A030 - Phase-out Plan.pdf

PDF 200 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA Federal contract opportunity
Solicitation number
SP3300-20-R-5001
Issued by
Defense Logistics Agency Distribution

About this file

This document contains a Contract Data Requirements List (CDRL) and related remarks outlining transition-out requirements for an expiring distribution services contract. The contractor must submit a phase-out plan six months prior to contract completion addressing continuity of service and closure tasks. The plan requires coordination with any incoming contractor on personnel matters and training. It also mandates cooperation on a joint inventory of all government property and resolution of any discrepancies. The contractor needs to reduce all backlog work in process, coordinate the final contract transition with the contracting officer, and maintain a 30-day supply of materials and submit weekly status reports detailing ongoing transition activities. The contract supports distribution operations at Defense Logistics Agency sites in San Diego, California involving depot-level repairables, electronics, industrial, medical, general, construction, clothing, petroleum, chemicals, steel, sheet metal, and ship/aviation parts.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0004.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
Amendment 0003.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Amend 0001 Attachment J.2 DDDC PWS.docx DOCX document
A031 - MPC Cargo Status Report Amend 0001.pdf PDF
Amendment 0001.pdf PDF
Attachment J.26 TE 5.0 APLs.doc DOC document
A004 - MECSP 1.28.20.pdf PDF
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
A015 - Monthly Cost Report for Special Projects and Surge and Sustainment CLIN.pdf PDF
A006 - Quality Control Plan.pdf PDF
Attachment J.26, TE 5.0 APLs.doc DOC document
A009 - Management Plan (MCCP).pdf PDF
A020 - Shipment to Restricted Country - Approval Necessary.pdf PDF
A024 - Physical Security Plan.pdf PDF
A036 - Local Delivery Refusal Log.pdf PDF
A017 - Government Cargo Recovery Effort Program (GOCARE) Program.pdf PDF
A001 - Transition Plan and Weekly Reports.pdf PDF
Attachment J.18, TE 3.4 GE MHE.xlsx XLSX spreadsheet
Attachment J.40 Draft Distribution Operations Training Schedule.xlsx XLSX spreadsheet
A027 - Monthly Contractor Employee CAC Report.pdf PDF
A004 - Surge, Sustainment, and Disaster Recovery Plan (SSDRP).pdf PDF
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Attachment J.33, TE 5.6, Local Delivery and Pick Up Points.rtf RTF text file
SF33 SP330020R5001.pdf PDF
Attachment J.41, Limitation on Subcontracting Report.xls XLS spreadsheet
A011 - Montly Cost Report for Scheduled and Unscheduled Equip Main CLIN.pdf PDF
Attachment J.34, TE 6.2N, Delivery Schedule Greater 10 miles.rtf RTF text file
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
Attachment J.19, TE 3.5 GE Misc Equipment.xlsx XLSX spreadsheet
A026 - Wood Packaging Material (WPM) Report.pdf PDF
Attachment J.32, TE 4.6, Contractor Equipment List.xlsx XLSX spreadsheet
A031 - Non-Accountable Engine Issue Report.pdf PDF
A035 - Daily Boat Movement Report.pdf PDF
Attachment J.17 TE 3.3 Government Data Systems 9.9.19.docx DOCX document
Attachment J.15, TE 3.1 Government Facilities.rtf RTF text file
A025 - Container Reclamation Report.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.23, TE 4.2 Gov Operated Equipment for Contractor Maintenance.xlsx XLSX spreadsheet
Attachment J.25, TE 4.5 Other Equipment PM Tasks REV.xls XLS spreadsheet
Attachment J.37, TE 6.1 Government Forms.docx DOCX document
Attachment J.44 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update July 22 2019 12 PM.docx DOCX document
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Continuation Page, Blk 16 Remarks

i MeetinventoryAPLsthroughouttransition‐outtonewContractor.
ii Participateinjointmissionstockinventories.
iii Performallcausativeresearchactionsresultingfrommissionstockinventory.

(h) Facilities

i Turnoverthefacilitiesinacceptablecondition.
ii Repairalldamageduetonegligence.
iii Maintaincleanliness
(i) WorkinProcess(WIP)
i Reduceallbacklogthatincludes,butisnotlimitedto,completingthefollowingIAW
therequirementsinC‐5andTE5.0APLs:
(a) Materialoff‐loadedfromconveyanceandawaitingreceiptinductionand

inspection.

(b) Materialreceiptsstarted,notcompleted.
(c) Materialreceiptsposted,notstowed.
(d) MROsinqueandrejects.
(e) DROsthatareawaitinganMROcycle.
(f) RCPsthatareawaitinganMROcycle.
(g) SpecialProjectMROsthatareawaitinganMROcycle.
(h) RCPA5Jtransactionspendinginventory.
(i) OpenSDRswithdispositionreceived,notcompleted.
(j) OpenDDForm1225swithdispositionreceived,notcompleted.
(k) MonthlyCOSISworkloadnotcompleted.
(l) Inventoriesnotcompleted.
(m) LocationSurveysnotcompletedIAWtheannualschedule.
(n) Opencausativeresearchactions.
(o) OpenISDRs.
(p) Openpackagingactions.
(q) Assetswaitingde‐packanddetrashthatarenotincludedintheDSSwork‐in‐
progress,ifapplicable.
ii Coordinateatransition‐outwiththeKOordesigneeandthenewContractorfor
transferofresponsibilityandworkforfinaldayoftransition.
(j) MaterialsandSupplies‐Retainaminimumofa30dayinventoryofdistribution

operations and maintenance supplies and materials to turn over to the successor contractor.

(k) ReportingRequirements‐Submitweeklystatusreportsdetailingthestatusof
transition‐outtasksthatareon‐going.
1_DATA_ITEM_NO: A030
2_TITLE_OF_DATA_ITEM: Phase-out Plan
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, C-1.11
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT:
10_FREQUENCY: See Block 16
11_AS_OF_DATE:
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1:
repro1: 1
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: The Contractor shall participate in a transition-out period in order to allow for a smooth and orderly transfer of responsibility for warehousing and distribution operations to a successor Contractor. The KO or designee will request the Contractor to submit a Contract Transition-Out Plan six (6) months prior to the end of the contract. The plan shall set forth actions, plans, procedures, and timelines necessary to ensure a smooth and orderly transition-out. In this plan the Contractor shall address responsibilities for continuity of service and tasks related to the closure of the contract. The plan shall identify how the Contractor shall:

1. Coordinate with the incoming Contractor on personnel actions including, but not limited to:

(a) Providing workforce with availability to attend interviews during normal hours of operation.

(b) Providing personnel training, certifications and licenses, and providing workforce with availability to attend training during normal hours of operation.

2. Government Property Inventory:

(a) Cooperate in the preparations for the pre-proposal site visit by staging GE in a limited number of areas for inspection by offerors and providing access to all Government Facilities (GF).

(b) Prepare for joint GP inventory by:

i Ensuring the automated equipment management control system records are up-to-date.

ii Validating the information in the Government’s Accountability Property System is accurate and notify the KO or designee of required updates.

iii Ensuring disposal records are up-to-date.

(c) Participate in joint inventory of GP.

(d) Resolve discrepancies.

i Identify disposition of missing equipment.

ii Replace or repair equipment damaged based on the results of the DD Form 200 (See paragraphs C-5.1.1.2 Liability for Government Property/Equipment and ensure all maintenance on equipment is up-to-date.

(e) Ensure support equipment such as racks and bins are kept in functional condition throughout transition and repair as needed or identified by the KO or designee.

(f) Account for all Government property/equipment identified on the hand receipt, including equipment identified for turn-in to the Government, identifying equipment that was disposed and provide the appropriate documentation.

(g) Mission Stock Inventory:

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2018-11-02T13:08:50-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T14:50:40-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .