This document contains a federal contract solicitation and related questions and answers for medium voltage switchgear replacement services at a hydroelectric power plant in Sault Sainte Marie, Michigan. The solicitation requires replacing aging 5kV switchgear and transformers to increase reliability of power distribution. Services include installation of new switchgear and a dry-type transformer, cable work, benchboard modifications, metering, control devices, protective relaying, and interface wiring. The estimated cost is $1-5 million. The NAICS code is 238210 and HUBZone price preference applies. The response due date was extended to December 21, 2020 with work expected to begin in February 2021. Site visits were available individually by scheduling with the point of contact between November 18-December 15, 2020. Questions from interested contractors were answered to clarify equipment specifications, drawings, responsibilities, and treatment of removed materials.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES92982895
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Medium Voltage Sw itchgear Amendment 0001 This amendment is issued to:
1. Extend the proposal due date to 21 December 2020 at 2:00 PM Eastern Time
2. Extend the Request for Information period to 08 December 2020
3. Add additional site visits as described in FAR 52.236-27
4. Revise the specifications and plan as described in Section SF 30 Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK20R0010
X 9B. DATED (SEE ITEM 11)
10-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Dec-2020
CODE
U.S.ARMY ENGINEER DISTRICT, DETROIT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK20R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0001
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 10-Dec-2020 02:00 PM to 21-Dec-2020 02:00 PM.
The following have been modified:
NOTES TO OFFERORS
REQUESTS FOR INFORMATION
Questions/Inquiries. All questions pertaining to this requirement shall be submitted in writing no later than December 8, 2020 at 5:00 P.M. Eastern Time. The offeror shall put the solicitation number located in Block 1 of the SF 1442 followed by QUESTIONS in the subject line of the email. All questions received after the above date and time WILL NOT BE ANSWERED.
Questions shall be submitted to Emery Moser, Contract Specialist at Emery.S.Moser@usace.army.mil, Sandra Kenzie, Contracting Officer at Sandra.M.Kenzie@usace.army.mil, and the Detroit District Contracting inbox at LRE-Proposal@usace.army.mil.
CERTIFIED FINAL DOCUMENTS – W911XK20R0010 TECHNICAL DRAWINGS
The following Sheets have been revised:
E-101 AUXILIARY TURBINE, PLAN VIEW, EL 587.50, 5 KV SWITCHGEAR &
TRANSFRORMER TA, INSTALL
Added note No. 5 and reference drawing 1557605.
E-205 ELEVATION RELAYBOARD LAYOUT, INSTALL
Clarified Panel 0 replacement scope. Added note No. 8.
E-601 MAIN ONE-LINE DIAGRAM INSTALL
Added note No. 2 and reference drawings E-204 and E-205.
E-708 RELAYBOARD WIRING DIAGRAM, PANEL #4 (TOP), INSTALL
Revised note No. 3.
CERTIFIED FINAL DOCUMENTS – W911XK20R0010 TECHNICAL SPECIFICATIONS
The following Sections have been revised:
26 08 01.00 SYSTEM TESTING AND COMMISSIONING
Paragraph 1.1 DESCRIPTION Deleted occurrence of ‘GSU Transformer’ and replaced with ‘dry-type transformer’.
26 12 16.00 DRY-TYPE TRANSFORMERS
Paragraph 1.3 SUBMITTALS Added unfused disconnect switch to SD-03 – Product Data Submittal.
Paragraph 2.3.1 TYPE AND RATING Revised primary transformer rating from 13.2 kV to 13.6 kV.
Removed totally enclosed non-ventilated (TENV) from this paragraph.
Expanded insulation technology from ‘cast resin’ to ‘cast resin or cast coil sealed type’.
Paragraph 2.3.2 WINDING TAPS Revised center tap or rated primary voltage transformer rating from 13.2 kV to 13.6 kV.
