STM 5 kV Switchgear certified final Contract Drawings 30 Oct 2020.pdf
PDF 186 MB Posted
- Attached to
- Medium Voltage Switchgear, Saint Marys River, MI
- Solicitation number
- W911XK20R0010
About this file
This solicitation is for construction services to replace the medium voltage switchgears at the New Power Plant in Sault Sainte Marie, MI. The project includes replacing the existing 5 kV switchgear and dry type transformer with new equipment, along with related work such as cabling, generator transformer modifications, control switches, wiring, protective relaying, and surge arrestors. The hydroelectric plant provides power to the local community, so outages will be limited or phased. The estimated cost is between $1,000,000 to $5,000,000, with a NAICS code of 238210. Site visits must be scheduled by November 18, 2020 between 0700-1530 Eastern Time. Contractors must perform 25% of the work with their own organization and register with SAM prior to proposal submission. The solicitation number is W911XK20R0010 and is a full and open procurement subject to the HUBZone 10% price evaluation preference.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .