Attachment 0039 - RFP Q&A 01182018.xlsx
XLSX spreadsheet 135 KB Posted
- Attached to
- Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0001
About this file
This notice provides details for the Logistics Civil Augmentation Program (LOGCAP) V request for proposal to be issued on November 6, 2017. The U.S. Army Contracting Command-Rock Island will seek to award a minimum of four and up to six indefinite delivery, indefinite quantity contracts to provide global logistical support services to the U.S. Military worldwide. Services will include setting the theater, supply operations, transportation, engineering, base camp support, and other logistics and sustainment functions. The estimated maximum contract value is $82 billion over ten years. Offerors must submit proposals by the closing date to be considered for award, and the Army will evaluate using best value tradeoff including technical/management, past performance, small business participation, and cost/price factors. Concurrent task orders will also be awarded for setting the theater requirements and other current known needs.
0039
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
| Item # | Subject | RFP/Attachment Reference | Question/Comment | Public/Private | USG Response |
| 1 | Section A, paragraph 23 and Paragraph L.2 | Section A, paragraph 23, of the solicitation RFP states questions should be submitted to either of you with a copy sent to a functional LOGCAP V email address; Section L, paragraph L.2, states all questions should be submitted to the PCO and the functional LOGCAP V email address – and does not list any other recipients. |
1. Please confirm Section A guidance does not conflict with Section L guidance; and
2. Is there a final date for submittal of questions?
| Public | RFP updated for consistency | ||
| 2 | Section A, Clause 3 on Page 2; Attachment_0003_-_AP_Other_Tech_Exhibit.xlsx | Under Section A, Clause 3 on Page 2 it states that “This contract will replace the current LOGCAP IV, Kuwait Base Operations and Security Services [excluding security], and Qatar Base Operations and Security Services Contracts.” We reviewed the RFP file “Attachment_0003_-_AP_Other_Tech_Exhibit.xlsx” and noted that none of the WBS references for 04.07 (Provide Health Care Services) are shown as “activated” in column J. |
It is our understanding that the current QBOSS contract includes medical personnel who staff and operate the Troop Medical Clinic on Camp as Sayliyah (CAS TMC). Based on the absence of activation for medical staffing in Attachment 03 we have the following questions:
1. What is the government’s intent with respect to these QBOSS medical contractor personnel?
2. Does the government intend to release a revised Attachment 03 showing WBS section 04.07 as activated to recompete these positions as part of the AP Other task order?
3. If not, how does the government plan to recompete the CAS TMC medical staff prior to the end of the current QBOSS period of performance?
| Public | Attachment 0003 is revised. WBS 04.07 requirements are now activated as an augmentation mission (reference Technical Exhibit K). | ||||
| 3 | Printed Copies of Proposal | L.7.1.(1)a. Regional Capability Matrix Attachment 0021 | Are offerors required to submit a Printed copy of Attachment 0021? Due to the complexity of the format of the xl file, the separate COCOM tabs and the length of the matrix it will be difficult to provide a printed version of this file in a readable format. Request the government remove the requirement to provide a PRINTED copy of Attachment 0021. | Public | RFP section L is amended to remove the requirement to provide a printed copy of Attachment 0021. |
| 4 | File format | L.7.1.(1).b. Regional Planning and Performance Capabilities | Should offerors provide one file with all six 10-page Regional Planning and Capabilities sections included or should we provide a separate 10-page file for each COCOM? Please clarify the file requirements. | Public | There is no preference, either way is acceptable. |
| 5 | Printed Copies of Proposal | L.7.1.(2).c. Labor Staffing Model and Approach | Are offerors required to submit a Printed copy of the Labor Staffing Model and Approachs? Due to the complexity of the format of the Labor Staffing Model xl file and the 9 separate task order approaches (nine (9) separate Task Orders with multiple worksheets) many of the worksheets will exceed a normal page size. It will be impossible to provide a printed version of this file(s) in a readable format. Request the government remove the requirement to provide a PRINTED copy of the Labor Staffing Model and Approaches. | Public | RFP section L is amended to remove the requirement to provide a printed copy of the labor staffing model and approaches. |
| 6 | Printed Copies of Proposal | L.7.1.(2).e. Labor Job Descriptions | Are offerors required to submit a Printed copy of Labor Job Descriptions xl file? Due to the complexity of the format of the xl file and the length of the matrix it will be very difficult to provide a printed version of this file in a readable format. Request the government remove the requirement to provide a PRINTED copy of the Labor Job descriptions. | Public | RFP section L is amended to remove the requirement to provide a printed copy of the labor job descriptions. |
| 7 | Printed Copies of Proposal | L.9.1.c. Attachment 0019 Small Business Participation | Are offerors required to submit a Printed copy of the Attachment 0019 xl file? Due to the complexity of the format of the xl file and the format of the file it will be very difficult to provide a printed version of this file in a readable format. Request the government remove the requirement to provide a PRINTED copy of Attachment 0019 | Public | Yes, a printed copy is required. RFP will not be amended to remove this requirement. |
| 8 | Delivery of Printed copies | L.5 PROPOSAL SUBMITTAL. All proposals and related information shall be submitted in the format identified above by the due date and time found on page one of the SF33. Printed copies must be sent to the Army at the following address: | Can offerors and subcontractors hand deliver the printed copies of proposals? Mail and other delivery services are not always reliable and to ensure on-time deliver we need the option to deliver by hand. Please provide instructions for hand delivery of the printed proposal. | Public | Yes. Hand delivery language is added to paragraph L.5. |
| 9 | Essential Contractor Services Plan | RFP Page 93,L.22.(b)- 252.237-7023 Continuation of Essential Contractor Services Oct/2010 |
(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in PWS technical exhibit J, Mission Essential Contractor Services, during periods of crisis. Are offerors required to submit a Mission-Essential Contractor Services Plan with their proposals? If so: - 1. In which Volume should this Plan be submitted? 2. Is there a page limit for the plan? 3. Should this be a generic plan applicable to any COCOM? 4. Please provide instructions for the submittal of the Mission-Essential Contractor Services Plan. Public 1. Volume I
2. No page limit
3. Yes
4. Language updated in paragraph L.6.5
| 10 | Air Operations in support of contractors | Attachment 0010 | Workload data input for " Tab"- Data Package for A.1 and H.2- "lines" 18-21 states "offerors assumptions". Please explain what this means and what you want offerors to estimate. If offerors are to estimate number of flight hours and assets needed, we will need more detail to include: what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Activation of this WBS indicates Government approval for contractor to develop and use air services in support of contractor operations. Contractor approach determines assets, flight hours, etc. | |
| 11 | Air Operations in support of contractors | Attachment 0009 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want offerors to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include: what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Activation of this WBS indicates Government approval for contractor to develop and use air services in support of contractor operations. Contractor approach determines assets, flight hours, etc. | |
| 12 | Air Operations in support of contractors | Attachment 0008 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want us to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include: what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 13 | Air Operations in support of contractors | Attachment 0007 | Workload data input for " Tab"- Data Package for A.1 and H.2 - lines 18-21 states "offerors assumptions". Please explain what this means and what you want us to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include: what we are expected to move (pax/cargo), the ammount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 14 | Air Operations in support of contractors | Attachment 0006 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want us to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include: what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 15 | Authorized personel | Attachment 0006 | Tab C.4 states that OCNs and LNs are not authorized base access badges or any other services. Is the contractor to assume that only EXPATs are authorized on this contract and that our staffing should not include local Marshallese? | Public | OCNs are not authorized. LNs (local Marshallese) are authorized. Technical Exhibit C.4 Exhibits is updated. | |
| 16 | Air Operations in support of contractors | Attachment 0005 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want offerors to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include what we are expected to move (pax/cargo), the ammount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 17 | Authorized personel | Attachment 0005 | In tab C.4 it states that OCNs and LNs are not authorized base access badges or any other services. Is the contractor to assume that only EXPATs are authorized on this contract and that our staffing should not OCNs and LNs? | Public | C.4 Exhibits are updated | |
| 18 | Air Operations in support of contractors | Attachment 0004 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want us to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 19 | Air Operations in support of contractors | Attachment 0003 | Workload data input for " Tab"- Data Package for A.1 and H.2- lines 18-21 states "offerors assumptions". Please explain what this means and what you want offerors to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 20 | Authorized personel | Attachment 0003 | C.4 states that OCNs and LNs are not authorized base access badges or any other services at APN001. Is the contractor to assume that only EXPATs are authorized at this location and that our staffing should not OCNs and LNs? | Public | Yes, Attachment 003 Tech Exhibit C.4 is revised | |
| 21 | Air Operations in support of contractors | Attachment 0002 | Workload data input for " Tab"- Data Package for A.1 and H.2 lines 18-21 states "offerors assumptions". Please explain what this means and what you want offerors to estimate. If we are to estimate number of flight hours and assets needed, we will need more detail to include what we are expected to move (pax/cargo), the amount we need to move, the frequency, and physical locations of where this is going to be moved to as flight hours are determined by distance. Please clarify this requirement. | Public | Distances between sites are provided in Attachment 0041. Contractor approach will dictate workload. | |
| 22 | Workload Data Report Template | Attachment 0011 | Can the Government please confirm that this attachment is to be used in execution of the contract and not submitted with the proposal? If this Attachment should be included with the proposal please provide instructions in Section L for inclusion of Attachment 0011 in the proposal. | Public | Yes, this is for execution/post award and not requireed to be submitted with the proposal. | |
| 23 | Critical Subcontractors | RFP L.8.9 | Is the contractor required to submit past performance citations for critical subcontractors or is it optional? | Public | Submittal of past performance citations for critical subcontractors is optional. Per L.8.2., "In addition, the Offeror may submit up to two (2) project/contract references for proposed major subcontractor(s), and up to two (2) project contract references for up to two (2) subcontractor(s) it determines critical to its approach." | |
| 24 | Labor Brokers | RFP L.8.9 | In the past, RICC has not required the submission of past performance of labor brokers because they are providing personnel and not a service and the prime contractor controls the day-to-day work of the employee. Question: Please confirm that past performance submissions are required from labor brokers who will likely be providing a signifcant amount of labor on certain TOs, especially in CENTCOM? | Public | Offerors are not required to submit past performance references for any subcontractors, including labor brokers. However, if the Offeror does submit references, per L.8.2, the Offeror may submit references for labor brokers just as it would submit references for any other subcontractor, so long as the labor broker meets the thresholds described. | |
| 25 | Labor Staffing Model Approach | RFP L.7.1.c | The new requirements for the base labor staffing model are somewhat confusing. Would the Government consider providing an example of what is required since there is no longer an opportunity to engage the Government at an industry day or one-on-ones? | Public | No examples will be provided. USG intent is for the offeror to provide a base labor staffing model approach based on USG provided inputs (L.7.1.c.2-3) | |
| 26 | Labor Staffing Model Approach | RFP L.7.1.c | Is the intent to create a base labor staffing model that generates the staffing approach once workload drivers are inputted the model for any given TO? | Public | Yes. The labor staffing model should produce the outputs, based on inputs from Attachments 0002-0010 requirement workbooks, for each task order. | |
| 27 | Small Business Plan | RFP H.10 Small Business Subcontracting Plan | Are offerors, other than Small Businesses, required to submit a Small Business Subcontracting Plan IAW Far 52.219.9 as part of the proposal submission? If so should the SB Subcontracting Plan be included in Volume IV ? Please provide instructions in Section L for submittal of the Small Business Subcontracting Plan required by RFP para H.10. | Public | Yes, Offerors other than Small Business are required to submit a Small Business Subcontracting Plan IAW Far 52.219.9 as part of the proposal. RFP amended to move proposal submission language from RFP H.10 to paragraph L.6.6. | |
| 28 | Proposal Format | RFP L.3.6 | RFP States "All Proposal volumes should include Cover sheet, table of contents, List of Figures and Tables and Glossary of Abbreviations" Question: Are the List of figures and the Glossary of Abbreviations included in the page limits for any volume? | Public | RFP amended paragraph L.3.4 to add exclusions of L.3.6.2.- List of Tables and Figures and L.3.6.3. - Glossary of Abbreviations and Acronyms for each volume. | |
| 29 | Attachment 0002- 0010 | Attachment 0002 – 0010 Tech Exhibit F Tab CDRLS, line 47 | Line 47 of this tab in each Attachment (0002-0010) requires submission of an "Emergency Response Plan" Task Order PWS, 09.00.04. Safety, Health, and Emergency Response Plans to be submitted with the proposal. Question: Is this emergency response plan supposed to be submitted with the offerors proposal? If so in which Volume is it to be submitted and is there a page limit for the plan? Do offerors have to submit a separate Emergency Response Plan for each of the 9 Task Orders identified in Attachments 0002 -0010? Please clarify this requirement. | Public | RFP Tech Exhibit F.1 tab updated to require plan within 60 days of award. | |
| 30 | Conus Replacement Center | Attachment 0001 PWS 02.02.06 page 22 | Will the Contractor be required to use the CRC to deploy new employees to the theater on all Task Orders? Specifically KBOS which currently does not have this requirement? | Public | Pre-deployment processing is theater/site specific, currently the only sites requiring pre-deployment processing are Iraq and Afghanistan. Specific to PWS 02.02.06, is the requirement for the contractor to operate an N-m IRDO in support of the contractor's personnel. | |
| 31 | Holiday Schedules | RFP Documents | Is the USG going to direct the Contractor to use the US Holiday schedule or the Host Country Holiday schedule? If it is the former, then there may be a cost impact in being compliance with the Host Nation Laws. Please advise. | Public | The USG is not directing the use of any holiday schedule. Offerors shall comply with Host Nation laws, unless specified in any alternative agreements, e.g. SOFA. | |
| 32 | FFP Pricing | FFP Template Attachment 0017 | The titles in rows 15, 22, 29, 36, 43, 50 , 57 , 64 and 71 of the each COCOM tabs appear to be incorrect. Should these rows be changed from Base to OY1, OY2,…OY9 in each FFP Template Tab in each of the COCOMs? Please advise and correct Attachment 0017 if required. | Public | These rows should be referring to OY1, OY2, and so on to OY9. Attachment 0017 will be revised. | |
| 33 | Small Business Subcontracting Plan | RFP H.10 Small Business Subcontracting Plan | Should offerors provide a separate SB Subcontracting Plan for NORTHCOM (since it has different goals than the other COCOM's) and a separate SB Subcontracting Plan for the other 5 COCOMs ? Or should offerors provide one subcontracting plan to comprehensively cover all the GCCs? Please clarify. | Public | Offeror shall submit one subcontracting plan to encompass all GCCs/ASCCs. Per L.6.6 (revised) must correlate with percentages of small business utilization identified in contractors small business participation plan (RFP Section L.9.). | |
| 34 | Pricing | RFP Attachment 0031- CLIN Structure | Request the Government advise what CLIN should be used for the Transition Plug? | Public | The Offeror should allocate the transition plug numbers across all performance CLINs applicable to each task order. Attachment 0031 is updated to include notes. | |
| 35 | Pricing | RFP Attachment 0031 & Attch. 0015-Section 2.a)(2)(a)(ii): For the purpose of proposing and estimating fee, the offeror shall assume the entire plug number is fee bearing. | Since there is no column for Fee under Transition period in Attch.#0031, we request the Government confirm that the plug number is still fee bearing according to Attch. 15-Section 2.a)(2)(a)(ii)? | Public | Attachment 0031 will be updated to include an additional transition column to account for fee. | |
| 36 | H Clauses | I-65- 52.222-62 - PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 | Question: Since Executive Order 13673 was revoked by President Trump, and therefore was not implemented would the USG consider removing this clause? | Public | Clause related to Executive Order 13673 is not included in RFP. Executive Order 13706 has not been revoked, clause 52.222-62 will remain in RFP. | |
| 37 | Past Performance Cover page limits | RFP - L.8.1, Past Performance Page limits Page Limits for each reference: | ||||
| Cover Company Name, CAGE, and Duns 1 page per reference | The page limits state that the Cover should include company name, CAGE and DUNS and is limited to “1 page per reference.” Can the Government clarify what they require? Does each contract reference need a separate cover page? | Public | Yes, each submitted reference requires its own cover page. Cover page will be the first page preceding the individual reference. Cover page shall include: Company Name, CAGE Code and DUNS number. | |||
| 38 | H Clauses | RFP Section I-49 52.222-16 APPROVAL OF WAGE RATES | Question: The FAR clause references Construction Wage Rate Requirements minimum wage rate determination included in the contract; For NORTHCOM (Ft Irwin) please provide any applicable (SCA) wage determinations that covers work, previous contracts or labor categories other than what is provided in Attachments 34 and 35? | Public | This specific clause is for cost reimbursement construction contracts. No construction requirements are included for current task orders and is therefore not applicable at this time. |
The wage determination for San Bernardino California is provided as Attachment 0040.
| 39 | RFP Attachment 0037 | RFP Attachment 37 - US RMI Compact of Free Association- Sub Agreements | In Attachment 37, US-RMI Compact of Free Association sub agreements, Appendix VI, Article VIII “Joint Labor Relations Board and Employment of Labor”, Paragraph 3. It states “In the employment of local hire personnel, the Armed Forces of the United States and United States contractors shall provide equal pay for equal work. In carrying out this provision, due consideration shall be given to relevant recommendations of the Joint Labor Relations Board” – Question: Will the USG provides copies of the recommendations of this Board, so that we can comply with this requirement? | Public | There are currently no recommendations to provide. |
| 40 | RFP Attachment 0037 | RFP Attachment 37- US RMI Compact of Free Association- Sub Agreements | In Attachment 37, US-RMI Compact of Free Association sub agreements, Appendix VI, Article VIII “Joint Labor Relations Board and Employment of Labor”, Paragraph 4. It states “The wages of local hire personnel who were in the employment of the Armed Forces of the United States contractors on October 21, 1986, shall not be reduced by reason of the cessation of the applicability of the United States law in the Republic of the Marshall Islands as of October 21, 1986.” – Question: Will the USG provide a list of those employees currently on the active contract who were in the employment on or prior to this date, so that we can comply with this requirement? | Public | No, the USG will not provide a list of names. |
| 41 | RFP |
Att 0010 Att 0004 Att 0005 Att 0003 H-1 / p15 and
Att 0010, Tech Exhibit C.4 Att 0004, Tech Exhibit C.4 Att 0005, Tech Exhibit C.4 Att 0003, Tech Exhibit C.4 The footnotes under the Government Furnished Contractor Support Summary (page 15 of the RFP) explain how to interpret the check marks that are contained in the summaries provided for each GCC/ASCC. Specifically, Note **** states "Check the DFAC AND Government Furnished Meals boxes if the contractor will have access to the DFAC at no cost. Government Furnished Meals (GFM) is defined as meals at no cost to the contractor (e.g, MREs, or meals at the DFAC). If GFM is checked, DFAC must also be checked."
The following sites have both GFM and DFAC boxes checked, thus indicating that the Government will furnish meals at no cost to the Contractor. But the Remarks Sections under these Technical Exhibits appear to conflict with the checked boxes.
-Tech Exhibit C.4, Remarks for Afghanistan : "Contractor is required to pay the standard meal rate for all DFAC provided meals in Afghanistan."
-Tech Exhibit C.4, Remarks for Iraq: "Contractor personnel have access to Dining Facilities. Contractor personnel may pay the Standard Meal Rate at the Dining Facilities."
-Tech Exhibit C.4, Remarks for EUCOM: "Contractor is required to pay the standard meal rate for all DFAC provided meals in EUCOM."
-Tech Exhibit C.4, Remarks for APN002: "Messing Facilities - Government furnished and contractor paid meals."
| Please indicate which direction takes precedence; the checkmarks on the Tech Exhibit or the Remarks Section. | Public | Technical Exhibit C.4 has been updated to remove Government Furnished Meals where the contractor is required to pay for meals. | ||||
| 42 | Essential Contractor Services | L-22, page 93 | The section states that, "The Offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in PWS technical exhibit J, Mission Essential Contractor Services, during periods of crisis." Where does the government want Offerors to include the plan? In Volume 1? | Public | Yes, include in Volume I. | |
| 43 | EVMS | L-27, page 94 | The RFP has provisions for providing EVMS documentation for proposals in the amount of $100,000,000 or more. Where should Offerors include the information? In Volume 1? | Public | Reference Section A, paragraph 17. Please also reference Attachment 0038 - LOGCAP V Clause matrix. EVMS is not applicable to the task order requirements being competed. | |
| 44 | RFP L.8.1, page 102 of 120 | L.8. VOLUME III - PAST PERFORMANCE, Section L.8.1. provides page limits for reference projects. The first line of the page limits requires that a cover be provided for each reference. |
Cover Company Name, CAGE, and Duns 1 page per reference Section 1 - Project Descriptions 2 pages per reference Section 2 - Performance Narratives 3 pages per reference Section 3 - Contract Performance Questionnaires 1 Questionnaire per Reference (w/ Parts Ia. & Ib. completed) Section 4 - Adverse Contract Performance No page limitation Section 5 - Subcontractor Consent Letter 1 page per reference
But the outline for Volume III appears to require that Section 1 include a project description for each project, Section 2 include a performance narrative for each project, and Section 3 include a contract performance questionnaire for each project. Are covers to be included in Section 1, in Section 2, in Section 3, or in all three sections?
| Alternatively, the Government could eliminate the requirement for project covers, since the information to be included on each cover is already included on the first page of the Section 1 project descriptions. | Public | Each submitted reference requires its own cover page. Cover page will be the first page preceding the individual reference. Cover page shall include: Company Name, CAGE Code and DUNS number. | ||||
| 45 | PWS Para 07.01.04 | |||||
| Page 97 of 120 | The PWS description for Personnel Transport seems to focus on routine port to port transport "provide in-theater point-to-point personnel movements via motor transport, watercraft operations, rail and rotary air". However the Standard for Personnel Transport seems to be an emergency Medevac requirement "prepare patients in critical status for medical evacuation, coordinate transport of critically ill transport". Additionally PWS 04.12.03 Ambulance Services provides the requirement for ground and air ambulance services "the contractor shall provide medical evacuation via ground and air." Are we correct that Personnel Transport should be routine point to point service as in the description of the PWS and ignore the STD and AQL? | Public | PWS has been updated. This AQL has been moved to PWS 04.12.03 Ambulance Services. | |||
| 46 | All Attachments | There are 172 PWS workload lines that are Activated but which do not have a workload assigned. Is the government planning to provide workload for the 172 lines activated lines with no workload assigned? (See Attachment 1 to these questions) | Public | Yes, Attachments 0002-0010 have been revised. | ||
| 47 | All Attachments | There are 66 PWS workload lines that are not activated but which do have a workload assigned. Is the Government planning to activate these workload lines or should we disregard the workload numbers on the non-activated lines? (See Attachment 2 to these questions). | Public | Yes, Attachments 0002-0010 have been revised. | ||
| 48 | Attachment 0003 | All workload for site APN002 is duplicated in every activated PWS. Should Offerors bid this as a single site and delete duplicate entries? | Public | Attachment 0003 is revised | ||
| 49 | Attachment 0004 | Site OIR003 states we will pick up 157,000 lbs of mail per month using only one postal run per month. There appears to be a typographical error in either the total pounds of mail per month or the number of postal runs per month. | Public | Attachment 0004 is revised | ||
| 50 | Attachment 0005 | There appears to be a typographical error in the EUCOM recycle quantities. All sites list 58,000 tons of waste to be recycled per month. The recycle quantities far exceed the total waste quantities for each of the sites. Please provide a quantity to be used for monthly recycle to be accomplished at each of these sites. | Public | Attachment 0005 is revised | ||
| 51 | Attachment 0010 | Sites AFG001 and AFG002 list 2,000 tons of recycled waste per month. But none of the sites have a recycle center. Should we assume that a recycle center will be available and estimate operation of the recycle center for 2,000 tons of waste per month? | Public | Attachment 0002 is revised | ||
| 52 | Attachment 0011 | Attachment_0011_-_Workload_Data_Report_Template is not referenced within the RFP or PWS. What is the Government's intent with this attachment? | Public | Attachment 0011 is a reporting format to be used in post award execution. Technical exhibit F.1 of requirement workbooks (attachment 0002-0010) will be updated. | ||
| 53 | Attachment 0016 | On the "Grand Total Price Summary" of Attachment_0016_-_Cost_Reimbursable_Pricing_Proposal_Format_2017-11-20_Final, there is no row for Subcontracts. Does the Government intend for the contractor to propose Subcontracted Labor under the Direct Labor tab and Subcontracted ODCs under the ODC tab? | Public | Yes. Reference Attachment 0015, paragraph 2.d.(2). | ||
| 54 | Labor Details Q5 | Attachment 0016 | Is "Overtime Cost" related to a premium associated with overtime or is it a combination of hours worked in excess of regular time and an associated premium? | Public | Overtime Cost as used in the "Labor Adders" column should be the overtime premium itself. The column title and notes will be revised. | |
| 55 | Set Theater FFP | Attachment 17 LOGCAP V Firm Fixed Priced Pricing Template | Attachment 17 titled LOGCAP V Firm Fixed Priced Pricing Template requires the "offeror to insert its total proposed firm fixed price for each task order period of performance and PWS within the appropriate cell in column C. Note that these prices are the TOTAL firm fixed prices for their respective period of performance and PWS. They are not unit prices." |
The cells in Column C are protected and do not allow insertion of information. In addition, the instructions do not indicate what information is required to be insert in Columns B and D. Finally, the spreadsheet requires information for "Setting the Theater - Base Year" for nine (9) base years. Since there should be only one base year, what are the annual periods of performance for which we should include pricing? Public Attachment 0017 will be revised to correct column references in the instructions, and correct performance period designations so that pricing is required for the base year through option year 9.
The following table shows the original column reference in Attachment 0017's instructions, and the correct reference:
As used in Correct instructions reference C B E D F E
| 56 | Attachment 0024 | Attachment 24 is missing from the RFP issued on 20 November. Does the Government plan to issue this attachment in the future? | Public | Yes, Attachment 0024 has been added. | |
| 57 | Proposal Instructions Delivery of Offers | RFP Section L.5 |
SF 33 Solicitation block 9 Paragraph L.5 states:
PROPOSAL SUBMITTAL. All proposals and related information shall be submitted in the format identified above by the due date and time found on page one of the SF33. Printed copies must be sent to the Army at the following address:
Army Contracting Command Rock Island ATTN: Brian Knutson 3055 Rodman Avenue Rock Island Arsenal, IL 61299-8000
The RFP is silent on hand delivery instructions (i.e., Section L does not offer amplifying information on the lack of SF 33 block 9 information).
Please
1. Confirm the Government will allow hand delivery of offerors, and
2. Provide hand delivery instructions for delivery
| Public | Hand delivery language is added to paragraph L.5. | |
| 58 | Proposal Instructions | |
| Page Counts | RFP Section L.7.1.(1). b. (page 99 of 115) | Because this is the first section within the DTMA, contractors may need to present some overarching introductory capabilities and technics which apply across multiple COCOMs. |
Request the Government revise the page limitation as follows:
From:
Regional Planning and Performance Capabilities Format: Microsoft Word Page Limit: Ten (10) pages per GCC/ASCC
To:
Regional Planning and Performance Capabilities Format: Microsoft Word Page Limit: Total of 65 pages, including introductory remarks if needed, and no more than ten (10) pages per any single GCC/ASCC
| Public | The RFP will be updated to allow for fifteen (15) pages per GCC/ASCC. The Offerors respective approach for each GCC/ASCC shall be contained within the page count limitations of 15 per GCC/ASCC. | |
| 59 | Proposal Instructions | |
| Third Party Agreements | RFP Section A.14. (page 3 of 115) | At Section A, paragraph 14, the RFP states, "All offerors will be required to enter into agreements with PSC permitting necessary access and establishing proper protections (see FAR 9.505-4(b))." |
Please provide the name, position title and email of the point of contact for Productivity Solutions Corporation (PSC) so coordination of the agreements can be made.
| Public | PSC POC information added to Section A. Paragraph L6.7 added for offeror to provide copy of its corporate NDA agreement. | |
| 60 | Augmentation Table | Attachment_0003_-_AP_Other_Tech_Exhibit.xlsx, Data Pkg for A.1 and H.2 |
Tech Exhibit K for WBS Ref. 04.06 Food Service at site APN001 04.06 Food Service is not indicated as an activated service in the Data Pkg for A.1 and H.2 tab. Technical Exhibit K indicates a requirement to provide staff to augment 04.06 Food Service.
Will the USG active this service?
| Public | Attachment 0003 is revised. 04.06 Food Service is activated for augmentation mission only. | |
| 61 | Augmentation Table | Attachment 003_AP Other, Technical Exhibit K, Augmentation |
PWS 02.02.01 Program Management Office Augmentation table assigns FTE to WBS 02.02.01, Program Management Office. The intent of WBS 02.02.01, as implied in the PWS, is to cover contractor requirements in support of the project, e.g. quality, safety, visa, etc. The explanation for this PWS does not appear to include services that support military offices (PAO) and soldier requirements (drug testing).
Request the Government clarify the intent of 02.02.01 Program Management office.
Recommend the Tasks in Technical Exhibit K be assigned to the appropriate WBS in SECTION IV – Base Operations Services Support
| Public | Technical Exhibit K has been revised to align with the appropriate WBS. | ||
| 62 | Contractor Support to Event Start | Attachment 0002, Kuwait | Attachment activates WBS 02.02.02 Contractor Support to Event Start for Kuwait. The activities required in this WBS are normal transition activities. The Government is providing a plug number for transition. |
Recommend the Government remove WBS 02.02.02 activation from Kuwait
| Public | Attachment 0002 is revised | |
| 63 | Electrical Standards | RFP, Section C |
¶C-5 ECC-A Clause 5152.236-5900, Electrical and Structural Building Standards for Construction Projects;
Section H ¶H-2 ECC-A Clause 5152.225-5910, Contractor Health and Safety;
Section I
¶I-256, DFARS 252.246-7004,
Safety of Facilities, Infrastructure, and Equipment for Military Operations The intention of these paragraphs appears to be an attempt to accommodate requirements of a specific GCC/ASCC resulting in conflicting and inconsistent standards for electrical work.
Will the government standardize solicitation requirements (wording, references) for electrical performance?
Who is the Government "qualified engineer" noted in paragraph C-5?
Typical COCOM procedures delegate authority to determine standards related to codes and regulations to an individual identified as the "Authority Having Jurisdiction (AHJ); please advise what the Government's direction is for involving the AHJ.
Public
1. Clauses are theater mandated, 5152.236-5900 and 5152.225-5910 apply only to Afghanistan. 252.246-7004 applies to all requirements. Through the PWS the USG has standardized to the maximum extent practical.
2. The qualified engineer is the authority having jurisdiction (AHJ).
3. The AHJ has been added to paragraph 03.02 Engineering
| 64 | Electrical Standards | RFP Section C | |
| ¶C-5 5152.236-5900, Electrical and Structural Building Standards for Construction Projects | The wording in C-5 closely mirrors the contract requirements of earlier LOGCAP task orders, which proved to be too broad, too prone to misunderstanding, and resulted in controversy and confrontation between affected parties (users, contractors, ACOs, QARs, etc.). An example is of controversial/confusing language is subparagraph (d), "These standards must be met when it is reasonable to do so with available materials. When conditions dictate deviation apply British Standard (BS 7671, Edition 17 defacto standard for 50 HZ installations). Any deviations from the above necessary to reflect market conditions, shall receive prior written approval from a qualified engineer and the Contracting Officer." results in different interpretations on what the standard is and who has the authority to approve deviations. |
Elsewhere the PWS notes the authority to resolve conflicting requirements rests with the "Authority Having Jurisdiction."
Recommend the Government:
(1) provide more clarity to the standard and
(2) identify GCC/ASCC Authorities Having Jurisdiction, and areas of responsibility for each Authority Having Jurisdiction if there are multiple authorities.
Public (1) There is no additional clarity to provide for the clause. Please reference PWS paragraphs for additional clarity regarding standards.
(2) Authorities having Jurisdiction will be provided post award.
65 Facility Clearance Requirements RFP Section A, paragraph 16, DD Form 254 Contract Security Classification Specification Attachment 0001 LOGCAP V PWS, paragraph 2.01 The standard for PWS paragraph 2.01 states "The contractor senior planner shall … possess a top secret clearance …", which implies the contractor's facility (facilities) will have a top secret clearance and safeguarding requirement (DD Form 254, block 1).
Please confirm the Government will provide contractors SIPR services (access and accounts), authorization for classified communication equipment, and authorization to use the Defense Courier Service.
| Public | The contactor will have access to SIPR systems at the ASCC headquarters and as necessary authorization to use DCS. | ||
| 66 | GCC/ASCC Unique Paragraphs in the RFP | RFP Various Paragraphs: Examples C-6, H-3, H-4, I-250, I-253, I-254 | A number of solicitation paragraphs are specific to a single GCC/ASCC. In some cases these are clearly identified in the title, in other cases wording in the body of the clause would indicate that it was specific to a GCC/ASCC. During the draft RFP period the Government indicated a matrix would be provided identifying clauses applicable to each GCCs/ASCCs. |
Please confirm when the Government will provide matrix (or listing) identifying clauses that are applicable to a specific GCC/ASCC, rather than all GCCs/ASCCs.
| Public | The USG will provide a clause matrix. | |
| 67 | Government Furnished Services (GFS) | RFP Section H, ¶H-1 |
Technical Exhibit C.4 for Attachments 0002 thru 0010 "APO/FPO/POSTAL SERVICES" is identified as authorized support in Attachments 0002 (Kuwait), 0003 (AP), 0005 (EUCOM), 0006 (Kwajalein), 0008 (AFRICOM), and 0010 (Afghanistan).
APO/FPO/POSTAL SERVICES is not identified as authorized support in Attachment 0004 (Iraq), Attachment 0007 (NTC), or Attachment 0009 (Soto Cano): given US Postal Service is available at NTC the lack of this GFS in Attachment 0007 is understandable.
However, given the solicitation requirements for US Citizens the lack of access to the USPS (via the APO/FPO system) appears to disenfranchise certain rights these individuals possess (e.g., voting, pharmaceuticals, etc.). Please confirm the lack of GFS postal services for CAAF personnel in Iraq and at Soto Cano is not an oversight or typographical error.
| Public | Technical Exhibit C.4 is revised | ||
| 68 | Life, Health, Safety | PWS 03.02.11.01 Technical Inspections | Prior to accepting facilities for LOGCAP O&M, the contractor shall conduct a technical inspection to identify all needed repair work broken into the following categories: Life-threatening violations, safety-threatening violations, and health-threatening violations of the referenced construction, fire safety, and occupational safety and health codes. Restore to operational functionality for its intended purpose. Other repairs required to comply with standards not previously identified. STD: Contractor shall perform technical inspections IAW the applicable UFC IAW paragraph 03.02 AQL 100%. |
Recommend instead of references to the UFC we use the TF SAFE definition of LHS:
“... an immediate LHS issue is a condition or conditions that are not within standards, codes, regulations and requirements referenced in the Statement of Work, as they apply to the Area of Operations, that could cause or are likely to cause illness, injury or loss of life, limb or eyesight if not corrected immediately."
| Public | UFC standards supercede TF SAFE; the PWS will not be amended. | |
| 69 | LOGCAP Program Specific Reports | Technical Exhibit F for Attachments 0002 thru 0010 |
| Attachments 0025 thru 0030 | In order to ensure offeror business systems are able to support the Government's reporting requirements (e.g., cost baseline report, cost variance report, etc.) please provide copies of the Microsoft Office LOGCAP Program Specific Reports where offerors are required to use US Government formats. | ||
| Public | USG formats for program level reports are provided in Technical Exhibit F.2 Attachment . Localized reporting formats will be provided during transition. | ||
| 70 | Mission Essential Contractor Services Plan | RFP, Section I-264 DFARS 252.237-7023 Continuation of Essential Contractor Services | |
| RFP Section L-22 DFARS 252.237-7023 Continuation of Essential Contractor Services | Section L-22 states that "(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in PWS technical exhibit J, Mission Essential Contractor Services..." |
We recommend the mission essential contractor services plan be required after award.
If the plan is required before award:
a. Confirm that the Mission Essential Contractor Services Plan is required to be submitted with the proposal.
b. Clarify in which volume should the Mission Essential Contractor Services Plan is to be included.
c. Clarify is a single plan is required, or if a plan is required for each GCC/ASCC?
Public a. Yes, it is required to be submitted with the proposal.
b. Volume I
c. One overarching plan 71 Operational Support Office (OSO) Attachments 0005 and 0007 Task Order Technical Exhibits, WBS 02.02.03 Attachments do not activate WBS 02.02.03 Operational Support Office for EUCOM and NORTHCOM. The PWS states: "The contractor shall activate an Operational Support Office, an operation based management structure, when OPTEMPO, operational size, or span of control does not permit adequate support from the PMO." It appears this WBS is required for each GCC given the RFP acquisition strategy to add/reduce activities in each GCC.
Please confirm the Government will activate WBS 02.02.03 for EUCOM and NORTHCOM.
| Public | WBS 02.02.03 is now activated in support of Attachment 0005 EUCOM requirements, see revised Attachment 0005. WBS 02.02.03 is not activated in support of Attachment 0007 NTC requirements. |
| 72 | Plug Numbers for Firm Fixed Price |
Section B Supplies or Services and Prices/Costs Setting the Theater requirements are Firm Fixed Price. The Government is providing equipment and material plug numbers.
(1) Do the material, equipment and transition plug numbers contained in Attachment 0015, Cost Price Proposal Requirements only apply to the cost plus CLINS?
(2) If not, how will the plug number capture the fixed price cost for the Setting the Theater CLINS?
| Public | Plug numbers contained in Attachment 0015 only apply to cost plus CLINs. | ||
| 73 | Regional Capability Matrix | Attachment 21 - Regional Capability Matrix | Attachment 21 PWS descriptions do not mirror those in the PWS provided by the USG. For example 3.02.11.01 on the matrix is labeled Repair of Facilities, however the PWS description lists Technical Inspections. There are a number of duplicate listings and many missing PWS listings. |
Will the USG provide an updated matrix which lists all the current PWS listings?
| Public | Attachment 0021 updated |
| 74 | Setting and Surging the Theater |
PWS 02.01.02 Develop Concept of Support; PWS 02.01.04 Project Planning/ Estimates; Technical Exhibit H.1 Performance Requirements Summary; and Technical Exhibits 0025 - 0030 PWS 02.01.02 and Technical Exhibit H.1 for PWS 02.01.02 require preparation of a rough order of magnitude estimate for each concept of support. PWS 02.01.02 is activated but the workload in Technical Exhibits 0025 - 0030 is silent on the standard for preparation of a rough order of magnitude.
PWS 02.01.04 is not activated in Technical Exhibits 0025 -0030.
Request clarification for proposal purposes on the requirement to provide staffing for a rough order of magnitude estimate.
| Public | See revised PWS. The rough order of magnitude estimates supporting concepts of support under PWS 02.01.02 are intended to be high level and are not associated to the estimates provided under PWS 02.01.04, which are focused on emerging requirements. |
| 75 | Standard Operating Procedures |
PWS 09.01 Standard Operating Procedures PWS states, "SOPs will become the property of the USG after they are submitted for government review at the PMR."
We believe there are sufficient safeguards in the procurement process that providing contractor SOP to the Government for review and quality assessments. However, we do not believe there are sufficient safeguards, knowledge of US Laws (including penalties), or understanding by non procurement personnel of Government responsibilities to safeguard the information contained in contractor SOP.
SOP are contractor proprietary documents providing means and methods protected by the Trades on how the contractor organizes, operates and procedures and processes. Providing the Government "rights in data" ownership of such data is contra to existing US Government practices in general and LOGCAP prior courses of action. Given the Government's, and LOGCAP's, history of data spills involving protected information this requirement to transfer ownership raises significant concerns; specific concerns include;
(A) the loss legitimate competitive advantages,
(B) compensation from the USG in the event this data is released, and
(C) the draconian personnel actions mandated by US Law (i.e., the Trades Secrets Act) for USG personnel should this data be spilled (released).
We strongly recommend, and urgently request, removal of the PWS statement(s) pertaining to SOP data becoming USG property.
| Public | Paragraph 09.01 has been revised to remove SOPs becoming USG property. |
| 76 | Workload Descriptions and Workload Data |
Attachments 0002 - 0010 Task Order Technical Exhibits PWS 04.03.02 Produce Bulk Potable Water and Technical Exhibits Workload descriptions are incomplete and differ for the same service, are not internally consistent, and vary so widely as to appear to be unrealistic. The Attachment 0004 workload for PWS 04.03.02 illustrates these observations:
1) Incomplete/differing workload descriptions:
site OIR001 wrkld driver "Gallons Per Person Per Day" site OIR002 wrkld driver "Gallons Produced Per Day" site OIR003 wrkld driver "Avg Gallons Produced Per Day" site OIR005 wrkld driver "Required Gallons Produced Per Day"
2) Unrealistic description:
site OIR001 wrkld driver is "22" site OIR002 wrkld driver is "14.8" (~2/3rd of sites OIR001, OIR 003?)
site OIR003 wrkld driver is "22" site OIR005 wrkld driver is "8" (~1/3rd of sites OIR001, OIR 003?)
Inferring the Government's intention is "gallons per person per day" using a 30-day month to check this assumption against the average monthly production workload driver results in quanties that do not match ; reversing this process results in numbers that do not match the stated population workload driver.
Please confirm the provided workload drivers are correct, or provide new workload drivers.
| Public | See revised Attachments 0002-0010 |
| 77 | Workload Descriptions and Workload Data |
04.17.02 Agricultural Cleaning and Task Order Technical Exhibits A work load factor is "Number of Pieces by Type per Wash Point per Month." The size of the item determines the time required to meet agricultural standards e.g. a HUMVEE versus a RTCH.
Request workload be revised to include a range of types of equipment similar to the workload for PWS 04.02.02 Power/Electricity.