Fort Sill SPCCP-ISCP Vol I June 2019.pdf
PDF 9 MB Posted
- Attached to
- Fuel Operations GOCO Ft. Sill, OK Federal contract opportunity
- Solicitation number
- SPE60320R0510
- Issued by
- Defense Logistics Agency Energy
About this file
This document provides information about an upcoming federal contract opportunity for fuel operations at Fort Sill, Oklahoma. The Defense Logistics Agency Energy will issue a Request for Proposal for a Government-Owned Contractor-Operated fuel services contract at Fort Sill. The contractor will be responsible for operating, maintaining, managing and providing all fuel services and facilities. The contract is set aside for small businesses and will be fixed price. The base period of performance is four years from October 1, 2020 through September 30, 2024, with an option to extend through September 30, 2029. There is also a six-month extension option. The contract will be subject to Service Contract Labor Standards requirements.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 June 2019
U.S. Army Corps of Engineers, Tulsa District
2488 E. 81st Street, Suite 1600 Tulsa, Oklahoma 74137
FINAL
Spill Prevention, Control, and
Countermeasures Plan/Installation
Spill Contingency Plan
Volume I – Master Plan
U.S. Army Garrison
Fort Sill, Oklahoma
June 2019
Contract Number: W912BV-15-D-0019, Task Order: W912BV17F0071
Prepared by:
Auxilio Management Solutions 51 West 4th Avenue Denver, CO 80223
This page intentionally left blank
FINAL
Spill Prevention, Control, and Countermeasures Plan/
Installation Spill Contingency Plan
U.S. Army Garrison
Fort Sill, Oklahoma
June 2019
COMMAND SIGNATURE/ENGINEER CERTIFICATION
This Spill Prevention, Control, and Countenneasure Plan/Installation Spill Contingency Plan (SPCCP/ISCP) has been reviewed, approved, and is fully supported by the command and will be immediately implemented throughout Fort Sill Military Reservation.
All manpower, equipment, and materials required to expeditiously control and remove any quantity of oil or hazardous substance discharged that may be hannful will be provided.
Fort Sill Garrison Commander Date
Chief, Environmental Quality Division Date
REGISTERED PROFESSIONAL ENGINEER CERTIFICATION
I hereby certify that I or my agent has examined the facility, and being familiar with the provisions of Anny Regulation (AR) 200-1; 40 Code of Federal Regulations (CFR) Part 112; and 40 CFR Part 265 Subpart D; attest that this SPCCP/ISCP has been prepared in accordance with good engineering practices including consideration of applicable industry standards and with the requirements of AR 200-1 and 40 CFR Part 112. Furthennore, I certify that procedures for required inspection and testing have been established. The SPCCP/ISCP is adequate for this facility.
Douglas J. Schlagel, P.E., CHMM Date
Auxilio Management Services
State of Registration: Colorado Seal:
Registration Number: 36733
Certification of Applicability of an EPA Facility Response Plan (FRP)
Also known as the "Cel1ification of Substantial Harm Determination Form"
If there is a "Yes" answer to one or more of the five questions below, then an EPA FRP is required.
Does the facility transfer fuel over water to or from vessels, Yes -- No _L and does the facility have a total fuel storage capacity greater than or equal to 42,000 gallons?
Does the facility have a total fuel storage capacity greater Yes -- No X than or equal to 1 million gallons, and does the facility lack secondary containment that is sufficiently large enough to contain the capacity of the largest aboveground fuel storage container plus sufficient freeboard to allow for precipitation within any aboveground fuel storage container area?
Does the facility have a total fuel storage capacity greater Yes -- No _L than or equal to 1 million gallons, and is the facility located at a distance such that a discharge from the facility would shut down a public drinking water intake?
Does the facility have a total fuel storage capacity greater Yes -- No _L than or equal to 1 million gallons, and is the facility located at a distance such that a discharge from the facility could cause injury to fish and wildlife and sensitive environments?
Does the facility have a total fuel storage capacity greater Yes - - No _L than or equal to 1 million gallons, and has the facility experienced a reportable fuel spill in an amount greater than or equal to 10,000 gallons within the last five years?
Explanations of the above referenced tenns can be found in Appendix C of 40 CFR 112. If an alternative fonnula to the one referenced is used to establish the appropriate distance to sensitive environments or drinking water intakes, documentation of the reliability and analytical soundness of that fonnula must be provided.
I certify under penalty of law that I personally examined and am familiar with the infonnation submitted in this document, and that based on my inquiry of those individuals responsible for obtaining this infonnation, I believe that the submitted infonnation is true, accurate, and complete.
Date: ~. (1 · 'OJ
Name: Douglas J. Schlagel, P.E., CHMM
Title: Senior Program Manager CAuxilio Management Services)
Certification of Qualification Criteria - Reportable Discharge History
Qualified Oil-Filled Operational Equipment
If there is a "Yes " answer to one or more of the questions below, then Fort Sill does not meet the Certification of Qualification Criteria.
Has Fort Sill had a single discharge as described in 40 CFR Yes -- No _L 112.l(b) from any oil-filled operational equipment exceeding 1,000 U.S. gallons?
Has Fort Sill had two discharges as described in 40 CFR Yes -- No _L 112.1(b) from any oi l-filled operational equipment each exceeding 42 U.S. gallons within any 12-month period in the three years prior to the SPCC Plan certificate date, or since becoming subject to this pmi if the facility has been in operation for less than three years (other than oil discharges described in 40 CFR 112.1(b) that are the result of natural disasters, acts of war, or terrorism)?
If there is a "No " answer to one or more of the questions below, then Fort Sill does not meet the Certification of Qualification Criteria.
Has the facility established alternative requirements to Yes _X_ No --general secondary containment?
Has Fort Sill documented the procedures for inspections or Yes _X_ No --monitOIing to detect equipment fai lures and/or a discharge?
Has Fort Sill prepared a contingency plan following the Yes _X_ No --provisions of 40 CFR 109?
Has Fort Sill provided written commitment of manpower, Yes ~ No --equipment, and materials required to exped itiously control and remove any quantity of oi l discharge that may be harmful?
Signa,me-S;:U 1 [ f "- Date: (, -lor - I~
Name: Douglas J. Schlagel, P.E., CHMM
Title: Senior Program Manager (Auxilio Management Services)
SPCCP/ISCP CHANGE LOG
Section or
Page #
Date Technical
Revision?
Describe Revision Name
FINAL SPCCP/ISCP
U.S. Army Garrison Fort Sill, OK
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 i June 2019
TABLE OF CONTENTS
1.0 INTRODUCTION ........................................................................................................................ 1-1
1.1 PURPOSE ..................................................................................................................................... 1-1
1.2 IMPLEMENTATION ...................................................................................................................... 1-1
1.3 APPLICABILITY ........................................................................................................................... 1-1
1.4 PLAN DEVELOPMENT ................................................................................................................. 1-2
1.5 CONFORMANCE WITH STATE REQUIREMENTS ........................................................................... 1-2
1.6 CONFORMANCE WITH 40 CFR 112.7 GENERAL REQUIREMENTS FOR SPCC PLANS ................. 1-2
1.7 SPCC RULE CROSS-REFERENCE ................................................................................................ 1-5
1.8 ISCP RULE CROSS-REFERENCE ................................................................................................. 1-5
1.9 ISCP QUICK REFERENCE GUIDE ................................................................................................ 1-5
1.9.1 Typical Hazardous Wastes Stored at Fort Sill ..................................................................................... 1-5
1.9.2 Emergency Equipment, Notification Systems, and Evacuation Plans .................................................. 1-7
1.9.3 Emergency Contact Information .......................................................................................................... 1-8
2.0 INSTALLATION OVERVIEW ................................................................................................. 2-1
2.1 LOCATION .................................................................................................................................. 2-1
2.2 MISSION ..................................................................................................................................... 2-1
2.3 ENVIRONMENTAL SETTING ........................................................................................................ 2-1
2.3.1 Climate ................................................................................................................................................. 2-1
2.3.2 Topography .......................................................................................................................................... 2-2
2.3.3 Soils and Geology ................................................................................................................................ 2-2
2.3.4 Hydrology ............................................................................................................................................ 2-2
3.0 ORGANIZATION FOR SPILL RESPONSE ........................................................................... 3-1
3.1 INSTALLATION RESPONSE TEAM ............................................................................................... 3-1
3.2 INSTALLATION ON-SCENE COORDINATOR ................................................................................. 3-1
3.3 FORT SILL FIRE & EMERGENCY SERVICES ................................................................................ 3-3
3.4 ENVIRONMENTAL QUALITY DIVISION ........................................................................................ 3-3
3.5 INSTALLATION OPERATIONS CENTER ........................................................................................ 3-3
3.6 DIRECTORATE OF EMERGENCY SERVICES .................................................................................. 3-4
3.7 DIRECTORATE OF PUBLIC WORKS .............................................................................................. 3-4
3.8 MEDICAL DEPARTMENT ACTIVITY ............................................................................................ 3-5
3.9 OFF-POST SPILL RESPONSE RESOURCES .................................................................................... 3-5
3.9.1 Local Authorities ................................................................................................................................. 3-5
3.9.2 State of Oklahoma Emergency Response ............................................................................................. 3-6
3.9.3 Regional Response Center ................................................................................................................... 3-6
3.9.4 Private Contractors ............................................................................................................................. 3-6
3.9.5 Chemical Transportation Emergency Center ....................................................................................... 3-7
3.9.6 Computer-Aided Management of Emergency Operations .................................................................... 3-7
3.9.7 Aerial Location of Hazardous Atmospheres ........................................................................................ 3-7
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 ii June 2019
4.0 POTENTIAL SPILL SOURCES ................................................................................................ 4-1
5.0 SPILL CATEGORIES ................................................................................................................ 5-1
5.1 REPORTABLE QUANTITIES OF CHEMICALS ................................................................................ 5-1
5.2 INCIDENTAL SPILLS .................................................................................................................... 5-1
5.3 SMALL SPILLS ............................................................................................................................ 5-1
5.4 LARGE SPILLS ............................................................................................................................ 5-2
6.0 PROCEDURES AND NOTIFICATION FOR RESPONSE TO SPILLS .............................. 6-1
6.1 SMALL SPILL RESPONSE PROCEDURES ...................................................................................... 6-2
6.2 LARGE SPILL RESPONSE PROCEDURES ...................................................................................... 6-3
6.2.1 Initial On-Site Detection and Control Procedures .............................................................................. 6-3
6.2.2 Notification and Mobilization Procedures ........................................................................................... 6-4
6.2.3 Site Assessment and Chemical Identification ....................................................................................... 6-4
6.2.4 Source Elimination, Control, and Containment.................................................................................... 6-5
6.2.5 Protection of Personnel ........................................................................................................................ 6-5
6.2.6 Spill Remediation ................................................................................................................................. 6-6
6.2.7 Site Restoration .................................................................................................................................... 6-6
7.0 DISCHARGE PREVENTION, EARLY DETECTION, AND INSPECTIONS .................... 7-1
7.1 DISCHARGE AND DRAINAGE CONTROLS.................................................................................... 7-1
7.1.1 Routine Handling of Products ............................................................................................................. 7-1
7.1.2 Bulk Storage Container Facilities ....................................................................................................... 7-1
7.1.3 Facility Transfer Operations ............................................................................................................... 7-2
7.1.4 Mobile Fuel Tanker Loading Rack ...................................................................................................... 7-3
7.2 INSPECTIONS .............................................................................................................................. 7-3
7.2.1 Inspections by On-Site Personnel ........................................................................................................ 7-4
7.2.2 Inspections by DPW Service Contractor Personnel ............................................................................ 7-5
7.2.3 EQD and Other Inspections ................................................................................................................. 7-6
7.3 TESTING ..................................................................................................................................... 7-7
7.4 TRAINING ................................................................................................................................... 7-7
8.0 FACILITY ANALYSIS ............................................................................................................... 8-1
8.1 FACILITY TYPES ......................................................................................................................... 8-1
8.1.1 Motor Pools/Tactical Equipment Shops ............................................................................................... 8-1
8.1.2 Logistics Readiness Center Complex ................................................................................................... 8-1
8.1.3 Vehicle Maintenance Shops.................................................................................................................. 8-2
8.1.4 Forward Operating Bases/Tactical Training Bases ............................................................................. 8-2
8.1.5 DFMWR and AAFES Facilities ........................................................................................................... 8-2
8.2 EQUIPMENT TYPES ..................................................................................................................... 8-2
8.2.1 Hazardous Materials Conex ................................................................................................................ 8-2
8.2.2 Used Oil Tank....................................................................................................................................... 8-3
8.2.3 Aboveground Storage Tanks ................................................................................................................ 8-4
8.2.4 Spill Pallet ........................................................................................................................................... 8-5
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 iii June 2019
8.2.5 Oil/Water Separators ........................................................................................................................... 8-6
8.2.6 Oil–Filled Operational Equipment ...................................................................................................... 8-6
8.2.7 Calculation of Spill Rates from Containers ......................................................................................... 8-7
8.3 FACILITY PLANS ......................................................................................................................... 8-7
9.0 RESPONSE EQUIPMENT AND RESOURCES ...................................................................... 9-1
9.1 SPILL KITS .................................................................................................................................. 9-1
9.2 PERSONAL PROTECTIVE EQUIPMENT ......................................................................................... 9-1
9.3 SPILL RESPONSE EQUIPMENT ..................................................................................................... 9-2
9.4 SAFETY DATA SHEETS ............................................................................................................... 9-3
9.5 STANDARD OPERATING PROCEDURES ....................................................................................... 9-4
9.6 ADDITIONAL REFERENCE MATERIALS ....................................................................................... 9-4
10.0 PLAN ADMINISTRATION ..................................................................................................... 10-1
10.1 INCIDENT DOCUMENTATION AND REPORTING ........................................................................ 10-1
10.1.1 Spill or Incident Report Record ..................................................................................................... 10-1
10.1.2 Regulatory Agency Notification .................................................................................................... 10-1
10.1.3 Recovery of Damages .................................................................................................................... 10-2
10.2 TRAINING (INCLUDES ANNUAL TRAINING, OSHA TRAINING, SPILL RESPONSE EXERCISES) . 10-2
10.3 PERSONNEL SAFETY AND MEDICAL SURVEILLANCE ............................................................... 10-3
10.4 RECORDKEEPING ...................................................................................................................... 10-3
10.5 PLAN UPDATE .......................................................................................................................... 10-3
11.0 FINDINGS AND RECOMMENDATIONS ............................................................................. 11-1
11.1 FINDINGS .................................................................................................................................. 11-1
11.1.1 Rule Deviations ............................................................................................................................. 11-1
11.2 RECOMMENDATIONS ................................................................................................................ 11-1
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 iv June 2019
LIST OF TABLES
Table 1-1. SPCC Rule Cross Reference ..................................................................................................... 1-9
Table 1-2. ISCP Rule Cross Reference .................................................................................................... 1-10
Table 3-1. Installation Response Team Contact List ................................................................................. 3-2
Table 3-2. Federal, State, and Local Agencies........................................................................................... 3-6
Table 8-1. Facility-Specific SPCC/ISCP Plans in Volume II .................................................................... 8-7
Table 9-1. Recommended Spill Control Materials and Equipment ........................................................... 9-1
Table 9-2. PPE for Initial Site Entry .......................................................................................................... 9-2
Table 9-3. Spill Response Equipment ........................................................................................................ 9-2
Table 11-1. Non-Conformances ............................................................................................................... 11-1
LIST OF FIGURES
Figure 2-1. Site Location ........................................................................................................................... 2-5
Figure 2-2. Site Hydrogeology .................................................................................................................. 2-7
Figure 8-1. Typical HMC .......................................................................................................................... 8-3
Figure 8-2. Typical Used Oil Tank ............................................................................................................ 8-4
Figure 8-3. Typical AST - Smaller Variety ............................................................................................... 8-4
Figure 8-4. Typical AST 'Housing' - Larger Variety ................................................................................. 8-5
Figure 8-5. Assortment of Typical Spill Pallets ......................................................................................... 8-6
LIST OF APPENDICES
Appendix A Determining Reportable Quantities
Appendix B Records, Logs, and Checklists
Appendix C Guidance for Field Mobile Tanker Truck
Appendix D Storage Tank Specifications
Appendix E 3-Year Spill History
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 v June 2019
LIST OF ACRONYMS AND ABBREVIATIONS
AAFES Army and Air Force Exchange Service
ADA Air Defense Artillery
AEC Army Environmental Command
AF/VO Animal Fats and Vegetable Oils
ALOHA Aerial Locations Of Hazardous Atmospheres
API American Petroleum Institute
AR Army Regulation
AST Aboveground Storage Tank
Auxilio Auxilio Management Services
BDE Brigade
CAMEO Computer-Aided Management of Emergency Operations
CFR Code of Federal Regulations
CHEMTREC Chemical Transportation Emergency Center
DES Directorate of Emergency Services
DOT Department of Transportation
DPTMS Directorate of Plans, Training, Mobilization, and Security
DPW Directorate of Public Works
EMP Emergency Management Plan
EMS Emergency Medical Service
EO Environmental Officer
EOD Explosive Ordnance Detachment
EPA U.S. Environmental Protection Agency
EPAS Environmental Performance Assessment System
EPCRA Emergency Planning and Community Right-to-Know Act
EQD Environmental Quality Division
F-24 Jet Fuel
F&ES Fort Sill Fire & Emergency Services
FMTV Family of Medium Tactical Vehicles
FOB Forward Operating Base
FOD Field Officer of the Day
FTX Field Training Exercise
GSA General Services Administration
HAZCOM Hazard Communication
HEMTT Heavy Expanded Mobility Tactical Truck
HM Hazardous Materials
HMC Hazardous Materials Conex
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 vi June 2019
HMMWV High Mobility Multipurpose Wheeled Vehicle
HW Hazardous Waste
ICG Installation Command Group
ICP Incident Command Post
IOC Installation Operations Center
IOSC Installation On-Scene Coordinator
IMCOM U.S. Army Installation Management Command
IROC Installation Response Operations Center
IRT Installation Response Team
ISCP Installation Spill Contingency Plan
LEPC Local Emergency Planning Committee
LETRA Lake Elmer Thomas Recreation Area
LRC Logistics Readiness Center
MASCAL Mass Casualty
MEDDAC Medical Department Activity
MFT Mobile fuel tanker
MKT Mobile Kitchen Trailer
MP Military Police
NCO Noncommissioned Officer
NCP National Contingency Plan
NFPA National Fire Protection Association
NIOSH National Institute of Occupational Safety and Health
NRC National Response Center
OAC Oklahoma Administrative Code
OCC Oklahoma Corporation Commission
ODEQ Oklahoma Department of Environmental Quality
OSHA Occupational Safety and Health Administration
OWS Oil/Water Separator
PAO Public Affairs Office
PLS Palletized Load System
POL Petroleum, Oil, Lubricants
PPE Personal Protective Equipment
PSO Post Safety Office
PSTD Petroleum Storage Tank Division
RQ Reportable Quantity
SCBA Self-Contained Breathing Apparatus
SDS Safety Data Sheet
SOP Standard Operating Procedure
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 vii June 2019
SPCC Spill Prevention, Control and Countermeasures
SPCCP Spill Prevention, Control, and Countermeasures Plan
TPU Tank and Pump Unit
TTB Tactical Training Base
USACE U.S. Army Corps of Engineers
UST Underground Storage Tank
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 viii June 2019
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-1 June 2019
1.0 INTRODUCTION
1.1 Purpose
It is the Army’s policy to prevent spills of oil and hazardous substances and maintain readiness to rapidly respond when spills occur. Army Regulation (AR) 200-1, Chapter 11 defines this policy and corresponding program requirements. One requirement is to develop a spill prevention program that assigns duties and responsibilities for coordination, oversight, and execution. It is the goal of the Army and Fort Sill to use, generate, transport, store, handle, and dispose of oil and hazardous substances in a manner that protects the environment and public health.
The Fort Sill Spill Prevention, Control, and Countermeasures Plan (SPCCP)/Installation Spill
Contingency Plan (ISCP) fulfills the AR 200-1 requirement for developing a spill prevention and contingency program that establishes responsibilities, duties, procedures, and resources to be employed to contain, mitigate, and cleanup oil and hazardous substance spills. This plan will be used by Fort Sill in responding to and cleaning up oil or hazardous substance spills on the military reservation or other designated areas.
The Spill Prevention, Control and Countermeasures (SPCC) rule can be found in Title 40 of the Code of
Federal Regulations (CFR), Part 112 (Oil Pollution Prevention), and 40 CFR Part 109 (Criteria for
Development of Contingency Plan). Title 40 CFR, Part 265, Subpart D outlines recommended specific requirements for an ISCP.
1.2 Implementation
This SPCCP/ISCP and any future amendments will become effective on the date that the plan or amendments are reviewed and approved by the Chief of the Fort Sill Environmental Quality Division
(EQD), Fort Sill Garrison Commander, and is certified by a registered Professional Engineer familiar with
40 CFR Part 112. The Fort Sill Garrison Commander is the designated person accountable for commitment of all manpower, equipment, and materials required in spill prevention and control at Fort
Sill. The SPCCP/ISCP applies to all military units and organizations operating within the boundaries of
Fort Sill.
The SPCCP/ISCP is implemented on a daily basis for routine spill prevention, and for spills, whenever: 1) a spill of 55 gallons or more of petroleum, oil, or lubricants (POL) or an uncontained spill of POL occurs;
2) a hazardous substance spill other than POL that is not an incidental spill occurs; 3) any spill of POL or hazardous substance that enters a stormwater conveyance or body of water occurs; or 4) an emergency situation develops. Quantities that are considered reportable can be found in 40 CFR 302.4 and 40 CFR
355 which are presented in Appendix A.
1.3 Applicability
40 CFR Part 112 requires owners or operators of facilities, under which condition Fort Sill falls, that engage in drilling, producing, gathering, storing, processing, refining, transferring, or consuming oil and
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-2 June 2019 oil products to prepare an SPCCP if that facility is non-transportation related and if: 1) the aggregate aboveground storage capacity of the facility exceeds 1,320 gallons (excluding those bulk storage containers and oil filled equipment below 55 gallons in shell capacity); or 2) if the aggregate underground storage capacity of the facility exceeds 42,000 gallons (excluding those that are currently subject to all of the technical requirements of 40 CFR Part 280 or 40 CFR Part 281); and if, due to its location, the facility could reasonably be expected to discharge oil into or upon the navigable waters or adjoining shorelines of the United States. Fort Sill falls under Category 1 above.
The SPCCP/ISCP applies to all military units and organizations operating within the boundaries of Fort
Sill. Contractors performing work at Fort Sill shall provide the EQD a Professional Engineer-certified
SPCCP in accordance with 40 CFR Part 112 if the construction activity at any time for the duration of the project will reach an aggregate aboveground “Oil” storage capacity of greater than 1,320 U.S. gallons based on the shell capacity of all containers storing “Oil” that have a “Shell Capacity” equal to or greater than 55 U.S. gallons, including any applicable “Oil-Filled Equipment”, and as otherwise set forth in 40
CFR Part 112.
1.4 Plan Development
Fort Sill’s existing SPCCP/ISCP, dated September 2014, was used as the basis for developing this plan, which combines the SPCCP and ISCP into one plan, focusing on making the facility-specific information stand-alone for easy updates and distribution. Volume I of this SPCCP/ISCP provides spill prevention and contingency planning for the installation as a whole and is referred to as the Master Plan. Volume II of this SPCCP/ISCP provides spill prevention and contingency planning for the individual facilities on Fort
Sill, such as motor pools and maintenance facilities.
The U.S. Army Corps of Engineers (USACE), Tulsa District tasked Auxilio Management Services
(Auxilio) to update the SPCCP and ISCP under Contract Number W912BV-15-D-0019, Task Order No.
912BV17F0071. Tasks performed under this contract included reviewing existing information, conducting site assessments (field surveys) at Fort Sill, updating the Fort Sill SPCCP and ISCP, and providing all technical revisions and certification from a Professional Engineer.
1.5 Conformance with State Requirements
Fort Sill’s aboveground storage tanks are not registered with nor regulated by the State of Oklahoma. The
Oklahoma Corporation Commission (OCC) does not have regulatory authority over aboveground storage tanks located on Fort Sill.
1.6 Conformance with 40 CFR 112.7 General Requirements for SPCC
Plans
This section provides a discussion of Fort Sill’s conformance with the requirements listed in 40 CFR Part
112.7 and a reference to the applicable sections in this Plan.
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-3 June 2019
112.7(a) Introduction and General Requirements
• 112.7(a)(1) – This installation is in conformance with the SPCC Regulations that became effective on August 16, 2002 and the 2009 SPCC Amendments.
• 112.7(a)(2) – In complying with the applicable requirements of the SPCC Regulation, deviations employed or claimed in this Plan, are discussed in detail in Section 11.1.1 of this volume as well as the table in Section 10.1 of each individual site plan found in Volume II. Implementing the recommendations provided in Section 12.1 of this document will correct these deviations.
• 112.7(a)(3)(i), (ii) & (iii) – o type of oil in each container and its storage capacity;
o discharge prevention measures;
o discharge/drainage controls;
o countermeasures for discharge discovery, response, and cleanup;
o methods of disposal of recovered materials; and o contact list and phone numbers for response.
Detailed Facility Site Maps, located in Volume II, present the facility layout, HM storage locations, and general arrangement of facilities. Also provided on the diagrams are stormwater drain inlets and flow
(slope) directions of surface water runoff (and spilled oil paths). As required under this section, the Site
Maps illustrate the locations and contents of each storage container at the time of the site visit. Also listed are underground storage tanks (USTs) (otherwise exempted).
• 112.7(a)(3)(iv) & (v) – Spill kits are utilized by on-site personnel to clean-up minor spills at the facilities described in Section 10.1 of this Plan. The Installation Response Team (IRT) is utilized to handle large spills. Procedures for spill response, clean-up, site restoration, and disposal of recovered materials are contained in Sections 6.0 and 7.0 of this document.
• 112.7(a)(3)(vi) – The Emergency Management Contact List for spill reporting and response is provided in Section 3 of this Plan.
• 112.7(a)(4) & (5) – Information concerning spill discovery and response procedures can be found in Section 1.6 of the individual site plans, which are located in Volume II of this plan. Additional copies of these site-specific plans are kept at each of the facilities.
Information and procedures for spill reporting are contained in Section 6 of this plan (Volume I) and
Section 1.6 of the individual site plans, which are located in Volume II of this plan. Appendix A contains information on determining reportable quantities; Appendix B provides example records, logs, and checklists; Appendix C contains guidance for field mobile tanker trucks; Appendix D contains storage tank specifications; and Appendix E contains the 12-month spill history.
112.7(b) Equipment Failure Analysis
Information on spill potential from equipment failures and other spill scenarios is provided in Section 1.5 of the individual site plans (Volume II).
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-4 June 2019
112.7(c) Secondary Containment
112.7(c)(1) – Appropriate secondary containment is provided to prevent discharges. Details on secondary containment structures for storage facilities are included in the Storage Area Information table in Section
1.10 of each individual facility SPCCP/ISCP provided in Volume II.
112.7(d) Contingency Planning
Section 3 of this plan (Volume I) and Section 1.6 of the individual site plans (Volume II) establishes the responsibilities, duties, procedures, and resources to be used to contain and clean up spills on the installation and to provide assistance to other agencies when requested.
112.7(e) Inspections, Tests, and Records
Information on inspections, tests, and records is provided in Section 7.0 of this volume. Appendix B provides the Spill or Incident Report Record, Weekly Environmental Inspection Log, POL Containment
Drainage Record, the Steel Tank Institute STI SP001 Monthly and Annual Checklists, and the Fort Sill
Environmental Compliance Checklist.
112.7(f) Employee Training and Discharge Prevention Procedures
Information on personnel training and oil-handling procedures is provided in Section 7.0 of this volume.
112.7(g) Security (Excluding Oil Production Facilities)
Information on general facility security is provided in Section 1.4 of the individual site plans (Volume II).
Specific security measures are in place.
112.7(h) Loading/Unloading (Excluding Offshore Facilities)
Information on facility tank truck loading and unloading spill prevention and control procedures is provided in Section 7.0 and Appendix C of this Plan.
112.7(i) Brittle Fracture Evaluation
There are no field-constructed aboveground storage containers located at Ft. Sill.
112.7(j) State Rules
The State of Oklahoma does not have regulatory authority over aboveground storage tanks located on
Fort Sill.
112.7(k) Qualified Oil-Filled Equipment
Ft. Sill is in conformance with the requirements established for “Qualified Oil-filled Operational
Equipment” (Section 8.2.6 of this plan).
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-5 June 2019
1.7 SPCC Rule Cross-Reference
The SPCCP conforms to the requirements set forth in 40 CFR 112.7. In accordance with 40 CFR
112.7(a)(1), Table 1-1 provides a cross-reference to the requirements listed in the Final SPCC Rule (40
CFR Part 112) and the equivalent requirements in the SPCCP. Table 1-1. SPCC Rule Cross Reference lists each requirement in the Final SPCC Rule, provides a description of the requirement, and provides the location (section/page number) of the provision in the SPCCP/ISCP. “NA” in the “Page” column indicates sections of 40 CFR 112.7 that are not applicable to Fort Sill.
1.8 ISCP Rule Cross-Reference
The ISCP conforms to the requirements set forth in 40 CFR 265, Subpart D. Table 1-2. ISCP Rule
Cross Reference lists each requirement in the ISCP as per Subpart D of CFR Part 265 – Interim Status Standards for
Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.
1.9 ISCP Quick Reference Guide
The ISCP conforms to the requirements set forth in 40 CFR 265, Subpart D. The following provides
Quick Reference Guide information related to hazardous waste management at Fort Sill.
1.9.1 Typical Hazardous Wastes Stored at Fort Sill
The following provides the typical hazardous wastes stored at the Fort Sill 90-Day Hazardous Waste
Storage Yard (Facility 2515).
Fort Sill Hazardous Waste Profile List
LITHIUM METAL BATTERY - REACTIVE (NOT
DISCHARGED)
LITHIUM MANAGANESE BATTERY - REACTIVE
(NOT DISCHARGED)
BATTERIES WET FILLED WITH ACID (LEAD ACID
BATTERIES)
LITHIUM-ION BATTERIES CYLINDRICAL CELL
BATTERY ACID
MAGNESIUM BATTERY
ALKALINE BATTERIES BA3517/U
NICKLE - CADMIUM BATTERY
SEALED WET LEAD ACID BATTERIES
DRAINED LEAD ACID BATTERIES
WET DAMAGED BATTERIES W/FLUID
DAMAGED SEALED LEAD ACID BATTERY (HW)
LITHIUM METAL THIONYL CHLORIDE BATTERY
CHROMIUM FILTERS
M272 WATER TESTING KIT
ASZM TEDA CHARCOAL FILTERS
M258/M258A1/M280 DECON PACKETS
M58A/M58A1/M280 TRAINING AID/REFILL KITS
M256/256A1 CHEMICAL KITS W/MERCURY
M291DECON KIT PACKETS
M295 DECON KIT PACKETS
NERVE GAS ANTIDOTE
UNCONTAMINATED OILS
KERSOSENE
HULL FLUID
CONTAMINATED F24 (WASTE)
GREASE
UNCONTAMINATED FUEL
LUBRICATING OIL AREROSOL
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-6 June 2019
CONTAMINATED GASOLINE (MOGAS)
BOOMS CONTAMINATED WITH F24
REFRIGERATION OIL CONTAMINATED WITH
FREON
UNUSED ANTIFREEZE
CONTAMINATED ANTIFREEZE
CARTRIDGE ENGINE STARTER
FUEL CONTAMINATED WITH ANTIFREEZE
WAX FLAMMABLE
WASTE PAINT FROM LRC PAINT SHOP
PAINT PRODUCTS
AEROSOLS, FLAMMABLE (Paint)
ENAMEL PAINT
LATEX PAINT
POLISH,FURNITURE,LIQUID,TYPE I
TURPENTINE
PINE OIL DETERGENT
ISOPROPYL ALCOHOL
METHANOL (METHYL ALCOHOL)
DENATURED ALCOHOL
1,1,1, TRICHLOROETHANE
LIQUID WAX
CLEANER NONREGULATED LIQUID
AEROSOL CLEANER, CORROSIVE, FLAMMABLE
FLOOR FINISH - COMBUSTIBLE
PINE OIL, FLAMMABLE
LOTION
ACETONE
FLAMMABLE CLEANER
HEXANES
AMMONIUM HYDROXIDE
BRASSO POLISH/CLEANER
WINDSHIELD WAHER CONCENTRATE
DISINFECTANT AEROSOL
MICRO MIST LUBRICANT AEROSOL
WD-40 MULTI-USE AEROSOL
INSECTICIDE AEROSOL W/RESMETHRIN
WURTH BRAKE & PART CLEANER AEROSOL
ETHYL ALCOHOL (UNMIXED)
DEICER AEROSOL, FLAMMABLE
INSECT REPELLENT, AEROSOL, FLAMMABLE
AEROSOL, NONFLAMMABLE CLEANER
BRAKE PARTS CLEANER AEROSOL
CLEANING COMPOUND - SOLVENT
CLEANER - ISOPROPANOL
WASP AND INSECT KILLER AEROSOL, FL
UNUSED SKYSOL (CLEANER)
DE-ICER WINDOWS AND WIPERS
POWER DUSTER AEROSOL, FLAMMABLE
SODA LIME
DENTAL TISSUE CONDITIONER AND RECLINER
LIQUID
WAX REMOVER
ACRYLIC LIQUID
TRICHLOROACETIC ACID SOLUTION
MERCURY IN MANUFACTURED ARTICLES
AMMONIA INHALANT SOLUTION
THINPREP
BONDING AGENT
FECAL PARA-PAK FIXATIVE
ETCHING GEL
MODEL SEALER
NATURAL DIE MATERIAL SEPARATOR
FORMALIN 10% - NR
ALCOHOL
INSTRUMENT BRIGHTER CLEANER
WARFARIN
DISINFECTANT/CLEANER
FLAMMABLE/CORROSIVE
NITRIC ACID 70%
FERRIC CHLORIDE
HAND CLEANER
JESSNER'S SOLUTION
PHENOL LIQUID
FORMALDEHYDE 37-66%
ORGANIC PEROXIDE, TYPE F
DENTAL AMALGAM
MERCURY
HYDROGEN PEROXIDE >20% <40%
SILVER NITRATE
NICOTINE TRANSDERMAL SYSTEM
NITROGLYCERIN SPRAY LIQUID
1NITROGLYCERIN OINTMENT
UNUSED XYLENE
DENTAL VARNISH
ALCOHOL PREP SWAB STICKS
DENTAL ACRYLIC LIQUID - CAN POLYMERIZE
FORMALDEHYDE 4% SOLUTION (BUFFERED
FORMALIN) COMBUSTIBLE
CARBON REMOVING COMPOUND/STRIPPER
INSECTICIDE LINDANE
MRE HEATERS
ACIDIC CLEANER
CLEANER CORROSIVE
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-7 June 2019
CALCIUM HYPOCHLORITE HYDRATED
MIXTURE>39% CHLORINE
CALCIUM HYPROCHORITE GRANULARS (70%)
HYDROCHLORIC ACID
ETHYL CHLORIDE
SODIUM HYDROXIDE SOLUTION
INSECT REPELLENT, CLOTHING- AEROSOL
W/PERMITHRIN
INSECT REPELLANT AEROSOL W/ D-
PHENOTHRIN
HYPOCHLORITE SOLUTION
SULFURIC ACID
COMPRESSED GAS NFNIGHT VISION IMAGE
INTENSIFIER TUBES
STRIPPER AEROSOL
FILTERS FROM WEAPONS CLEANER
SMARFOAM COMPONENT B
DINITROTOLUENE SOLID
SMART FOAM A SOLIDIFIED
AMYL ACETATE
CHLORINATING TABS PLUS FOR POOL
BROMINATING TABLETS FOR POOLS
POTASSIUM HYDROXIDE SOLUTIONSWIMMING
POOL ALL PURPOSE ALGAECIDE
PH DOWN POOL PRODUCT
REMOVER/CLEANER (SODIUM METASILICATE)
POOL SHOCK
TENT CANVAS W/BARIUM
CORROSIVE CLEANER (SULFAMIC ACID)
SAWYER INSECT REPELLENT LOTION
PEPPER SPRAY AEROSOL
CLEANER AEROSOL, NONFLAMMABLE
CHEMGUARD 3% AFFF C-303-FILM FORMING
FOAM
HERBICIDE
INSECTICIDE
OVEN CLEANER
CLEANER, CORROSIVE => 30% POTASSIUM
HYDROXIDE
POTASSIUM CHLORATE
LIQUID NAILS SOLIDIFIED
ADHESIVE SOLIDIFIED
PLASTIC WOOD SOLIDIFIED
ADHESIVE LIQUID
ADHESIVE (LIQUID) NR
ADHESIVE SOLID (NR)
ADHESIVE CORROSIVE
ADHESIVE AEROSOL
PAINT CHIPS, BLASTING BOOTH COMPOSITE
(LRC)
WEAPONS CLEANING RAGS
BEAD BLASTING MEDIA
BEAD BLAST MEDIA FILTERS
PCB CONTAMINATED ARTICLES SOLID
NON-PCB BALLASTS - DLADS
NONPCB OIL (NR)
WEAPONS CLEANING SYSTEM FLUID (USED
SKYSOL)
PARTS WASHER SOLVENT FILTERS
PARTS WASHER FLUID SOLVENT (SKYSOL)
AQUEOUS PARTS WASHER FLUID
USED FLUORESENT LAMPS
CARBON MONOXIDE CYLINDER
CYLINDERS CONTAINING NITROGEN DIOXIDE
NONFLAMMABLE CYLINDERS CONTAINING
HYDROGEN CYANIDE
NONPCB TRANSFORMER
TRANSFORMERS (HM)
It should be noted that Fort Sill’s hazardous waste inventory is continuously changing, and the information above reflects typical wastes and storage quantities. None of the hazardous wastes typically stored at Fort Sill are expected to require unique or special treatment by medical or hospital staff in the event of an exposure. Each facility in Volume II details the onsite storage practices and locations of hazardous materials.
1.9.2 Emergency Equipment, Notification Systems, and Evacuation Plans
Emergency equipment, notification systems, and evacuation plans are described in Section 9.0 and within each facility’s site-specific response plan, contained in Volume II of this SPCCP/ISCP.
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-8 June 2019
1.9.3 Emergency Contact Information
Emergency contact information is provided in Table 3-1 of this SPCCP/ISCP.
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-9 June 2019
Table 1-1. SPCC Rule Cross Reference
Final SPCC
Rule Description of Section Section/Page
§ 112.7 General requirements for SPCC Plans for all facilities and all oil types. 1.6/1-2
§ 112.7(a) Facility's conformance with rule requirements
Deviations from Plan requirements
Facility characteristics that must be described in the Plan; spill reporting information in the Plan; emergency procedures:
• Type of oil in each container and its storage capacity
• Discharge prevention measures
• Discharge/drainage controls
• Countermeasures for discharge discovery, response, and cleanup
• Methods of disposal of recovered materials
• Contact list and phone numbers for response
Discharge reporting procedures
Individual Site
Plans (Volume II)
§ 112.7(b) Failure analysis Individual Site
Plans (Volume II)
§ 112.7(c) Secondary containment Individual Site
Plans (Volume II)
§ 112.7(d) Contingency planning Individual Site
Plans (Volume II)
§ 112.7(e) Inspections, tests, and records 7.3/7-7
§ 112.7(f) Employee training and discharge prevention procedures 7.4/7-7
§ 112.7(g) Security (excluding oil production facilities) Individual Site
Plans (Volume II)
§ 112.7(h) Loading/unloading (excluding offshore facilities) N/A
§ 112.7(i) Brittle fracture evaluation requirements N/A
§ 112.7(j) Conformance with State requirements 1.5/1-2
§ 112.7(k) Requirements related to qualified oil-filled operational equipment 8.2.6/8-6
§ 112.8
§ 112.12
Requirements for onshore facilities (excluding production facilities) 8.0/8-1
§ 112.8(a)
§ 112.12(a)
General and specific requirements Individual Site
Plans (Volume II)
§ 112.8(b)
§ 112.12(b)
Facility drainage Individual Site
Plans (Volume II)
§ 112.8(c)
§ 112.12(c)
Bulk storage containers 7.1.2/7-1
§ 112.8(d)
§ 112.12(d)
Facility transfer operations, pumping, and facility process 7.1.3/7-2
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 1-10 June 2019
Table 1-2. ISCP Rule Cross Reference
Final ISCP
Rule Description of Section Section/Page
§ 265, Subpart
D
General requirements for SPCC Plans for all facilities and all oil types. 1.1/1-1
§ 265.50 Applicability 1.3/1-1
§ 265.51 Purpose and Implementation of contingency plan 1.1-1.2/1-1
§ 265.52 Content of contingency plan Individual Site Plans
(Volume II)
§ 265.53 Copies of contingency plan Individual Site Plans
(Volume II)
§ 265.54 Amendment of contingency plan SPCCP/ISCP
Change Log
§ 265.55 Emergency Coordinator 3.2/3-1
§ 265.56 Emergency procedures 6.0/6-1
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 2-1 June 2019
2.0 INSTALLATION OVERVIEW
2.1 Location
Fort Sill occupies approximately 93,600 acres in southwestern Oklahoma in central Comanche County, immediately north of Lawton, Oklahoma, and 75 miles southwest of Oklahoma City. The cantonment area sits in the east central portion of the Post with Interstate 44 (I-44) transecting the eastern one-third of the cantonment area and dividing it from the western two-thirds (see Figure 2-1).
2.2 Mission
Fort Sill is home to the Fires Center of Excellence that trains, educates and develops soldiers and leaders;
creates and develops capabilities; engages, collaborates and partners with stakeholders; sustains and provides a fires force to support the joint warfighting commander across the spectrum of operations in the joint, interagency, intergovernmental and multinational environments.
Today, the field artillery is joined by the air defense artillery and electronic warfare branches as part of the Fires Center of Excellence. This center makes an incredible contribution to the nation’s defense and is made up by: Air Defense Artillery School (31st ADA BDE); Basic Officer Leaders Course (75th Fires
BDE); Field Artillery School (214th Fires BDE), and Fort Sill NCO Academy.
The Fires Center of Excellence gives officers and soldiers a lifetime of professional training in the schoolhouse, in simulators and in the field. From private to sergeant first class, soldiers are given world class education using the latest equipment and tactics.
Military units and activities on the installation use large numbers of tracked vehicles, heavy trucks, mobile tankers, and other vehicles and equipment. In addition, lighter cars and small trucks are used by the civilian workforce on the installation. Significant quantities of fuel, oil, and other vehicle fluids are required to operate and maintain these vehicles and equipment. Other specialized activities on the installation use and store other hazardous substances such as paints, solvents, and pesticides.
2.3 Environmental Setting
2.3.1 Climate
Southwestern Oklahoma has a highly variable climate featuring four distinct seasons. The continental climate is characterized by a combination of warm moist air from the Gulf of Mexico, West Coast marine air, and cold dry Arctic air. These various air masses are typically associated with a corresponding season;
however, transitional times frequently exhibit characteristics of multiple air masses in a very short time span. Strong thunderstorms accompanied by tornadic activity are common in the spring and early summer. Strong winds can occur throughout the year. The average annual temperature on the Post is 61 degrees Fahrenheit, and the average annual precipitation is 27 inches. Snow occurs infrequently and does not usually persist longer than a few days at a time.
Contract No.: W912BV-15-D-0019, TO: W912BV17F0071 2-2 June 2019
2.3.2 Topography
The topography of Fort Sill is classified as Central Rolling Red Prairies Land Resource Area. The land on the Post is characterized as follows: 51 percent of the land area is level or gently sloping, 20 percent of the land area is rolling hills or undulations having slopes between 3 percent and 5 percent, and 29 percent of the land area has slopes greater than 5 percent. The maximum elevation on-post is approximately 2,200 feet at the summit of Mount Sheridan and the minimum elevation is approximately 1,080 feet at the point where East Cache Creek leaves Fort Sill.
2.3.3 Soils and Geology
Soils across the Post vary widely from thick well-developed loams to hydric soils to thin rocky immature series. Most of the areas/facilities under analysis in this Plan are located over highly modified soils that have been made suitable for construction of large buildings and parking large equipment.
The geology of this region represents some of the oldest geologic strata outcropping in Oklahoma. The
Wichita Mountains, on the western portion of the Post, were formed during the Cambrian Period, 550 to
525 million years before present, and are composed primarily of igneous rocks such as granite and rhyolite. The eastern portion of the Post is underlain by Permian aged – 280 to 230 million years before present – ‘red beds’ typically composed of iron-rich sandstone and siltstone.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .