USAG ST BASOPS FY26 Annex A_OVERARCHING_08MAY2026.docx

DOCX document 1 MB Posted

Attached to
Base Operations USAG Stuttgart
Solicitation number
PAN409-26-P-0000027869
Issued by

About this file

This is a Performance Work Statement (PWS) for Base Operations and Support Services at U.S. Army Garrison (USAG) Stuttgart, covering five installations including Kelley Barracks, Patch Barracks, Panzer Kaserne, Robinson Barracks, and Stuttgart Army Airfield. The Contractor shall provide comprehensive base maintenance services including on-demand and preventative maintenance for all Government buildings, equipment, and components; grounds maintenance; snow and ice removal; pavement clearance; horizontal maintenance; pest management; and Army Family Housing facility maintenance. The contract is structured as a non-personal services contract requiring the Contractor to furnish all personnel, equipment, supplies, facilities, transportation, tools, and materials necessary to perform work in compliance with Federal, German State and Local Laws, German Institute for Standardisation (DIN) standards, and applicable Army Regulations. Work is categorized into service annexes (Unaccompanied Housing, Grounds Maintenance, Pavement Clearance, Facility Maintenance, Army Family Housing Facility Maintenance, Horizontal Maintenance, and Pest Control Services) with specific performance standards, quality levels, and response timelines established for each work order type: Priority 1 (Emergency) work requires one-hour response and 24-hour completion; Priority 2 (Urgent) requires 24-hour response and seven-day completion; Priority 3 (Routine) requires 30-day completion.

All work shall be managed through the General Fund Enterprise Business System (GFEBS) and Army Maintenance Application (ArMA), with the Contractor operating a 24/7 Help Desk located in Building 3320 at Kelley Barracks to serve as the central point of contact for all work requests. The Contractor is responsible for inventory management, preventive maintenance program development and execution, warranty management, documentation in compliance with Government SharePoint protocols, environmental compliance, personnel qualification verification (including German trade certifications or IHK FOSA equivalency), security training and clearances, and adherence to German Civil Code requirements including labor law and building protection regulations. Critical deliverables include Personnel Qualification Plan, Quality Control Plan, Safety Plan, Environmental Protection Plan, Contingency Plans, transition plans, weekly and monthly schedules, reports of findings, facility inspections, and comprehensive documentation packages for all completed work. The Contractor must accommodate extensive administrative lead times for Common Access Card (CAC) issuance and installation access—acknowledged as many months for non-U.S. citizens—with failure to obtain timely credentials not constituting an excusable delay for performance deficiencies.

View the file

Other files

File Type Posted
TE-H-26_PATCH_STEUBWEICHT SANIT SEW STORM DRAIN.pdf PDF
TE A-22_SHIP Material List_SHIP Store 8.5 x 11.7 in.pdf PDF
TE A-20_ENV_Garrison_Stuttgart_SPRP2024_EN.pdf PDF
TE A-02_Space Assignment and Equipment.xlsx XLSX spreadsheet
TE-H-26_PATCH_General Sanitary Sewer and Storm Drainage Map 1of2 1990.PDF PDF
TE F-004_Lawn Mowing Area Maps.docx DOCX document
TE A-20_ENV_USAG ST HWMP_2024_Signed.pdf PDF
TE-H-26_RB_SHRT13_LP_Bestand_Kanal_Uebersicht.pdf PDF
TE-H-26RB Abwasser SW.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-3.PDF PDF
TE-A-08_Master Preventive Maintenance Task and Price Catalog_05-08-2026.xlsx XLSX spreadsheet
TE-H-26_PATCH_patchbks2_sanit_sew.pdf PDF
TE-H-26_RB COMB SEWER 1985 3of4.pdf PDF
TE-H-26_Kelley-Sewer revision_2016-12-13_wash-rack.pdf PDF
TE A-22_SHIP Material List_SHIP Store (8.5 x 11.7 in).pdf PDF
TE-H-26_KELLEY STORM SEWER LINE - KELLEY BKS. - WEIDACH.pdf PDF
TE I-001_AFH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE F-003_Service Performance Standards.xlsx XLSX spreadsheet
USAG ST BASOPS FY26 Annex F_GROUNDS_10FEB2026_PWS.docx DOCX document
USAG ST BASOPS FY26 Annex H_FACILITY MAINTENANCE_08MAY2026_PWS.docx DOCX document
TE-H-21 SWPPP_Final_2024-with-appendices.pdf PDF
TE-H-26_PATCH_Steuben-Weicht Sewer Deficiency 1988.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-5.PDF PDF
TE A-23_Historical Data_Preventive Maintenance Schedule.xlsx XLSX spreadsheet
TE-H-26_Kelley-Entwaesserung Plan-4.PDF PDF
TE-H-26_Kelley_Repair Underground Sewage System 1-2 compressed.pdf PDF
TE A-01 PATCH BARRACKS.pdf PDF
TE F-005_Trash and Animal Waste Station Maps.docx DOCX document
TE A-01 ROBINSON BARRACKS.pdf PDF
TE A-01 PANZER KASERNE.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-1.PDF PDF
TE A-01 ECHTERDINGEN AIRFIELD.pdf PDF
TE-H-26_RB COMB SEWER 1985 1of4.pdf PDF
TE A-04_Excavation Clearance Request - Digging Permit-Digging Example.pdf PDF
TE-H-26_RB COMB SEWER 1985 2of4.pdf PDF
TE-H-26_kelleybks_comb_sew_monochrome.pdf PDF
TE-H-26_Kelley-kelhsg1_comb_sew-monochrome.pdf PDF
TE-H-26_PATCH_patchbks1_comb_sew.pdf PDF
TE-H-26_Kelley-kelhsg1_storm_drain-monochrome.pdf PDF
TE-H-26_PATCH_patchbks2_comb_sew.pdf PDF
TE-H-26_Kelley-kelhsg1_sanit_sew.pdf PDF
TE-H-26_Kelley-B-8L001_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE-H-26_Kelley-kelhsg1_sanit_sew-monochrome.pdf PDF
TE-H-26_Kelley-kelhsg2_comb_sew-monochrome.pdf PDF
TE-H-26_PATCH_patchbks1_storm_drain.pdf PDF
TE-H-01 Electrical Demarcation.pdf PDF
TE A-20_ENV_Policy on Lithium Battery Disposal _Signed 21.08.2024.pdf PDF
TE-J-05 Annex J Functional Location Reference List.xlsx XLSX spreadsheet
TE-H-26_Kelley_3320_Underground_Drainpipe_sep2019.pdf PDF
USAG ST BASOPS FY26 Annex I_AFH GFOQ_13APR2026_PWS.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Base Operations (BASOPS) Overarching

08 May 2026

Table of Contents

1Introduction.13
1.1Background.13
1.2Objectives.13
1.2.1German Institute for Standardisation (Deutsche Institut fuer Normung , DIN).14
1.2.2Governing Documents and Order of Precedence14
1.3Objectives (cont’d).14
1.3.1Standards.15
1.4Climatic Conditions.15
1.5Facility Access.15
1.6Traffic Flow.16
1.7Drainage.16
1.8Restoration of Landscape Damage.16
1.9Dust Suppression.16
1.10Utility Location.16
1.10.1Damaged Utilities.17
1.11Excavation Permits.17
1.11.1Digging and soil excavation (known or high likelihood of contamination)17
1.11.2PFAS contamination Airfield17
1.12Work Clearance.18
2Requirements.18
2.1Description of Services.18
2.1.1Non-Personal Services.18
2.1.2General Information.18
2.1.2.1Transition (Phase In/Phase Out).18
2.1.2.1.1Phase In/Phase Out for Incumbent Contractor.19
2.1.2.2Transition (Phase-Out).19
2.1.3Place of Performance and Hours of Operation.20
2.1.3.1Place of Performance.20
2.1.3.2Hours of Operation.20
2.1.4Federal Holidays21
2.1.4.1After-Hours Staffing22
2.1.4.2Installation Closures.22
2.1.4.3Inclement Weather Delay.22
2.1.4.4Curtailment of Operations.23
2.1.5N/A.23
2.1.6Emergency Services.23
2.1.6.1Emergency Medical Treatment.23
2.1.6.2Accident Reporting.23
2.1.7Contract Administration and Management.23
2.1.7.1Post Award Conference and Performance Evaluation Meetings.23
2.1.7.2Total Management.24
2.1.7.3Roles.24
2.1.7.3.1Contracting Officer (KO).24
2.1.7.3.2Contracting Officer’s Representative (COR).24
2.1.7.3.3COR Authority.25
2.1.7.3.4Representation.25
2.1.8COR/ACOR/Designated Government Representative Functions.25
2.1.8.1Communication Protocol and Subject Matter Expert (SME) Interaction25
2.1.9Quality Control (QC).26
2.1.10Subcontractor Management.26
2.1.11Contractor Employees.27
2.1.11.1Key Personnel.27
2.1.11.1.1Project Manager (PM).27
2.1.11.1.2GFEBS PM Coordinator Lead.28
2.1.11.2Reserved28
2.1.11.3GFEBS Certification.28
2.1.11.4Common Access Card (CAC).29
2.1.11.5German Residency and Work Permit29
2.1.11.6Qualification Standards, Equivalency, and Personnel Qualification Plan (PQP)29
2.1.11.7Contractor Identification.31
2.1.11.8Standards of Conduct.31
2.1.11.9Contractor Hiring Restrictions.31
2.1.11.10BMAS (Bundesministerium für Arbeit und Soziales - Federal Ministry of Labour and Social Affairs)31
2.1.12Business Relations.32
2.1.13Manual Operations.32
2.1.14Data Ownership, Management and Classification33
2.1.14.1Government Ownership and Data Rights33
2.1.14.2Handling of Controlled Unclassified Information (CUI)33
2.1.14.3Prohibition on Data Exfiltration and Use of Unauthorized Systems33
2.1.14.4Safeguarding of Proprietary and Third-Party Information34
2.1.14.5Return of Government Data34
2.1.15Reserved.34
2.1.16System of Record Modifications, Updates and Replacements34
2.1.17Inventory List35
2.1.18Master New Equipment Log35
2.1.19Contract Administration and Interpretation.35
2.1.20Material Quality and Compliance36
2.2Work Management.37
2.2.1Coordination.37
2.2.1.1Help Desk37
2.2.1.1.1Location and Staffing.38
2.2.1.1.2Centralized Work Order Reception.38
2.2.1.1.3Work Protocol with F-OPS Contractor.38
2.2.1.1.4Hours of Operation & System Access.40
2.2.1.1.5Help Desk Responsibilities.40
2.2.1.1.6GFEBS Order Number Provision.40
2.2.1.1.7Order Creation and Management40
2.2.1.1.8Personnel Qualifications & Duties.40
2.2.1.1.9Customer Service & Language Requirements.41
2.2.1.1.10Reporting Requirements.41
2.2.1.2Appointment Scheduling41
2.2.1.2.1Initial Appointment Scheduling.41
2.2.1.2.2Follow-up Appointment Scheduling.41
2.2.1.2.3Work Scheduling Updates.42
2.2.1.2.4Appointment Confirmation.42
2.2.1.3Prime Contractor's Responsibility for Timely Closeout42
2.2.1.4Work Completion Notification and Signature43
2.2.1.5Work Status43
2.2.1.6Work Notification/Release44
2.2.1.7Date of Physical Completion44
2.2.2General Fund Enterprise Business System (GFEBS)44
2.2.2.1Army Maintenance Application (ArMA).45
2.2.2.2Contingency Plan.45
2.2.2.3Transition (Phase-in) Plan.45
2.2.2.4ArMA and GFEBS46
2.2.2.5Duplicate Orders.46
2.2.2.6GFEBS Completion & Late Order Determination46
2.2.3Demand Maintenance Orders (DMOs).47
2.2.3.1DMO Pricing Principles47
2.2.3.2DMO Receipt, Entry, Response and Completion.48
2.2.3.2.1Priority 1 (Emergency).48
2.2.3.2.2Priority 2 (Urgent).49
2.2.3.2.3Priority 3 (Routine).49
2.2.3.3GFEBS and/or ArMA Case Number.50
2.2.3.3.1Completed Work.50
2.2.3.3.2DMO Conversion.51
2.2.4Preventive Maintenance Orders (PMOs).51
2.2.4.1Pricing Principles51
2.2.4.2PMO Performance Standards and Timelines52
2.2.4.3PM Program Development and Execution.52
2.2.4.4Weekly Schedule.53
2.2.4.5Approved PM Schedule.54
2.2.4.6PMO Stickers/Log.54
2.2.4.7Manufacturer's Warranty Program.54
2.2.4.8Deficiencies Found During Preventive Maintenance Inspection.55
2.2.4.9TüV and Certified Specialist Inspections55
2.2.4.10PMO Task List56
2.2.4.11Meter Readings56
2.2.5Operations Work Orders (OWOs).56
2.2.5.1OWO Pricing Principles56
2.2.5.2Fixed-Price Operational Work (OWO-F)57
2.2.5.3On-Demand Operational Work (OWO-D)57
2.2.5.4OWO Execution Matrix58
2.2.6Project Work Orders (PWOs).58
2.2.6.1PWO Categories and Initiation.59
2.2.6.1.1Standard PWOs (New Work/Construction).59
2.2.6.1.2Conversion of DMO to PWO59
2.2.6.1.3Special Event PWOs60
2.2.6.1.4Between Occupancy Maintenance (BOM) PWOs61
2.2.6.2Cost Estimates and Proposals for PWOs61
2.2.6.2.1Standard PWO Estimates (New Work/Construction)61
2.2.6.2.2DMO-Converted PWO Estimates (Streamlined)61
2.2.6.2.3Quote Package61
2.2.6.2.4Exchange Rate for PWO Cost Estimation62
2.2.6.2.5Subcontract Work62
2.2.6.2.6Specialty Subcontracting Work62
2.2.6.2.7Certificate of Independent Pricing for PWOs63
2.2.6.3PWO Execution and Management63
2.2.6.3.1Execution of PWO Work.63
2.2.6.3.2PWO Bi-weekly Meetings63
2.2.6.3.3PWO Reporting Requirements.64
2.2.6.3.4Completion Extension64
2.2.6.3.5Acceptance (by Government) and PWO Records64
2.2.6.3.6Warranty Management Plan (WMP)64
2.2.7Warranty Program.64
2.2.7.1Warranty Enforcement Manager.65
2.2.7.2Warranty Management.65
2.2.7.3Routing of Warranty DMOs.65
2.2.7.4Warranty Records.65
2.2.7.5Warranty of Workmanship and Materials65
2.2.7.6Exceptions.66
2.2.7.7Technical Document Library Operation66
2.2.8Government’s SharePoint (GSP)67
2.2.9BUILDER67
2.2.9.1BILDER and GFEBS Data Reconciliation67
2.2.10Maintenance Checklist (Task Lists)68
2.2.10.1Checklist Requirements68
2.2.11Operational Test (OT)69
2.2.12Tools Calibration69
2.2.12.1Calibration Documentation Requirement.69
2.2.12.2Documentation Upload & Accessibility.69
2.2.12.3Audit & Inspection Compliance.69
2.2.13Logbook (Operations Log)69
2.2.14Report of Findings (ROF)70
2.2.15Post-Work Site Cleanup71
2.3As-Builts.71
2.3.1Maintain As-Builts.71
2.3.1.1Support.72
2.3.2Real Property Records Updates.72
2.3.3Reserved73
2.3.4Reserved.73
2.4Historic Property or Archaeological Site.73
2.4.1Repair and Replacement.73
2.4.2Salvage.73
2.5Special Requirements.74
2.5.1Security.74
2.5.1.1Access and General Protection/Security Policy and Procedures.74
2.5.1.1.1Compliance75
2.5.1.1.2Installation Access75
2.5.1.2Motor Vehicle Operators.76
2.5.1.3Contractor Vehicle Registration76
2.5.1.3.1Contractor and Vendor Access.76
2.5.1.3.2Reserved76
2.5.1.4Physical Security.76
2.5.1.5Secure Area Access.77
2.5.1.6Departing Employees.77
2.5.1.7Key Control.77
2.5.2Security Training.78
2.5.2.1iWATCH Training.78
2.5.2.2Anti-Terrorism (AT) Level 1 Awareness Training.79
2.5.2.3Operational Security (OPSEC) Awareness Training.79
2.5.2.4DoD Cybersecurity Awareness Training79
2.5.3Safety.79
2.5.3.1Safety Plan.80
2.5.3.2Occupational Safety and Health.80
2.5.3.3Hot Work Permit.80
2.5.3.4Confined Space Standards.80
2.5.3.5Reporting Fire and Safety Hazards.80
2.5.4Training, Physical Requirements, or other Expertise Required.81
2.5.4.1Certification and Licensure.81
2.5.4.2New Facilities and Equipment Training.81
2.5.4.3Environmental Officer Training.81
2.5.4.4Child Abuse Prevention, Identification, and reporting.81
2.5.4.5Building Coordinator Training.82
2.5.4.6Evacuation Coordinator/Fire Prevention Training.82
2.5.4.7Building Energy Monitor.82
2.5.4.8Hazardous Substances Ordinance Training.82
2.5.4.9HAZCOM Training.82
2.5.4.10Asbestos Training. (Building Contaminants Training)83
2.5.4.11CUI Training83
2.5.5Environmental Requirements.83
2.5.5.1Green Procurement.83
2.5.5.2Recycled or Recovered Products.83
2.5.5.3Environmental Compliance.83
2.5.5.4Environmental Plans and Submissions.83
2.5.5.5Spill Management.84
2.5.5.6Spill Reporting Requirements.84
2.5.5.7Hazardous Materials and Waste84
2.5.5.8Building Contaminants and Abatement85
2.5.5.9Refrigerant Management and Log85
2.5.5.10Other Environmental Duties85
2.5.6Contingency Plans.86
2.5.6.1General.86
2.5.6.2Mobilization Contingency Plan.86
2.5.6.3Disaster Contingency Plan.86
2.5.6.4Labor Dispute Contingency Plan.86
2.5.6.5Plan Updates.87
2.5.6.6Emergency Utilities Operating Procedures.87
2.5.6.7Other Emergency Services87
2.5.7Authorized to Perform Services in Germany.87
2.5.8Electromagnetic Compatibility Directive.88
2.5.9Language Requirements for Non-Key /Maintenance Personnel.88
2.5.10Employee Log.88
2.5.11Self-Help Issue Point (SHIP) Operation.89
2.5.12German Civil Code Section 613A.89
2.5.13Work in Sensitive Compartmented Information Facilities and Secure Areas89
2.5.14GFEBS Access and Training Requirements90
2.6Government Operations: Lapses in Funding and Continuing Resolutions91
2.7Personnel Requirements93
3Performance Requirements and Standards.94
3.1Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).94
3.2Quality Assurance (QA).94
3.3Quality Control Plan (QCP).94
3.4Quality Control Files.95
4Performance Requirements Summary (PRS) Matrix.96
5Installation Services (ISR)98
6Deliverables99
7Related Documents.103
7.1Definitions and Acronyms103
7.1.1Definitions.103
7.1.1.1Acceptable Quality Level (AQL).103
7.1.1.2Alternate Contracting Officer’s Representative (ACOR).103
7.1.1.3Ashes.103
7.1.1.4Bulk Waste.103
7.1.1.5Bulky Waste.103
7.1.1.6Cannibalize.103
7.1.1.7Carpet Care.104
7.1.1.8Child, Youth and School Services (CYS).104
7.1.1.9Cleaning.104
7.1.1.10Contract Line Item Number (CLIN).104
7.1.1.11Collection.104
7.1.1.12Collection Frequency.104
7.1.1.13Collection Point.104
7.1.1.14Commercial Solid Waste.105
7.1.1.15Construction and Demolition (C&D) Waste.105
7.1.1.16Contract Administrator (CA).105
7.1.1.17Contract Discrepancy.105
7.1.1.18Contract Discrepancy Report (CDR).105
7.1.1.19Contractor.105
7.1.1.20Contractor Acquired Property (CAP).105
7.1.1.21Contracting Officer (KO).105
7.1.1.22Contracting Officer’s Representative (COR).106
7.1.1.23Curb Side Pick-Up.106
7.1.1.24Damage Caused by Contractor.106
7.1.1.25Damage Report.106
7.1.1.26Debris.106
7.1.1.27Defective Service.106
7.1.1.28Deliverable.106
7.1.1.29Demand Maintenance Order (DMO).106
7.1.1.30DIN.107
7.1.1.31Equipment.107
7.1.1.32Fertilization.107
7.1.1.33Food Waste.108
7.1.1.34Garbage.108
7.1.1.35General Fund Enterprise Business System (GFEBS).108
7.1.1.36Generation.108
7.1.1.37Government-Furnished Property (GFP).108
7.1.1.38Government Property.108
7.1.1.39Grass Cutting.108
7.1.1.40Hard Surface Floor Care.109
7.1.1.41Hazardous Material.109
7.1.1.42IHK FOSA109
7.1.1.43Installation Design Guide (IDG).109
7.1.1.44Institutional Solid Waste.109
7.1.1.45Key Personnel.109
7.1.1.46Lavatories, Latrines, or Bathrooms.110
7.1.1.47Loss of Government Property.110
7.1.1.48Lot.110
7.1.1.49Lot Size.110
7.1.1.50Material.110
7.1.1.51Material Handling Area.110
7.1.1.52Non-Combustible Material.110
7.1.1.53Non-Personal Services.111
7.1.1.54Organic Storage Site.111
7.1.1.55Operational Work Order (OWO).111
7.1.1.56Performance Indicator.111
7.1.1.57Performance Requirements Summary (PRS).111
7.1.1.58Physical Security.111
7.1.1.59Plant.112
7.1.1.60Plant Maintenance Task List.112
7.1.1.61Plant Maintenance Item.112
7.1.1.62Plant Maintenance Plan.112
7.1.1.63Plant Maintenance Program.112
7.1.1.64Preventive Maintenance Order (PMO).112
7.1.1.65Project Work Order (PWO).113
7.1.1.66Property.113
7.1.1.67Property Administrator (PA).113
7.1.1.68Property Records.113
7.1.1.69Provide.114
7.1.1.70Pruning.114
7.1.1.71Public Traffic Areas.114
7.1.1.72Quality Assurance (QA).114
7.1.1.73Quality Assurance Evaluator (QAE).114
7.1.1.74Quality Assurance Surveillance Plan (QASP).114
7.1.1.75Quality Control.114
7.1.1.76Raise.114
7.1.1.77Random Number Table.114
7.1.1.78Random Sample.115
7.1.1.79Random Sampling.115
7.1.1.80Real Property.115
7.1.1.81Recycling.115
7.1.1.82Recycling Materials.115
7.1.1.83Recycling Facility.115
7.1.1.84Regulated Medical Waste.115
7.1.1.85Refuse.115
7.1.1.86Refuse Collection.115
7.1.1.87Refuse/Recycling Storage Containers.116
7.1.1.88Residential Solid Waste.116
7.1.1.89Sachkundiger116
7.1.1.90Sample Size.116
7.1.1.91Sampling.116
7.1.1.92Scavenging.116
7.1.1.93Sensitive Property.117
7.1.1.94Service/Maintain.117
7.1.1.95Shrub.117
7.1.1.96Soil.117
7.1.1.97Solid Waste.117
7.1.1.98Solid Waste Management Facility (SWMF).117
7.1.1.99Source Separation.118
7.1.1.100Spray Buffing.118
7.1.1.101Spot Cleaning.118
7.1.1.102Standard.118
7.1.1.103Stairwell Cleaning.118
7.1.1.104Street Wastes.118
7.1.1.105Stripping.118
7.1.1.106Subcontractor.118
7.1.1.107Tonnage.119
7.1.1.108Transfer Station.119
7.1.1.109Trash Removal.119
7.1.1.110Tree.119
7.1.1.111Trimming.119
7.1.1.112Unit Acquisition Cost.119
7.1.1.113Vector.119
7.1.1.114Wash.119
7.1.1.115Wide Area Workflow (WAWF).119
7.1.1.116Workday.120
7.1.1.117Work Week.120
7.1.1.118Yard Wastes.120
7.1.1.119New Work.120
7.2Acronyms.121
7.3Applicable Directives, Publications.123
7.4Technical Exhibit (TE).136
7.4.1TE-A-01 – USAG Stuttgart Maps136
7.4.2TE-A-02 – Space Assignment and Equipment136
7.4.3TE-A-03 – Historic Properties and Associated Work Requirements137
7.4.4TE-A-04 – Excavation Clearance Request (Digging Permit) Procedures138
7.4.5TE-A-05 – Language Qualification Requirements140
7.4.6TE-A-06 – Personnel Qualification Plan and Standards142
7.4.7TE-A-07 – Report of Findings Template (ROF)144
7.4.8TE-A-08 – Scheduled Maintenance Task Frequency146
7.4.9TE-A-09 – GFEBS and ArMA Process and Data Entry147
7.4.9.1General Procedures and Responsibilities147
7.4.9.2GFEBS Work Order Workflow148
7.4.9.3FFP Work Order Processing and Closeout148
7.4.9.4Maintenance Order Data Entry150
7.4.9.5Documentation and SharePoint Protocol153
7.4.9.6On-Site Work Documentation and Signature Forms153
7.4.9.7GFEBS Financial and Material Rules153
7.4.9.8Data Correction and Reopening Closed Orders153
7.4.9.9Due Date Calculation153
7.4.9.10Pre-Submission Invoice Review and WAWF Process154
7.4.9.11Master Invoiced Order Tracker154
7.4.9.12GFEBS Data Accuracy and Quality Control154
7.4.9.13Financial and Performance Reporting155
7.4.9.14End of Fiscal Year (EOFY) Closeout Procedures155
7.4.9.15Contract Year Financial Closeout156
7.4.9.16Army Maintenance Activity (ArMA).156
7.4.10TE-A-10 – Emergency and Urgent Work158
7.4.11TE-A-11 – Government’s SharePoint (GSP)159
7.4.11.1General159
7.4.11.2Documentation Upload Protocol and Naming Convention159
7.4.11.3SharePoint Metadata Entry Requirement160
7.4.11.4Digital O&M Library161
7.4.11.5Personally Identifiable Information (PII) Data Handling161
7.4.11.6Language.161
7.4.12TE-A-12 – Operational Test and Tools Calibration Requirements162
7.4.13TE-A-13 – Logbook Requirements164
7.4.14TE-A-14 – Turn-over/Final Inspection Memorandum Template166
7.4.15TE-A-15 – Contractor's Guide to Installation and Network Access168
7.4.16TE-A-16 – Employee Log Requirements170
7.4.17TE-A-17 – BUILDER Equipment Replacement Sheet171
7.4.18TE-A-18 – Confined Space Entry Procedures173
7.4.19TE-A-19 – Warranty Management Plan (WMP)176
7.4.20TE-A-20 – Environmental Management Plans and Policies179
7.4.21TE-A-21 – Installation Access Process Chart181
7.4.22TE-A-22 – Self-Help Issue Point (SHIP) Material Management182
7.4.23TE-A-23 – Historical Data184
7.4.24TE-A-24 – Synchronized Task Flow: BASOPS & F-OPS185
7.4.25TE-A-25 – Master New Equipment Log186
7.4.26TE-A-26 – Special Events PWOs187
7.4.27TE-A-27 – Between Occupancy Maintenance (BOM) PWOs190
7.5Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE).192
7.5.1Utilities.192
7.5.2Emergency Services.192
7.5.3Communications.192
7.5.3.1Common Access Cards (CAC).192
7.5.3.2Defense Switched Network (DSN).192
7.5.3.3Internet Access and Email.193
7.5.3.4GFEBS.193
7.5.3.5ArMA.193
7.5.3.6Enterprise Military Housing (eMH)193
7.5.3.7Other Systems.194
7.5.4Facilities.194
7.5.4.1Government Property & Accountability.194
7.5.4.2Contractor Responsibilities.194
7.5.4.3Government Rights & Vacancy.195
7.5.5Christmas Decorations.195
7.5.6Housing Refrigerators.195
7.6Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE).197
7.6.1Contractor-Furnished Material and Responsibilities.197
7.6.2Contractor-Furnished Items197
7.6.2.1Identification of Contractor Vehicles and Trailers.197
7.6.2.1.1Unserviceable Contractor Equipment.198
7.6.2.1.2Fuels.198
7.6.3Contractor Facilities.198
7.6.4Damage Caused by Contractor.198
7.6.5Third Party Repair Damaged Areas.198
7.6.6Equipment Replacement (Government Property).198
7.6.7Permits.199
7.6.8Recycling Containers.199
7.6.9HAZMAT Storage Containers.199
7.6.10Mechanical and Technical Standards.199
7.6.11Equipment and Tools Calibration.199
7.6.12Consumable Materials.200
7.6.13Stock Levels.200
7.6.14Common Use Equipment.200

Annex A - Overarching Base Operations PWS, USAG Stuttgart BASOPS

Annex A - Overarching Base Operations PWS, USAG Stuttgart BASOPS

Introduction.

This is a non-personal services contract to provide Base Operation and Support Services. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. The Contractor is responsible for providing all parts required for Preventive Maintenance Orders (PMOs) and all repair parts required for Demand Maintenance Orders (DMOs) or minor new construction Project Work Orders (PWOs).

Note:

Fire protection, suppressions, fire alarm systems, and backflow preventers are NOT part of this contract, and they belong to Fire Operation and Support Services Contract (F-OPS).

Fire doors and smoke detectors connected to fire alarm control panel, fire dumpers, smoke ventilations systems, emergency exit lights, sprinkler pumps, lightning protection, and other associated equipment directly or indirectly connected to fire protection, suppressions, and fire alarm systems Background.

Stuttgart includes five installations: Kelley Barracks (between Möhringen and Plienningen), Patch Barracks (Vaihingen), Panzer Kaserne (Böblingen), Robinson Barracks (Bad Cannstatt), Stuttgart Army Airfield (SAAF) (near Stuttgart Airport) and Olga Strasse, downtown Stuttgart. The two largest customers of USAG Stuttgart are Headquarters United States European Command (EUCOM) and United States Africa Command (AFRICOM). The USAG Stuttgart is composed of administrative and service organizations to provide support for all military organizations, service members, DoD Civilians, and their families.

Objectives.

The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and Local Laws, Regulations, and Directives to include, but not limited to, the publications in Section 7, Related Documents. The Government’s expectation is to provide residents with a reliable and safe living environment. The administrative facilities, homes, and neighborhood facilities shall be safe, well maintained, and aesthetically pleasing. Homes shall be available when needed and repairs shall be completed on a timely basis to help minimize disruptions for the residents. The Contractor shall support a hospitable, safe, reliable living, and working environment. The Contractor shall apply “best practice” expertise to furnish timely, flexible, friendly, responsive, resident-focused services that achieve consistent quality and continuous improvements in efficiency.

German Institute for Standardisation (Deutsche Institut fuer Normung , DIN).

The Contractor shall adhere to all German industry standards when performing maintenance, repair and construction under this contract.

Governing Documents and Order of Precedence In the event of any conflict, inconsistency, or discrepancy among the documents comprising this Performance Work Statement, the order of precedence for interpretation shall be as follows:

a. Publications and Forms: The Contractor shall provide all services in accordance with all applicable directives, publications, and forms.

b. Order of Precedence: In the event of any conflict, inconsistency, or discrepancy among the documents comprising this Performance Work Statement, the order of precedence for interpretation shall be as follows:

1. First: The specific, detailed requirements listed within the Technical Exhibits.

2. Second: The general performance requirements described in the main body of the individual Service Annexes.

3. Third: The general administrative and management requirements described in the Overarching PWS (Annex A).

For the avoidance of doubt, this means that if a frequency or standard described in a Technical Exhibit differs from a general summary statement in the main PWS text, the requirement detailed in the Technical Exhibit shall govern.

Objectives (cont’d).

The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. The Contractor shall analyze Federal, State, and Local Laws, Regulations, Directives and recommend to the COR, the most stringent, to resolve the conflict.

The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill Grounds Maintenance, Pavement Clearance, Snow Ice Removal, Facility Maintenance, Army Family Housing Facility Maintenance, Surface and Unsurfaced Areas Maintenance, Heating and Cooling Service, and Pest Management, and their component needs, emphasizing innovation and best commercial practices.

The Contractor shall comply with statutory requirements as defined in AR 420-1 per unit cost for General Flag Officer Quarters (GFOQ), Army Family Housing (FH), Unaccompanied Personnel Housing (UPH), surplus and non-surplus units, maintain an accurate accounting of resources, and submit reports within a timeline provided by the COR or Government representative.

Standards.

The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. The Contractor shall obtain and ensure their personnel and subcontractors hold all licenses and permits required to perform work under this contract, without additional expense to the Government. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost-effective ways to fulfill base operations and their component needs, emphasizing innovation and commercial best practices.

The Contractor shall comply with all applicable Federal, DINs, Host Nation, and local laws, Army regulations, standard industry codes while performing any work on all housing units, non-housing facilities, and structures and their components.

All work under this contract shall be performed in a timely, skillful, and workmanlike-manner. The KO may require, in writing, that the Contractor remove from the work any employee, including subcontractors, that the Government deems incompetent, careless, unqualified, lack ability to meet deadlines and requirements as described in the PWS, or otherwise objectional.

Climatic Conditions.

The average annual rainfall for the Stuttgart area is forty (40) inches; with the wettest months being May - August. The average annual snowfall is ten (10) inches, with snowfall expected during the period of December – February. The average frost-free period (growing season) during the year is about 230 days. The first killing frost may be expected about November, and the last killing frost generally occurs in March. The average annual maximum and minimum temperatures are approximately one-hundred (100) and five (5) degrees Fahrenheit, respectively. Monthly normal temperatures ranged from a low of five (5) degrees in the month of January to a high of 100 degrees in the month of August. Summer temperatures often reach 85-90 degrees Fahrenheit, while sub-freezing weather is common during the winter months.

Facility Access.

The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes. The Contractor shall inform the Fire Department point-of-contact (POC), prior to outages that will impact the function of the system, special problems, or circumstances, which require Fire Department inspection.

Traffic Flow.

The Contractor shall maintain the free flow of traffic during surfaced area maintenance. The Contractor shall notify the Contracting Officer (KO), in writing, a minimum of fourteen (14) calendar days in advance of any scheduled closure of streets. Emergency road closures shall be coordinated with the Contracting Officer Representative (COR) or Alternate Contracting Officer Representative (ACOR).

Drainage.

The maintenance and repair work performed under this contract shall not impede drainage.

Restoration of Landscape Damage.

Trees or other landscape features damaged by the Contractor’s operations shall be restored to the original state at no additional cost to the Government.

If the Contractor causes land damage, the Contractor shall restore the land to a condition that matches or improves the condition prior to Contractor operations. The Contractor shall protect and preserve all land resources. Land damages are defined as a change in land or turf which is not authorized by the COR, and which detracts from the aesthetic qualities, biological support capabilities, or military training value of the land

The Contractor shall be responsible for tree protection on construction sites IAW DIN 18920. Any root or trunk damages will be reported to the COR and will be subject to mitigation by the Contractor. If trees need to be removed, a tree cut maintenance order (OWO) IAW para 7.4.9, TE-A-09 GFEBS and ArMA Process and Data Entry.

Dust Suppression.

The Contractor shall perform dust suppression when necessary, during maintenance and repair activities or as directed by the Contracting Officer or COR.

Utility Location.

The Contractor shall perform utility cuts in pavements as required to repair existing utilities after obtaining a digging permit to do so. The Contractor shall locate and stake out underground utility pipes/cables prior to digging operations required by any contract on USAG Stuttgart property. The Contractor shall be responsible for having the proper equipment to locate all underground utilities. Mechanical digging shall not be permitted within ten (10) feet of identified underground utilities.

Damaged Utilities.

The Contractor shall repair all damage to utilities as a result of an improper and/or missing utility location marking at no cost to the Government.

Excavation Permits.

All excavation permits shall be initiated on an Excavation Clearance Request (ECR) identified at Technical Exhibit TE-A-04, Excavation Clearence and processed through the work control office in this Contract. The Contractor shall keep record of every permit, assign a unique number, provide locator and marking service, coordinate marking with the communications Contractor, etc. and provide status to the Government. The Contractor shall notify the requestor within twenty-four (24) hours of receiving a processed excavation permit package.

The Contractor shall have a valid excavation permit before commencing work in accordance with (IAW) para 7.4.4, TE-A-04 Excavation Clearence, and shall keep Excavation Log excel spreadsheet up to date on the Government SharePoint (GSP), which will serve as the main online repository source of all documents produced under this contractor. (Deliverable A-001).

Any soil excavated as part of the project must be piled and secured against water run-off and tested for contamination to determine soil disposal requirements. Contaminated soil must be disposed according to host nation law. Contaminated material found during testing must be reported to the Environmental Division.

Digging and soil excavation (known or high likelihood of contamination) Due to the known or high likelihood of soil contamination, it is highly recommended that the Contractor commissions a soil sampling survey to assist in estimating the cost of disposal and identifying any other related occupational health and safety requirements.

Once soil excavation commences, removed soil must be piled and securely covered to avoid washout of possible contaminants. It is recommended that piles be separated based on expected contamination to minimize disposal costs.

PFAS contamination Airfield Due to the known and high probability of PFAS contamination at SAAF, special consideration and sampling is required here. A technical expert for contaminated sites (Altlastensachverständiger) shall be consulted for soil sampling and Host Nation involvement/coordination is required. The Contractor shall contact DPW Environmental Division for coordination with Host Nation.

Work Clearance.

For work involving digging/excavation operations, the Contractor shall obtain a properly approved digging permit before ground disturbance.

Requirements.

Description of Services.

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the SERVICE functions of the Base Operations specified below. This shall be done IAW all the Terms, Conditions, General and Special Provisions, Specifications, Drawings, Attachments, and Exhibits contained herein or incorporated by reference. The Contractor shall ensure that all work meets or exceeds the specifications for the listed SERVICE.

SERVICE
Service Title
Annex No.
200
Unaccompanied Housing (UH)
Annex C
404
Grounds Maintenance
Annex F
408
Pavement Clearance
Annex G
411
Facility Maintenance
Annex H
414
Army Family Housing (AFH) Facility Maintenance
Annex I
420
Horizontal Maintenance
Annex J
510
Pest Control Services
Annex M

Non-Personal Services.

The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government IAW Federal Acquisition Regulation (FAR) subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

General Information.

Transition (Phase In/Phase Out).

The Contractor shall prepare and submit a comprehensive Transition Plan to the KO and COR NLT ten (10) calendar days after contract award. This plan shall detail the contractor's specific, actionable strategy for assuming full operational control of all PWS requirements with no degradation of service.

a. Phase-In (First 90 Days):

The plan must outline the 90-day phase-in period. A critical component of this plan shall be the "Personnel Onboarding and Access Strategy." This section must explicitly address the contractor's plan to manage the extensive, multi-month lead times required for obtaining installation access, Common Access Cards (CACs), and access to all required Government systems, including GFEBS, ArMA, and the Government SharePoint (GSP). The strategy must detail how the Contractor will staff the contract and perform all required duties while key personnel are still undergoing the credentialing process.

b. Observation and Familiarization:

During the phase-in period, the Contractor shall observe all operations pertinent to the PWS, including office functions, GFEBS procedures, and field maintenance operations, to ensure their personnel are knowledgeable and familiar with their assigned duties.

c. Full Performance:

The Contractor shall provide a sufficient, experienced, and fully qualified workforce to ensure that all services are maintained at the required level of proficiency from day one of the contract. The Contractor shall commence all operations required by this PWS as of the first day of the contract period.

d. Phase-Out:

The plan shall also include a phase-out strategy, detailing how the Contractor will ensure a smooth transition of services, data, and Government property to a succeeding contractor at the end of the contract's period of performance.

(This complete plan constitutes Deliverable A-060) Phase In/Phase Out for Incumbent Contractor.

If the Contractor is the incumbent Contractor, the phase out/phase in period shall be no more than thirty (30) calendar days and will primarily consist of administrative transition under the new contract number. All documents shall be updated with the new contract number and new dates and submitted for approval. All previous approvals under the old contract are invalid. The Contractor shall submit all updated deliverables IAW with this contract for re-approval.

Transition (Phase-Out).

Sixty (60) calendar days prior to contract expiration will constitute the phase-out period. The Contractor shall develop and implement a plan to affect a smooth and orderly transfer of performance responsibility to a potential successor. The initial phase-out plan shall be submitted to the COR for approval no later than six (6) months after the start of the base contract year. The plan shall contain details that include but are not limited to; timelines for events, key personnel involved and interface with the Government and follow-on Contractor. The plan shall fully describe how the Contractor shall approach the following issues: Employee notification; Retention of key personnel; Turn-over of work-in-progress, inventories and transfer of Government furnished property; Removal of Contractor property; Data and information transfer; deletion of password access to Government systems, installation clearance actions including turn-in of windshield decals and controlled access cards (CAC) and any other actions required to ensure continuity of operations. The plan shall also include a joint inventory among the incumbent, the Government, and the successor Contractor; reconciliation of all property accounts and requisitions, turn-in of excess property and cleanup of Contractor work areas.

The Contractor shall correct any damage to Government-Owned Property caused by employee negligence or mistake, intentional or otherwise. During the thirty (30) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract. The Contractor shall not defer any needed repairs or maintenance for the purpose of transferring responsibility to the successor Contractor. The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties. The Contractor shall provide reasonable assistance to the Government's contract solicitation process such as verifying workload data and other factual information to be included in a new solicitation and providing access to the workplace for site visit(s) of prospective offerors.

Place of Performance and Hours of Operation.

Place of Performance.

The Contractor shall perform all the work under this contract on locations described in para 1.1, Background, and para 7.4.1 TE-A-01 USAG Stuttgart Maps. Teleworking and working off-site is not approved under this contract.

Hours of Operation.

The Government's regular (normal) hours are from 0700 – 1600 hours, excluding Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

The Contractor’ operated Help Desk shall be available after normal business hours to serve as the central point of contact for Contractor operations. The Contractor shall perform emergency repair and maintenance that may occur outside of normal business.

The Contractor-operated Work Reception desk shall be manned twenty (24) hours a day, seven (7) days a week and shall have GFEBS and ArMA capabilities and shall be responding to DMOs and/or customer requests outside of standard working hours. Standard working hours are from 0700 to 1600 hours, Monday through Friday. Terms “work reception desk”, “service order desk”, “help desk”, “DMO” desk” are interchangeably used throughout this PWS to describe the main receiving and processing point for all work.

Federal Holidays U.S. Holidays.

Work shall be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the KO.

The absence of personnel on U.S. holidays may provide the Contractor with an opportunity for access to facilities and areas for uninterrupted performance of work. The Contractor shall take full advantage of such opportunities by planning maintenance or other actions that are better accomplished when personnel are not using facilities during those times. The Contractor shall not perform work in Government housing quarters on U.S. holidays, weekends and after-hours, except to resolve an emergency condition or with the expressed permission of the occupant in advance.

New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

NOTE: When a holiday falls on a Sunday, the following Monday will be observed as a holiday, and, when a holiday falls on a Friday or Saturday, the preceding Thursday is observed as a holiday by U.S. Government Agencies. Federal holidays also include any Presidential or Congressionally designated days off other than the holidays listed above.

German Holidays

Routine work shall not be performed on German holidays occurring during the normal workweek unless otherwise directed by the KO.

On German holidays, the Contractor shall provide 24/7 after-hours services for emergency work and Help Desk operations. The Help Desk shall coordinate all work with BASOPS and other contractors during after-hours, weekends, and holidays. Except as otherwise specified, the Contractor shall not schedule routine work on German holidays. When a scheduled service is required and the schedule for that work falls on a German holiday, the Contractor shall accomplish the work on the workday preceding or following the holiday. On German holidays, all Contractor offices may be closed, except for minimum essential personnel, or as otherwise specified in this PWS.

The German national and local holidays are:

New Year’s Day, January 1stThree Kings Day, January 6th
Good Friday, VariesEaster Monday, Varies
Labor Day, May 1stAscension Day, Varies
Whit Monday, VariesCorpus Christ, Varies
Day of German Unity, October 3rdAll Saint Day, November 1st
1st Christmas Day, December 25th2nd Christmas day, December 26th

After-Hours Staffing The Contractor shall provide personnel support within one (1) hour of emergency notification (P1) outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. The Contractor’ operated Help Desk shall be available after normal hours to serve as the central point of contact for Contractor operations. See para 7.4.10, TE-A-10 for the list of pre-approved emergency work. See para 2.2.3.2.1 and 2.2.5.1.1 for P1 procedure.

Contractor personnel shall not be scheduled for overtime work (with the exception of emergency work) on a regular basis. If routine work or Preventive Maintenance cannot be performed during regular work hours, the Contractor shall request and obtain, in writing, approval from the COR /KO for overtime work approval and compensation. The Contractor shall comply with German Working Hours Act and German Labor Law.

Installation Closures.

The Contractor shall reschedule the work to be performed the next business day following the closure unless the following day is a Saturday, Sunday, a recognized Federal Holiday, and when routine work is not scheduled for that day. The Government will coordinate with the Contractor to reschedule the work.

Inclement Weather Delay.

If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO/COR if inclement weather suspends operations within two (2) hours prior to suspending operations. The Contractor shall resume operations with KO/COR approval.

Curtailment of Operations.

When operations are curtailed due to manmade or natural conditions on a working day, it may be necessary for the KO/COR to interrupt that day’s work under this contract. The Contractor shall reschedule the work on any day acceptable to the Government. If the KO/COR agrees, the Contractor may continue the work as scheduled. The KO/COR will provide verbal announcements of immediate curtailment of operations to the Contractor.

N/A.

Emergency Services.

Emergency Medical Treatment.

The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR/ACOR immediately, not later than (NLT) two (2) hours of the incident.

The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

The Contractor shall be responsible to contact 112 or 110 and shall coordinate installation access with Directorate of Emergency Services.

USAG Stuttgart does not provide emergency medical response services.

Accident Reporting.

The Contractor shall comply with Host Nation requirements for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. A completed typed original plus one (1) copy of ENG FORM 3394 United States Army Corps of Engineers Accident Investigation Report shall be delivered to the KO/COR within five (5) calendar days of occurrence, whenever an accident involving personal injury or government owned property occurs. (Deliverable A-002) Contract Administration and Management.

Post Award Conference and Performance Evaluation Meetings.

The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5, Post-award Orientation.

The KO and COR/ACOR/DPW PM Controller will meet monthly with the Contractor to review the Contractor’s performance. Written minutes of meetings will be recorded by the Contractor for Government review and comment then signed by both the Project Manager and the KO. The written minutes will be distributed within five (5) calendar days after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.

Biweekly meetings between contractor/COR/KO shall occur to maintain communication and review of contract performance issues. The Government will write and distribute the agenda and meeting minutes.

Total Management.

Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

Roles.

The following provides the roles and their respective authority during the performance of the contract:

Contracting Officer (KO).

The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be affected by KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

Contracting Officer’s Representative (COR).

The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or Alternate Contracting Officer’s Representative (ACOR), and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The Alternate Contracting Officer Representative (ACOR) will serve as on-site representatives of the COR in the performance of actual contract surveillance, if they meet all COR training and experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

COR Authority.

A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.

Representation.

The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

COR/ACOR/Designated Government Representative Functions.

The COR/ACOR/Designated Government Representative monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR/Designated Government Representative is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.

DPW’s Quality Assurance (QA) team, GFEBS Subject Matter Experts (SME), DPW Preventive Maintenance Controller, Housing, and Environmental Divisions are considered to serve as designated Government representatives.

Communication Protocol and Subject Matter Expert (SME) Interaction To ensure efficient contract performance, the Contractor shall adhere to the following communication protocol. While the COR is the primary point of contact for all contractual matters, direct communication with the Government representatives designated in paragraph 2.1.8 is authorized and required for specific procedural issues.

a. Authorized Direct Communication: The Contractor is required to communicate directly with the designated Government SMEs on matters strictly related to the clarification and execution of procedures already defined in this PWS and its Technical Exhibits. This includes, but is not limited to, questions regarding:

· GFEBS/ArMA Procedures: All questions regarding GFEBS processes and transaction codes or ArMA processing shall be directed to the DPW GFEBS SME.

· PM Program Management: All questions regarding the implementation of the PM Program or PM task lists shall be directed…