C_10.pdf
PDF 378 KB Posted
- Attached to
- COCO fuel services (bulk and retail) operations and maintenance at MCB Camp Pendleton, CA Federal contract opportunity
- Solicitation number
- SP0600-09-R-0526
- Issued by
- Defense Logistics Agency Energy
About this file
BEAP
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
c hap t e r 10 Submittal Requirements
10.1 Summary
Prepare construction documents under the direction of a registered Architect or Engineer, licensed by the State of California. Wet sign, stamp and include the license expiration date on each sheet of the drawings.
The designer and/or contractor is required to review the design documents for technical accuracy and constructability. Government review is for functional adequacy only. Approval of the design documents by the Government does not relieve the designer/contractor of the responsibilnies in providing a complete and accurate set of plans, specifications and design calculations for the project.
Provide wrH:ten responses to all government design review comments in accordance with the Southwest Division (SWDIV) Guide For Architectural Engineering (AlE) firms.
Prepare drawing format and content according to the SWDIV Guide For AlE firms. The Public Works Office will return incomplete construction documents submitted for plan review. Do not use adhesive transparencies (sticky backs) on plans submitted for final approval.
Site development, parking, building accessibility and building interiors are to conform to the Americans with Disabilities Act (ADA) for handicap accessibility requirements.
All designs are to comply with NationaVFederal, State and local building codes including:
• Uniform Building Code (UBC) and Uniform Fire Code (UFC)
• Uniform Mechanical Code (UMC) Uniform Plumbing Code (U PC)
• National Fire Protection Association (NFPA)
• National Electric Code (NEC)
• Americans with Disabilities Act (ADA)
• Specific Military Handbooks
When the work shown on the plans is completed, the Architect or Engineer of record is to provide Record Drawings (As-Builts) in accordance with of the SWDIV guide for AlE firms.
Base Exterior Archnecture Plan Camp Pendleton, California Marine Corps Base
10-1
10.2 Submittal Matrix
Submit tal Concept Design Reguir ements Matrix
Development Submittal
No.of sets i
I 10
•••••.• ~.~ ..••.••.•••.•• 10
~ 5 i;
;·· ••• 1 ~
~Ii ", .... ".
air~~.·.
~\'{111l
':t
>~t:i::i ~~~I
I~~i
::i
• 30 days
Base Exterior Architecture Plan Camp Pendleton, California Marine Corps Base
Set Size
8%" X 1111
8%" X 1111
8%" X 1111
8%" X 1111
16" X 20
Construction Special Notes Document Submittal
No.of sets Set Size
10 % size See 10.5 for a check list of minimum information required.
Provide Title Block per Section
10.6 in the upper right corner of board.
10 % size
10 % size
10 % size
10 % size
10 % size
10 % size If required by code analysis
1 Prepared according to the latest edition on one of the following formats:
· Specsintact (Navy)
· AlA
· CSI
10 Y2 size Required for projects under construction during the period between Sept. 15 - April 15.
3 Prepared by a California
Licensed Civil Engineer.
30 days Provide written response to the government design review per the SWDIV. AlE Guide.
10-2
10.3 Signage Requirements
Submit five copies of a Comprehensive Sign Package to the PWO (Code 304) for review and approval before sign fabrication and installation. The sign package is to include exterior and interior signage, graphic descriptions of size, shape, design, materials, colors, lettering, lighting, and installation methods. Include accurate locations proposed for all signage.
10.4 Facilities Management System (FMS)
Applicability: FMS interface is required for all buildings with one or more of the following items;
Air Handling (All Types) Radiant Heat Systems Mech. Pumping System (HW, CW, CHW, etc.)
Boiler Systems Exterior Lighting Electrical Meters Gas Meters Solar Systems Security Systems (By Zone) Fire Alarm Systems (By Zone) Fire Alarm Panels (By Zone) Security Alarm Panels Domestic Hot Water Systems Sewage Pumping/Handling Systems Potable Water Pumping/Handling Systems Refrigeration Equipment Training Tanks/Pools and Related Equip.
Weather Data for Building Control Hazardous Alarms and Equipment Alarms of all types, including secondary containment monitoring, oily waste, etc.
Landscape Irrigation Generators
Notes 1 . Depending on Application
MONITOR
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
CONTROL
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
2. Point of contact for technical questions, points of connections and trunk line locations is Arthur J. Rahn, Engineer-Account Executive, Honeywell.
Base Exterior Architecture Plan Camp Pendleton, California
10-3
10.5 Site Plan Preparation Guidelines
10.5 A. Site Survey of Improvements
Show all existing and proposed improvements including:
1. Proposed project limits or boundaries.
2. Names, widths and centerline of bordering streets and alleys.
3. Existing and proposed topography.
4. Existing and proposed curbs, access aprons, sidewalks and landscape.
5. All utilities and proposed routes or rerouting.
6. Identification of all existing and proposed buildings or structures, their uses, and number of stories.
7. Distances from the street to the nearest building or structure.
8. Distance from the centerline of the street to the proposed building.
9. Distance between buildings and structures to streets or project boundaries.
10. Heights and types of all fences and walls.
11. North arrow and drawing scale.
12. Show all easements or security setbacks.
13. Show any existing survey hubs, pipes, or similar permanently installed survey monuments.
10.5 B. Traffic Circulation Study
Provide a study and impact to the proposed project on surrounding existing Base vehicle circulation and traffic.
Base Exterior Architecture Plan Camp Pendleton, California Marine Corps Base
10-4
/" Centtit' I irJ8 ----------- of Street
STREET
CUFtB
SIDEWALK 10'
Survey Market ..
60' P.L.
It:
= E b ~w~
__ - -= .. 20' ___ --__ --_-__ ---04
Figure 10.5 - 1: Typical Site Plan Layout
10.6 Color Board Title Block
Note: Place the Color Board Title Block in the upper right hand corner of 16" x 20" board.
AlE FIRM DEPARTMENT 0pTCi~CI C We> tfK§TIc:,~GFfel~ COMMAND
MARINE CORPS BASE CAMP PENDLETON CA
PLANNER DATE COLOR AND MATERIAL BOARD
PLANNING DIRECTOR PROJECT TITLE AND LOCATION
APPROVED CAT CODE SIZE NAVFAC DWG NO
PUBLIC WORKS OFFICER DATE
SATISFACTORY TO SCALE CONTRACT NO BOARD NO
TITLE DATE
of
10.7 Drawing I Sheet Title Block
Note: Place the Drawing I Sheet Title Block in the lower right hand side of the drawing.
AlE FIRM DEPARTMENT 0pTCi~rl C We>tf({§TIc:,~GFfel~ COMMAND
MARINE CORPS BASE CAMP PENDLETON CA
ENGINEER IN CHARGE DATE SHEET TITLE
DESIGN MANAGER PROJECT TITLE AND LOCATION
APPROVED CAT CODE SIZE NAVFAC DWG NO
PUBLIC WORKS OFFICER DATE
SATISFACTORY TO SCALE CONTRACT NO SHEET NO
TITLE DATE
of i."~"~'-""'.'...... Base Exterior Architecture Plan ~ Camp Pendleton, California
10-5
File details come from the government source that posted it. Updated .