TE-BBB-1_AST-UllageLog_Revision 1.docx

DOCX document 24 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Attachment S - PIEE Solicitation Vendor Posting Offer Training.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 14 JUN 23 Cell J31 Formula.xlsx XLSX spreadsheet
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_w_Changes.pdf PDF
Amended RFP W5168W23R0002-0003-Conformed Document -.pdf PDF
DGP BaseOps Site visit Sign-in Roster 2-2-2023.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
Attachment 18 - CLS 411 Facility Maintenance_ Vertical_12 Apr 22.docx DOCX document
Attachment 22 - CLS 502 Water Services_12 Apr 22.docx DOCX document
Attachment 24 - CLS 510 Pest Management_12 Apr 22.docx DOCX document
Attachment 15 - CLS 404 Grounds Maintenance_12 Apr 22.docx DOCX document
TE-VVVV Master keys dupicate keys and locks.docx DOCX document
TE-L_Irrigation_Systems_Drawing_1-35 Revision 1.pdf PDF
TE-YY_Evaporative_Coolers_Revision 1.pdf PDF
TE-EE__Unpaved_Roads_Revision 1.pdf PDF
TE-U-1_Ditto_Improved_Area_Revision 1.pdf PDF
TE-V-2_MAAF_Avery_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-V-1_Ditto_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-DDDD OSHA 3138-01R 2004. Confined Spaces.pdf PDF
TE-FF_Snow_Removal_Priorities_Revision 1.pdf PDF
TE-G_Burn_Rate_Example_Revision 1.xlsx XLSX spreadsheet
TE-ZZZ_Self_Help_Stock_Level_Revision 1.pdf PDF
TE-A_Automation_Technology_Revision 1.pdf PDF
TE-SSSS Stored Presticides Report Example.xlsx XLSX spreadsheet
TE-DDD Deliverable Schedule-DUGWW6B6AAWKI13.docx DOCX document
TE-PP Boilers 20200506.xlsx XLSX spreadsheet
TE-KKK_Government_Owned_Propane__Tanks_Revision 1.xlsx XLSX spreadsheet
TE-JJJ_Fire_Pump_Data_Revision 1.xlsx XLSX spreadsheet
TE-HHH_Clean_Agent_Fire_Suppression_System_Revision 1.xlsx XLSX spreadsheet
TE-CC-1_Out_of_cycle_request_Revision 1.xlsx XLSX spreadsheet
TE-ZZZZ Priority Facilities.xlsx XLSX spreadsheet
TE-XXXX Tank List.xlsx XLSX spreadsheet
TE-WWW_List_Army_Housing_Units_Revision 2.xlsx XLSX spreadsheet
TE-C_ISR_Requirements_Revision 1.pdf PDF
TE-NNNN Monthly Pest Management Operations Record.xlsx XLSX spreadsheet
TE-AA_Pure_Live_Seed_Mix_Revision 1.pdf PDF
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
Attachment 2 - Annex B to OPORD 18-011 Facilities Maint Inst.docx DOCX document
Attachment 1 - Annex A Overarching PWS_12 Apr 22.docx DOCX document
Attachment 11 - DBA Wage Determination - Residential.pdf PDF
Attachment 8 - Davis Bacon - Building.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx DOCX document
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
Attachment 19 - CLS 414 Facility Maintenance_AFH_12 Apr 22.docx DOCX document
Attachment 20 - CLS 420 Facility Maintenance_Horizontal_12 Apr 22.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-S_O and M-Plans_Revision 1.doc DOC document
TE-U_English_Village_Improved_Area_Revision 1.pdf PDF
TE-J Current GFE.xlsx XLSX spreadsheet
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE-BBB-1

AST Ullage Log 11/14/2018 Revision 1

ABOVEGROUND STORAGE TANK ULLAGE LOG

Use a separate log sheet for each tank

Use either this form or its equivalent to document ullage (available capacity) calculations as required by Utah’s Storage Tank Regulations. Use the correct tank chart to convert from inches to gallons. If ullage is calculated by an ATG, it is acceptable to save the ATG inventory tape that shows the ullage in gallons. Keep these records at least six (6) months. However, it is advisable to keep records indefinitely, since they may be required as part of the compliance review concerning a claim for reimbursement from the Petroleum Storage Tank Fund. The requirement to determine ullage before delivery begins applies to all ASTs, including ASTs equipped with overfill prevention equipment that stops delivery or sounds an audible alarm.

Facility name

Fac. ID # (if known)

Street address

Product in tank

City

ZIP

Tank capacity (gallons)

Date
Gauge or stick reading
Conversions to gallons
Available Capacity
Quantity Added
Initials

Report Suspected or Confirmed Leaks to the Dugway Environmental Compliance Division @ 435-831-3218

File details come from the government source that posted it. Updated .