Paragraph 2.4 UNFUSED DISCONNECT SWITCH (NEW) Added close coupled unfused disconnect switch product specifications.
Paragraph 3.1.1 FACTORY TESTING - GENERAL Added unfused disconnect switch routine production tests as defined in IEEE C37.20.3.
Paragraph 3.3.1 FIELD TESTING AND ACCEPTANCE – GENERAL Added field test reference IEEE C37.20.3.
26 13 26.00 METAL-CLAD SWITCHGEAR
Paragraph 2.2.1 SWITCHGEAR RATINGS Revised BIL from 95 kV to 60 kV and withstand current from 50kA to 25kA.
Paragraph 2.2.2 CIRCUIT BREAKER RATINGS Revised BIL from 95 kV to 60 kV and withstand current from 50kA to 25kA.
33 00 00.01 CRIB DAM CIVIL STRUCTURES
Paragraph 1.1 DESCRIPTION Deleted occurrence of ‘GSU Transformer’ and replaced with ‘dry-type transformer’.
Paragraph 1.5.4 TRANSFORMER FOUNDATION AND BOLLARD FOUNDATION Clarified that load data for dry-type transformer assembly is provided by the Contractor during this contract.
Solicitation Issued 10 November 2020 Solicitation #
W91XK20R0010
Questions as of 24 November 2020
5 kV Switchgear Number Question Answer
1 Please provide specs for the speed droop meter, speed changer reference meter, gate limit and gat position indicator and generator 10 exciter voltmeter shown on drawing E-204 to be replaced.
Reference specification Section 26 05 00.00 26 - Basic Electrical Materials and Methods, Paragraph 2.9. Meters are intended to be digital replacements with similar dimensions and characteristics. Coordinate model preferences with field personnel after award.
2 The panel layout on E-204 shows the generator metering to be replaced. The layout on E-601 shows to reuse existing. Which is correct?
E-204 is correct for metering scope of work.
See amended drawing E-601 with note pointing to E-204 for benchboard device replacement installation scope.
3 The panel layout on E-204 shows the 13.8/4kV transformer ammeter to be replaced. The layout on E-601 shows to reuse existing. Which is correct?
E-204 is correct for metering scope of work.
See amended drawing E-601 with note pointing to E-204 for benchboard device replacement installation scope.
4 The COE is providing the required SEL relays.
Can part numbers for the intended relays be provided to assist in ascertaining what will be required for test switches?
The relays are already listed in specification section 01 35 13, paragraph 1.5.10.4.
5 Section 26 08 01.00 26 Paragraph 1.1.a mentions a Government-furnished GSU transformer, in addition to a dry-type transformer. Are there two transformers to be installed on this project or just TA? Is TA government or contractor furnished?
A GSU transformer is not in the scope of this project. See amended 26 08 01.00 26 attached.
6 Section 33 00 00.01 26 Paragraph 1.1 (first paragraph) says “new GSU transformers”. Are there multiple transformer to be installed under this contract?
Revised subject text from 'new GSU transformer' to 'new dry-type transformer'.
While technically the station service unit Unit 3A steps-up to 13.8 kV through the new dry-type transformer, it isn't a dedicated generator step-up transformer. See amended '33 00 00 26.’
7 Section 33 00 00.01 26 Paragraph 1.5.4 states “as defined herein in addition to the loads for the transformer as defined in the transformer design data from the transformer manufacturer located in the reference drawings.” We could not locate this information. Furthermore, this makes it unclear if the government or the contractor is supplying the transformer.
This paragraph errantly points to existing equipment load data and should point to new dry-type transformer load data provided by the contractor during this contract. See amended 33 00 00 26 attached.
8 Section 01 35 13 Paragraph 1.5.10.4 lists equipment to be furnished by the government under this contract. Only 3 relays are listed, however, Section 26 08 01.00 26 Paragraph 1.1.a says the GSU is government furnished. Please clarify.
No change to 01 35 13. Error revised in Section 26 08 01. See related RFI comment 5 and See amended attached.
9 Drawings ED-204, ED-205, E-204, & E-205: Are demo and install wiring diagrams for these modified panels to be provided by the Government or does this design need to be
Some details on wiring diagrams have been redacted for cyber security reasons. These will be made available to the contractor after award. If additional information is required provided by the Contractor? The 700-series drawings do cover some wiring, but it doesn't appear to account for most of the device changes.
If contractor designed, will full wiring diagrams of existing panels be available for design?
beyond the current solicitation pacakge, contractor as-builting and design will be required.
10 Drawings E-604 through E-613: It appears there are several auxiliary contacts that will likely need to tie into generator controls. Will the Government provide design for these interfaces to generator controls or will this be provided by the contractor? If by contractor, will the existing generator control schematics and any impacted wiring diagrams be provided for design?
Generator control schematics and wiring diagrams are already included with reference drawing package. If additional information is required beyond the current solicitation pacakge, contractor as-builting and design will be required.
11 Per drawing E-601 Main One Line Diagram Install are the items in gray customer furnished or should they be included in the bid?
Gray items on E-601 are existing. Reference related RFI items 2 and 3 regarding benchboard device scope.
12 Per drawing E-601 Main One Line Diagram Install are the SEL-751 Relays, SEL-787 & SEL- 700G to be included in the price of this bid? Are the relays mentioned above mounted in the switchgear or in a separate control board?
Relaying is Government furnished or exitisting. Compensating works SEL 751 is shown as a Contractor Installation item for its interface wiring. It isn't moving locations, however, it is changing the device it is protecting. See contract drawing E-201 and E-205 for mounting locations.
13 Who is responsible for programming the SEL Relays?
Reference specification Section 26 08 01.00 26, Paragraph 1.6. Contractor shall implement Government provided protective settings.
14 Are the 751 relays from the old 5kV Switchgear being reused in the new 5kV Switchgear?
The new compensating works SEL 751 is repurposed and used to provide the existing switchgear bus protection. Reference drawings ED-205 and E-205. All other SEL 751 relays are being reused. Reference specification Section 26 05 19.00 26 for cable replacement scope associated with power, control, and instrumentation.
15 What is the depth of the relay board on E-205? The relayboards are open at the rear and the estimated distances are 36" in the area above the bottom terminal blocks and 12" in the area between the bottom terminal blocks and the relayboard. Panel 0 has a 12" distance between the relayboard front and a structural column that spans the complete width of this panel. The bottom terminal blocks are approximately 24" above the finished floor.
16 Who is responsible for the relay coordination study to determine the settings for the relays provided?
The Government is responsible for the relay programming and coordination study.
17 Per drawing E-205 will the Yokagawa Device DX2030 be customer furnished? If so will it be shipped to the factory to be installed or will it need to be installed onsite?
See Note 4 of ED205. Yokagawa is an existing device that will be reinstalled in the new station service instrument panel.
18 Per drawing E-205 is the Panel 0 an existing cabinet or will it be a new cabinet? Providing it
Panel 0 is a new swinging panel front. See amended drawing E-205 clarifying the expectation of a new panel front.
as a new cabinet would minimize field work and be the most cost efficient.
19 Where is the relay board, shown on E-205, located on the layout drawings?
The relayboards are located between the Control Room and the Relay Room at elevation 611.50 shown on G-008. See reference drawing DC-179-4.
20 Where is the control benchboard, shown on E- 203/204 located, on the layout drawings?
The control bench board is located in the center of the Control Room at elevation
611.50 shown on G-008. See reference drawing DC-179-4.
21 One drawing E-101 there is a cabinet called CT’s.
Is this cabinet supposed to house Current transformers from the switchgear or is this for utility provided Current Transformers? Please provide a drawing on this cabinet.
See amended E-101. Unit 3A neutral CTs for replacement are located here. See drawing E-101, note 3 for cabling scope associated with this CT cabinet. See associated reference drawing D1557605 (sheet 17 of 109).
22 How wide is the bridge connected to the island where the switchgear is to be installed?
54" at narrowest point, with a 40 psf load limit.
23 How much weight can the bridge connected to the island where the switchgear is to be installed hold?
G-007 shows the 40 psf load limit of the bridge.
24 How wide and tall are the doors to the building/openings to get the equipment inside?
Original drawings reflect south elevation
600.00 door dimensions of 14' wide by 21'- 9-1/2" high. Measured width of doors at 13'- 2" is shown on G-009.
25 Please include a date and time for a pre-bid site walk through. Contractors will require this to understand all site constraints and scope.
Per FAR 52.236-27 of the solicitation, site visits were scheduled on an individual basis on 18 November 2020. Per Amendment 0001, additional site visits will be available.
Reference FAR 52.236-27 for instructions on scheduling site visits.
26 Please confirm the new transformers primary voltage is 13.6kV and secondary is 4.16kV.
Contract drawing E-601 correctly reflects the voltage ratings. Revised 26 12 16.00 26, paragraph 2.3.1 to reflect the 13.6 kV primary and 4.16 kV secondary.
27 What is the crane capacity in the building onsite? The elevation 600.00 bridge crane main hoist capacity is 80 tons and the auxiliary hoist capacity is 20 tons.
28 Please extend the bid due date to 10 business days after receipt of answers to all questions.
The proposal due date will be extended to 21 December 2020 at 2:00 P.M. Eastern Time.
29 Please provide a list of plan holders or where a list can be obtained. This information will be used to assemble project teams capable of successfully executing the project.
The interested vendors list can be viewed on the interested vendors tab on the beta.sam.gov solicitation announcement. If this tab is not viewable to you, you must submit a help ticket through the beta.sam.gov help desk to resolve any issues.
30 Please detail the anticipated award date and notice proceed date
The anticipated award date is mid to late January. The anticipated notice to proceed date stated in the solicitation is 01 February 2021.
31 Please detail the period of performance in days for this project
Reference FAR Clause 52.211-10 Alt I.
This clause states the anticipated notice to proceed date and the substantial and administrative completion dates.
32 Specification 26.12.16.00.26 Section 2.3.1 - Is a totally-Enclosed Non-Ventilated (TENV) cast resin, dry-type, self-cooled, NEMA Class AA required or can IP 55 or Sealed coil design be utilized?
See amended 26 12 16.00 26. Removed TENV from subject paragraph. Expanded insulation technology from 'cast resin' to 'cast resin or cast coil sealed type,'.
33 Specification 26.12.16.00.26 Section 2.3.1 - Please confirm transformer primary voltage.
13.2KV and 13.6KV shown on new one lines.
14.4KV shown on existing transformer and reference drawings
Contract drawing E-601 correctly reflects the voltage ratings. Revised 26 12 16.00 26, paragraph 2.3.1 to reflect the 13.6 kV primary and 4.16 kV secondary.
34 Specification 26.12.16.00.26 Section 2.3.2 - Should 3000KVA transformer be supplied as a step up transformer with voltage taps
15120,14760,14400,14040,13680 KV?
Center tap or rated primary voltage is 13.6 kV with four full-capacity taps each ±2.5 percent, 2 above rated voltage and 2 below rated voltage. Reference specification Section 26 12 16.00 26, paragraphs 2.3.1 and
2.3.2. See related RFI items 26 and 33.
35 Reference drawings E-601. The one line shows a primary and secondary disconnect switch on the 3000KVA transformer. Please confirm where these switches are to be installed. Assumed to provided with the transformer installation / design. SEALED coil transformer with connections to Primary and Secondary Switches.
Medium voltage interrupters are to be close coupled with the outdoor transformer TA.
See revised specification Section 26 12 16.00.
36 Reference drawings E-601. One line shows a primary and secondary disconnect switch on the 3000KVA transformer, however no specifications provided for this equipment. Please confirm load break NEMA 4 switch for this application.
Medium voltage interrupters are to be close coupled with the outdoor transformer TA.
See revised specification Section 26 12 16.00.
37 Reference drawings E-601. One line shows an arrestor on primary of 3000KVA transformer.
Please confirm supplied as part of transformer design. Confirm equipment supplied as part of transformer vs 5KV switchgear
Surge arrestor part of the transformer design to be located at the transformer on the primary side. Surge arrestor also included in 5kv switchgear design. See specification section 26 13 26.00 26, paragraph 2.9.
38 Specification 26.13.26.00.26 Section 2.2.1 calls for 95KV BIL impulse withstand and 50 KV withstand current. 5KV switchgear does not offer these criteria. Propose 60KV BIL impulse withstand and 25 KV withstand current for this application.
See amended specifications Section 26 13
26.00 26. Revised withstand current to 25 kA and BIL to 60 kV.
39 Specification 26.13.26.00.26 Section 2.2.2 calls for 95KV BIL impulse withstand and 50 KV withstand current. 5KV switchgear does not offer these criteria. Propose 60KV BIL impulse withstand and 25 KV withstand current for this application.
See amended specifications Section 26 13
26.00 26. Revised withstand current to 25 kA and BIL to 60 kV.
40 Specification 01.35.26 Section 1.7.2.12. Photos of control panel wiring show suspect asbestos insulation. Has this insulation been tested for asbestos content? If NOT is the contractor to assume asbestos insulation and bid as an abatement for the control wiring?
Drawing ED-203 note 2 states that the insulation contains asbestos. The contractor is to bid disposal of the control wiring in accordance with local, state, and federal laws.
41 Specification 01.35.26 Section 1.7.2.12. If suspect insulation is to be abated will USACE be providing a specification for removal as per usual
EM 385-1-1 section 06C includes the necessary specifications for asbestos transportation and disposal. It also includes section 02-82-00 Existing Conditions in other work specifications?
specifications for abatement if the contractor's selected means and methods include abatement.
42 Specification 01.35.26 Section 1.7.2.12. Has asbestos evaluation been performed on insulation on other wiring to be removed, equipment insulators, and other suspect materials? If NOT is the contractor required to test all suspect materials prior to removal to determine possible asbestos content?
Drawing ED-203 note 2 states that the insulation contains asbestos. If the contractor's selected means and methods for disposal requires a test of the asbestos insulation, this should be included in the contractor's bid.
43 Specification 01.35.26 Section 1.7.2.12 If unidentified asbestos materials are found is USACE accepting change order and schedule impact for asbestos abatement requirements?
See specification 01 35 26 paragraph 3.1.4 which covers unforeseen hazardous material.
44 Reference drawings STM 5 kV Switchgear certified final Contract Drawings. Please confirm scope of work for contactor. SCADA demo disconnections and install connections. Drawing comments show work performed by government on some drawings and by contractor on other drawings.
E - 600 series drawings accurately note the contractor responsibility for SCADA terminations. E-700 drawings also reflect Contractor SCADA termination responsibility, save E-708. See amended E- 708.
45 Reference drawings STM 5 kV Switchgear certified final Contract Drawings. Will the government complete all SCADA programming and integration?
Government is responsible for SCADA programming.
46 Reference drawings E-801. How will government handle any cabling if it can not be used due to length, integrality, safety (abatement)? For instance canal feeders one and two. Will these cases be handled as additional change orders?
If cable cannot be used because it differs materially from what is indicated in the contract, the contractor is required to immediately notify the COR in writing and the government will respond in accordance with the Differing Site Conditions Clause.
All known hazardous materials have been identified and indicated in the contract documents. See specification 01 35 26 paragraph 3.1.4 which covers unforeseen hazardous material.
47 Specification 26.13.26.00.26 Section 2.7. Please confirm protective relays shown in the drawings (including SEL-587Z, SEL387L, SEL-751 ) will be furnished, installed, tested, and commissioned by the government. Contractor will supplied a new door for Panel 0 with device cutouts and install. Once government installs relays in new door contractor will terminate wiring as specified
Regarding the repurposed SEL 751, see response to RFI item 14. Reference specification 01 35 13, paragraph 1.5.10.4 - Government Furnished Materials and equipment, which includes the SEL 387L and SEL 587Z relays. The installation is per the contract drawing E-205 for panel 0 (SEL 387L) and E-201 for switchgear equipment
(SEL 587Z).
48 Reference drawings E-205. Please confirm government will supply all nameplates for relay board and control benchboard. Contractor to install supplied nameplates
Contractor is to provide nameplates per specifications Section 26 05 00.00 26, 26 12
16.00 26, and 26 13 26 for devices and equipment installed in the scope of this work. E-205, Note 4 explicity states contractor responsibility to provide nameplates.
49 Specification 26.13.26.00.26 Section 2.5.9 calls for a capacitive trip device is only required for circuit breaker 3AG2. Please Confirm this 15KV breaker requires a capacitive trip device. Provide the manufacturer, style, type and catalog number for this breaker. Provide manufacture drawings for this switchgear.
Pertinent 15 kV equipment drawings are included within the reference drawings.
Breaker is a Westinghouse, Air Circuit Breaker, Type 150-DH250, style 17YI999.
See drawings 32A2886 through 32A2888 (pdf sheets 12-14 of 109).
50 Specification 01.12.16.00.26 Section 1.7. If a capacitive trip device is required for 3AG2 provide the work sequence to isolate this equipment to modify. As defined by the work sequence the 15KV switchgear will not be de-energized.
The outage for 3AG2 will be accounted for by the preconstruction submittals required in specification Section 01 12 16.00 26 in addition to work sequence requirements outlined in this specification.
51 I need to know what manufacture/vendor you require for the new transformer so that we can request a quote? I have looked thru all of the documents and I wasn’t able to find any manufacture information requirements.
No sole source or brand name justification is in place with contracting, therefore, Contractor must bid with commercially available equipment in compliance with these specifications. See amended 26 12
16.00 26 and related RFI items 35 and 36.
52 I need to know what manufacture/vendor you require for the new 5kv switchgear so that we can request a quote? I have looked thru all of the documents and I wasn’t able to find any manufacture requirements.
No sole source or brand name justification is in place with contracting, therefore, Contractor must bid with commercially available equipment in compliance with these specifications. Amended specification Section 26 13 26 ratings, that are now readily available.
53 I need to know what manufacture/vendor you require and part numbers for the new DC control panel, new meters, gauges and switches so that we can request a quote? I have looked thru all of the documents and I wasn’t able to find any manufacture requirements.
See response to RFI item 1 for new meters, gauges, and switches. No sole source or brand name justification is in place with contracting, therefore, Contractor must bid with commercially available equipment in compliance with these specifications.
54 What should we do with old transformer, 5kv gear, old gauges, old switches, old wire (some are most likely Asbestos or hazardous material)? I couldn’t find any info on the old material disposal requirements.
Remove and dispose of equipment per specifications. Removed property becomes Contractor property unless otherwise indicated in the specifications.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
(b) Due to the social distancing guidelines provided by the Centers for Disease Control and Prevention (CDC) because of COVID-19, site visits will be conducted on an individual basis.
Informal site visits can be scheduled with Starr Gallegos on a regular business day up to 15 December 2020 between the hours of 0700 and 1530.
Point of Contact : Starr Gallegos Email: Starr.M.Gallegos@usace.army.mil Phone: (906) 635-3465
(End of Summary of Changes)
File details come from the government source that posted it. Updated .