wal l s of t he ent i r e pr oj ect t o begi n at t i me of subst ant i al f r amed or as di r ect ed by t he Cont r act i ng Of f i cer t hr ough t o compl et i on.
o. Det ai l ed as- bui l t s of al l Sl abs f or al l pr oj ect s l ab pl acement s j ust pr i or t o pl aci ng concr et e or as di r ect ed by t he Cont r act i ng Of f i cer .
p. Det ai l ed i nt er i or as- bui l t over l appi ng phot os of t he ent i r e bui l di ng t o i ncl ude document at i on of al l mechani cal , el ect r i cal , and pl umbi ng syst ems i n ever y wal l and cei l i ng, t o be conduct ed af t er r ough- i ns ar e compl et e, j ust pr i or t o i nsul at i on and or dr ywal l , or as di r ect ed by Cont r act i ng Of f i cer .
q. Fi ni shed det ai l ed i nt er i or as- bui l t over l appi ng phot os of al l
SECTI ON 01 30 00 Page 4 wal l s, cei l i ngs, and f l oor s t o be schedul ed by Cont r act i ng Of f i cer pr i or t o occupancy.
I mages wi l l be t aken by a commer ci al phot ogr apher and must show di st i nct l y, at as l ar ge a scal e as possi bl e, al l par t s of wor k embr aced i n t he pi ct ur e.
Coor di nat i on of phot o shoot s i s accompl i shed t hr ough Cont r act i ng Of f i cer . At t end const r uct i on t eam meet i ngs as necessar y. Pr ovi de r egul ar updat es r egar di ng t he st at us of t he document at i on, i ncl udi ng phot o shoot s concl uded, t he avai l abi l i t y of new pr ogr essi ons or as- bui l t s v i ewabl e upon r equest and r egul ar l y updat ed i nt o t he CPW.
Upon compl et i on of t he pr oj ect , pr ovi de f i nal copi es of t he document at i on ( t he " Per manent Recor d" ) wi t h t he i ndexi ng and navi gat i on syst em embedded ( and act i ve) i n an el ect r oni c medi a f or mat , t ypi cal l y an ext er nal har d dr i ve. Make t he Per manent Recor d have Bui l di ng I nf or mat i on Model i ng ( BI M) i nt er f ace capabi l i t i es.
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.
1. 6 PRECONSTRUCTI ON CONFERENCE
I mmedi at el y af t er awar d, pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he Pr econst r uct i on Conf er ence. The conf er ence must t ake pl ace wi t hi n 35 cal endar days af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he s i t e. The pur pose of t hi s meet i ng conf er ence i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o: dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.
1. 6. 1 At t endees
Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.
1. 7 PARTNERI NG
To most ef f ect i vel y accompl i sh t hi s Cont r act , t he Cont r act or and Gover nment must f or m a cohesi ve par t ner shi p wi t h t he common goal of dr awi ng on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a successf ul pr oj ect wi t hout saf et y mi shaps, conf or mi ng t o t he Cont r act , wi t hi n budget and on schedul e. The par t ner i ng t eam must consi st of per sonnel f r om bot h t he Gover nment and Cont r act or i ncl udi ng pr oj ect l evel and cor por at e l evel l eader shi p posi t i ons. Key Per sonnel f r om t he suppor t ed command, end user , Cont r act or , key subcont r act or s and t he Desi gner of Recor d ar e r equi r ed t o par t i c i pat e i n t he Par t ner i ng pr ocess.
SECTI ON 01 30 00 Page 5
1. 8 ACCOMMODATI ONS FOR GOVERNMENT PERSONNEL
The Cont r act or shal l f ur ni sh and mai nt ai n a doubl e wi de of f i ce t ype t r ai l er f or t he use of Gover nment i nspect or s. The t r ai l er shal l have a mi ni mum f l oor space of 1, 400 squar e f eet wi t h f our of f i ces, t wo r est r ooms, and one cent r al conf er ence r oom.
The t r ai l er shal l meet t he f ol l owi ng r equi r ement s:
a. Suf f i c i ent bl ocks and st r aps ( Per EM385) t o st eady t he t r ai l er when spot t ed f or use.
b. An ent r ance near each end wi t h each ent r ance equi pped wi t h a door wi t h f i xed wi ndow and scr een door .
c. Mi ni mum of appr oxi mat el y 80 squar e f eet vent i l at i ng t ype of wi ndow space wi t h al l wi ndows havi ng l ouver ed scr eens or scr eens and venet i an bl i nds.
d. Fl oor s, cei l i ng and wal l s t o be i nsul at ed.
e. Cei l i ng vent s wi t h at l east one havi ng an exhaust f an.
f . Var ni shed pl ywood i nt er i or .
g. I nl ai d l i nol eum cover ed f l oor s.
h. Cei l i ng l i ght oper at ed f r om swi t ch at door .
i . Fl uor escent t wo 40- wat t t ube f i xt ur es at each end of t r ai l er and i n each of f i ce.
j . Doubl e el ect r i c out l et s l ocat ed near ends of t r ai l er wi t h one ext er i or weat her pr oof out l et . Thr ee doubl e out l et s i n each of f i ce.
k. El ect r i c 5 gal l on wat er cool er wi t h t wo pl ast i c bot t l es r epl aced wi t h new wat er bot t l es as needed.
l . For ced- ai r cent r al el ect r i c heat i ng uni t wi t h mi ni mum capaci t y of 60 B. t . u. per squar e f oot , t her most at i c cont r ol l ed.
m. Ther most at i cal l y cont r ol l ed 24, 000 B. t . u. cent r al ai r condi t i oni ng uni t pr ovi di ng si x ai r changes per hour .
n. War dr obe/ cupboar d of appr oxi mat el y 48 i nch l engt h.
o. Four kneehol e desk 30 i nches by 32 i nches by 5 f eet 0 i nches, wi t h 3 dr awer s on each si de of t he kneehol e.
p. One l egal s i ze 4 dr awer l at er al f i l i ng cabi net .
q. Dr af t i ng t abl e on shel f wi t h bui l t - i n cabi net s bel ow. Dr af t i ng st ool .
r . Pl an r ack capabl e of hol di ng appr oxi mat el y 75 st andar d dr awi ngs.
s. Lar ge whi t eboar d i n each of f i ce, t hr ee i n conf er ence r oom.
t . Lar ge cor kboar d i n conf er ence r oom.
SECTI ON 01 30 00 Page 6
u. 2x conf er ence t abl es.
v. 12x manager s chai r s.
w. 1x caf e t abl e.
x. 1x f ul l s i ze r ef r i ger at or .
y. 1x cof f ee pot .
z. 1x mi cr owave.
aa. 1x l ar ge t r ash can.
bb. 4x smal l t r ash can.
cc. Used f ur ni t ur e, i n good condi t i on, wi l l be accept abl e.
dd. Two Fi ve pound CO2 f i r e ext i ngui sher s.
ee. Two I nt er i or t oi l et f aci l i t i es wi t h bl ack/ gr ey wat er t ank syst em and heat ed l i nes. I nt er i or wat er hol di ng t anks suppl i ed f or each r est r oom.
f f . 1x f l at scr een or pr oj ect or capabl e of pr oduci ng a hi gh- def i ni t i on i mage of 60h x 60h.
gg. 1x 360- degr ee omni di r ect i onal USB speaker phone wi t h noi se r educt i on.
hh. 1x s i x- uni t vent ed l ocker .
The t r ai l er shal l be l ocat ed at t he di r ect i on of t he Cont r act i ng Of f i cer ' s Repr esent at i ve. The Cont r act or shal l pr ovi de accommodat i ons, weekl y j ani t or i al ser vi ce, f uel f or l i ght pl ant and heat i ng f aci l i t i es, el ect r i c i t y, i nt er net , sewage, and wat er , al l at no cost t o t he Gover nment .
For i nt er net , t he cont r act or shal l pr ovi de one hi gh- speed dat a l i ne ( f i ber opt i c, T1 or sat el l i t e) f or comput er use wi t h r out er and modem. The comput er l i ne shoul d be pr ovi ded t hr ough cl ose coor di nat i on wi t h t he Cont r act i ng Of f i cer . I f hi gh speed dat a i s not avai l abl e, t he KTR shal l pr ovi de sat el l i t e i nt er net ser vi ces.
Pr ovi de an ANSI appr oved, 16- uni t f i r st ai d k i t , mount ed on t he wal l of t he t r ai l er . The ent i r e f aci l i t y , i ncl udi ng f ur ni t ur e, wi l l r emai n t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he si t e upon compl et i on of t he cont r act , t he t r ai l er shal l r emai n t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he si t e of t he wor k.
The f aci l i t y shal l be equi pped wi t h ADA/ ABA Compl i ant r amps. Al l wi ndows ar e t o be pr ovi ded wi t h secur i t y scr eens, door bar s, and heavy- dut y enf or cer l ocks.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 30 00 Page 7
SECTI ON 01 30 00 Page 8
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00. 24
OTHER ADMI NI STRATI VE AND SPECI AL REQUI REMENTS
12/ 21
PART 1 GENERAL
1. 1 REFERENCES
1. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE
1. 3 CONTRACTOR SUPPLY AND USE OF ELECTRONI C SOFTWARE FOR PROCESSI NG
CONSTRUCTI ON WAGE RATE REQUI REMENTS STATUTE CERTI FI ED LABOR
PAYROLLS
1. 4 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS
CONTRACTS
1. 5 CONTRACTOR PERFORMANCE EVALUATI ONS
1. 6 ANTI TERRORI SM ( AT) / OPERATI ONS SECURI TY ( OPSEC) PROVI SI ONS
1. 7 CONTRACT DRAWI NGS AND SPECI FI CATI ONS
1. 7. 1 SETS FURNI SHED
1. 7. 2 REPRODUCTI ON AND DI STRI BUTI ON
1. 7. 3 NOTI FI CATI ON OF DI SCREPANCI ES
1. 7. 4 OMI SSI ONS
1. 8 SUBMI TTALS
1. 9 PAYMENT
1. 9. 1 PROMPT PAYMENT ACT
1. 9. 2 PAYMENT FOR MATERI ALS STORED OFFSI TE
1. 10 AVAI LABI LI TY OF UTI LI TY SERVI CES
1. 11 UTI LI TY SERVI CE I NTERRUPTI ONS
1. 12 DI GGI NG PERMI TS AND ROAD CLOSI NGS
1. 13 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER
1. 14 I NSURANCE REQUI RED
1. 15 SUPERVI SI ON
1. 15. 1 Super i nt endent Qual i f i cat i ons
1. 15. 2 Mi ni mum Communi cat i on Requi r ement s
1. 15. 3 Dut i es
1. 15. 4 Non- Compl i ance Act i ons
1. 16 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( Red Zone Meet i ngs)
1. 16. 1 Red Zone Checkl i st
1. 16. 2 Meet i ngs
1. 17 SECURI TY REQUI REMENTS
1. 17. 1 Cont r act or ' s Empl oyee I dent i f i cat i on
1. 17. 2 Ent r y Requi r ement s
1. 17. 3 Occupi ed and Exi st i ng Bui l di ngs
1. 18 CONTRACTOR QUALI TY CONTROL ( CQC)
1. 19 NONDOMESTI C CONSTRUCTI ON MATERI ALS
1. 20 DAI LY WORK SCHEDULES AND WEEKLY COORDI NATI ON MEETI NGS
1. 21 AS- BUI LT DRAWI NGS
1. 22 SI GN
1. 23 EQUI PMENT ROOM DRAWI NGS
1. 24 CONTRACTOR FURNI SHED EQUI PMENT DATA
1. 25 SPECI AL I NSTRUCTI ONS FOR PROGRESS CHARTS
1. 26 PARTNERI NG
SECTI ON 01 30 00. 24 Page 1
1. 26. 1 Faci l i t at ed ( For mal ) Par t ner i ng
1. 27 PROFI T
1. 28 LABOR CONDI TI ONS APPLI CABLE TO TEMPORARY FACI LI TI ES
1. 29 DRAWI NG SCALES
1. 30 FEDERAL HOLI DAYS
1. 31 SI TE HOURS
1. 32 COST AND TI ME I MPACT ( CTI ) LOG
PART 2 NOT USED
PART 3 EXECUTI ON
3. 1 APPENDI X A- CONTRACT DOCUMENT DI STRI BUTI ON LI ST
ATTACHMENTS:
Appendi x A - Cont r act Document Di st r i but i on Li st
Pr oj ect Si gn Det ai l s
SECTI ON 01 30 00. 24 Page 2
SECTI ON 01 30 00. 24
OTHER ADMI NI STRATI VE AND SPECI AL REQUI REMENTS
12/ 21
PART 1 GENERAL
At t achment s:
Appendi x A - Cont r act Document Di st r i but i on Li st
Pr oj ect Si gn Det ai l s
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2024) Saf et y - - Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s
1. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE
I n accor dance wi t h FAR 31. 105( d) ( 2) ( i ) ( b) , f or t he pr edet er mi ned schedul e of const r uct i on equi pment use r at es, use Engi neer Pamphl et ( EP) 1110- 1- 8, Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e. Copi es of each r egi onal schedul e may be obt ai ned t hr ough t he f ol l owi ng i nt er net s i t e:
ht t ps: / / www. publ i cat i ons. usace. ar my. mi l / USACE- Publ i cat i ons/ Engi neer - Pamphl et s/ on pages 10 and 11 of 13.
1. 3 CONTRACTOR SUPPLY AND USE OF ELECTRONI C SOFTWARE FOR PROCESSI NG
CONSTRUCTI ON WAGE RATE REQUI REMENTS STATUTE CERTI FI ED LABOR PAYROLLS
a. Use a commer ci al l y- avai l abl e el ect r oni c syst em t o pr ocess and submi t cer t i f i ed payr ol l s el ect r oni cal l y t o t he Gover nment . The r equi r ement s f or pr epar i ng, pr ocessi ng and pr ovi di ng cer t i f i ed l abor payr ol l s ar e est abl i shed by t he Wage Rat e Requi r ement s st at ut e.
b. Obt ai n and pr ovi de f or al l access, l i censes, and ot her ser vi ces r equi r ed t o pr ovi de f or r ecei pt , pr ocessi ng, cer t i f y i ng, el ect r oni cal l y t r ansmi t t i ng t o t he Gover nment , and st or i ng weekl y payr ol l s and ot her dat a r equi r ed f or t he Cont r act or t o compl y wi t h t he Wage Rat e Requi r ement s st at ut e. Use t he el ect r oni c payr ol l ser vi ce t o pr epar e, pr ocess, and mai nt ai n t he r el evant payr ol l s and basi c r ecor ds dur i ng al l wor k under t hi s const r uct i on cont r act . The el ect r oni c payr ol l ser vi ce must be capabl e of pr eser vi ng t hese payr ol l s and r el at ed basi c r ecor ds f or t he r equi r ed t hr ee year s af t er cont r act compl et i on. Obt ai n and pr ovi de el ect r oni c syst em access t o t he Gover nment , as r equi r ed t o compl y wi t h t he Wage Rat e Requi r ement s over t he dur at i on of t he const r uct i on cont r act .
SECTI ON 01 30 00. 24 Page 3
c. The Cont r act or ' s pr ovi s i on and use of an el ect r oni c payr ol l pr ocessi ng syst em must meet t he f ol l owi ng basi c f unct i onal cr i t er i a:
( 1) commer ci al l y avai l abl e;
( 2) compl i ant wi t h appr opr i at e Wage Rat e Requi r ement s st at ut e payr ol l pr ovi s i ons i n t he FAR;
( 3) abl e t o accommodat e t he r equi r ed number s of empl oyees and subcont r act or s pl anned t o be empl oyed under t he cont r act ;
( 4) capabl e of pr oduci ng an Excel spr eadsheet - compat i bl e el ect r oni c out put of weekl y payr ol l r ecor ds f or expor t i nt o an Excel spr eadsheet t o be i mpor t ed i nt o t he cont r act or ' s mode of Resi dent Management Syst em 3. 0;
( 5) demonst r at ed secur i t y of dat a and dat a ent r y r i ght s;
( 6) abi l i t y t o pr oduce Cont r act or - cer t i f i ed el ect r oni c ver si ons of weekl y payr ol l dat a;
( 7) abi l i t y t o i dent i f y er r oneous ent r i es and t r ack t he dat a/ t i me of al l ver si ons of t he cer t i f i ed Wage Rat e Requi r ement s st at ut e payr ol l s submi t t ed t o t he gover nment over t he l i f e of t he cont r act ;
( 8) capabl e of gener at i ng a dur abl e r ecor d copy i n a Compact Di sc ( CD) or Di gi t al Ver sat i l e Di sc ( DVD) and Por t abl e Document For mat ( PDF) f i l e r ecor d of dat a f r om t he syst em dat abase at t he end of t he cont r act c l oseout . Thi s dur abl e r ecor d copy of dat a f r om t he el ect r oni c payr ol l pr ocessi ng syst em must be pr ovi ded t o t he Gover nment dur i ng cont r act c l oseout .
d. Al l Cont r act or - i ncur r ed cost s r el at ed t o t he Cont r act or ' s pr ovi s i on and use of an el ect r oni c payr ol l pr ocessi ng ser vi ce must be i ncl uded i n t he Cont r act or ' s pr i ce f or t he over al l wor k under t he cont r act . The cost s f or compl i ance wi t h t he Wage Rat e Requi r ement s st at ut e by usi ng el ect r oni c payr ol l pr ocessi ng ser vi ces must not be a separ at el y bi d or r ei mbur sed i t em under t hi s cont r act .
1. 4 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS
222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
- U. S. Depar t ment of Labor Vet er ans’ Empl oyment and Tr ai ni ng Ser vi ce
( VETS) :
ht t ps: / / www. dol . gov/ vet s/
- Feder al Vet er an Empl oyment I nf or mat i on: ht t ps: / / www. f edshi r evet s. gov/
- Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am:
SECTI ON 01 30 00. 24 Page 4 ht t ps: / / www. benef i t s. va. gov/ vow/
- U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:
ht t ps: / / wct . ar my. mi l / modul es/ empl oyer s/ i ndex. ht ml
- Hi r i ng Our Her oes: ht t ps: / / www. uschamber f oundat i on. or g/ hi r i ng- our - her oes
1. 5 CONTRACTOR PERFORMANCE EVALUATI ONS
See Feder al Acqui s i t i on Regul at i on ( FAR) Subpar t 42. 1502( e) f or t he r equi r ement s on past per f or mance eval uat i ons f or const r uct i on cont r act s.
For const r uct i on cont r act s val ued at or above $750, 000. 00, i ncl udi ng al l modi f i cat i ons, t he USACE wi l l eval uat e Cont r act or ' s per f or mance usi ng t he web- based Cont r act or s Per f or mance Assessment Repor t i ng Syst em ( CPARS) .
Af t er t he USACE dr af t s an eval uat i on ( i nt er i m or f i nal ) , t he Cont r act or wi l l have t he oppor t uni t y t o access, r evi ew, comment and ei t her concur or non- concur wi t h t he eval uat i on i n t he CPARS syst em f or a per i od of 60 days. Access t o t he CPARS syst em r equi r es ei t her speci f i c sof t war e cal l ed PKI cer t i f i cat i on ( r ecommended met hod) or a user name and passwor d. The PKI cer t i f i cat i on i s a Depar t ment of Def ense r ecommendat i on and t o pr ovi de secur i t y i n el ect r oni c t r ansact i ons. The cer t i f i cat i on sof t war e coul d cost appr oxi mat el y $110 - $125 per cer t i f i cat e per year and may be pur chased f r om an Ext er nal Cer t i f i cat e Aut hor i t i es ( ECA) vendor . Cur r ent i nf or mat i on about t he PKI cer t i f i cat i on pr ocess and cont act i ng vendor s can be f ound on t he web si t e: ht t ps: / / www. cpar s. gov.
1. 6 ANTI TERRORI SM ( AT) / OPERATI ONS SECURI TY ( OPSEC) PROVI SI ONS
1. Gener al secur i t y r equi r ement s and gui dance:
The secur i t y r equi r ement s descr i bed bel ow appl y t o al l cont r act per sonnel ( i ncl udi ng empl oyees of t he pr i me Cont r act or ( " Cont r act or " ) and al l subcont r act or empl oyees) suppor t i ng t he per f or mance r equi r ement s of t hi s cont r act . The Cont r act or i s r esponsi bl e f or compl i ance wi t h t hese secur i t y r equi r ement s. Quest i ons r egar di ng secur i t y mat t er s shal l be addr essed t o t he desi gnat ed Gover nment r epr esent at i ve ( e. g. , Cont r act i ng Of f i cer Repr esent at i ve ( COR) , Requi r i ng Act i v i t y ( RA) r epr esent at i ve, or Cont r act i ng Of f i cer ( i f a COR or ot her RA r epr esent at i ve i s not appoi nt ed) ) . Cont r act per sonnel ar e cr i t i cal t o t he over al l secur i t y and saf et y of US Ar my Cor ps of Engi neer s ( USACE) i nst al l at i ons, f aci l i t i es and act i v i t i es, and secur i t y awar eness t r ai ni ng cont r i but es t o t hose ef f or t s.
The Depar t ment of Def ense ( DoD) and Ar my secur i t y t r ai ni ng r equi r ement s speci f i ed bel ow, i f appl i cabl e, ar e per f or mance r equi r ement s; al l appl i cabl e cont r act per sonnel shal l compl et e i ni t i al t r ai ni ng wi t hi n 30 days of cont r act awar d or t he dat e new cont r act per sonnel begi n per f or mance on t he cont r act . Wi t hi n f i ve busi ness days f r om t he compl et i on of t r ai ni ng, t he Cont r act or shal l pr ovi de wr i t t en document at i on ( e. g. , emai l or memor andum) t o t he Gover nment r epr esent at i ve. The document at i on shal l i ncl ude t he names of cont r act per sonnel t r ai ned and whi ch t r ai ni ng t hey compl et ed; t he Cont r act or shal l mai nt ai n t r ai ni ng r ecor ds as par t of t hei r cont r act f i l es and be pr epar ed t o pr ovi de copi es of t r ai ni ng cer t i f i cat es t o t he Gover nment r epr esent at i ve. Cont r act or per sonnel and vehi c l es ar e subj ect t o sear ch when ent er i ng f eder al i nst al l at i ons.
Addi t i onal l y, al l cont r act per sonnel shal l compl y wi t h For ce Pr ot ect i on Condi t i on ( FPCON) measur es, Random Ant i t er r or i sm Measur es ( commonl y r ef er r ed t o as " RAMs" ) , and Heal t h Pr ot ect i on Condi t i on ( HPCON) measur es.
The Cont r act or i s r esponsi bl e f or meet i ng per f or mance r equi r ement s dur i ng el evat ed FPCON and/ or HPCON l evel s i n accor dance wi t h appl i cabl e RA pl ans and pr ocedur es- t hi s i ncl udes i dent i f y i ng mi ssi on essent i al and non- mi ssi on essent i al per sonnel . I n addi t i on t o t he changes ot her wi se aut hor i zed by t he changes cl ause of t hi s cont r act , shoul d t he FPCON or HPCON l evel s at any i ndi v i dual f aci l i t y or i nst al l at i on change, t he Gover nment may
SECTI ON 01 30 00. 24 Page 5 i mpl ement secur i t y changes t hat af f ect cont r act per sonnel . The Cont r act or shal l ensur e al l cont r act per sonnel ar e awar e of t hei r secur i t y r esponsi bi l i t i es, i ncl udi ng any si t e- speci f i c r equi r ement s i dent i f i ed i n l ocal pol i c i es or pr ocedur es.
2. Ant i t er r or i sm AT Level I t r ai ni ng:
Al l cont r act per sonnel r equi r i ng r out i ne access t o Ar my i nst al l at i ons, f aci l i t i es, and cont r ol l ed access ar eas, or r equi r i ng net wor k access shal l compl et e i ni t i al and annual r ef r esher AT Level I awar eness t r ai ni ng.
Onl i ne AT Level I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .