TE F-003_Service Performance Standards.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Base Operations USAG Stuttgart
Solicitation number
PAN409-26-P-0000027869
Issued by

About this file

This is a Service Performance Standards document that establishes maintenance requirements and performance metrics for grounds maintenance operations at USAG Stuttgart. The document defines performance standards across four ground categories: Improved Grounds (high-visibility areas including parade fields, schools, playgrounds, and athletic fields), Semi-Improved Grounds (common areas including airfields and ranges), Security Perimeter Fence Clear Zones, and Unimproved Grounds (undeveloped areas, forests, and wetlands).

The performance standards specify detailed service requirements and frequency intervals for grass cutting, edging, trimming, lawn treatments (fertilization, aeration, seeding, sodding, and hydroseeding), weed control, debris and litter removal, tree and shrub maintenance, athletic field maintenance, and playground maintenance. For Improved Grounds, grass shall be maintained at 10 centimeters or mowed every 14 days (whichever comes later), with mower heights set at 5 centimeters for spring and 3 centimeters thereafter. Specific maintenance frequencies are prescribed using a standardized legend (e.g., 1W for once weekly, 2Y for twice yearly, 1M for monthly). The document defines grounds categories by usage and required intensity of maintenance, ranging from intensive annual maintenance for Improved Grounds to unpredictable, mission-driven maintenance for Unimproved Grounds. This specification document serves as the baseline for evaluating contractor performance on the Base Operations USAG Stuttgart contract.

View the file

Other files

File Type Posted
TE-H-26_RB_robinson_waste and stormwat.pdf PDF
TE-H-26_kelleybks_comb_sew - copy-black-white.pdf PDF
TE F-006_Leaf Removal Area Maps.docx DOCX document
TE-H-26_PANZERKAS_SOUTH_COMBSEW.pdf PDF
TE-H-26_RB ABWASSER Bestand Farbe.pdf PDF
TE A-20_ENV_USAG-ST-INRMP 2019-prefinal.pdf PDF
TE-H-26_Kelley_Repair Underground Sewage System 1-2.PDF PDF
TE A-01 KELLEY BARRACKS.pdf PDF
TE-H-26_Kelley-kelhsg2_storm_drain-monochrome.pdf PDF
TE-H-26_PATCH_GE_656_Patch Waste Water SYSTEM HP.PDF PDF
TE-H-26_kelleybks_comb_sew.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-2.PDF PDF
TE A-20_ENV_e_Guide to Species Protection during construction_final.pdf PDF
TE-H-26_PANZERKAS_panzerkas2_comb_sew.pdf PDF
TE-H-26_Kelley-B-8L002_Koersch_As_built_Kanal_Vorabzug_20201111.pdf PDF
TE-H-26_kelleybks_comb_sew - black_white.pdf PDF
TE-H-26_kelleybks_comb_sew - Copy.pdf PDF
TE A-20_ENV_USAG_Stuttgart_Command_Policy_Letter_19.pdf PDF
TE-H-26_Kelley-kelhsg2_sanit_sew-monochrome.pdf PDF
TE C-01_UH Inventory and Space Assignment.xlsx XLSX spreadsheet
TE F-002_Historical Workload.xlsx XLSX spreadsheet
TE A-16_Employee Log.xlsx XLSX spreadsheet
USAG ST BASOPS FY26 Annex G_PAVEMENT CLEARENCE SNOW AND ICE REMOVAL_10FEB2026_PWS.docx DOCX document
TE-H-26_PATCH_STEUBWEICHT SANIT SEW STORM DRAIN.pdf PDF
TE A-22_SHIP Material List_SHIP Store 8.5 x 11.7 in.pdf PDF
TE A-20_ENV_Garrison_Stuttgart_SPRP2024_EN.pdf PDF
TE A-02_Space Assignment and Equipment.xlsx XLSX spreadsheet
TE-H-26_PATCH_General Sanitary Sewer and Storm Drainage Map 1of2 1990.PDF PDF
TE F-004_Lawn Mowing Area Maps.docx DOCX document
TE A-20_ENV_USAG ST HWMP_2024_Signed.pdf PDF
TE-H-26_RB_SHRT13_LP_Bestand_Kanal_Uebersicht.pdf PDF
TE-H-26RB Abwasser SW.pdf PDF
TE-H-26_Kelley-Entwaesserung Plan-3.PDF PDF
TE-A-08_Master Preventive Maintenance Task and Price Catalog_05-08-2026.xlsx XLSX spreadsheet
TE-H-26_PATCH_patchbks2_sanit_sew.pdf PDF
TE-H-26_RB COMB SEWER 1985 3of4.pdf PDF
TE-H-26_Kelley-Sewer revision_2016-12-13_wash-rack.pdf PDF
TE A-22_SHIP Material List_SHIP Store (8.5 x 11.7 in).pdf PDF
TE-H-26_KELLEY STORM SEWER LINE - KELLEY BKS. - WEIDACH.pdf PDF
TE I-001_AFH Inventory and Space Assignment.xlsx XLSX spreadsheet
USAG ST BASOPS FY26 Annex F_GROUNDS_10FEB2026_PWS.docx DOCX document
USAG ST BASOPS FY26 Annex H_FACILITY MAINTENANCE_08MAY2026_PWS.docx DOCX document
TE A-23_Historical Data - DMO_OWO.xlsx XLSX spreadsheet
TE A-02_Space Assignment and Equipment_04-10-2026.xlsx XLSX spreadsheet
TE-H-26_PATCH_General Sanitary Sewer and Storm Drainage Map 2of2 1990.PDF PDF
TE-H-26_Kelley_Repair Underground Sewage System 2-2.PDF PDF
TE-H-26_Kelley_Repair Underground Sewage System 2-2 compressed.pdf PDF
TE A-20_ENV_ISWMP USAG Stuttgart 13Feb24.pdf PDF
TE-H-26_RB COMB SEWER 1985 rev1991 4of4.pdf PDF
TE A-23_Historical Data - BOM.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

404 Grounds Maintenance

TASKFrequency
Improved Grounds (High Visibility) such as the main gate, parade fields, drill fields, schools, playgrounds, Army Family Housing, and athletic areasDescription of Service PerformedImprove Grounds (high Visibility) Garrison executes grass cutting performance standards at 100% of high visibility grass acres within the Containment area footprint

Grass Cutting Mow the following vegetation: Rye, Fescue, tall Fescue, St. Augustine, Buffalo, Bermuda, Bent, Centipede, Zoysia. Additionally all weeds shall be mowed to same height as grass. Set mower height to 5CM for the first cuts in spring then lower to 3cm unless weather is too dry Grass height 10cm or 14 day interval, whichever comes later

Edging responsibilities shall include, but not be limited to, flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other concrete (except against asphalt edges) located in the Improved Grounds. Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curb joints.
Trimming responsibilities include grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects that project above the ground so grass and weed height is maintained consistent with adjacent grass.
Provide Periodic Lawn Treatment ServiceProvide Lawn Treatment - Fertilize -Apply commercial, N-P-K granular fertilizer and pulverized agricultural lime3Y
Provide Lawn Treatment - Aerate and Seed -1Y
Provide Lawn Treatment -Regeneration measurements for parade fields only- scarify, fertilize, sand1Y
Provide Lawn Treatment - Hydroseed1Y
Provide Lawn Treatment -Sodding1Y
Grass Area RepairAs needed with COR approval
Maintain Flower Beds and Planted AreasFertilize2Y
Mulch2Y
WaterAs required when rainfall is not sufficient
Add compost and till1Y
Weed2M
Trim and/or Prune2Y
Weed ControlApply Herbicide to Parade Fields and Athletic Fields2Y
Remove weeds from the edge of buildings, fences, trash islands, and other structures1M
Use hot foam water and or steel wheel machine on all roads, sidewalks, driveways and parking lots in order to prevent weed growth2Y
Debris, Leaves, and Litter RemovalPrior to and After Mowing remove trash, paper, branches, rocks or other debris that would present a safety hazard or detract from the finished appearance of the cutGrass height 10cm or 14 day

interval, whichever comes later

Trash and litter - pick up trash and litter from parking lots, roads, curbstones, fence lines, lawns1W
Emptying of litter baskets to include ash trays and receptacles at the entrances of all buildings throughout the Garrison, and replacing of plastic bags in the litter baskets.1W
Animal waste containers shall be emptied and plastic bags replaced1W
Collect, remove, and dispose of all leaves, including bagged leaves3Y
Remove grass clippingsSame day following Mowing Actions
Tree, Shrub, Brush, and Hedge MaintenancePruning Trees2Y
Trimming Trees along walkways and roads1Y
Tree Cutting/Removal1Y
Shrubs/brush Trimming3Y
Hedge Trimming3Y
Hedge, Bush, and Shrub Fertilization1Y
Athletic Fields MaintenanceGrass Mowing1W
Grass WateringAs required when rainfall is not sufficient
Grass Regeneration Measures - scarify, aeration, and sanding1Y
Grass Fertilization2Y
Tamped Sand Areas- remove old and spreading out new brick dust, rolling, watering, re-leveling and edging in-fields. Remove all weeds1M
Weed Removal to produce an even and consistent grassed area1W
Holes and Depressions in tamped areas to be filled and compacted1M
Tennis and Pickle Ball Courts to be maintained by watering of the clay courts for dust control, compacting and spreading out brick sand1W

Playground Maintenance Replace Sand in sand boxes 1Y

Rake and clean all foreign materials from playgrounds2M
Replenish sandAs needed with COR approval
Security Perimeter Fence Clear Zone MaintenanceMowing - Bases of fence lines surrounding the entire installation and housing areas shall be kept free of vegetation in an area of 1.20 meters inside and 1.20 meters outside the fence lines.2Y
Tree Pruning - all branches 1 meter above the fence within the 1.2meter inside and outside the fence1Y
Semi-Improved Grounds (Common Areas) all other areas that don't fall into the other three categories including airfieldsN/A
Grass Cutting (set mower height 5cm)Mow the following vegetation: Rye, Fescue, tall Fescue, St. Augustine, Buffalo, Bermuda, Bent, Centipede, Zoysia. Additionally all weeds shall be mowed to same height as grassBSLA Area - 3Y

Rifle Range Berms - 2Y Obstacle Course - 2Y Olgastrasse - 2Y

Fire Breaks and Ranges: Along Fence Lines, Weapons Ranges, Along Utility Lines, etc.Description of Service Performed: Maximum Frequency Standard Along Fence Lines, Weapons Ranges, Along Utility Lines, etc.Cut Grass when height is minimum 16" or 4Y, whicever comes later
Airfield
Grass Cutting on airfield, clear zone, landing sitesMow the following vegetation: Rye, Fescue, tall Fescue, St. Augustine, Buffalo, Bermuda, Bent, Centipede, Zoysia. Additionally all weeds shall be mowed to same height as grassGrass height minimum 10cm or 14 day interval, whichever comes later
Grass cutting around markers, lights, and other aerial targetsMow the following vegetation: Rye, Fescue, tall Fescue, St. Augustine, Buffalo, Bermuda, Bent, Centipede, Zoysia. Additionally all weeds shall be mowed to same height as grassMin cuts rqd for safety visibility
Remove grass clippingsSame day following Mowing Actions
Unimproved Grounds (outside Cantonment area) such as undeveloped areas, grazing lands, forests, lakes, ponds, and wetlands-Grass height minimum 24" or 2Y, whichever comes later
Legend:
A/R - As Required/Requested
D - Daily1Y – 1 Time a Year
1W - Once a Week2Y - 2 Times a Year
2W - Twice a Week4Y - 4 Times a Year
3W - Times a week5Y - 5 Times a Year
1M - Once a Month6Y - 6 Times a Year
2M - Twice a MonthN/F - No Funded at this Capability Level
Grounds Defined: Grounds consist of all land and water acreage for which an installation commander has responsibility (including outlying and satellite areas). Grounds are grouped into the following Categories:
Installation Cantonment Area(s): Are defined as the geographic area(s) comprising the most urban areas of the installation. The areas are characterized by concentrations of pedestrians and permanent assets (facilities) for non-field training purposes. The cantonment area includes, but is not limited to, family and unaccompanied housing areas, schools, medical facilities, office facilities, an airfield, industrial facilities, limited recreational places and community activities. Cantonment Area(s) may include the main access roads with the road shoulders (10 feet from the edge of the roads) from the primary controlled security entrance posts to the installation. Grounds classified as Improved, Semi-improved, and Unimproved ground may be included in the cantonment area dependent on location and usage.
Improved Grounds: This category includes acreage on which intensive landscape maintenance activities must be planned and performed annually as fixed requirements. Maintenance activities include mowing, irrigation, fertilization, cultivation, aeration, seeding, sodding, spraying, pruning and trimming; weed, dust, and erosion control; drainage; and planting for landscape effect, wind, and sound abatement, and other intensive practices. Examples are areas within the built-up section of an installation which contain lawns and landscape plants; parade grounds; drill fields; non-synthetic turf athletic field facilities; cemeteries; and similar areas.
Semi-improved Grounds: This category includes areas on which periodic recurring maintenance is performed but to a lesser degree than on improved grounds. Maintenance activities include mowing primarily for safety and security, weed and brush control, erosion control, dust control, and drainage maintenance. Examples are small arms ranges, antenna facilities, picnic areas, mowed road shoulders, ammunition storage areas, airfield shoulders and clear zones, drop zones, firebreaks, and similar areas.

Unimproved Grounds: This category includes all other acreage not classified as improved or semi-improved. Maintenance activities are generally unpredictable and normally evolve from the military mission; also, for soil, water, and wildlife conservation; floods; fires; insect infestations; and disease epidemics. Examples are bombing and gunnery areas; impact areas, training, and maneuver areas; forest areas; agricultural and grazing lands, lakes, ponds and swamps; beach and similar areas requiring limited or no maintenance.

File details come from the government source that posted it. Updated .