This document comprises specifications for the Veterans Boulevard Drainage Improvements Phase II project in Texas, detailing sitework and infrastructure requirements for a stormwater relief project that includes a new detention pond along Alberta Road and associated stormwater infrastructure improvements. The specifications cover multiple construction divisions including site clearing, earthwork, excavation, backfill, precast concrete manholes, drainage structures, and trench safety systems. Key work items include preparing the right-of-way through removal and disposal of obstructions; installation of precast concrete manhole sections up to 48 inches in diameter with resilient connectors and non-shrink grout; placement of frames, grates, rings, and covers conforming to AASHTO H-20 loading standards; earthwork and site grading with compaction to 95-98 percent of maximum dry density under pavement areas; removal of existing pavements and structures; clearing and grubbing on an acreage basis; trench excavation with safety systems per OSHA 29 CFR standards; and excavation and backfill for utilities with specified embedment and compaction requirements. The specifications reference numerous ASTM standards, AASHTO specifications, and regulatory requirements including NPDES storm water management standards and Texas health and safety codes.
Payment for most work items is structured as unit prices or lump sum depending on contract type, with measurement on linear feet, cubic yards, or per-unit bases for specific items such as manholes, frames and covers, and clearing and grubbing. Backfill materials must meet classification standards free of rocks larger than specified sizes and organic material, with field quality control testing including density and moisture-content verification at specified frequencies. The contractor bears responsibility for locating and protecting existing utilities, providing adequate dewatering and surface water control, managing trench safety per OSHA standards through a licensed engineer-sealed safety program, and completing work in accordance with geotechnical investigation recommendations. Submittals are required for shop drawings, manufacturer data, safety programs, and test reports, with independent laboratory testing to verify soil compaction and material classification throughout construction.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 2
SITEWORK
________________________________________ PREPARING RIGHT OF WAY
02010 1 of 2
SECTION 02010
PREPARING RIGHT OF WAY
PART 1 GENERAL
1.01 SECTION INCLUDES
A. This section shall govern for the preparation of the right of way for construction operations by the removal and disposal of all obstructions from the right of way and from designated easements, where removal of all such obstructions is not otherwise shown on the plans and specifications.
B. Such obstructions shall be considered to include remains of houses, foundations, floor slabs, concrete, brick, lumber, plaster, septic tank drain fields, basements, abandoned utility pipes or conduits, equipment, fences, retaining walls, outhouses and shacks.
C. This Item shall also include the removal of trees and shrubs and other landscape features not designated for preservation, stumps, brush, roots, vegetation, logs, curb and gutter, driveways, paved parking areas, miscellaneous stone, sidewalks, drainage structures, manholes, inlets, abandoned railroad tracks, scrap iron and debris, whether above or below ground except live utility facilities.
D. It is the intent of this specification to provide for the removal and disposal of all obstructions and objectionable materials not specifically provided for elsewhere by the plans and specifications.
1.02 MEASUREMENT AND PAYMENT
A. Unit Prices.
1. This work shall not be paid for directly but will be considered subsidiary to the various bid items of this contract.
2. Refer to Section 01270 - Measurement and Payment for unit price procedures.
B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for work in this
Section is included in total Stipulated Price.
PART 2 PRODUCTS – Not Used
PART 3 EXECUTION
3.01 CONSTRUCTION METHODS
A. All areas, as shown on the plans, shall be cleared of all structures and obstructions as defined above. Those trees, shrubs and other landscape features specifically designated by the Engineer for preservation shall be carefully protected from abuse, marring, or damage during construction operations. Continual parking and/or servicing of equipment under the branches of trees marked for preservation will not be permitted. When trees and shrubs are designated for preservation and require pruning, they shall be trimmed as directed by the Engineer and all exposed cuts over 2 inches in diameter shall be treated with a material approved by the Engineer.
B. Culverts, storm sewers, manholes and inlets shall be removed in proper sequence for maintenance of traffic to the following depths:
1. In areas to receive embankment: 2 feet below natural ground, except when permitted by plans, trees and stumps may be cut off as close to natural ground as practicable on areas which are to be covered by at least three feet of embankment.
2. In areas to be excavated: 2 feet below the lower elevation of the excavation.
3. All other areas: 1 foot below natural ground.
________________________________________ PREPARING RIGHT OF WAY
02010 2 of 2
3.02 DISPOSAL OF MATERIAL
Unless otherwise shown herein, all materials and debris removed shall become the property of the Contractor, including all merchantable timber, and shall be removed from the right of way and disposed of in a manner satisfactory to the Engineer.
3.03 BACKFILL
A. Holes remaining after removal of all obstructions, objectionable material, trees, stumps, etc., shall be backfilled with approved material, compacted and restored to approximately its original contours by balding, bulldozing, or by other methods, as approved by the Engineer. In areas to be immediately excavated, the backfilling of holes may not be required when approved by the Engineer.
B. Before backfilling, the remaining ends of all abandoned storm sewers, culverts, sanitary sewers, conduits, and water or gas pipes over 3 inches in diameter, shall be plugged with an adequate quantity of concrete to form a tight closure.
END OF SECTION
SPECIFICATIONS PRECAST CONCRETE MANHOLES
02082-1 of 7
Section 02082
PRECAST CONCRETE MANHOLES
PART 1 G E N E R A L
1.01 SECTION INCLUDES
A. Precast concrete sanitary sewer and storm sewer manholes.
B. Precast concrete sanitary sewer manholes with PVC liner.
1. Payment for normal depth manholes, up to 5 feet deep, is on a unit price basis for each manhole installed. Depth is measured from top of cover to sewer invert.
2. Payment for extra depth manholes is on a unit price basis per vertical foot for each foot of depth greater than 5 feet. Depth is measured from top of cover to sewer invert.
3. Payment for manhole drops is on a unit price basis for each drop installed. Payment for manhole drop does not include the price of the manhole.
4. Refer to Section 01270 - Measurement and Payment for unit price procedures.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this
Section is included in the total Stipulated Price.
1.03 REFERENCES
A. ANSI B 16.1 - Cast Iron Pipe Flanges and Flanged Fittings
B. ASTM A 307 - Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile.
C. ASTM C 443 - Standard Specification for Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets.
D. ASTM C 478 - Standard Specification for Precast Reinforced Concrete Manhole Sections.
E. ASTM C 920 – Standard Specification for Elastomeric Joint Sealants.
F. ASTM C 923 - Standard Specifications for Resilient Connectors Between Reinforced Concrete Manhole
Structures and Pipes.
G. ASTM C 1107 - Packaged Dry, Hydraulic-Cement Grout (Nonshrink).
H. ASTM D 698 - Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lb/ft3)
I. ASTM D 2665 - Specification for Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste and Vent Pipe and
Fittings.
J. ASTM C 270 - Specification for Mortar for Unit Masonry.
02082-2 of 7
1.04 SUBMITTALS
A. Conform to requirements of Section 01330 - Submittal Procedures.
B. Submit manufacturer's data and details of following items for approval:
1. Shop drawings of manhole sections and base units and construction details, including reinforcement, jointing methods, materials, and dimensions.
2. Summary of criteria used in the manhole design including, as a minimum, material properties, loadings, load combinations, and dimensions assumed. Include certification from manufacturer that precast manhole design is in full accordance with ASTM C 478 and design criteria as established in Paragraph 2.01E of this Specification.
3. Frames, grates, rings, and covers.
4. Materials to be used in fabricating drop connections.
5. Materials to be used for pipe connections at manhole walls.
6. Materials to be used for stubs and stub plugs, if required.
7. Manufacturer's data for pre-mix (bag) concrete, if used for channel inverts and benches.
PART 2 P R O D U C T S
2.01 PRECAST CONCRETE MANHOLES
A. Provide manhole sections, base sections, and related components conforming to ASTM C 478. Provide base riser section with integral floors, unless shown otherwise. Provide adjustment rings which are standard components of the manufacturer of the manhole sections. Mark date of manufacture and name or trademark of manufacturer on inside of barrel.
B. Provide barrels constructed from 48-inch-diameter standard reinforced concrete manhole sections unless otherwise indicated on Drawings. Combine various lengths of manhole sections to total the correct height with the fewest joints. Wall sections shall be designed for depth and loading conditions as required in Paragraph 2.01E, but shall not be less than 5 inches thick. Base section shall have a minimum thickness of 12 inches under the invert.
C. Provide cone tops to receive cast iron frames and covers designed to support an H-20 loading, unless indicated otherwise.
D. Where the Drawings indicate that manholes larger than 48-inch diameter are required, precast base sections of the required diameter shall be provided with flat slab top precast sections used to transition to 48-inch diameter manhole access riser sections. Transition shall be concentric or eccentric as shown on the Drawings. The transition shall be located to provide a minimum of 7-foot head clearance from the top of bench to underside of transition.
E. Design Loading Criteria: The manhole walls, transition slabs, cone tops, and manhole base slab shall be designed, by the manufacturer, to the requirements of ASTM C 478 for the depth as shown on Drawings and to resist the following loads.
1. AASHTO H-20 loading applied to the manhole cover and transmitted down to the transition and base slabs.
02082-3 of 7
2. Unit soil weight of 140 pcf located above all portions of the manhole, including base slab projections.
3. Lateral soil pressure based on saturated soil conditions producing an at-rest equivalent fluid pressure of 100 pcf.
4. Internal liquid pressure based on a unit weight of 63 pcf.
5. Dead load of manhole sections fully supported by the transition and base slabs.
F. Design: The manhole walls, transition slabs, cone tops, and manhole base slab shall be designed according to the requirements of ASTM C 478 and the following:
1. Design additional reinforcing steel to transfer stresses at openings.
2. Wall loading conditions:
a. Saturated soil pressure acting on an empty manhole.
b. Manhole one half filled with liquid, with no balancing external soil pressure.
3. The minimum clear distance between any two wall penetrations shall be 12 inches or half the diameter of the smaller penetration, whichever is greater.
G. Provide joints between sections with o-ring gaskets conforming to ASTM C 443.
2.02 CONCRETE
A. Conform to requirements of Section 03315 - Concrete for Utility Construction.
B. Channel Inverts: Concrete for inverts not integrally formed with manhole base shall be either 5 sack premix (bag) concrete or Class A concrete, with a minimum compressive strength of 3000 psi.
C. Concrete Foundation: Provide Class A concrete with minimum compressive strength of 3000 psi for concrete foundation slab under manhole base section where indicated on Drawings.
2.03 REINFORCING STEEL
A. Reinforcing steel shall conform to requirements of Section 03315 - Concrete for Utility Construction.
2.04 MORTAR
A. Conform to requirements of ASTM C 270, Type S using Portland Cement.
2.05 MISCELLANEOUS METALS
A. Provide cast-iron frames, rings, and covers conforming to requirements of Section 02084 - Frames, Grates, Rings and Covers.
2.06 DROP CONNECTIONS AND STUBS
A. Provide drop connections and stubs conforming to the same pipe material requirements used in the main pipe, unless otherwise indicated on the Drawings.
2.07 PIPE CONNECTIONS FOR SANITARY SEWERS
02082-4 of 7
A. Provide resilient connectors conforming to requirements of ASTM C 923. Metallic mechanical devices as defined in ASTM C 923 shall be made of the following materials:
1. External clamps: Type 304 stainless steel
2. Internal, expandable clamps on standard manholes: Type 304 stainless steel, 11 gauge minimum.
3. Internal, expandable clamps on corrosion-resistant manholes:
a. Type 316 stainless steel, 11 gauge minimum, or
b. Type 304 stainless steel, 11 gauge minimum, coated with minimum 16 mil fusion-bonded epoxy conforming to AWWA C 213.
B. Where joints between pipe and a manhole base are specified or shown on the Drawings, provide polyethylene-isoprene waterstop meeting the physical property requirements of ASTM C 923, such as Press-Seal WS Series, or approved equal.
2.08 SEALANT MATERIALS
A. Provide sealing materials between precast concrete adjustment rings and between rings and manhole cover frame, meeting the requirements of ASTM C 920 Type M, Grade NS, Class 25.
B. Provide internal manhole chimney seal conforming to the applicable requirements of ASTM C923, Cretex or equal.
2.09 LINER MATERIAL FOR MANHOLES
A. Where manhole liners are required, provide either PVC or HDPE materials as specified. Liner shall be placed on the interior surfaces of the manhole (cone, wall, bottom, section and base).
1. PVC liner shall be provided in accordance with the applicable provisions of specification 09903 -
PVC Sheet Liner for New Concrete Structures.
2. HDPE Liner shall be provided in accordance with the applicable provisions of Specification 09904 - HDPE Sheet Liner for New Concrete Structures.
2.10 BACKFILL MATERIALS
A. Backfill materials shall conform to the requirements of Section 02317 - Excavation and Backfill for Utilities.
2.11 NON-SHRINK GROUT
A. Provide prepackaged, inorganic, flowable, non-gas-liberating, non-metallic, cement-based grout requiring only the addition of water.
B. Grout shall meet the requirements of ASTM C 1107 and shall have a minimum 28-day compressive strength of 7000 psi.
2.12 VENT PIPES
A. Provide external vent pipes for manholes as indicated on the Drawings.
PART 3 E X E C U T I O N
02082-5 of 7
3.01 EXAMINATION
A. Verify that lines and grades are correct.
B. Determine if the subgrade, when scarified and recompacted, can be compacted to 95 percent of maximum Standard Proctor Density according to ASTM D 698 prior to placement of foundation material and base section. If it cannot be compacted to that density, the subgrade shall be moisture conditioned until that density can be reached or shall be treated as an unstable subgrade.
3.02 PLACEMENT
A. Install precast manholes to conform to locations and dimensions shown on Drawings.
3.03 MANHOLE BASE SECTIONS AND FOUNDATIONS
A. Place precast base on 12-inch-thick (minimum) foundation of crushed stone wrapped in filter fabric, or a concrete foundation slab.
B. Unstable Subgrade Treatment: When unstable subgrade is encountered, the subgrade shall be over-excavated to allow for a 24-inch thick layer of crushed stone wrapped in filter fabric as the foundation material under the manhole base.
3.04 PRECAST MANHOLE SECTIONS
A. Install sections, joints, and gaskets in accordance with manufacturer's printed recommendations.
B. Install precast adjustment rings above tops of cones or flat-top sections as required to adjust the finished elevation and to support the manhole frame.
C. Seal any lifting holes with non-shrink grout.
D. Where PVC liners are required, seal joints between sections in accordance with manufacturer’s recommendations.
3.05 PIPE CONNECTIONS AT MANHOLES
A. Install approved resilient connectors at each pipe entering and exiting sanitary sewer manholes in accordance with manufacturer's instructions.
B. Ensure that no concrete, cement stabilized sand, fill, or other rigid material is allowed to enter the space between the pipe and the edge of the wall opening at and around the resilient connector on either the interior or exterior of the manhole. If necessary, fill the space with a compressible material to guarantee the full flexibility provided by the resilient connector.
C. Where a new manhole is to be constructed on an existing sewer, a rigid joint pipe may be used. Install a waterstop gasket around the existing pipe at the center of the cast-in-place wall. Join ends of split waterstop material at the pipe springline using an adhesive recommended and supplied by the waterstop manufacturer.
3.06 INVERTS FOR SANITARY SEWERS
A. Construct invert channels to provide a smooth flow transition waterway with no disruption of flow at pipe-manhole connections. Conform to following criteria:
1. Slope of invert bench: 1 inch per foot minimum; 1-1/2 inches per foot maximum
02082-6 of 7
2. Depth of bench to invert:
a. Pipes smaller than 15-inches: one-half of the largest pipe diameter
b. Pipes 15 to 24-inches: three-fourths of the largest pipe diameter
c. Pipes larger than 24-inches: equal to the largest pipe diameter
3. Invert slope through manhole: 0.10-foot drop across manhole with smooth transition of invert through manhole, unless otherwise indicated on Drawings.
B. Form invert channels with concrete if not integral with manhole base section. For direction changes of mains, construct channels tangent to mains with maximum possible radius of curvature. Provide curves for side inlets and smooth invert fillets for flow transition between pipe inverts.
3.07 DROP CONNECTIONS FOR SANITARY SEWERS
A. Construct drop connections with same materials used in main pipe unless otherwise indicated on drawings. Install a drop connection when a sewer line enters a manhole higher than 30 inches above the invert of the manhole.
3.08 STUBS FOR FUTURE CONNECTIONS
A. In manholes, where future connections are indicated on the Drawings, install resilient connectors and pipe stubs with approved watertight plugs.
3.09 MANHOLE FRAME AND ADJUSTMENT RINGS
A. Combine precast concrete adjustment rings so that the elevation of the installed casting cover matches the pavement surface. Seal between adjustment ring and the precast top section and between adjustment rings with a bed of sealant. Set the cast iron frame on the adjustment ring in a bed of approved sealant. The sealant bed shall consist of two beads of sealant, each bead having minimum dimensions of 1/2-inch and 3/4-inch wide.
B. For manholes in unpaved areas, top of frame shall be set a minimum of 6 inches above existing ground line unless otherwise indicated on Drawings. In unpaved areas, encase the manhole frame in non-shrink grout placed flush with the face of the manhole ring and the top edge of the frame. Provide a rounded corner around the perimeter.
C. When indicated on the Drawings, install manhole chimney seals to prevent inflow between manhole frames and chimneys. Conform to Section 02084 - Frames, Grates, Rings, and Covers.
3.10 BACKFILL
A. After leakage testing, place and compact backfill materials in the area of excavation surrounding manholes in accordance with requirements of Section 02317 - Excavation and Backfill for Utilities.
Provide embedment and trench zone backfill, as specified for the adjacent utilities.
B. Where rigid joints are used for connecting existing sewers to the manhole, backfill under the existing sewer up to the springline of the pipe with Class B concrete.
C. In unpaved areas, provide positive drainage away from manhole frame to natural grade. Provide a minimum of 4 inches of topsoil conforming to requirements of Section 02911 - Topsoil. Seed in accordance with Section 02921 - Hydromulch Seeding. If shown on Drawings, sod disturbed areas in accordance with Section 02922 - Sodding.
02082-7 of 7
3.11 FIELD QUALITY CONTROL
A. Conduct leakage testing of manholes in accordance with requirements of Section 02533 - Acceptance Testing for Sanitary Sewers.
3.12 PROTECTION
A. Protect manholes from damage until work has been finally accepted. Repair damage to manholes at no additional cost to the Owner.
FRAMES, GRATES, RINGS, AND COVERS
02084-1 of 2
Section 02084
A. Iron castings for manhole frames and covers, inlet frames and grates, catch basin frames and grates, meter vault frames and covers, adjustment rings, and extensions.
1. No payment will be made for frames, grates, rings, covers, and seals under this Section.
Include payment in unit price for related item.
2. Refer to Section 01270 - Measurement and Payment for unit price procedures.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this section is included in the total Stipulated Price.
A. AASHTO - American Association of State Highway and Transportation Officials Standard Specification for Highway Bridges.
B. ASTM A 48 - Specification for Gray Iron Castings.
A. Submit product data in accordance with Section 01330 - Submittal Procedures.
B. Submit copies of manufacturer's specifications, load tables, dimension diagrams, anchor details, and installation instructions.
C. Submit shop drawings for fabrication and installation of casting assemblies that are not included in drawings. Include plans, elevations, sections and connection details. Show anchorage and accessory items. Include setting drawings for location and installation of castings and anchorage devices.
2.01 CASTINGS
A. Castings for frames, grates, rings and covers shall conform to ASTM A 48, Class 30. Provide locking covers if indicated on Drawings.
B. Castings shall be capable of withstanding the application of an AASHTO H-20 loading without permanent deformation.
C. Fabricate castings to conform to the shapes, dimensions, and with wording or logos shown on the drawings.
D. Castings shall be clean, free from blowholes and other surface imperfections. Cast holes in covers shall be clean and symmetrical, free of plugs.
02084-2 of 2
2.02 BEARING SURFACES
A. Machine bearing surfaces between covers or grates and their respective frames so that even bearing is provided for any position in which the casting may be seated in the frame.
2.03 SPECIAL FRAMES AND COVERS
A. Where indicated on the Drawings, provide watertight manhole frames and covers with a minimum of four bolts and a gasket designed to seal cover to frame.
2.04 FINISH
A. Unless otherwise specified, coat iron castings with the manufacturer’s standard asphaltic paint.
3.01 INSTALLATION
A. Install castings according to the Drawings, approved shop drawings, instructions given in related specifications, and applicable directions from the manufacturer's printed materials.
B. Set castings accurately at required locations to proper alignment and elevation. Keep castings plumb, level, true, and free of rack. Measure location accurately from established lines and grades.
Brace or anchor frames temporarily in formwork until permanently set.
EARTHWORK AND SITE GRADING
02200-1 of 4
SECTION 02200
PART 1 - GENERAL
1.01 SCOPE
A. Perform all work required to complete the project as indicated by the Contract Documents, and furnish all supplementary items necessary for the completion of all work specified in this Section.
B. The work included in this Section shall include furnishing all labor, tools, materials and incidentals required to complete the work; excavate and fill to the lines, elevations and limits shown on the drawings for all pavements, buildings, landscaped areas, etc. as indicated below and cleaning up. The landscaped areas shall be graded to an elevation 6 inches below finished grade allowing for topsoil placement. The pavement areas shall be graded to an elevation below finished grade allowing for pavement placement. Building foundation areas shall be prepared in accordance with the geotechnical investigation and these specifications. The Contractor shall comply with all requirements of the city standards, the E.P.A. requirements and with the standards and specifications stated herein. All earthwork shall be done in accordance with the Geotechnical Investigation.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02100 - Site Clearing B. Section 02270 - Soil Erosion and Sediment Control B. Section 03300 - Concrete
1.03 QUALITY ASSURANCE
A. Codes and Standards
1. Perform excavation work in compliance with applicable requirements of governing authorities having jurisdiction. The contractor shall have a trench safety plan prepared by a registered professional engineer for all excavations in excess of 5 feet deep.
B. Testing and Inspection Service
1. The owner will engage a soil testing and inspection service for quality control testing during earthwork operations to inspect and test all soil materials proposed for use in all excavation and fill operations.
1.04 JOB CONDITIONS
A. Existing Utilities
1. It shall be the Contractor's responsibility to verify the location (horizontal and vertical depth) of all utilities prior to beginning earthwork operations. If utilities are to remain in place, provide protection from damage during construction operations.
2. Should uncharted or incorrectly charted piping or other utilities be encountered during excavation, consult owner immediately for directions as to how to proceed.
Cooperate with owner, public and private utility companies in keeping services and
02200-2 of 4 facilities in operation. Repair damaged utilities to satisfaction of utility owner.
3. Do not interrupt existing utilities serving facilities occupied and used by owner or adjacent properties, except when permitted in writing by property owner and then only after temporary utility services have been provided.
B. Use of Explosives
1. The use of explosives is not permitted.
C. Protection of Persons and Property
1. Barricade open excavations occurring as part of this work and post with warning lights. Provide traffic control as required by the city and as required to protect the public.
2. Protect structures, utilities, sidewalks, pavements, and other facilities from damages caused by settlement, lateral movement, undermining, washout and other hazards created by excavation operations.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Fill Material:
1. Onsite excavated material free from trash, vegetation, rocks and lumps of earth larger than 4 inches in diameter or other objectionable material. Imported fill, if required, shall also be clean and have a liquid limit less than 50 percent.
B. Select Material:
1. Uniformly blended clayey sand to very sandy with a plasticity index between 6 and
15 and liquid limit of less than 35 percent.
PART 3 - EXECUTION
3.1 INSPECTION
A. Examine the areas and conditions under which earthwork and site grading operations are to be performed. After excavation to subgrade, proofroll with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 25 tons or greater to help compact pockets of loose soil and expose additional areas of weak, soft or wet soils in the presence of the owner's representative. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner.
3.2 EXCAVATION
A. The Contractor shall excavate to the lines and elevations shown on the drawings, as previously indicated herein, regardless of the type, condition, or moisture content of the material encountered. Conduct excavation operations to provide positive drainage, at contractor's expense, at all times during construction. If positive drainage cannot be maintained, contractor shall keep standing water out of all excavations with adequate dewatering equipment.
B. All areas shall be cut accurately to the indicated grades. Care shall be taken to prevent
02200-3 of 4 excavation below the grades indicated and any bottoms or slopes that have been undercut shall be backfilled with approved materials and compacted to the required fill density.
C. Excavation required for rough grading shall be finished within a tolerance of 0.10 foot above or below the rough grade and in no case shall depressions be left that will not completely drain.
3.3 BUILDING SUBGRADE
A. Follow recommendations in geotechnical report and on the structural drawings.
3.4 FILLING
A. Remove all vegetation, organic materials and debris prior to placing fill.
B. Fill used below the parking and landscape areas shall be onsite soils encountered in the excavation or imported fill except grass, weeds, roots, vegetation and similar materials. The largest rock, particle or clod shall be less than 4 inches in diameter prior to compaction.
C. Care should be taken that utility cuts are not left open for extended periods and that cuts are properly backfilled. A positive cut-off of 1’ thick compacted clay at the building line shall be used to help prevent water from migrating in the utility trench.
D. Before fill is placed under pavement or if subgrade is in an excavation, subgrade soils shall be scarified to a depth of 8" and recompacted between 95 and 98 percent of maximum dry density per ASTM D698 at a moisture content from +2 to +5 percent above optimum moisture content.
E. Fill below all pavement and landscaped areas shall be placed in 6 to 8 inch loose lifts and compacted to a minimum dry density of 95 percent of the standard proctor density (ASTM D698) under pavement and 95 percent elsewhere. The moisture content shall be between - 1 and +3 percent above optimum.
F. Compaction shall be obtained by use of sheeps foot rollers, rubber-tired rollers, or other approved equipment capable of obtaining the required density. In the event the embankment material is too wet or too dry for adequate compaction, the contractor shall add moisture or dry the material as required to the extent necessary to obtain the required density.
3.5 PAVEMENT SUBGRADE
A. Construct subgrades for paved areas to conform to the grades, lines and cross sections shown on the drawings and per the recommendations in the geotechnical report.
B After the pavement subgrades have been shaped and compacted, bring the surface to a firm, unyielding surface by rolling the entire area with an approved vibratory roller. Compact all areas inaccessible to the roller with hand tampers weighing not less than 50 pounds, and with face area not more than 100-square-inches. Unless the material at the time of the rolling contains sufficient moisture to insure proper compaction, add water as directed before compacting. Allow the material containing excess moisture to dry to the proper consistency and moisture content before being compacted.
3.6 MOISTURE CONTROL
A. Where soil material must be moisture conditioned before compaction, uniformly apply
02200-4 of 4 required amount of water to surface of soil material in such manner as to prevent free water appearing on surface during, or subsequent to, compaction operations.
B. Remove and replace, or scarify and air dry soil material that is too wet to permit compaction to specified percentage of maximum density.
C. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread on surface where directed by owner's representative and permitted to dry. Assist drying by discing, harrowing or pulverizing until moisture-density relation tests fall within the herein-specified range.
3.7 FIELD QUALITY CONTROL
A. Quality Control Testing During Construction
1. Testing laboratory services shall be in accordance with section 01454.
2. Allow owner's testing service to inspect and approve subgrades and fill layers before further construction work is performed. In the building areas, there will be at least 1 density test per 2500 square feet per lift with a minimum of 3. In the pavement areas there will be at least 1 density test per 5000 square feet per lift with a minimum of 3.
3. If, in the opinion of the owner, based on testing service and inspection, the subgrade or fills which have been placed are below the specified density, the contractor shall provide additional compaction and testing at no additional expense to the owner.
4. The results of density tests which may be selected will be considered satisfactory when they are in each instance equal to or greater than the specified density, and if not more than 1 density test out of 5 has a value greater than 2% below the required
3.8 MAINTENANCE
A. Protection of Graded Areas
1. Protect newly graded areas from traffic and erosion. Keep free of trash and debris.
2. Repair and re-establish grades in settled, eroded, and rutted areas to the specified tolerances.
B. Reconditioning Compacted Areas
1. Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, scarify the surface, reshape, and compact to the required density prior to further construction. Use hand tamping for recompaction over underground utilities.
3.8 DISPOSAL OF EXCESS AND WASTE MATERIALS
Remove all excess excavation, trash, debris and waste materials, and legally dispose of off the owner's property, at no additional cost.
STANDARD-SITE WORK REMOVING EXISTING PAVEMENTS AND STRUCTURES
02221-1 of 2
Section 02221
REMOVING EXISTING PAVEMENTS AND STRUCTURES
A. Removing concrete pavement, asphaltic concrete pavement, and base courses.
B. Removing concrete curbs, concrete curbs and gutters, sidewalks and driveways.
C. Removing pipe culverts and storm sewers.
D. Removing existing inlets and manholes.
E. Removing miscellaneous structures of concrete or masonry.
F. Removing irrigation concrete pipe, stand pipes, valves and related irrigation structures.
1. No Separate payment will be made for work performed under this Section. Include cost of work performed under this Section in pay items for which this work is a component.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this
1.03 REGULATORY REQUIREMENTS
A. Conform to Section 01576 – Waste Material Disposal, applicable codes, and local laws for disposal of debris.
B. Coordinate clearing work with utility companies.
A. Conform to the requirements of Section 01330 – Submittal Procedures.
PART 2 P R O D U C T S - Not Used
3.01 PREPARATION
A. Obtain advance approval from Resident Project Representative for dimensions and limits of removal work.
Submit preconstruction photographs in accordance with the applicable portions of Section 01321 – Construction Photographs.
B. Locate and identify buried utilities. Identification shall be by flagging and offset staking.
STANDARD-SITE WORK REMOVING EXISTING PAVEMENTS AND STRUCTURES
02221-2 of 2
3.02 PROTECTION
A. Protect the following from damage or displacement:
1. Adjacent public and private property.
2. Trees, plants, and other landscape features designated to remain.
3. Utilities designated to remain.
4. Benchmarks, monuments, and existing structures designated to remain.
3.03 REMOVALS
A. Remove pavement and structures by methods that will not damage underground utilities. Do not use a drop hammer near existing underground utilities.
B. Minimize amount of earth loaded during removal operations.
C. Where existing pavement is to remain, make straight saw cuts in existing pavement to provide clean breaks prior to removal. Do not break concrete pavement or base with drop hammer unless concrete or base has been saw cut to a minimum depth of 2-inches.
D. Where street and driveway saw cut locations coincide or fall within 3-feet of existing construction or expansion joints, break out to existing joints.
E. Remove sidewalks and curbs to nearest existing dummy, expansion, or construction joint.
F. Where existing end of pipe culvert or end of sewer is to remain, install and 8-in-thick masonry plug in pipe end prior to backfill.
G. Remove all irrigation structure that are to be abandoned as per the construction plans, all underground pipes and appurtenances shall be removed and the disturbed soils shall be replaced and compact to a minimum of 85% density to the elevation equal to the surrounding natural ground.
3.04 BACKFILL
A. Backfill of removal areas shall be in accordance with requirements of Section 02316 – Excavation and Backfill of Structures.
3.05 DISPOSAL
A. Disposal shall in accordance with requirements of Section 01576 – Waste Material Disposal.
B. Remove debris, rubbish, and extracted plant material from the site in accordance with requirements of
Section 01576 - Waste Material Disposal.
CLEARING AND GRUBBING
02233 - 1 of 2
Section 02233
CLEARING AND GRUBBING
A. Removing surface debris and rubbish.
B. Clearing site of plant life and grass.
C. Removing trees and shrubs.
D. Removing root system of trees and shrubs.
1. Payment for Clearing and Grubbing will be made on an Acre basis.
2. Measurement shall be per acres.
3. No payment shall be made if this item is not a bid item.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this
1.03 REGULATORY REQUIREMENTS
A. Conform to applicable codes for disposal of debris.
B. Coordinate clearing work with utility companies.
A. Conform to the requirements of Section 01330 – Submittal Procedures.
CLEARING AND GRUBBING
02233 - 2 of 2
A. Verify that existing plant life and features designated to remain are identified and tagged. Submit preconstruction photographs in accordance with the applicable portions of Section 01321 – Construction Photographs.
1. Living trees located 3 feet or more outside of the intersection of side slopes and original ground line.
2. Plants other than trees and landscape features designated to remain.
3. Utilities designated to remain.
4. Bench marks, monuments, and existing structures designated to remain.
3.03 CLEARING
A. Remove stumps, main root ball, and root system to:
1. A depth of 24 inches below the finished subgrade elevation in the area bounded by lines two feet behind back of curbs.
2. A depth of 24 inches below the finished surface of the required cross section for other areas.
B. Clear undergrowth and deadwood without disturbing subsoil.
C. Remove vegetation from top soil scheduled for reuse.
3.04 REMOVAL
A. Remove debris, rubbish, and extracted plant material life from the site in accordance with requirements of Section 01576 - Waste Material Disposal.
_______________________________________ TRENCH SAFETY SYSTEM
02260 1 of 3
SECTION 02260
TRENCH SAFETY SYSTEM
1.01 SECTION INCLUDES
A. Trench Safety System for the construction of trench excavations.
B. Trench Safety System for structural excavations that fall under provisions of State and Federal trench safety laws.
A. Unit Prices:
1. Measurement and Payment for Trench Safety Systems used on trench excavations is on a linear foot basis measured along the centerline of the trench, including manholes and other line structures.
2. No payment will be made for Trench Safety Systems for structural excavations under this section. Include payment for Trench Safety System in applicable structure installation sections.
3. Payment for Trench Safety Program shall be a Lump Sum Amount for the Design of trench and structural excavation.
3. Refer to Section 01270 - Measurement and payment for unit price procedures.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this Section is included in the total Stipulated Price.
1.03 DEFINITIONS
A. A trench shall be defined as a narrow excavation (in relation to its depth) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet.
B. The Trench Safety System requirements will apply to larger open excavations if the erection of structures or other installations limits the space between the excavation slope and the installation to dimensions equivalent of a trench as defined.
C. Trench Safety Systems include but are not limited to sloping, sheeting, trench boxes or trench shields, sheet piling, cribbing, bracing, shoring, dewatering or diversion of water to provide adequate drainage.
A. Submittals shall conform to requirements of Section 01330 - Submittal Procedures.
B. Submit a safety program specifically for the construction of trench excavation. Design the Trench
Safety Program to be in accordance with OSHA 29 CFR standards governing the presence and activities of individuals working in and around trench excavations.
C. Construction, shop drawings and standards or special designs of the Trench System Program shall be sealed by a licensed Engineer retained and paid by Contractor.
D. Review of the safety program by the Engineer will only be in regard to compliance with this specification and will not constitute approval by the Engineer nor relieve Contractor of obligations under State and Federal trench safety laws.
02260 2 of 3
1.05 REGULATORY REQUIREMENTS
A. Install and maintain Trench Safety Systems in accordance with the detail specifications set out in the provision of Excavations, Trenching, and Shoring, Federal Occupation Safety and Health Administration (OSHA) Standards, 29 CFR, Part 1926, Subpart P, as amended, including Final Rule, published in the Federal Register Vol. 54, No. 209 on Tuesday, October 31, 1989. The sections that are incorporated into these specifications by reference include Sections 1926-650 through 1926-652.
B. A reproduction of the OSHA standards included in "Subpart P - Excavations" from the
Federal Register Vol. 54, No. 209 is available upon request to Contractors bidding on projects.
The Owner assumes no responsibility for the accuracy of the reproduction. The Contractor is responsible for obtaining a copy of this section of the Federal Register.
C. Legislation that has been enacted by the Texas Legislature with regard to trench safety systems, is hereby incorporated, by reference, into these specifications. Refer to Texas Health and Safety Code Ann., § 756.021 (Vernon 1991).
D. Reference materials, if developed for a specific project, will be issued with the Bid Documents, including the following:
1. Trench Safety Geotechnical Information: Geotechnical information obtained for use in design of the Trench Safety System.
2. Special Shoring Requirements.
1.06 INDEMNIFICATION
A. Contractor shall indemnify and hold harmless the Owner, its employees and agents, from any and all damages, costs (including, without limitation, legal fees, court costs, and the cost of investigation), judgements or claims by anyone for injury or death of persons resulting from the collapse or failure of trenches constructed under this Contract.
B. Contractor acknowledges and agrees that this indemnity provision provides indemnity for the
Owner in case the Owner is negligent either by act or omission in providing for trench safety, including, but not limited to safety program and design reviews, inspections, failures to issue stop work orders, and the hiring of the Contractor.
3.01 INSTALLATION
A. Install and maintain Trench Safety Systems in accordance with provisions of OSHA 29 CFR.
B. Install specially designed Trench Safety Systems in accordance with the Contractor's trench excavation safety program for the locations and conditions identified in the program.
C. A competent person, as identified in the Contractor's trench safety program, shall verify that trench boxes and other pre-manufactured systems are certified for the actual installation conditions.
02260 3 of 3
3.02 INSPECTION
A. Contractor, or Contractor's independently retained consultant, shall make daily inspections of the
Trench Safety Systems to ensure that the installed systems and operations meet OSHA 29 CFR and other personnel protection regulations requirements.
B. If evidence of possible cave-ins or slides is apparent, Contractor shall immediately stop work in the trench and move personnel to safe locations until necessary precautions have been taken by Contractor to safeguard personnel entering the trench.
C. Maintain a permanent record of daily inspections.
3.03 FIELD QUALITY CONTROL
A. Contractor shall verify specific applicability of the selected or specially designed Trench Safety
Systems to each field condition encountered on the project.
SOIL EROSION AND SEDIMENT CONTROL
02270-1 of 2
SECTION 02270
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Furnish all labor, materials, tools, equipment, and services for all soil erosion and sediment control, as indicated, in accord with provisions of Contract Documents.
B. Completely coordinate with work of all other trades.
C. Although such work is not specifically indicated, furnish and install all supplementary or miscellaneous items, appurtenances and devices incidental to or necessary for a sound, secure and complete installation in order to meet the United States Environmental Protection Agency requirements.
1.2 QUALITY ASSURANCE
A. Erosion Control Standards:
1. United States Environmental Protection Agency, National Pollutant Discharge
Elimination System (NPDES) - Storm Water Management for Construction Activities.
2. North Central Texas Council of Governments (NCTCOG) - Storm Water Quality Best
Management Practices for Construction Activities.
1.3 EROSION CONTROL PRINCIPLES:
A. Perform demolition, construction and other soil disturbances in a manner which minimizes soil erosion.
B. Retain and protect existing vegetation as much as is feasible.
C. Keep area which is exposed and free of vegetative cover to a minimum, within practical limits.
D. Protect exposed critical areas during prolonged construction or other land disturbance by temporary seeding, mulching or other suitable stabilization measures.
1.4 JOB CONDITIONS:
A. Comply with all requirements of the EPA for implementation of the storm water pollution prevention plan, under the NPDES General Permits for Storm Water Discharges from Construction Sites.
1.5 SUBMITTALS
A. Project Information:
1. Submit copy of NPDES Storm Water Permit for Construction Activities to Owner prior to construction.
PART 2 - PRODUCTS
02270-2 of 2
2.1 MATERIALS:
A. Filter Fabric: Sediment control silt fabrics, AMOCO Style #2125 or approved equal.
B. Crushed stone.
C. Metal clips or ties.
D. Steel fence posts.
E. Grass Seed: annual ryegrass or Bermuda depending on the season.
F. Concrete block.
G. Wire screen.
PART 3 - EXECUTION
3.1 BEGINNING CONSTRUCTION
A. Prior to general demolition, install temporary silt fences and stabilized construction entrance as indicated on the storm water pollution prevention plan or where directed by Owner.
B. Construct erosion control devices in accordance with the storm water pollution prevention plan and as directed by the Owner during demolition and as demolition progresses.
C. Seed disturbed areas where construction activities temporarily cease at rate necessary to achieve a full stand of grass. Reseed as required until good stand of grass is achieved.
3.2 DURING CONSTRUCTION
A. Maintain temporary silt fences.
B. Inspect regularly, especially after rainstorms.
C. Repair or replace damaged or missing items.
D. Sow temporary grass cover over disturbed areas where construction activities temporarily cease for more than 21 days and as required by NPDES permit.
E. Install inlet protection as indicated by the storm water pollution prevention plan at each inlet.
F. Provide swales and dikes as necessary to direct all water towards a protected device.
G. Do not disturb existing vegetation (grass and trees) outside limits of demolition.
H. Remove sediment from behind temporary silt fences when it reaches a depth of 6 in.
3.3 COMPLETION OF CONSTRUCTION AND STABILIZATION OF THE SITE
A. Remove from site all temporary erosion control devices.
STANDARD SPECIFICATION ROADWAY EXCAVATION, ROADSIDE DITCHES,
DRAINAGE DITCHES, AND SWALES
02315-1
Section 02315
ROADWAY EXCAVATION, ROADSIDE DITCHES, DRAINAGE DITCHES, AND SWALES
A. Excavation and compaction of materials for roadways.
B. Excavation and compaction of materials for roadside ditches.
C. Excavation and compaction of materials for drainage ditches.
D. Excavation and compaction of materials for swales.
1. Payment for roadway excavation is on a cubic yard basis.
a. No payment will be made for material excavated more than 2 feet outside of vertical planes behind back of curbs, for portion within limits of trench for utilities 24-inch and greater constructed by open-cut methods, or as indicated otherwise on the Drawings.
2. Payment for roadside ditches is on a linear foot basis.
3. Payment for drainage ditch is on a cubic yard basis.
4. Payment for swales is on a linear foot basis.
5. Refer to Section 01270 - Measurement and Payment for unit price procedures.
B. Stipulated Price (Lump Sum). If the Contract is a Stipulated Price Contract, payment for work in this
A. ASTM D 698 – Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12.44 ft-lbf/ft³).
B. ASTM D 2216 – Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass.
C. ASTM D 2922 – Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth).
D. ASTM D 3017 – Standard Test Method for Water content of Soil and Rock in Place by Nuclear Methods
(Shallow Depth).
E. ASTM D 4318 – Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
02315-2
A. MATERIALS
B. Provide topsoil conforming to requirements of Section 02911 - Topsoil.
C. Provide backfill which is excavated material, graded free of roots, lumps greater than 6 inches, rocks larger than 3 inches, organic material, and debris.
D. Provide structural backfill which is select material meeting the following requirements:
1. Plasticity index: not less than 12 nor more than 20.
2. Maximum liquid limit: 45.
A. Identify required lines, levels, and datum. Coordinate with Section 01725 - Field Surveying.
B. Identify and flag surface and aerial utilities.
C. Notify utility companies to remove or relocate utilities.
D. Identify, stake, and flag known utility locations below grade. Make temporary or permanent relocation of underground pipes, ducts, or utilities where indicated on Drawings.
E. Upon discovery of unknown or badly deteriorated utilities, or concealed conditions, discontinue work.
Notify Project Manager and obtain instructions before proceeding in such areas.
F. Obtain approval of top soil quality before excavating and stockpiling.
1. Trees, shrubs, lawns, existing structures, and other features outside of grading limits.
2. Utilities either above or below grade, which are to remain.
3.03 TOPSOIL REMOVAL
A. Strip off topsoil from the area to be excavated to a minimum depth of 6 inches, unless indicated otherwise on the Drawings.
B. Stockpile topsoil in a designated location for reuse. Stockpile topsoil to depth not exceeding 8 feet. Cover to protect from erosion.
3.04 SOIL EXCAVATION
A. Excavate to lines and grades shown on Drawings.
B. Remove unsuitable material not meeting specifications. Backfill with embankment materials and compact to requirements of Section 02330 - Embankment.
02315-3
C. Record location and plug and fill inactive water and oil wells. Conform to Texas Department of Health, Texas Natural Resource Conservation Commission, and Texas Railroad Commission requirements.
Notify Project Manager prior to plugging wells.
D. At intersections, grade back at minimum slope of one inch per foot. Produce a smooth riding junction with intersecting street. Maintain proper drainage.
E. If an area is inadvertently over excavated, fill the area in accordance with requirements of Section 02330 - Embankment at no additional cost to the Owner.
F. Remove material not qualified for use and excess soil not being reused from the site in accordance with requirements of Section 01576 - Waste Material Disposal.
3.05 COMPACTION
A. Maintain optimum moisture content of subgrade to attain required density.
B. Compact to following minimum densities at a moisture content of optimum to 3 percent above optimum as determined by ASTM D 698,…