TE-MMM_Gas_Leak_Survey_Requirements_Revision 1.docx

DOCX document 26 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Attachment H - Dugway Pricing Matrix CLIN Structure revised 14 JUN 2023.xlsx XLSX spreadsheet
Attachment P - Past Performance Questionnaire Rev 1.docx DOCX document
W5168W23R0002 0003 Attachments.zip ZIP file
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
Attachment 2 - Annex B to OPORD 18-011 Facilities Maint Inst.docx DOCX document
Attachment 1 - Annex A Overarching PWS_12 Apr 22.docx DOCX document
Attachment 11 - DBA Wage Determination - Residential.pdf PDF
Attachment 8 - Davis Bacon - Building.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx DOCX document
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
Attachment 19 - CLS 414 Facility Maintenance_AFH_12 Apr 22.docx DOCX document
Attachment 20 - CLS 420 Facility Maintenance_Horizontal_12 Apr 22.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-S_O and M-Plans_Revision 1.doc DOC document
TE-U_English_Village_Improved_Area_Revision 1.pdf PDF
TE-J Current GFE.xlsx XLSX spreadsheet
TE-Q-1 2019-2020 Historical Workload Data.xlsx XLSX spreadsheet
TE-WW_Air_Dryers_Revision 1.pdf PDF
TE-GGG_Fire_Alarm_and_Fire_Suppression_System_List_Revision 1.pdf PDF
TE-UUU_List_Back_Flow_Preventors_Revision 1.pdf PDF
TE-KKK-1_Amerigas_Owned_Propane_Tanks_Revision 1.pdf PDF
TE-P_Real_Property_PM_Task_List_Revision 1.xlsx XLSX spreadsheet
TE-LLL-2 DPW Utility Reimbursable Meters 18MAY2020.pdf PDF
TE-FF-1_Historical_Snowfall_Data_Revision 1.xlsx XLSX spreadsheet
TE-QQQ_Sewage_Treatment_Monthly_Log_Revision 1.xlsx XLSX spreadsheet
TE-NNN_Gas_Leak_and_Repair_Report_Revision 1.docx DOCX document
TE-Z_Top_Dressing_Soil_Spec_Revision 1.pdf PDF
TE-LLL-1 DPW Utility Meters 18MAY2020.xlsx XLSX spreadsheet
TE-KKKK Snow Ice and Sand Removal Plan.docx DOCX document
TE-LLLL Water Treatment Description.docx DOCX document
TE-JJ-1_Generator_Hour_Report_Revision 1.xlsx XLSX spreadsheet
TE-HH_PCB_SOP_Revision 1.docx DOCX document
TE-KKK_Government_Owned_Propane_Tanks_Revision 1 30oct18.xlsx XLSX spreadsheet
TE-H_GFP_and_CAP_Report_Revision 1.xlsx XLSX spreadsheet
TE-FFF_VTS_Location_and_Data_Revision 1.xlsx XLSX spreadsheet
TE-F_Subcontract_Report_Example_Revision 1.xlsx XLSX spreadsheet
TE-CCC_Auto_Gates_and_Arms_Revision 1.xlsx XLSX spreadsheet
TE-W_Mowing_Requirements_Ranges_Revision 1.docx DOCX document
Attachment 18 - CLS 411 Facility Maintenance_ Vertical_12 Apr 22.docx DOCX document
Attachment 22 - CLS 502 Water Services_12 Apr 22.docx DOCX document
Attachment 24 - CLS 510 Pest Management_12 Apr 22.docx DOCX document
Attachment 15 - CLS 404 Grounds Maintenance_12 Apr 22.docx DOCX document
TE-VVVV Master keys dupicate keys and locks.docx DOCX document
TE-L_Irrigation_Systems_Drawing_1-35 Revision 1.pdf PDF
TE-YY_Evaporative_Coolers_Revision 1.pdf PDF
TE-EE__Unpaved_Roads_Revision 1.pdf PDF
TE-U-1_Ditto_Improved_Area_Revision 1.pdf PDF
TE-V-2_MAAF_Avery_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-V-1_Ditto_Semi-Improved_Land_Area_Revision 1.pdf PDF
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit Revision 1

TE-MMM

Annual Gas Leak Survey Requirements

1. Surveyed: All underground gas mains, service lines, valves and above ground service lines which include post side gas regulators and meters. (Excludes individual building service lines in the family housing areas.)

2. Testing Equipment: Identify detection equipment used during the survey. Identify when equipment calibration was performed, by whom and to what standard.

3. Leak Testing Procedures: All lines are to be walked or driven with appropriate leak detection equipment. All suspected leaks shall be further investigated / tested in the following manner: Above ground leaks shall be pinpointed with appropriate leak detection device and leak detection soap. Underground gas leaks shall be pinpointed using approved bore hole procedures and pot holing. (DMOs shall be called in and a leak report submitted for any leaks found.)

4. Area Survey / Dates: identify what was surveyed and when by month. Using map pages to identify areas is acceptable

5. Propane Tanks: Identify the building number, tank size and serial number of all propane tanks surveyed. Using map pages to identify areas is acceptable

6. Leaks: In a narrative format, Indicate the number of gas leaks responded to; how many were positive vs negative, the leaks discovered during the survey by location, how leaks were repaired, and any propane tank discrepancies.

File details come from the government source that posted it. Updated .