STM 5kV Switchgear certified final Reference Drawings.pdf

PDF 59 MB Posted

Attached to
Medium Voltage Switchgear, Saint Marys River, MI
Solicitation number
W911XK20R0010
Issued by

About this file

This document outlines a federal contract opportunity to provide construction services for replacing medium voltage switchgears at a hydroelectric generating facility in Sault Sainte Marie, Michigan. The project involves replacing aging 5kV switchgear and dry type transformers over 40 years old with increased reliability and operational risks. The scope of work includes installing new cabling, generator transformers, control switches, wiring, protective relaying for new feeders, and surge arrestors. Site visits are available by appointment on November 18, 2020 between 0700-1530 hours. Contractors must be registered in the System for Award Management and the project requires at least 25% of work be performed by the prime contractor. The estimated value is between $1-5 million under NAICS code 238210. Responses are due in accordance with Federal Acquisition Regulation 19.1307 and will be evaluated using the HUBZone 10% price preference.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .