About this file

COCO Utilities Site Map

View the file

Other files for this federal contract opportunity

Other files attached to COCO fuel services (bulk and retail) operations and maintenance at MCB Camp Pendleton, CA, newest first.
File Type Posted
0526 Amendment 0008.pdf PDF
0526 Amendment 0007.pdf PDF
0526 Amendment 0006.pdf PDF
0526 Amendment 0005 final version.pdf PDF
210587-1 As-built Drwg 2008.pdf PDF
22141_2.JPG JPG image
210587 Design Plan.TIF TIF image
22141_8.JPG JPG image
22141_.JPG JPG image
22141-5 As-built Drwg 2008.pdf PDF
210587_As-Built Dwg_3Sep2004.pdf PDF
22141_1.JPG JPG image
0526 Amendment 0004.pdf PDF
0526 Amendment 0003.pdf PDF
SOP_AST —
SOP_UST.doc DOC document
Camp_Pendleton_SPCC_112608.pdf PDF
Core_Plan_112608.pdf PDF
C_9.pdf PDF
C_10.pdf PDF
C_11.pdf PDF
C_appendices.pdf PDF
TOC.pdf PDF
C_8.pdf PDF
C_7.pdf PDF
C_6.pdf PDF
C_5.pdf PDF
C_4.pdf PDF
C_3.pdf PDF
C_2.pdf PDF
BEAP cover.pdf PDF
C_1.pdf PDF
BFOP Final_EA_1-06.pdf PDF
0526 Amendment 0002 final version.pdf PDF
0526 Conference Attendees.pdf PDF
0526 Amendment 0001.pdf PDF
21 Area Site.pdf PDF
52 Area Site.pdf PDF
22 Area Site.pdf PDF
0526 RFPfinalversion.pdf PDF
0526 OSPfinalversion.pdf PDF
41 Area Site.pdf PDF
0526 Wage Determination.pdf PDF
14 Area Site.pdf PDF
bfop_signed_rona.pdf PDF
fuel sites.pdf PDF
Camp Pendleton PWS.doc DOC document
bfop_signed_fonsi.pdf PDF
43 Area Site.pdf PDF
Pendleton Lease.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water connection Point

Sewer Connection Point Telephone Connection Point Storm water Storm Water 6” Electrical POC Water POC for additional fire hydrant

Water Connection Point Telephone Connection Point Storm water Electrical POC

1. Any road mandatory trenching within paved roadways must employ a "T-CUT“ wherein a larger area of the pavement is removed than the trenched area. Backfill must be a slurry fill with a base material separation between the slurry fill and the replacement pavement

Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required.
The Base will permit trenching across the asphalt road per para 1 above

Telephone Electrical POC Storm Drainage Water connection

1. Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for this site

Water Connection Point Electrical POC Telephone Connection Point Storm water Water POCs for 2 fire hydrants

Telephone Connection Military Fuel station Bldg 430704 Water Connection Storm water Electric POC

Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for the this site.

This site will require that up to 6 power poles be relocated.

Telephone Connection Sewer Connection Water Connection Storm water Water POCs for 2 fire hydrants Electrical POC

Any road mandatory trenching within paved roadways must employ a "T-CUT“ wherein a larger area of the pavement is removed than the trenched area. Backfill must be a slurry fill with a base material separation between the slurry fill and the replacement pavement

Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for this site.

Trenching through Basilone Road will be permitted per para one above.