COCO Utilities Site Map
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water connection Point
Sewer Connection Point Telephone Connection Point Storm water Storm Water 6” Electrical POC Water POC for additional fire hydrant
Water Connection Point Telephone Connection Point Storm water Electrical POC
1. Any road mandatory trenching within paved roadways must employ a "T-CUT“ wherein a larger area of the pavement is removed than the trenched area. Backfill must be a slurry fill with a base material separation between the slurry fill and the replacement pavement
| Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required. |
| The Base will permit trenching across the asphalt road per para 1 above |
Telephone Electrical POC Storm Drainage Water connection
1. Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for this site
Water Connection Point Electrical POC Telephone Connection Point Storm water Water POCs for 2 fire hydrants
Telephone Connection Military Fuel station Bldg 430704 Water Connection Storm water Electric POC
Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for the this site.
This site will require that up to 6 power poles be relocated.
Telephone Connection Sewer Connection Water Connection Storm water Water POCs for 2 fire hydrants Electrical POC
Any road mandatory trenching within paved roadways must employ a "T-CUT“ wherein a larger area of the pavement is removed than the trenched area. Backfill must be a slurry fill with a base material separation between the slurry fill and the replacement pavement
Per DESC Dave Ray, no Base stub-up of utilities or Site access improvements will be required for this site.
Trenching through Basilone Road will be permitted per para one above.