Attachment_0009_-_Soto_Cano_Tech_Exhibit_-_Rev3.xlsx
XLSX spreadsheet 899 KB Posted
- Attached to
- Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0001
About this file
This award notice announces the upcoming release of a Request for Proposal for the Logistics Civil Augmentation Program V (LOGCAP V) logistical support services contract. The U.S. Army Contracting Command-Rock Island intends to issue the RFP on or about November 6, 2017. LOGCAP V will provide global logistical support services to the U.S. Military worldwide in alignment with the Geographical Combatant Commands. Services will include setting the theater, supply operations, transportation, engineering, base camp services, and other logistics and sustainment support across all phases of operations. The Army plans to award a minimum of four and up to six Indefinite Delivery, Indefinite Quantity contracts for an initial five-year period plus options, with an estimated maximum value of $82 billion over ten years. A "Setting the Theater" task order will be awarded for each command concurrently with the basic contracts.
Soto Cano Tech Exhibit
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data Pkg for A.1 and H.2
| UNCLASSIFIED | Site Code Key will be provided to offerors off line via email. | |||||||||||||
| Soto Cano | ||||||||||||||
| GCC | Country | Task Order | Site Name | Site Code | CLIN | WBS Ref. | Service | Workload / H.2 | Activated | Workload Driver | Workload Descriptor | Workload Data Input | H.2 Data Input | |
| 02.00 | Management and Planning | A.1 | ||||||||||||
| 02.01 | Setting and Surging the Theater (Phases 0-II) | A.1 | ||||||||||||
| 02.01.01 | Theater Analysis | A.1 | ||||||||||||
| 02.01.02 | Develop Concept of Support | A.1 | ||||||||||||
| 02.01.03 | Exercise Support | A.1 | ||||||||||||
| 02.01.03 | Exercise Support | Workload | ||||||||||||
| 02.01.04 | Project Planning/Estimates (Phase 0) | A.1 | ||||||||||||
| 02.02 | Management Support - Post Activation Planning | A.1 | ||||||||||||
| 0009AA | 02.02.01 | Program Management Office | A.1 | X | ||||||||||
| 02.02.01.01 | Project Planning | A.1 | ||||||||||||
| 0009AA | 02.02.01.02 | Procurement and Supply Management | A.1 | X | ||||||||||
| 02.02.02 | Contractor Support to Event Start | A.1 | ||||||||||||
| SOUTHCOM | HND001 | 0009AA | 02.02.03 | Operational Support Office (OSO) | A.1 | X | ||||||||
| 0009AA | 02.02.04 | Air Operations in Support of Contractors | A.1 | X | ||||||||||
| 0009AA | 02.02.05 | Contractor Health Service Support | A.1 | X | ||||||||||
| 02.02.06 | Non-military Individual Replacement Deployment Operations (N-m IRDOs) | A.1 | ||||||||||||
| 03.00 | Engineering Services | A.1 | ||||||||||||
| 03.01 | Planning for Engineering Support | A.1 | ||||||||||||
| 03.01.01 | Power Generation and Distribution Planning | A.1 | ||||||||||||
| 03.01.02 | Operational Energy (OE) Initiatives | A.1 | ||||||||||||
| 03.01.03 | Water Support Planning | A.1 | ||||||||||||
| 03.02 | Engineering | A.1 | ||||||||||||
| 03.02.01 | Force Provider | |||||||||||||
| 03.02.02 | Base Expeditionary Airfield Resources (BEAR) | |||||||||||||
| 03.02.03 | Utilities | |||||||||||||
| 03.02.03.01 | Power Generation Equipment Engineering | |||||||||||||
| 03.02.03.02 | Water Production Engineering | |||||||||||||
| 03.02.03.03 | Water Purification Engineering | |||||||||||||
| 03.02.03.04 | Water Storage Engineering | |||||||||||||
| 03.02.03.05 | Water Distribution System Engineering | |||||||||||||
| 03.02.03.06 | Plumbing Engineering | |||||||||||||
| 03.02.04 | Human Waste Management | |||||||||||||
| 03.02.04.01 | Latrines Engineering | |||||||||||||
| 03.02.04.02 | Sewage and Sanitation System Engineering | |||||||||||||
| 03.02.05 | Infrastructure | |||||||||||||
| 03.02.05.01 | Retail Fuel Storage and Issue | |||||||||||||
| 03.02.05.02 | Bulk Fuel Storage | |||||||||||||
| 03.02.05.03 | Petroleum Distribution Systems | |||||||||||||
| 03.02.06 | Horizontal Construction | |||||||||||||
| 03.02.06.01 | Site Preparation | |||||||||||||
| 03.02.06.02 | Repair Roads, Railways, or Parking Lots | |||||||||||||
| 03.02.06.03 | Drainage Systems | |||||||||||||
| 03.02.06.04 | Runways, Taxiways, Parking Aprons, Helicopter Pads | |||||||||||||
| 03.02.06.05 | Airfield Operational Support Areas (Horizontal) | |||||||||||||
| 03.02.07 | Force Protection Engineering | |||||||||||||
| 03.02.07.01 | Ditches and Berms | |||||||||||||
| 03.02.07.02 | Barriers | |||||||||||||
| 03.02.07.03 | Protection, Security and Defense Structures | |||||||||||||
| 03.02.07.04 | Guard Force Facilities | |||||||||||||
| 03.02.08 | Vertical Construction | |||||||||||||
| 03.02.08.01 | Life Support Areas and Billeting | |||||||||||||
| 03.02.08.02 | Administrative Facilities | |||||||||||||
| 03.02.08.03 | Food Service Facilities | |||||||||||||
| 03.02.08.04 | Morale, Welfare, and Recreation (MWR) Facilities | |||||||||||||
| 03.02.08.05 | Training Support Facilities | |||||||||||||
| 03.02.08.06 | Fitness Facilities | |||||||||||||
| 03.02.08.07 | Nonhazardous Material Storage | |||||||||||||
| 03.02.08.08 | Hazardous Material Storage | |||||||||||||
| 03.02.08.09 | Hazardous Waste Storage | |||||||||||||
| 03.02.08.10 | Waste Management Facilities | |||||||||||||
| 03.02.08.11 | Motor Pool and Maintenance Facilities | |||||||||||||
| 03.02.08.12 | Emergency Services Facilities | |||||||||||||
| 03.02.08.13 | Aviation Support Facilities | |||||||||||||
| 03.02.08.14 | Navigation Aids, Airfield Systems, and Airfield Lighting | |||||||||||||
| 03.02.08.15 | Airfield Berms, Revetments | |||||||||||||
| 03.02.08.16 | Seaport Support Facilities | |||||||||||||
| 03.02.09 | Soldier Support Facilities | |||||||||||||
| 03.02.09.01 | Laundry Facilities | |||||||||||||
| 03.02.09.02 | Chapel Facilities | |||||||||||||
| 03.02.09.03 | Postal Facilities | |||||||||||||
| 03.02.09.04 | Shower Facilities | |||||||||||||
| 03.02.10 | Other Construction | |||||||||||||
| 03.02.11 | Minor Construction including, Facility Repair, Refurbishment, Repurposing, and Improvement to Existing Structures | |||||||||||||
| 03.02.11.01 | Technical Inspections | |||||||||||||
| 03.02.11.02 | Facility Repair | |||||||||||||
| 04.00 | Base Camp Services | A.1 | ||||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | A.1 | X | ||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Billeting Population | 1400 | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Number Bed/Bed Space | 1400 | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Number of Billeting Offices | 1 | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.01 | Shelter and Billeting | Workload | X | Avg billeting space issued per month | 30 | ||||
| 04.02 | Utility Operations | A.1 | ||||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | A.1 | X | ||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Split HVAC Units | 360 | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Package HVAC Units | 98 | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.01 | Environmental Control | Workload | X | Window Units | 636 | ||||
| 04.02.01 | Environmental Control | Workload | Swamp Chillers | |||||||||||
| 04.02.01 | Environmental Control | Workload | Unknown | |||||||||||
| 04.02.01 | Environmental Control | Workload | Heaters | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.02 | Power/Electricity | A.1 | X | ||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.02 | Power/Electricity | Workload | X | GEN 1 to 400 Kw | 43 | ||||
| 04.02.02 | Power/Electricity | Workload | GEN over 401 Kw | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.03 | Emergency Backup Power Generation | A.1 | X | ||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.02.03 | Emergency Backup Power Generation | Workload | X | GEN 1 to 400 Kw | 43 | ||||
| 04.02.03 | Emergency Backup Power Generation | Workload | GEN over 401 Kw | |||||||||||
| 04.03 | Water and Ice Service | A.1 | ||||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | A.1 | X | ||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | Workload | X | Population | Number of Personnel | 1400 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | H.2 | X | Days of Supply (Class I and II) | Days | 5 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | H.2 | X | Water Source | Source | Well | |||
| 04.03.01 | Source and Produce Bulk Water | Workload | Number of less than 1500 GPH Mobile ROWPU | Quantity EA | ||||||||||
| 04.03.01 | Source and Produce Bulk Water | Workload | Number of greater than or equal to 1500 GPH Mobile ROWPU | Quantity EA | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | Workload | X | Number of Water Treatment Facilities (Permanent or Semi-Permanent Facility) | Quantity EA | 1 | |||
| 04.03.01 | Source and Produce Bulk Water | H.2 | Production Capacity of Water Treatment Facility | Gallons per Day | ||||||||||
| 04.03.01 | Source and Produce Bulk Water | Workload | Class I (Potable Water) | Gallons Per Month | ||||||||||
| 04.03.01 | Source and Produce Bulk Water | H.2 | Type of Class I Potable Water Produced (ROWPU Treated Water, Bottled Water, Packaged Field Water) | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | Workload | X | Class II (disinfected fresh water) Gallons Produced | Gallons Per Month | 132086 | |||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | Workload | X | Class III (untreated fresh water) Water Sourced | Gallons Per Month | 264172 | |||
| 04.03.01 | Source and Produce Bulk Water | Workload | Class IV (brackish or seawater) Water Sourced | Gallons Per Month | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.03.01 | Source and Produce Bulk Water | H.2 | X | Water Distribution Point | Maintain Bulk (Potable and Non-Potable) and Bottled Water Distribution Points | One (1) Bulk Potable Water Distribution Point. |
| 04.03.02 | Currently Not Used | |||||||||||
| 04.03.03 | Currently Not Used | |||||||||||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | A.1 | X | |||||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | H.2 | X | Type of production facility or equipment and production capacity | ||||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | H.2 | X | Number of Ice Plants capable of producing less than or equal to 5 Tons per day | Quantity EA | 1 | ||
| 04.03.04 | Ice Services | H.2 | Number of Ice Plants capable of producing greater than 5 Tons per day up to 20 Tons per day | Quantity EA | ||||||||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | Workload | X | Potable Ice Produced (Monthly Average) | 8 Pound Bag (EA) | 1875 | ||
| 04.03.04 | Ice Services | Workload | Non-Potable Ice Produced (Monthly Average) | 8 Pound Bag (EA) | ||||||||
| 04.03.04 | Ice Services | Workload | Dry Ice (in 1/2" pellets or block) Produced (Monthly Average) | 10 Pound Bag or Block (EA) | ||||||||
| 04.03.04 | Ice Services | H.2 | Number of Retail Distribution Points (point of issue - ice to customers) | Quantity EA | ||||||||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | H.2 | X | Hours of Operation for Retail Distribution Point | Hours Per Day / Days per Week | Subsistence Supply Management Office | ||
| SOUTHCOM | HONDURAS | HND001 | 0009AA | 04.03.04 | Ice Services | Workload | X | Days of Supply in Storage | 1 DOS = 70 (8 LB) Bags | 2 | ||
| 04.04 | Laundry and Textile Services | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Laundry Operations | Fee based laundry services; with the exception of organizational items, OCIE and linens | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Number of 18 LB (approximate weight) Laundry Bags Turned In | Average Bags Per Month | 5600 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Linens Turned in per Month | Average Total Pounds | 3600 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Industrial Multi-Load Laundry Washer (55 LB or greater) | Quantity EA | 1 | GFP or CAP |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Commercial Laundry Washer Single Load (20 LB) | Quantity EA | 4 | GFP or CAP |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Industrial Multi-Load Dryer (55 LB or greater) | Quantity EA | 1 | GFP or CAP |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Commercial Dryer Single Load (20 LB) | Quantity EA | 4 | GFP or CAP |
| 04.04.01 | Full Service Laundry | H.2 | Hours of Operation for Laundry Facility (if dictated) | Hours Per Day / Days Per Week | ||||||||
| 04.04.01 | Full Service Laundry | H.2 | Turnaround Time (hrs.) for Full Service Laundry | Hours | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | Workload | X | Number of Drop-off/Pick-up Points | Quantity EA | 2 | One is in the containment area for individuals, the other is in the laundry plant for organizations. |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Hours of Operation for Drop Off/Pick-up Points | Hours Per Day | 10 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Offer a Bundle service | Items per bag | Limited to 20 items per bag | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround Time (One-Day Service) | Hours | 8 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround Time (Two-Day Service) | Work days | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.01 | Full Service Laundry | H.2 | X | Turnaround Time (Three-Day Piece Service) | Work days | 3 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | Workload | X | Number of 18 LB (approximate weight) Laundry Bags Turned In | Average Bags Per Month | 4800 | |
| 04.04.02 | Medical Service Laundry | H.2 | Industrial Multi-Load Laundry Washer (55 LB or greater) | Quantity EA | GFP or CAP |
Machines identified in this WBS (04.04.02) are for Medical Laundry only. If no machines are identified in this WBS, there is co-utilization of machines for Full Service (04.04.01) and Medical laundry.
04.04.02 Medical Service Laundry H.2 Commercial Laundry Washer Single Load (20 LB) Quantity EA GFP or CAP
Machines identified in this WBS (04.04.02) are for Medical Laundry only. If no machines are identified in this WBS, there is co-utilization of machines for Full Service (04.04.01) and Medical laundry.
04.04.02 Medical Service Laundry H.2 Industrial Multi-Load Dryer (55 LB or greater) Quantity EA GFP or CAP
Machines identified in this WBS (04.04.02) are for Medical Laundry only. If no machines are identified in this WBS, there is co-utilization of machines for Full Service (04.04.01) and Medical laundry.
04.04.02 Medical Service Laundry H.2 Commercial Dryer Single Load (20 LB) Quantity EA GFP or CAP
Machines identified in this WBS (04.04.02) are for Medical Laundry only. If no machines are identified in this WBS, there is co-utilization of machines for Full Service (04.04.01) and Medical laundry.
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | H.2 | X | Turnaround Time (hrs.) for Full Service Laundry | Hours | 24 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | Workload | X | Number of Drop-off/Pick-up Points | Quantity EA | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.02 | Medical Service Laundry | H.2 | X | Hours of Operation for Drop Off/Pick-up Points | Hours Per Day / Days Per Week | 10 Hours a Day / 7 Days a week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Number of Facilities | 11 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Wash Machines | 157 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.03 | Self-Service Laundry | Workload | X | Dryers | 186 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.04 | Textile Repair | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.04.04 | Textile Repair | Workload | X | Avg Pieces per month | Per month | 200 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | DFAC Quantity | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | DFAC Sq. Ft. | 16,299 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | DFAC Frequency of Cleanings | Cleanings Per Day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Office Quantity | 118 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Office Sq. Ft. | 245335 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | Cleanings Per Day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Latrine Quantity | 29 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Latrine Sq. Ft. | 19162 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | Cleanings Per Day | 1 | |
| 04.05 | Custodial Services | Workload | Chemical Latrines | |||||||||
| 04.05 | Custodial Services | H.2 | Frequency of Cleanings | |||||||||
| 04.05 | Custodial Services | Workload | Hand wash Stations | |||||||||
| 04.05 | Custodial Services | H.2 | Frequency of Cleanings | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower Quantity | 7 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower Sq. Ft. | 6788 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower/Latrine Combination Quantity | 5 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Shower/Latrine Combined Sq. Ft. | 3634 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | Cleanings Per Day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | MWR Facility | Quantity EA | 41 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | MWR Sq. Ft. | 49189 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | Cleanings Per Day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Industrial Quantity | 267 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Industrial Sq. Ft. | 438271 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Med/Dental/Vet Treatment Facility | Quantity EA | 4 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | Workload | X | Med/Dental/Vet Treatment Facility Sq. Ft. | 11104 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.05 | Custodial Services | H.2 | X | Frequency of Cleanings | Cleanings Per Day | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Site Population | 1,400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Avg Meals Served Monthly | 42,000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Site Number of DFACs | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Meal Type | Regular and Short Order | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Seating Capacity | 250 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Breakfast Hours | Hours Per Day | 2.5 (M-F 0630-0900) |
3 (Sa-Su 0630-0930)
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Breakfast Avg Meals Served per Month | 16,500 | ||
| 04.06 | Food Service Operations | H.2 | Brunch Hours | |||||||||
| 04.06 | Food Service Operations | Workload | Brunch Avg Meals Served per Month | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Lunch Hours | Hours Per Day | 2 (M-Su) 1130-1330) | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Lunch Avg Meals Served per Month | 12,000 | ||
| 04.06 | Food Service Operations | H.2 | Supper Hours | |||||||||
| 04.06 | Food Service Operations | Workload | Supper Avg Meals Served per Month | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | H.2 | X | Dinner Hours | Hours Per Day | 2 (M-F 1700-1900) |
1.5 (Sa-Su 1700-1830)
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BB | 04.06 | Food Service Operations | Workload | X | Dinner Avg Meals Served per Month | 13,500 | ||
| 04.06 | Food Service Operations | H.2 | Midnight Meal Hours | |||||||||
| 04.06 | Food Service Operations | Workload | Midnight Meal Avg Meals Served per Month | |||||||||
| 04.06 | Food Service Operations | Workload | Mermite Meals per Month | |||||||||
| 04.06 | Food Service Operations | Workload | Soup and Sandwich | |||||||||
| 04.06 | Food Service Operations | Workload | Café' Grab n Go | |||||||||
| 04.07 | Provide Health Care Services (Medical, Dental, Veterinary) and Clinical Governance | A.1 | ||||||||||
| 04.07.01 | Clinical Governance and Credentialing | A.1 | ||||||||||
| 04.07.02 | Role 1 Medical Facility | A.1 | ||||||||||
| 04.07.03 | Role 2 Medical Facility | A.1 | ||||||||||
| 04.07.03.01 | Health Services Administration | A.1 | ||||||||||
| 04.07.03.01.01 | Patient Administration | A.1 | ||||||||||
| 04.07.03.01.01 | Patient Administration | H.2 | ||||||||||
| 04.07.03.01.01 | Patient Administration | H.2 | ||||||||||
| 04.07.03.01.02 | Records Management and Data Collection | A.1 | ||||||||||
| 04.07.03.01.02 | Records Management and Data Collection | H.2 | ||||||||||
| 04.07.03.01.02 | Records Management and Data Collection | H.2 | ||||||||||
| 04.07.03.01.03 | Referral Management and Emergent Medical Evacuation (MEDEVAC). | A.1 | ||||||||||
| 04.07.03.01.03 | Referral Management and Emergent Medical Evacuation (MEDEVAC). | H.2 | ||||||||||
| 04.07.03.02 | Medical Services. | A.1 | ||||||||||
| 04.07.03.03 | Radiology Services. | A.1 | ||||||||||
| 04.07.03.04 | Surgical Services. | A.1 | ||||||||||
| 04.07.03.05 | Clinical Laboratory Services. | A.1 | ||||||||||
| 04.07.03.06 | Dental Services. | A.1 | ||||||||||
| 04.07.03.07 | Behavioral Health. | A.1 | ||||||||||
| 04.07.03.08 | Preventive Medicine. | A.1 | ||||||||||
| 04.07.03.08.01 | Field Preventive Medicine | A.1 | ||||||||||
| 04.07.03.08.02 | Preventive Medicine Laboratory Services | A.1 | ||||||||||
| 04.07.03.08.03 | Community Preventive Medicine | A.1 | ||||||||||
| 04.07.03.08.04 | Occupational Health Services. | A.1 | ||||||||||
| 04.07.03.08.05 | Health Screening and Immunization. | A.1 | ||||||||||
| 04.07.03.08.06 | Environmental Health Services | A.1 | ||||||||||
| 04.07.04 | Physical Therapy. | A.1 | ||||||||||
| 04.07.05 | Optometry Services | A.1 | ||||||||||
| 04.07.06 | Pharmacy Support. | A.1 | ||||||||||
| 04.07.07 | Hyperbaric Medicine Services | A.1 | ||||||||||
| 04.07.08 | Telemedicine. | A.1 | ||||||||||
| 04.07.09 | Medical Logistics. | A.1 | ||||||||||
| 04.07.10 | Veterinary Services. | A.1 | ||||||||||
| 04.07.10.01 | Microchip Placement. | A.1 | ||||||||||
| 04.07.10.02 | Veterinary Laboratory. | A.1 | ||||||||||
| 04.07.10.03 | Veterinary Pharmacy. | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Facilities Supported | 698 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Avg Monthly Traps Set | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Avg Monthly pesticide applications | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Avg Rodenticide Used | Lbs. Per month | 60 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Avg Herbicide Used | Gallons Per Month | 60 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.08 | Pest Services | Workload | X | Avg Insecticide Used | Gallons Per Month | 60 | |
| 04.09 | Waste Management Services | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | Workload | X | Number of Dumpster (3-8 Yard) | Quantity EA | 20 | |
| 04.09.01 | Non-Hazardous Solid Waste Management | Workload | Number of Dumpster (10-40 Yard) | Quantity EA | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | H.2 | X | Emptying of Waste from Dumpster | Frequency | 5 Days a Week (Monday thru Friday). |
As required to ensure no overflow of waste outside of the dumpsters.
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | Workload | X | Amount of Solid Waste Collected | Average Metric Tons per Month | 32 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | Workload | X | Operate Non-Hazardous Waste Incinerator | Quantity EA | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.01 | Non-Hazardous Solid Waste Management | Workload | X | Amount of Waste Incinerated | Average Metric Tons per Month | 3.2 | |
| 04.09.01 | Non-Hazardous Solid Waste Management | Workload | Operate a Recycling Center | Quantity EA | ||||||||
| 04.09.01 | Non-Hazardous Solid Waste Management | Workload | Number of Recycling Containers | Quantity EA | ||||||||
| 04.09.01 | Non-Hazardous Solid Waste Management | H.2 | Emptying of Recyclable Materials from Containers | Frequency | As required to ensure no overflow of waste, outside of the dumpsters | |||||||
| 04.09.01 | Non-Hazardous Solid Waste Management | Workload | Average Recyclable Material Collected | Metric Tons per Month | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Number of Hazardous Waste Accumulation Points | Quantity EA | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 2 Gasses | Average Kilograms Received Monthly | 2212 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 2 | Average Monthly | 4 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 3 Flammable Liquids (gallons) | Average Gallons Received Monthly | 700 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 3 | Average Monthly | 2 | |
| 04.09.02 | Hazardous Waste Management | Workload | HAZMAT Class 4 Flammable Solids | Average Kilograms Received Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 4 | Average Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | HAZMAT Class 5 Oxidizers and Organic Peroxides | Average Kilograms Received Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 5 | Average Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | HAZMAT Class 6 Toxic Materials and Infectious Substances | Average Kilograms Received Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 6 | Average Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | HAZMAT Class 7 Radioactive Materials | Average Kilograms Received Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 7 | Average Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | HAZMAT Class 8* Corrosive Materials | Average Kilograms Received Monthly | ||||||||
| 04.09.02 | Hazardous Waste Management | Workload | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 8 | Average Monthly | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | HAZMAT Class 9* Miscellaneous Dangerous Goods | Average Kilograms Received Monthly | 2576 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.02 | Hazardous Waste Management | Workload | X | Average number of local haul (less than or equal to a 50 mile round trip missions)for Final Disposition Transports Class 9 | Average Monthly | 4 | |
| 04.09.03 | Medical Waste Management | A.1 | ||||||||||
| 04.09.03 | Medical Waste Management | Workload | Number Collection Points for Pick-up | Quantity EA | ||||||||
| 04.09.03 | Medical Waste Management | Workload | Operate Medical Waste Incinerator | Quantity EA | ||||||||
| 04.09.03 | Medical Waste Management | Workload | Avg of Waste Produced | Kilograms Per month | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.04 | Gray Water Management, Recycle and Reuse | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.04 | Gray Water Management, Recycle and Reuse | Workload | X | Gallons Produced | Gallons Per Month | 225,000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Gallons Collected | Gallons Per Month | 300,000 | |
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Chemical Latrines | Quantity EA | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Septic Tanks | Quantity EA | 4 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Lifting /Pump Stations | Quantity EA | 11 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.09.05 | Sewage and Black Water Waste Management | Workload | X | Waste Water Treatment Facilities (WWTF) | Quantity EA | 1 | |
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Deep Pit Latrine | Quantity EA | ||||||||
| 04.09.05 | Sewage and Black Water Waste Management | Workload | Septic Vacuum Service Truck (SST) | Quantity EA | ||||||||
| 04.10 | Community Services | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | A.1 | X | ||||
| 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | Number of Phone Banks | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | X | Number of Internet Café | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | H.2 | X | Hours of Operation | Hours Per Day / Days Per Week | 14 Hours a Day / 7 Days a Week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.01 | Morale, Welfare, Recreation Communication Centers | Workload | X | Avg Patrons per Month | 1400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Number of Community Centers | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Avg Patrons per Month | 400 | ||
| 04.10.02 | Community Centers | Workload | Distribution of Stars and Stripes Newspaper | |||||||||
| 04.10.02 | Community Centers | Workload | Distribution Points for Stars and Stripes Newspaper | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | Workload | X | Theater/Movie Room | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.02 | Community Centers | H.2 | X | Hours of Operation | Hours Per Day / Days Per Week | 14 Hours a Day / 7 Days a Week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Number of Athletic / Exercise Centers | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | H.2 | X | Hours of Operation | Hours Per Day / Days Per Week | 14 Hours a Day / 7 Days a Week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Avg Patrons per Month | 400 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | Cardio Rooms | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.03 | Athletic, Fitness, and Exercise Centers | Workload | X | CrossFit Rooms | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Frequency of Activities | Per month | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Track | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Volleyball Courts | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Basketball Courts | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Horseshoe Pits | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Multipurpose Fields | 2 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009CA | 04.10.04 | Athletic Fields and Activities | Workload | X | Outside Pavilions | 8 | ||
| 04.10.05. | Provide Education Services | A.1 | ||||||||||
| 04.10.05. | Provide Education Services | Workload | Establish and administer a school system; includes School Advisory Committee | Quantity EA | ||||||||
| 04.10.05. | Provide Education Services | Workload | Operate and administer a school | Quantity EA | ||||||||
| 04.10.05. | Provide Education Services | Workload | Student population (K-12) | Number of Students | ||||||||
| 04.10.05. | Provide Education Services | H.2 | Grades K-12 Course Offerings | Comparable DoDEA School |
(in Size and population)
| 04.10.05. | Provide Education Services | Workload | Number of Schools - Elementary School (K-6) | Quantity EA | |
| 04.10.05. | Provide Education Services | Workload | Operate a Elementary School (K-6) | Number of Days of academic instruction/Year | |
| 04.10.05. | Provide Education Services | H.2 | Operate a Elementary School (K-6) | Hours Per Day / Days Per Week | Elementary School Office: X (xxxx - xxxx) / X (xxx-xxx) |
Elementary School Class Hours: X (xxxx - xxxx) / X (xxx-xxx)
| 04.10.05. | Provide Education Services | Workload | Number of Schools - Junior High School (Grades 6-8) | Quantity EA | |
| 04.10.05. | Provide Education Services | Workload | Operate a Junior High School (Range of Potential Grades 6-8) | Days academic instruction/Year | |
| 04.10.05. | Provide Education Services | H.2 | Operate a Junior High School (Range of Potential Grades 6-8) | Hours Per Day / Days Per Week | Jr High School Office: X (xxxx - xxxx) / X (xxx-xxx) |
Jr High School Class Hours: X (xxxx - xxxx) / X (xxx-xxx)
| 04.10.05. | Provide Education Services | H.2 | Provide Junior High School level extracurricular clubs and activities for Students. | Clubs and Activities Required | |
| 04.10.05. | Provide Education Services | Workload | Number of Schools - High School (Grades 9-12) | Quantity EA | |
| 04.10.05. | Provide Education Services | Workload | Operate a Senior High School (Grades 9-12) | Days academic instruction/Year | |
| 04.10.05. | Provide Education Services | H.2 | Operate a Senior High School (Grades 9-12) | Hours Per Day / Days Per Week | High School Office: X (xxxx - xxxx) / X (xxx-xxx) |
High School Class Hours: X (xxxx - xxxx) / X (xxx-xxx)
| 04.10.05. | Provide Education Services | H.2 | Provide High School level extracurricular clubs and activities for Students. | Clubs and Activities Required | |
| 04.10.05. | Provide Education Services | Workload | Number of Schools - Junior/Senior High School (Grades 7-12) | Quantity EA | |
| 04.10.05. | Provide Education Services | Workload | Operate a Junior/Senior High School (Grades 7-12) | Days academic instruction/Year | |
| 04.10.05. | Provide Education Services | H.2 | Operate a Junior/Senior High School (Grades 7-12) | Hours Per Day / Days Per Week | Jr/Sr High School Office: X (xxxx - xxxx) / X (xxx-xxx) |
Jr/Sr High School Class (xxxx - xxxx) / X (xxx-xxx)
| 04.10.05. | Provide Education Services | H.2 | Provide High School level extracurricular clubs and activities for Students. | Clubs and Activities Required | |
| 04.10.06 | Child and Youth Services | A.1 | |||
| 04.10.06 | Child and Youth Services | Workload | Operate a School Age Services Program | Average Number of participants monthly | |
| 04.10.06 | Child and Youth Services | H.2 | Operate a School Age Services Program | Minimum before and after school care programs required, | |
| 04.10.06 | Child and Youth Services | H.2 | Operate a School Age Services Program | Hours Per Day / Days Per Week | X (xxxx - xxxx) / X (xxx-xxx) |
| 04.10.06 | Child and Youth Services | Workload | Operate a Child Development Center | Average Number of participants monthly | |
| 04.10.06 | Child and Youth Services | H.2 | Operate a Child Development Center | Hours Per Day / Days Per Week | Preschool Full Day: X (xxxx - xxxx) / X (xxx-xxx) |
5 Day Part Day Preschool AM: X (xxxx - xxxx) / X (xxx-xxx) 3 Day Part Day Preschool AM: X (xxxx - xxxx) / X (xxx-xxx)
| 04.10.06 | Child and Youth Services | Workload | Operate a Youth Center (Grades 7-12) | Average Number of participants monthly | |
| 04.10.06 | Child and Youth Services | H.2 | Operate a Youth Center (Grades 7-12) | Hours Per Day / Days Per Week | School in Session (Weekdays): X (xxxx - xxxx) / X (xxx-xxx) |
School in Session (Weekends and Holidays): X (xxxx - xxxx) / X (xxx-xxx) School not in Session (Breaks & Holidays): X (xxxx - xxxx) / X (xxx-xxx)
| 04.11 | Camp Postal Operations | A.1 | ||||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Army Post Offices | |||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Satellite Army Post Offices | |||||||||
| 04.11 | Camp Postal Operations | Workload | Number of Regional Distribution Centers | |||||||||
| 04.11 | Camp Postal Operations | H.2 | Hours of Operation | |||||||||
| 04.11 | Camp Postal Operations | Workload | Avg Pounds Processed Per Month | |||||||||
| 04.11 | Camp Postal Operations | Workload | Avg Postal Runs Per Month | |||||||||
| 04.12 | Fire and Emergency Services (F&ES) | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Number of Facilities | 698 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Monthly Preventive Inspections Performed | 60 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Monthly Number of Fire Extinguishers Serviced | 1500 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Number of Smoke Detectors | 3000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Monthly Exercises | Per month | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.12.01 | Fire Protection Services | Workload | X | Avg Education and Training | Per month | 1 | |
| 04.12.02 | Fire Fighting Services | A.1 | ||||||||||
| 04.12.02 | Fire Fighting Services | Workload | Airfield Crash Fire and Rescue Vehicles | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Avg Airfield Crash Fire and Rescue Responses per Month | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Avg Airfield Crash Fire and Rescue Exercises per Month | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Number of Fire Fighting Vehicle | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Number of Fire Stations | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Coverage Area | |||||||||
| 04.12.02 | Fire Fighting Services | Workload | Communications - Dispatches | |||||||||
| 04.12.03 | Ambulance Services | A.1 | ||||||||||
| 04.12.03 | Ambulance Services | Workload | Number of Emergency Vehicles | |||||||||
| 04.12.03 | Ambulance Services | Workload | Number of Ambulance Stations | |||||||||
| 04.12.03 | Ambulance Services | Workload | Coverage Area | |||||||||
| 04.13 | Security Services | A.1 | ||||||||||
| 04.13.01 | Badging Services and Biometric Support | A.1 | ||||||||||
| 04.13.01 | Badging Services and Biometric Support | Workload | ||||||||||
| 04.13.02 | Baggage and Postal Security Screening | A.1 | ||||||||||
| 04.13.02 | Baggage and Postal Security Screening | Workload | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | A.1 | X | ||||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Length of Roads | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Paved in Miles | 53 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Unpaved in Miles | 10 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Barriers (Total if unknown) | |||||||||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | HESCO barriers | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Jersey Barriers | 1000 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | T-Walls | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Acres of Grounds | 1920 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Perimeter Fencing (Linear Feet) | 89543 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Class I and Class II Fencing (Linear Feet) | 5115 | ||
| 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | Snow Removal Vehicles | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.14 | Horizontal Maintenance Activities (Roads, Grounds, Airfields, and Barriers) | Workload | X | Avg Sign Repair/Fabrication | 1500 | ||
| 04.15 | Range Management | A.1 | ||||||||||
| 04.15 | Range Management | Workload | Number of Ranges | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Emergency Service Requests | Per month | 140 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Urgent Service Requests | Per month | 420 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | Workload | X | Number of Monthly Routine Service Requests | Per month | 500 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 04.16 | Camp Operations / Public Works Service Center | H.2 | X | Consolidated Service Center | Daily Hours (Includes desk manning and on call services) | Desk Manned 8 Hours / On call 16 Hours | |
| 04.16.01 | Facilities Equipment Training | |||||||||||
| 04.17 | Camp Logistics Support Functions | A.1 | ||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Number of Retail Fuel Point | Quantity EA | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | H.2 | X | Retail fuel Point Hours of Operation | Hours Per Day / Days Per Week | 9 (0800-1700) Hours a Day / 7 Days a Week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | H.2 | X | Retail Fuel Pont Staffing | Minimum Manning | 1 Attendant 9 (0800-1700) Hours a Day / 7 Days a Week | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | H.2 | X | On Call Duty | Respond to Emergency Requirement or Facility Emergency | Outside Normal Retail Fuel Point Hours of Operation / 7 Days a Week | |
| 04.17.01 | Retail Energy Operations | Workload | Number of Hot FARP | Quantity EA | ||||||||
| 04.17.01 | Retail Energy Operations | H.2 | Hot FARP Hours of Operation | Hours Per Day / Days Per Week | ||||||||
| 04.17.01 | Retail Energy Operations | Workload | Number of Cold FARP | Quantity EA | ||||||||
| 04.17.01 | Retail Energy Operations | H.2 | Cold FARP Hours of Operation | Hours Per Day / Days Per Week | ||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Receive/Store/Issue Petroleum (JP8, MOGAS, DF2) | Average Gallons Per Month | 16000 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Operate Fuel Servicing Truck (1500-5000 Gallon) | Quantity EA | 1 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BE | 04.17.01 | Retail Energy Operations | Workload | X | Distribute Fuel to Equipment or Fuel Containers on Base/Camp/Installation | Daily Distribution Points EA | 2 | |
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning | A.1 | X | ||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning | Workload | X | Number of Wash Points | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009BD | 04.17.02 | Agricultural Cleaning | H.2 | X | Hours of Operations | Hours Per Day / Days Per Week | 8 Hours a Day / 5 Days a Week | |
| 04.18 | Mortuary Affairs | A.1 | ||||||||||
| 04.18.01 | Search and Recovery of Remains. | A.1 | ||||||||||
| 04.18.01 | Search and Recovery of Remains. | Workload | Remains and personnel effects recovered annually | |||||||||
| 04.18.02 | Process Remains. | A.1 | ||||||||||
| 04.18.02 | Process Remains. | Workload | Remains processed annually | |||||||||
| 04.18.02 | Process Remains. | Workload | Operate theater personal effects depot(s) (TPED) |
| 04.18.03 | Holding Remains. | A.1 | |||||||||||
| 04.18.03 | Holding Remains. | H.2 | Operate a Morgue | ||||||||||
| 04.18.03 | Holding Remains. | Workload | Number of remains processed through the morgue annually | Remains EA | |||||||||
| 04.18.03 | Holding Remains. | H.2 | Operate Mortuary Affairs Collection Point (MACP) | Minimum Manning | The contractor shall maintain a minimum staffing of four personnel. | ||||||||
| 04.18.03 | Holding Remains. | Workload | Number of remains processed through the MACP annually | Remains EA | |||||||||
| 04.18.03 | Holding Remains. | H.2 | Operate a mortuary under Current Death Program | Minimum Manning | The contractor shall maintain a minimum staffing of four personnel, one of which will be a US licensed mortician | ||||||||
| 04.18.03 | Holding Remains. | Workload | Number of remains processed through the mortuary annually | Remains EA | |||||||||
| 04.18.03 | Holding Remains. | H.2 | Operate a theater Mortuary Evacuation Point | Minimum Manning | The contractor shall maintain a minimum staffing of four personnel. | ||||||||
| 04.18.03 | Holding Remains. | Workload | Number of remains processed through the evacuation point | Remains EA | |||||||||
| 04.18.04 | Transportation of Remains | A.1 | |||||||||||
| 04.18.04 | Transportation of Remains | Workload | Remains evacuated annually | ||||||||||
| 04.18.05 | Mortuary Affairs Contaminated Remains Mitigation Sites (MACRMS). | A.1 | |||||||||||
| 04.18.05 | Mortuary Affairs Contaminated Remains Mitigation Sites (MACRMS). | Workload | Augmentation Teams | Number of MA Augmentation Teams required | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | A.1 | |||||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Provide Graphic Arts Services - Number of paper training support materials produced (e.g. Posters, bulletins and catalogues) | Average Per Month | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Provide Photography Services - Number of still photographs produced (e.g. DA Photo, Passport photo) | Average Per Month | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Produce Visual Information Broadcast/Video/Audio Services and VI Service Support - Number of video, audiotapes, and DVDs produced (@30 minute length) | Average Per Month | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Visual Information Media/Equipment Support Services and VI Service Support - Manage equipment loans and provide accompanying instruction on use | Average Per Month | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Provide Presentation Support - Number of set up, operations, and tear down (e.g. public address system, presentation support for official functions) | Average per Month | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | Workload | Operate a Visual Information Self Help Center | Quantity EA | |||||||||
| 04.19 | Communication and Information Technology (IT) Support | H.2 | Hours of Operation | Hours Per Day / Days Per Week | |||||||||
| 05.00 | Supply Management, Strategic and Operational | A.1 | |||||||||||
| 05.01 | Manage Supplies and Equipment, Operational and Tactical (Point of Service or Installation) | A.1 | |||||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | A.1 | X | |||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I Storage Facility | SSA | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I MROs | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I ASL / ATFL | # of lines | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class I Pallets/Multipacks Processed | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | Hours Per Day / Days Per Week | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII Storage Facility | SSA | 1 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII MROs | Monthly | 3000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII ASL / ATFL | # of lines | 1000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class II, III(P), IV, VII Pallets/Multipacks Processed; SSA incorporates CRSP operations | Monthly | 3000 | ||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | X | Hours of Operation | Hours Per Day / Days Per Week | 8 Hours a Day / 5 Days a Week | ||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) Storage Facility | SSA | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) MROs | Monthly | |||||||||
| SOUTHCOM | Honduras | SCAB | HND001 | 0009AA | 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | X | Class IX (Ground) ASL / ATFL | # of lines | Included in Class II, III(P), IV, VII ASL / ATFL | ||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Ground) Pallets/Multipacks Processed | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | Hours Per Day / Days Per Week | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) Storage Facility | SSA | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air)MROs | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) ASL / ATFL | # of lines | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class IX (Air) Pallets/Multipacks Processed | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | Hours Per Day / Days Per Week | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X Storage Facility | SSA | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X MROs | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X ASL / ATFL | # of lines | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | Workload | Class X Pallets/Multipacks Processed | Monthly | |||||||||
| 05.01.01 | Supply Support Activity (SSA) Operations, Tactical (Point of Service or Installation) | H.2 | Hours of Operation | Hours Per Day / Days Per Week | |||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | A.1 | |||||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | Workload | Centralized receiving and shipping points | Number of Pallets Processed Monthly | |||||||||
| 05.01.02 | Inventory Management, Operational and Tactical (Point of Service or Installation) | H.2 | Hours of Operation | Hours Per Day / Days Per Week |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .