This is a technical manual for the Allied Systems Company DC-8600CTS boat davit (marine crane), a hydraulic-powered lifting system designed for launching and recovering rigid hull inflatable boats (RHIBs) in heavy seas up to Sea State 5. The davit has an 8,600-pound safe working load capacity, operates on a constant tension winch system with a minimum hoisting speed of 72 feet per minute, and is equipped with both standard and SOLAS (Safety of Life at Sea) emergency launching capabilities. The system is powered by a 75 horsepower electric motor (460 vac, 3-phase, 60 Hz) driving an axial piston pump that delivers 47 gallons per minute at 3,000 psi to a three-section hydraulic control valve managing winch, pivot, and constant tension functions. Key components include a 125-gallon hydraulic tank with return filtration, proportional and solenoid-actuated control valves, anti-2-block safety controls, wire rope tension sensors, and both manual emergency control handles and hand-crank recovery systems for powerless operation.

The manual provides comprehensive installation, operation, preventive maintenance, and troubleshooting guidance for the DC-8600CTS (Serial Number 2394). Installation requires connection to 440-volt shore power, filling the 125-gallon hydraulic tank, and mounting the remote control console within 40 feet of the davit. Operation requires trained personnel and covers pre-operational testing, launching and recovery procedures, and emergency protocols including SOLAS-compliant procedures operable from both deck and boat locations using manual control handles. Preventive maintenance is prescribed on daily, weekly, monthly, quarterly, semi-annual, and annual schedules, including hydraulic oil analysis, filter changes, and component inspections. The manual includes detailed hydraulic and electrical schematics, parts lists with over 40 subassembly tables, and specifications for the constant tension winch system with integrated safety features for preventing hook overtravel and load slippage.

View the file

Other files for this federal contract opportunity

Other files attached to MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS, newest first.
File Type Posted
TJ-573-01 Cranes Deck and Boom O M.pdf PDF
TJ_FY2027 DD_Fire System Inventory_Fixed Semi-Cylinders.pdf PDF
NOAA Standard Specification MOC-167-1 Refurbishment of Water Tight Closures.pdf PDF
NOAA Standard Specification MOC-100-1A_Abs Load Line Survey.pdf PDF
NOAA Standard Specification AMC-505-1B_Valve Overhaul and Tests.pdf PDF
48026A-GI INDUSTRIAL-NOAA T JEFFERSON-POTBD_UTT.pdf PDF
1102-35 - Safe Use of Rigging Equipment (public).docx DOCX document
NF 57-07-12 - DryDock-UWILD Inspection Checklist (public).pdf PDF
Steyr Motors Marine Engines Manual.pdf PDF
TJ-233-03 EMD Engine 12-645F7B.pdf PDF
TJ-311-03 EDG Alternator.pdf PDF
Capstan_SA-1128 Manual for SA1014.pdf PDF
436-6634707 Machinery Alarm and Monitoring System Dk Pln - redline.pdf PDF
528-6634786E Plumbing and Deck Drains Arrangement and Details_130709483.pdf PDF
512-6634856_HVAC Arr and Details FCSLE Deck Fr 19-50.pdf PDF
TJ-079-03E Trim and Stability Booklet_101947795.pdf PDF
525-6634754E Fills Vents and Soundings Arrngmnt and Details.pdf PDF
TJ-528-009A - Grey Water and Sewage Modifications.pdf PDF
612-6634889D Lifelines Handrails and Stanchions.pdf PDF
TJ-611-6634891F DECK FITTINGS ARRANGEMENT and DETAILS.pdf PDF
163-6634821_Seachest Details.pdf PDF
243-6634740_Propeller Shafting Arrangement and Details.pdf PDF
TJ-582-002A New Transom Mooring Chock Inst.pdf PDF
636-6634911 Acoustic Tile Installation Arr.pdf PDF
601-6634921 Joiner Arrangement Main Deck.pdf PDF
320-6634691 Cable Wtrtight Penetrations - redline.pdf PDF
TJ_985_985-6634639_RevP_Sht1 THRU 3_ABS_FIRE CONTROL PLAN.pdf PDF
259-6634767 Diesel Engine Exhaust Arrangement.pdf PDF
514-3275003-12_91762335.pdf PDF
512-6634850F HVAC ARRNGMNT ENGRM_124644191.pdf PDF
TJ-583-022A Platform and Grating Mods.pdf PDF
101-6634867 Structural Module 8.pdf PDF
512-3275003-7 HVAC MODS 01 LVL AND ABV REV B.pdf PDF
801-6634641_Table of Offsets.pdf PDF
101-6634866_Structural Module Assembly No 7.pdf PDF
TJ-529-001A Cross Flooding Piping Installation.pdf PDF
TJ-562-001A Rudder Arrangment and Details_102457373.pdf PDF
562-6634741D Rudder Arrangement and Details.pdf PDF
073-6634629_Resilient and Dim Mounting List.pdf PDF
101-6634864 Structural Module 5.pdf PDF
259-6634766 Engine Exhaust System.pdf PDF
TJ-437-004 TLI Electrical Modifications.pdf PDF
TJ_FY2027 DD_Fire System Inventory_SCBA Tanks.pdf PDF
NOAA Standard Specification 997-1B Drydocking-Routine_Drydock-Work.pdf PDF
NOAA Standard Specification MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
NOAA Standard Specification MOC-300-3 General Requirements for Electrical_Electronic Items.pdf PDF
NOAA Standard Specification MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
NOAA Standard Specification AMC-634-1A_Deck Coverings.pdf PDF
Lufkin Marine Gears Spare Parts List RS2719S_LM584 RevB.pdf PDF
Show all 50

MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80-1286Rev: 5-2019

TECHNICAL MANUAL

BOAT DAVIT

MODEL DC-8600CTS

S/N 2394

Please check the Allied Systems website regularly for updates to the technical manual.

Important: Be certain to specify the serial number of your crane or davit when ordering parts.

MANUFACTURED BY

21433 S.W. OREGON ST., SHERWOOD 97140, OR U.S.A.

PHONE: 503.625.2560 • FAX: 503.625.7980

E-MAIL: cranes@alliedsystems.com WEBSITE: http://www.alliedsystems.com

Marine Crane

80-1286 Rev: 5-2019

INTENTIONALLY LEFT BLANK

0-1 80-1286Rev: 5-2019

Chapter 0 Front Matter Table of Contents.......................................................0-1 Abbreviations and Acronyms.....................................0-4 Safety Summary........................................................0-5

Chapter 1Introduction
1.1SAFETY PRECAUTIONS................................1-1
1.2INTRODUCTION.............................................1-1
1.2.1Scope...........................................................1-1
1.2.2Applicability...................................................1-1
1.3DAVIT DESCRIPTION.....................................1-1
1.3.1Davit Installation...........................................1-1
1.3.2Hydraulic Power Unit....................................1-1
1.3.3Remote Control Console..............................1-2
1.3.4Constant Tension Winch...............................1-2
1.3.5Hydraulic System..........................................1-2
1.3.5.1Control Valve.............................................1-2
1.3.5.2Pivot System..............................................1-2
1.3.5.3Winch System............................................1-2
1.3.5.4Emergency System (SOLAS)....................1-2
1.3.6Electrical System.........................................1-2
1.3.6.1Electric Motor............................................1-2
1.4REFERENCE DATA.........................................1-3
1.5WARRANTY....................................................1-8
Chapter 2Preparation for Use
2.1UNPACKING....................................................2-1
2.2INSPECTION...................................................2-1
2.3MAJOR COMPONENTS.................................2-1
Chapter 3Installation
3.1GENERAL........................................................3-1
3.2INSTALLATION................................................3-1
3.2.1Davit Installation...........................................3-1
3.3PREPARATION FOR OPERATION..................3-2
3.4PREPARATION FOR RESHIPMENT...............3-2
Chapter 4Principles of Operation
4.1INTRODUCTION.............................................4-1
4.2MECHANICAL SYSTEM.................................4-1
4.2.1Davit.............................................................4-1
4.2.2Winch............................................................4-2
4.2.3Control Console............................................4-2
4.3HYDRAULIC SYSTEM....................................4-3
4.3.1Hydraulic Power Unit....................................4-3
4.3.1.1Axial Piston Pump.....................................4-4
4.3.1.2Pressure Compensator..............................4-5
4.3.2Control Valve................................................4-6
4.3.3Pivot System.................................................4-7
4.3.4Winch System...............................................4-7
4.3.5Emergency Launch System..........................4-9
4.3.6SOLAS Emergency Launching System........4-9
4.4ELECTRICAL SYSTEM...................................4-9
4.4.1Wire Rope Tension Control...........................4-9
4.4.2Anti-2-Block Control......................................4-9
Chapter 5Operation
5.1INTRODUCTION.............................................5-1
5.2OPERATING CREW........................................5-1
5.3INSTRUMENTS AND CONTROLS.................5-1
5.3.1Control Console............................................5-1
5.3.2HPU (Hydraulic Power Unit).........................5-3
5.4OPERATING THE DAVIT.................................5-3
5.4.1Pre‑Operational Test.....................................5-3
5.4.2Initial Operational Test..................................5-4
5.4.3Launching Operation....................................5-4
5.4.4Recovery Operation......................................5-6
5.4.5Emergency Operation...................................5-7
5.4.5.1Emergency Control Valve Controls............5-7
5.4.5.2SOLAS Launch Operation from Deck........5-8
5.4.5.3SOLAS Emergency Launching Op. ..........5-8
5.4.5.4Winch Emerg. Recovery Hand Crank......5-10
5.5HAND SIGNALS............................................5-10
Chapter 6Preventive Maintenance
6.1INTRODUCTION.............................................6-1
6.2LUBRICATION SPECIFICATIONS..................6-1
6.3PREVENTIVE MAINTENANCE.......................6-1
6.4HYDRAULIC OIL MAINTENANCE..................6-2
6.4.1Storage and Handling...................................6-2
6.4.2In-Operation Care.........................................6-2
6.5SCHEDULED MAINTENANCE.......................6-2
6.5.1Daily or Every 10 Hours................................6-4
6.5.1.1Inspect Fasteners......................................6-4
6.5.1.2Inspect Hydraulic Hoses, Tubes, etc..........6-4
6.5.1.3Inspect Winch Drum..................................6-4
6.5.1.4Check Hydraulic Oil Level..........................6-4
6.5.1.5Inspect Anti-2-Block...................................6-5
6.5.2Weekly or Every 50 Hours............................6-5
6.5.2.1Wash with Fresh Water..............................6-5
6.5.3Monthly or Every 200 Hours.........................6-5
6.5.3.1Wash with Fresh Water/Detergent.............6-5
6.5.3.2Inspect And Lubricate Wire Rope..............6-5
6.5.3.3Inspect SOLAS Ropes.............................6-10
6.5.3.4Inspect Lifting Eye...................................6-10
6.5.3.5Inspect Hydraulic Cylinders.....................6-10
6.5.3.6Inspect Davit Structure............................6-11
6.5.3.7Check Accumulator Precharge................6-11
6.5.3.8Clean Hydraulic Tank Breather................6-11
6.5.3.9Inspect Electrical Boxes...........................6-11

6.5.3.10 Check Winch Housing Oil Level...............6-11

Marine Crane Chapter 0

Table of Contents

0-280-1286 Rev: 5-2019

6.5.4Every 3 Months or Every 500 Hours...........6-12
6.5.4.1Replace Hydraulic Return Filter...............6-12
6.5.4.2Lubricate Electric Motor...........................6-12
6.5.5Every 6 Months or Every 1000 Hours.........6-13
6.5.5.1Check Bolts and Fasteners......................6-13
6.5.6Annually or Every 2000 Hours....................6-13
6.5.6.1Obtain Oil Samples for Analysis..............6-13
6.5.6.2Change Winch Assembly Oils.................6-13

6.5.6.2.1 Change Winch Brake Oil......................6-13

6.5.6.2.2 Change Winch Gear Reducer Oil.........6-13

6.5.6.3Inspect Sheave........................................6-14
6.5.6.4Change Hydraulic System Oil..................6-16
6.5.7Every 5 to 8 Years or As Required..............6-17
6.5.7.1Replace Hydraulic Hoses........................6-17
6.6MAINTENANCE RECORDS..........................6-17
Chapter 7Corrective Maintenance
7.1INTRODUCTION.............................................7-1
7.1.1Maintenance Practices.................................7-1
7.2ADJUSTMENTS..............................................7-2
7.2.1Main System Relief Pressure.......................7-2
7.2.2CT Winch Pressure Adjustments..................7-3
7.2.3Anti-2-Block Control Adjustment...................7-4
7.2.4Wire Rope Tension Sensor Adjustment........7-4
7.3REPAIRS ........................................................7-5
7.3.1CT Winch......................................................7-5
7.3.1.1Removal.....................................................7-5
7.3.1.2Constant Tension Motor Replacement.......7-6
7.3.1.3Load Motor Replacement..........................7-6
7.3.1.4Winch Brake Replacement........................7-7
7.3.1.5Winch Brake..............................................7-8

7.3.1.5.1 Disassembly...........................................7-8

7.3.1.5.2 Assembly................................................7-9

7.3.1.6Winch Gear Reducer...............................7-10
7.3.1.7Winch Installation.....................................7-10
7.3.1.8Wire Rope Installation..............................7-11
7.3.2Lift Cylinder.................................................7-12
7.3.2.1Cylinder Removal....................................7-12
7.3.2.2Cylinder Disassembly..............................7-13
7.3.2.3Replace Cylinder Seals...........................7-15
7.3.2.4Reassemble Cylinder..............................7-15
7.3.3Control Valve..............................................7-17
7.3.3.1Remove Control Valve.............................7-17
7.3.3.2Disassemble Control Valve......................7-17
7.3.3.3Reassemble Control Valve.......................7-17
7.3.3.4Install Control Valve.................................7-18
7.3.4Accumulator................................................7-19
7.3.4.1Precharging The Accumulator.................7-19
7.3.4.2Checking the Precharge..........................7-19
7.3.4.3Precharging.............................................7-19
Chapter 8Storage
8.1SHORT TERM STORAGE...............................8-1
8.2LONG TERM STORAGE.................................8-1
Chapter 9Troubleshooting
9.1INTRODUCTION.............................................9-1
9.1.1Safety...........................................................9-1
9.1.2Problem Area Isolation.................................9-1
9.2PRELIMINARY TROUBLESHOOTING............9-1
9.2.1Pump Test.....................................................9-1
9.2.2Control Valve Test.........................................9-1
9.2.3Winch System Test.......................................9-1
9.3FAULT DETECTION........................................9-2
9.3.1Probable Mechanical Causes.......................9-2
9.3.2Probable Hydraulic Causes..........................9-2
9.3.3Probable Electrical Causes..........................9-2
Chapter 10Parts Lists
10.1INTRODUCTION...........................................10-1
10.1.1Major Subassemblies.................................10-1
10.1.2Special Notes.............................................10-1
10.2FORMAT........................................................10-1
10.2.1Item.............................................................10-1
10.2.2Notes..........................................................10-1
10.2.3ASC P/N.....................................................10-1
10.2.4Qty..............................................................10-1
10.2.5Description..................................................10-1
10.2.6Illustrations.................................................10-1
10.3SPARE PARTS LIST......................................10-2
Table 10-1DC8600CTS...................................... 10-5
Table 10-2Boom Assembly................................ 10-7
Table 10-3Boom Weldment................................ 10-8
Table 10-4Sheave Case Assembly.................... 10-9
Table 10-5Bracket Assembly........................... 10-10
Table 10-6Cylinder Assembly.......................... 10-13
Table 10-7Power Pack Assembly..................... 10-16
Table 10-8Motor/Pump Assembly.................... 10-17
Table 10-9Starter Assembly............................ 10-19
Table 10-10Accumulator Assembly................... 10-20
Table 10-11Filter Assembly............................... 10-21
Table 10-12Reeving Arrangement..................... 10-23
Table 10-13Winch Complete.............................. 10-24
Table 10-14Manifold Installation........................ 10-28
Table 10-15Manifold Assembly.......................... 10-31
Table 10-16Valve Shield Assembly.................... 10-32
Table 10-17Constant Tension Winch................. 10-33

Table 10-18 Winch Brake.................................... 10-35

Table 10-19Winch Lockout Assembly................ 10-36
Table 10-20Haul Ball.......................................... 10-37
Table 10-21Remote Console Assembly............. 10-39
Table 10-22Control Box Assembly..................... 10-42
Table 10-23Inlet & Return System..................... 10-47
Table 10-24Control Valve................................... 10-48

0-3 80-1286Rev: 5-2019

Table 10-25Ball Valve Assembly........................ 10-49
Table 10-26Pivot System................................... 10-51
Table 10-27Manifold Assembly.......................... 10-52
Table 10-28Winch System................................. 10-55
Table 10-29Electrical System............................ 10-58
Table 10-30Anti-2-Block Assembly.................... 10-60
Table 10-31A-2-B Switch Assembly................... 10-61
Table 10-32Weight Assembly............................ 10-62
Table 10-33Tension Switch Assembly............... 10-63
Table 10-34Junction Box Assembly................... 10-64
Table 10-35Power Box Assembly...................... 10-65
Table 10-36Downstop Assembly....................... 10-66
Table 10-37Davit Assembly............................... 10-67
Table 10-38SOLAS Controls Installation........... 10-71
Table 10-39Decal Installation............................. 10-73
Table 10-40Cradle Installation........................... 10-77
Table 10-41Pad Assembly, Stern....................... 10-78
Table 10-42Pad Assembly, Stern....................... 10-79
Table 10-43Pad Assembly, Bow......................... 10-80
Table 10-44Stop Assembly, RH......................... 10-81
Table 10-45Stop Assembly, LH.......................... 10-82
Table 10-47Spare Parts List.............................. 10-83

11 APPENDIX A: Model 10 Drive

12 APPENDIX B: Oilgear Pump

13 APPENDIX C: Marathon Motor

0-480-1286 Rev: 5-2019

ABS................................. American Bureau of Shipping Adj................................................................Adjustment amp.................................................................... Ampere API....................................American Petroleum Institute APL.................................................Allowance Parts List A/R.............................................................. As Required ASC........................................Allied Systems Company Aux................................................................... Auxiliary AWG............................................American Wire Gauge bar.................................... 14.5 pounds per square inch Brg..................................................................... Bearing C..................................................... Celsius (centigrade) CAGE....................Commercial And Government Entity CFR.................................. Code of Federal Regulations cid.............................................cubic inch displacement CNTRL................................................................ Control CT....................................................... Constant Tension CTRL.................................................................. Control DIN...................................Deutsche International Norm EIPS................................. Extra Improved Plough Steel Elec.................................................................. Electrical Ext.....................................................................External F....................................................................Fahrenheit fpm.......................................................... feet per minute FSCM.............. Federal Supply Code for Manufacturers gal.........................................................................Gallon Galv.............................................................. Galvanized Gnd.....................................................................Ground gpm...................................................Gallons Per Minute hp................................................................Horsepower HPU...............................................Hydraulic Power Unit Hyd..................................................................Hydraulic Hz..........................................Hertz (cycles per second) ID...........................................................Inside Diameter IEEE......Institute of Electrical and Electronic Engineers ISO...................... International Standards Organization IWRC............................... Independent Wire Rope Core kPa................................................................. kilopascal kw...................................................................... Kilowatt lb...........................................................................pound lbs....................................................................... pounds LH................................................................... Left Hand lpm.......................................................Liters Per Minute LT..............................................................................Left

Max................................................................. Maximum m............................................................................meter micron....................................................0.001 millimeter Min................................................................... Minimum N.C....................................................... Normally Closed N.O.........................................................Normally Open NATO........................ North Atlantic Treaty Organization NC........................................................ National Coarse NEMA.... National Electrical Manufacturer’s Association NF..............................................................National Fine NLGI.....................National Lubrication Grease Institute N-m.......................................................... Newton-meter Nom...................................................................Nominal NPTF..............................National Pipe Tapered for Fuel NSS......................................... Not Serviced Separately NSTM............................... Naval Ship Technical Manual OD......................................................Outside Diameter PC..............................................Pressure Compensator Pl............................................................................Plate P/N..............................................................Part Number POS................................................................... Position Pot............................................................Potentiometer psi............................................. pounds per square inch PVB..................................................Pump Side Module PVE................................... Proportional Valve Electrical Qty.....................................................................Quantity Ref................................................................. Reference RH................................................................Right Hand rpm............................................ Revolutions Per Minute RT...........................................................................Right SAE............................ Society of Automotive Engineers SOL..................................................................Solenoid SOLAS...........................................Safety Of Life At Sea Spec...........................................................Specification SS........................................................... Stainless Steel SW....................................................................... Switch TEFC............................... Totally Enclosed, Fan-Cooled Thk......................................................................... Thick TMCR............. Technical Manual Contract Requirement TYP......................................................................Typical v................................................................................ Volt vac...........................................Volts Alternating Current vdc...................................................Volts Direct Current VOM......................................................Volt-Ohm Meter

Abbreviations and Acronyms

0-5 80-1286Rev: 5-2019

Safety Summary

GENERAL SAFETY NOTICES

The following pages contain general safety warnings which supplement specific warning and cautions ap-pearing elsewhere in this manual. All electrical and hydraulic equipment is dangerous. You must thorough-ly review and understand the Safety Summary before attempting to operate, troubleshoot or service your equipment.

All possible safety hazards cannot be foreseen so as to be included in this manual. Therefore, you must al-ways be alert to potential hazards that could endanger personnel and/or damage the equipment.

The following symbols/terms are used to emphasize safety precautions and notices in this manual:

DANGER

The “DANGER” symbol indicates a hazardous situation which, if not avoided, will result in death or serious injury. Carefully read the mes-sage that follows to prevent serious injury or death.

WARNING

The “WARNING” symbol appears wherever incorrect operating procedures or practices could cause serious injury or death. Carefully read the message that follows to prevent seri-ous injury or death.

CAUTION

The “CAUTION” symbol appears where a haz-ardous situation which, if not avoided, could result in minor to moderate injury and equip-ment damage.

NOTICE

This signal word alerts to a situation that is not related to personal injury but may cause equip-ment damage.

NOTE: The term “NOTE” highlights operating pro-cedures or practices that may improve equipment reliability and/or personnel performance.

Obey the following cautions and warnings before using your machine to avoid equipment damage, personal injury or death.

OPERATING SAFETY

Qualifications

• This equipment must be operated and maintained by experienced and trained personnel.

• You must receive training prior to operating this equipment.

• If you do not routinely operate this equipment, refresher training is recommended. You must reac-quaint yourself with this manual and the equipment before starting, and then proceed slowly.

Do Not Operate Alone:

• It is essential that someone be on deck to watch clearances and hand signals. Ensure that the director is clear of the Davit or other moving parts and the load before you move it. Do not move the Davit or load if you cannot see this person.

Safety Regulations:

• Each country has its own safety legislation. It is in the operator’s own interest to be conversant with these regulations and to comply with them in full.

This also applies to local bylaws and regulations in force on a particular worksite.

• Should the recommendations in this manual devi-ate from those in the user’s country, the national regulations should be followed.

0-680-1286 Rev: 5-2019

Equipment Hazards:

• Do not operate this equipment if you know of mal-functions, missing parts, and/or incorrect adjust-ments. Any one of these situations can cause or contribute to an accident or damage to the equip-ment. Lower the load and stop the HPU immedi-ately if problems arise after starting.

• Do not start the hydraulic power unit if the “start” switch has been tagged-out with a “DO NOT START” or other red tag.

• Never allow anyone under the load. Ensure the area is clear before moving the Davit or the load.

• Never attempt to disconnect any of the safety devices installed on your equipment.

• When moving the load, always make sure that there is adequate clearance for both the boom and the load.

• Do not overload the Davit. Always operate within the rated capacity of the Davit and rigging. Refer to the load chart for this Davit’s lifting capacity.

• Always wear appropriate safety clothing and use prescribed safety equipment such as head, foot, hand, eye protection, etc.

• Accurately place the load, keeping in mind how you expect the load to respond when released.

• Lower and remove the load before leaving the Davit or securing the hydraulic power.

• Maintain proper clearance from electrically ener-gized equipment. If the Davit contacts energized equipment, stay clear and prevent anyone else from coming in contact with the Davit.

MAINTENANCE SAFETY

Unless properly serviced, this Davit can be extremely dangerous.

Qualifications:

• To ensure safety, each person working on this Davit must have the necessary skills, informa-tion, tools and equipment. Do not attempt to make adjustments or perform repairs unless you are authorized and qualified to do so.

Do Not Work Alone:

• Never attempt to service energized equipment alone. Make sure that someone capable of provid-ing aid is present in the event of accidental shock or other incidents.

Secure the Equipment:

• Do not rely on the hydraulic system to support any part of the Davit during maintenance or lubrication.

Never stand under a component that is supported only by the hydraulic system. Make sure that components are resting on their mechanical stops or supported with appropriate safety stands during maintenance or lubrication.

• Unless otherwise directed in this manual, never attempt service procedures when power is on. Tag the “START” switch and/or the disconnect switch with a “DO NOT START” sign when required.

• Never attempt to service the hydraulic power sys-tem or the Davit while it is moving or the hydraulic power unit is running. Lower the load and secure the power.

0-7 80-1286Rev: 5-2019

Equipment Safety:

• Test Equipment:

xx Make sure that the equipment used to test the hydraulic power system and the Davit is calibrated and in good working condition.

xx If an instrument must be held while taking measurements, electrically ground the case of the instrument before energizing the equip-ment when appropriate. There are some kinds of measuring devices that should not be grounded.

xx Do not hold ungrounded measurement de-vices while they are in use.

xx Do not touch energized equipment or person-nel working on energized equipment while holding a multimeter.

• Heavy Equipment:

xx Use lifting devices with a lifting capacity greater than twice the weight of any objects to be lifted to prevent personal injury or equip-ment damage.

• Pressurized Equipment:

xx Wear safety goggles when working on or near pressurized equipment.

xx Lower all loads and relieve all hydraulic pres-sure before disconnecting hydraulic lines. If this is not done the load could fall or pressur-ized hydraulic oil could cause personal injury or death. Never try to stop a hydraulic leak with any part of your body.

• Personal Protective Equipment:

xx Always use personal protective equipment (PPE) appropriate to the situation. This may include the use of hearing protection, eye pro-tection, a respirator, a hard hat, leather gloves, steel toed boots, etc.

Electrical Hazards:

• An electrical shock could be fatal. Be aware that the hydrau-lic power unit (HPU) is typi-cally driven by a 440 or 450 vac, 3-phase, 60Hz motor. Make sure that the power is “OFF” before opening electrical panels.

• Never attempt electrical test-ing or repair while standing in water.

• Remove watch-es, rings or any jewelry that may contact ener-gized circuits.

Hot Oil Hazards:

• Burns from hot oil can be severe. Always allow lubricating and hydraulic oil to cool before draining or disconnecting hydraulic fittings and hoses.

Fire Hazards:

• Hydraulic oil is flammable.

Do not smoke when check-ing or filling the tank. Keep open flames and sparks away from the hydrau-lic power system and the Davit.

• Regular pres-sure washing is recommended for fire prevention and improves general safety by removing oil, and dirt.

• Never overfill the hydraulic tank because the over-flow could contribute to a fire. Immediately repair any hydraulic leaks and clean up any spills.

0-880-1286 Rev: 5-2019

Compressed Air Hazards:

• When using compressed air to dry parts, pressure should not exceed 30 psi (200kPa).

• Air pressure penetrating your skin can be fatal.

Never direct compressed air at anyone.

Pressurized Hydraulics Hazards:

• Be aware of the hazards related to pressurized hydraulics:

xx Wear personal protective equipment, such as gloves and safety glasses, whenever servicing or checking a hydraulic system.

xx Assume that all hydraulic hoses and com-ponents are pressurized. Relive all hydraulic pressure before disconnecting any hydraulic line.

xx Never try to stop or check for a hydraulic leak with any part of your body. Use a piece of cardboard to check for hydraulic leaks.

xx Small hydraulic hose leaks are extremely dan-gerous and can inject hydraulic oil under the skin, even through gloves.

xx Infection and gangrene are possible when hydraulic oil penetrates the skin. See a doctor immediately to prevent loss of a limb or death.

Falling Hazard:

• Due to the height of some lubrication points, it is essential to personnel safety that approved ladders, personnel lifts and/or scaffolding is used while servicing the Davit. Always put the Davit in it’s parked position before attempting to perform repairs or service.

• Always use safety treads and handholds where provided.

The Davit can be dangerously slick whenever oily surfaces are exposed to rain or frost.

0-9 80-1286Rev: 5-2019

0-1080-1286 Rev: 5-2019

Figure 1-1. Component Identification

1-1 80-1286Rev: 5-2019

Marine Crane Chapter 1

Introduction

1.1 SAFETY PRECAUTIONS

Warnings and cautions appearing throughout this technical manual are extremely important to personnel and equipment safety. Before attempting to operate, troubleshoot, or service this equipment, you must thor-oughly review and understand the Safety Summary that precedes this chapter.

1.2 INTRODUCTION

This manual has been prepared to assist person-nel operating and servicing the Rescure Boat Davit- DC8600CTS. Chapters 1 through 9 comprise the in-stallation, operating and servicing instructions. Chapter 10 contains parts lists for all components of the crane.

1.2.1 Scope

This manual provides instructions for personnel to ac-complish the following:

1. Install the davit.

2. Prepare, operate, and secure the crane.

3. Detect, isolate, and correct malfunctions.

4. Remove, repair or replace, and reinstall parts.

5. Perform scheduled maintenance.

Intermediate and depot level maintenance, specifically inspection, operability tests, fault isolation, and over-haul of items such as motors, brakes, and winches, will normally be accomplished at more extensive shop facilities.

1.2.2 Applicability

This manual is applicable to the Rescue Boat Davit

DC8600CTS, S/N 2394.

1.3 DAVIT DESCRIPTION

See Figure 1-1. Model DC8600CTS davit was devel-oped for launching and retrieving rigid hull inflatable boats (RHIB’s) in heavy seas. Maintenance straps are provided to secure the boat in place when being stowed.

This davit is rated for a safe working load of 8,600 pounds (3900 kg) up to Sea State 5, and has the capability to raise and lower the hook approximately 80 feet (24.4 m) on a 5/8 inch diameter Endurance Dyform 34LR 3 wire rope, rated for nominal breaking strength of 56,400 pounds (25582 kg). Winch hoisting speed is a minimum of 72 feet per minute (fpm), [22 meters per minute (mpm)].

1.3.1 Davit Installation

The davit weldments, the structural members which support the load, are constructed of high strength steel with continuous welds. The winch is mounted to the davit, and a hook rated for 8,600 lb. (3900 kg) is rigged for one-part reeving from the winch line, through a sheave. The davit’s base assembly is bolted to the deck.

1.3.2 Hydraulic Power Unit

See Figure 1-1. System pressure is supplied by a hydraulic power unit (HPU) including a motor driven, pressure compensated, axial piston, variable displace-ment pump and a 125 gallon (473 liter) tank. Oil return-ing to the tank passes through a 10 micron return filter.

Delivery is up to 47 gpm (178 lpm), maintained at 3000 psi (20684 kPa) by a pressure compensator on the pump.

Figure 1-2. Constant Tension Winch

Constant Tension Hydraulic MotorWire Rope

Anchor

Drum

Gear Reducer

Hydraulic Motor

Main Winch Brake

Spring Brake

Winch Frame

1-280-1286 Rev: 5-2019

1.3.3 Remote Control Console

All controls required for operating the davit are located at the control console. System condition indicators are located here and are protected from the weather by a hinged cover when not in use.

1.3.4 Constant Tension Winch

See Figure 1-2. A constant tension type winch is mounted to the davit assembly. The winch consists of a load hydraulic motor, constant tension hydraulic motor, planetary gear reducer, spring applied/ hydraulically released friction brakes, frame, cable drum and shaft.

A sprague clutch in the main winch brake allows the load to be lifted without brake drag.

1.3.5 Hydraulic System

1.3.5.1 Control Valve

The control valve has three sections. The first (winch) section is a motor spool actuated by a control lever or proportional solenoid. The second (pivot) section has a three position cylinder spool actuated by a control lever or proportional solenoid. The third (constant ten-sion winch) section is a motor spool actuated by an electric solenoid.

1.3.5.2 Pivot System

The pivot system controls hydraulic power to pivot the davit. Hydraulic pressure from the control valve alters the pressure level within the hydraulic cylinder, causing it to shift. As it extends or contracts evening the pres-sure within, the davit pivots at the attachment points.

1.3.5.3 Winch System

The winch system controls hydraulic power to the winch for normal hoisting and lowering. Hydraulic power is applied to a load hydraulic motor. A counter-balance valve hydraulically locks the winch and keeps the load from dropping. A spring applied hydraulic release brake acts as a parking brake.

1.3.5.4 Emergency System (SOLAS)

The emergency operating system is designed to allow limited use of the hydraulically controlled functions of the davit (pivot and lowering) in the event of a loss of power. The system consists of the four accumulators, the pressure gauge and associated plumbing. The accumulators are pressurized when hydraulic power is applied to the davit and remains pressurized until discharged by the accumulator valve. The emergency system can also be operated when the davit is under full power.

1.3.6 Electrical System

Both power distribution and control functions are served by the electrical system. The electrical system consists of a starter, wiring to the motor, a solenoid, a proximity sensor, and the constant tension electrical system; constant tension electrical components, and constant tension proximity sensor.

1.3.6.1 Electric Motor

The hydraulic pump is driven by a 75 hp 460 vac 3-phase, 60 Hz electric motor. This motor is energized by a solid state soft start system.

1-3 80-1286Rev: 5-2019

Characteristics Description

Ratings:PERSONNEL RATED
Safety Factor, Wire Rope6:1
Load8,600 lbs (3,900 kg)
Hoist Speed72 fpm nominal (Bare Drum Speed)
Wire Rope5/8" (1.6 cm) Dia

Test Weights:

Dynamic (110% of Rated Load)9,460 lbs (4,290 kg)
Static (150% of Rated Load)12,900 lbs (5,851 kg)

Electrical Power Requirements: 440 vac, 3-phase, 60 Hz, 95 Amp

Hydraulic System:

Operating Pressure3,000 psi (20,684 kPa)
Relief Pressure3,200 psi (22,063 kPa)
Required Pump Output47 gpm (177 lpm)
Temperature Range0° F to 180° F (-17° C to 82° C)
Hydraulic FluidMobil DTE 13M
Hydraulic Power Unit:
PumpAxial Piston, Pressure Compensated, Variable Displacement
Motor75 hp, 460 vac, 3-phase, 60 Hz, 1800 rpm
Return FilterIn-Tank Type, 6 Micron Element
Tank125 Gallon (473 Liters) Capacity

Control Valve: 3-Section Lever/ Solenoid Actuated

Winch:
Maximum Rated Load8,600 lbs (3,900 kg)
Normal Hoisting Speed72 fpm (22 meters per minute)
Drum Speed33.58 rpm
Drum Capacity112 feet (34 meters)

Environmental:

Atmospheric Davit and equipment will withstand frequent soaking by salt spray and ambient atmospheric conditions

Temperature Davit and equipment will operate within ambient temperature range of -40° to 120° F (-40° C to 49° C)

Humidity Davit and equipment will withstand effects of relative humidity ranging from 0 to 100% under operating and stowage conditions

Stability Davit can withstand horizontal force along longitudinal axis of at least 10% of rated load and function satisfactorily in Sea State 5

Table 1-1. Reference Data

1.4 REFERENCE DATA

1-480-1286 Rev: 5-2019

"Solas Pivot" (Back Corner Under Handle on Base)

"High Voltage" "Start" "Stop" (Decals on Starter Box)

"Allied

DC8600CTS"

(Both Sides of Boom)

"Allied

DC8600CTS"

(Both Sides of Boom)

"Hydraulic Oil" (Oil Reservoir)

"Warning-No Step"

(Oil Reservoir)

"Accumulator Drain"

(Oil Reservoir)

"Solas Winch" "Handle Reset (Left on Base)

"Warning:

Hands Off"

(Both Cradle Legs)

"Warning:

Hands Off" (Both Cradle Legs)

"Warning: High Voltage"

"Warning:

Hands Off"

"Hand Crank" (On PVC Tube)

SOLAS winch approval decal

SOLAS Structural Approval Number

Reeving Chart

Winch Serial Number Plate

"Warning:

Manual Handles"

Figure 1-3. Decal Location

1-5 80-1286Rev: 5-2019

Model......................................................... DC8600CTS
Nomenclature................................................Boat Davit
Rated Capacity.............................. 8,600 lbs (3,900 kg)
Overturn Moment.................... 155,000 lb-ft (17512Nm)
Davit Total Gross Weight................ 9,000 lbs (4082 kg)

Note: Capacities shown in this manual make no allowances for such factors as freely suspended loads, operating speeds, or weights of any accessories.

Figure 1-4. Dimensional Data

1-680-1286 Rev: 5-2019

146.29 in (371.6 cm)

REMOTE

OPERATOR'S

CONSOLE

E D

G E

O F

H U

LL

108.13 in (274.65 cm)

5/8 DIA WIRE ROPE

INTEGRATED

BOAT CRADLE

107.26 in (272.4 cm)

HYDRAULIC

CONTROL VALVE

196.63 in (499.4 cm)

Allied CT10 Winch with SOLAS Capability

8600 (3,900 kg) Rated load

Figure 1-5. Dimensional Data

1-7 80-1286Rev: 5-2019

172.88 in (439.12 cm)

44.52 in (113 cm)

188.53 in (478.87 cm)

54°

85°

Approximate Travel Path

Approximately 100”

Davit Range of Motion

Cylinder Extends from 70” to 116”

(177.8cm to 294.6cm)

Figure 1-6. Davit Range of Motion

1-880-1286 Rev: 5-2019

WARRANTY

ALLIED SYSTEMS COMPANY, referred to as the Company, warrants its products to be free from defects in material and workmanship under normal use in service for a period of twelve (12) months after being placed in service by dealer or user, or within eighteen (18) months from shipment from factory, whichever occurs first. Within the warranty period, the Company will replace, EXW Sherwood, Oregon, or allow credit at the current dealer net price, any part that shall be proved defective, to the satisfaction of the Company. Upon the Company's request, all parts claimed defective must be properly identified and returned to the factory, freight prepaid. This policy makes no allowance for freight, travel expense or labor. ALLIED SYSTEMS COMPANY will honor properly documented and described warranty claims only on units for which a completed Warranty Validation form is in the Company's possession at the time when such claim is filed.

This Warranty is expressly in lieu of any other warranties, expressed or implied, including any implied warranty of merchantability or fitness for a specific purpose, and of any other obligations or liabilities on the part of ALLIED SYSTEMS COMPANY. No person, agent, distributor, or dealer is authorized to assume, for or on behalf of the Company any different or additional obligations in connection with the product. The Company's liability under this Warranty is limited to treatment of parts as set forth in the above paragraph. All other liabilities expressed or implied, arising under statute, through neglect or otherwise, including any warranty or merchantability or fitness for a particular purpose are hereby expressly waived.

This Warranty covers only new equipment in the possession of its original owner, which after shipment from the factory has not been modified, manufactured upon, altered, fitted with parts other than those specified in the parts book, or improperly repaired in any manner whatsoever, without the written consent of the Company. This Warranty is restricted to use within the specified performance rating or capacity in effect at time of sale of the equipment and excludes equipment which has been abused, misused, or operated under conditions other than those specified by

ALLIED SYSTEMS COMPANY.

Hydraulic and electrical components, engines, batteries, tools and similar equipment not manufactured by ALLIED SYSTEMS COMPANY, are covered only by the standard Warranty of the manufacturers of such equipment. Such items are not warranted by ALLIED SYSTEMS

COMPANY.

79-10B 2 October 2017

1.5 WARRANTY

2-1 80-1286Rev: 5-2019

Marine Crane Chapter 2

Preparation for Use

2.1 UNPACKING

Immediately upon receiving the DC8600CTS davit, the components should be unpacked, and an inventory taken. See Figure 2-1 and Figure 2-2 for a list of items that should be included. Report any missing items to Allied Systems Company (503.625.2560) immediately.

2.2 INSPECTION

Upon delivery of the system, inspect the shipment for lost items and any damage that may have occurred during transit. Refer to the shipping diagram and pack-ing slip for a list of items included in the shipment. If there is a package or crate that appears damaged, unpack the equipment for further inspection.

Some examples of damage:

• Scratched or scuffed paint

• Dents or cracks

• Broken or bent hydraulic tubes

• Leaking hydraulic components

• Corrosion

It is the responsibility of the person receiving the ship-ment to inspect all shipments for visible and/or con-cealed loss or damage at the time of receipt. Any and all loss or damage must be properly documented and reported to the carrier within the time limits and in the form and format required by the carrier, the tariff, or any related insurance or transportation regulation.

Documentation of visible loss or damage and/or short-ages are to be clearly noted on the freight bill and appropriately signed by representatives of the carrier and the customer/receiver BEFORE ALLOWING THE

DRIVER TO LEAVE YOUR DOCK.

Appropriate documentation of concealed loss or damage shall include, but not limited to, photographs showing evidence of loss or damage, evidence of the carrier’s subsequent inspection and findings and where appropriate, copies of the customer’s formal claim made on the carrier. The carrier may also insist that the original packaging (carton, pallet, box, crate, etc.) be saved for their inspection.

Allied Systems Company assumes no responsibility for any loss or damage, which has not been appropriately documented and reported.

Report any damage or claims to Allied Systems Com-pany Traffic Department immediately at: 503.625.2560.

2.3 MAJOR COMPONENTS

The major components (as shipped) of the davit are illustrated in Figure 2-1 and Figure 2-2.

2-280-1286 Rev: 5-2019

Figure 2-1. DC8600CTS - Approx 9,000 lbs

Figure 2-2. Remote Console - Approx 100 lbs

3-1 80-1286Rev: 5-2019

Marine Crane Chapter 3

Installation

3.1 GENERAL

This chapter is provided to assure a smooth and sat-isfactory installation of the Rescue Boat Davit, model

DC8600CTS, S/N 2394.

1. Have a crane available that will safely lift the davit assembly including winch and electric motor and the hydraulic power unit (9,000 lbs).

2. �When installing the davit, check for adequate pivoting clearance between the davit and the ship’s structures or any other deck mounted equipment.

3.2INSTALLATION
3.2.1Davit Installation

Figure 3-1.

1. Remove all access covers from the davit and console.

2. �Lift the davit over the mounting flange so that the base assembly attachment points will be centered over the deck attachment points.

3. �Position the davit so that all attachment points are in the correct position with the deck. Install (22) 3/4” Grade 8 capscrews, (22) 3/4” Esna Nuts, (22) 3/4” flat washers and (22) 3/4” lock washers under each capscrew and tighten as indicated in Figure 3-1. If welding to deck, critical weld zones are the 1/2” material regions around the bolt holes.

4. Connect the shipboard powerline (440v, 3 phase) to the starter box on the HPU (See Figure 10-8).

5. Mount the remote control console in it’s respective position. Clearance along the deck must be made for the electrical line between the remote control console to the davit.

6. �Connect the electrical line from the hydraulic pow-er unit to the control console. Verify connections as shown the Figure 4-13, Electrical Schematic, and Figure 10-28, Electrical System.

7. �Fill the hydraulic tank with approximately 125 gal-lons of clean hydraulic fluid. Check the sight gauge on the tank for correct level—Do not overfill.

Figure 3-1. Davit Installation

DAVIT BASE

F

IG

-1

3/4” GR8 CAPSCREWS

CRITICAL WELD ZONES

AROUND THE 1 ” MATERIAL

BOLT HOLE REGIONS

or

/2

Torque 3/4" Grade 8 bolts to 340 ft-lb lubricated or 230 ft-lbs with anti-seize.

3-280-1286 Rev: 5-2019

8. To test if the motor is wired correctly, perform a “bump test”. Remove the access cover on the pump/motor adapter to observe the coupler be-tween the motor and the pump. Very briefly apply voltage to the motor while observing the rotation of the coupler. It must be as indicated by the red arrow. If the direction of rotation is opposite of what is indicated, a qualified electrician must rewire the motor to reverse direction.

3.3 PREPARATION FOR OPERATION

1. Check all lines and fittings for security.

2. �Start the hydraulic power unit by depressing and releasing the start button on the starter box. Allow the HPU to warm up, and purge any air from the system.

3. Inspect for hydraulic leaks, unusual sounds, vibra-tions, or other problems. Correct as required.

4. Perform preliminary checks described in Chapter 9, Troubleshooting.

5. Carefully operate the pivot control lever, and en-sure the davit stops at the correct points in its pivot arc.

NOTE: The winch should have at least 100 lbs (45

kg) of weight on the hook to perform its functions.

If the winch does not stop at the correct point, refer to Chapter 7 Corrective Maintenance.

6. �Carefully operate the winch lever to ensure that the winch stops at the correct point. When hoisting, it should stop just before the lifting ring reaches the sheave.

3.4 PREPARATION FOR RESHIPMENT

To prepare the davit for reshipment, perform the follow-ing:

1. Remove the lifting ring. Wind the cable neatly onto the drum and secure the end of the cable to the drum.

2. Secure power to the hydraulic power unit.

3. Remove davit and console service covers. Close the console cover and secure with a nut and bolt.

4. �Drain the hydraulic tank to prevent spills and cover the hydraulic tank breather to prevent contamina-tion of the system. Similarly drain the hydraulic power unit and console.

WARNING

Ensure that the power to the equipment is off before attempting to disconnect the cables. An electrical shock could be fatal.

5. Tag and disconnect hydraulic lines and electrical wiring between the davit, control console and HPU.

CAUTION

Disconnected hydraulic lines must be covered to prevent hydraulic system contamination.

Make sure open ports on hydraulic compo-nents, including hoses, tubing, and fittings, are either capped or plugged during installation, maintenance and repair procedures.

6. Support the davit with an overhead crane that can safely lift at least 9,000 lbs, and remove the davit base mounting bolts. Use care when the davit becomes free, in case it is not well balanced with the crane attachment being used. Move the davit to a safe location.

7. �Long-term storage recommendations are listed in Chapter 8.

4-1 80-1286Rev: 5-2019

PRINCIPLES OF OPERATION

4.1 INTRODUCTION

The model DC8600CTS Davit provides the capability to launch or retrieve rigid hull inflatable boats (RHIB’s) in uneven seas.

The functions and capabilities of the davit are the result of several systems working together: Davit;

Winch; Operator Controls; Hydraulic System; Electrical System; and the Hydraulic Power Unit.

Figure 4-1. Component Identification

Chapter 4

4.2 MECHANICAL SYSTEM

4.2.1 Davit

The davit is the structural member which supports the load, and the winch is mounted to the davit. A hook rat-ed for 8,600 lb (3,900 kg) is rigged for one‑part reeving from the winch line, through a sheave at the end of the davit arm. The davit’s base assembly is bolted to the deck.

4-280-1286 Rev: 5-2019

Figure 4-2. CT Winch

Figure 4-3. Remote Control Console

4.2.2 Winch

See Figure 4-2. The boom mounted winch consists of a main winch motor, planetary gear reducer, spring-applied/hydraulically released friction brakes, frame, wire rope drum, and constant tension motor.

Brake

Gear ReducerFrame

Wire Rope Drum

Main Winch Motor

Constant Tension Motor

4.2.3 Control Console

See Figure 4-3. All instruments and controls are located in the control console which is mounted to the deck within 40 feet (12 meters) of the davit.

4-3 80-1286Rev: 5-2019

4.3 HYDRAULIC SYSTEM

4.3.1 Hydraulic Power Unit (HPU)

See Figures 4-4 and 4-5. The hydraulic power unit (HPU) provides hydraulic power for all davit functions.

The axial piston pump draws hydraulic oil from a 125 gallon (473 liter) reservoir and delivers 47 gpm (178 lpm) at 3000 psi (20.7 Mpa) to the control valve. Pres-sure compensated control ensures maximum flow until the preset pressure is reached, and then regulates discharge to maintain pressure in response to system demands.

Pump

125 Gallon (473 liter) Hydraulic Tank

Control Valve

Accumulators

Hydraulic Motor

Figure 4-4. Hydraulic Power Unit (HPU)

Figure 4-5. Hydraulic Power Unit (HPU) Schematic

4-480-1286 Rev: 5-2019

MAXIMUM

PARTIAL

8 7 6 3 1 5

9 2 10 11

Legend

1. Control Actuator7. Cylinder Barrel
2. Cylinder Bearing8. Valve Plate
3. Swash Block9. Valve Ports
4. Shaft10. Shaft Seal
5. Shaft Bearing11, Housing

6. Piston & Shoe

4.3.1.1 Axial Piston Pump

See Figure 4‑6. The axial piston, variable displacement pump is controlled by a pressure compensator which ensures maximum flow until it reaches the control pressure setting, and then regulates flow to match sys-tem requirements while maintaining control pressure.

As driveshaft (4) turns, piston and shoe assemblies

(6) held against swashblock (3) are drawn in and out of rotating cylinder barrel (7).