About this file

BEAP

View the file

Other files for this federal contract opportunity

Other files attached to COCO fuel services (bulk and retail) operations and maintenance at MCB Camp Pendleton, CA, newest first.
File Type Posted
0526 Amendment 0008.pdf PDF
0526 Amendment 0007.pdf PDF
0526 Amendment 0006.pdf PDF
0526 Amendment 0005 final version.pdf PDF
210587-1 As-built Drwg 2008.pdf PDF
22141_2.JPG JPG image
210587 Design Plan.TIF TIF image
22141_8.JPG JPG image
22141_.JPG JPG image
22141-5 As-built Drwg 2008.pdf PDF
210587_As-Built Dwg_3Sep2004.pdf PDF
22141_1.JPG JPG image
0526 Amendment 0004.pdf PDF
0526 Amendment 0003.pdf PDF
SOP_AST —
SOP_UST.doc DOC document
Camp_Pendleton_SPCC_112608.pdf PDF
Core_Plan_112608.pdf PDF
C_9.pdf PDF
C_11.pdf PDF
C_appendices.pdf PDF
TOC.pdf PDF
C_8.pdf PDF
C_7.pdf PDF
C_6.pdf PDF
C_5.pdf PDF
C_4.pdf PDF
C_3.pdf PDF
C_2.pdf PDF
BEAP cover.pdf PDF
C_1.pdf PDF
BFOP Final_EA_1-06.pdf PDF
0526 Amendment 0002 final version.pdf PDF
0526 Conference Attendees.pdf PDF
0526 Amendment 0001.pdf PDF
21 Area Site.pdf PDF
52 Area Site.pdf PDF
22 Area Site.pdf PDF
0526 RFPfinalversion.pdf PDF
0526 OSPfinalversion.pdf PDF
41 Area Site.pdf PDF
COCO SITE UTILITIES9.ppt PPT presentation
0526 Wage Determination.pdf PDF
14 Area Site.pdf PDF
bfop_signed_rona.pdf PDF
fuel sites.pdf PDF
Camp Pendleton PWS.doc DOC document
bfop_signed_fonsi.pdf PDF
43 Area Site.pdf PDF
Pendleton Lease.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

c hap t e r 10 Submittal Requirements

10.1 Summary

Prepare construction documents under the direction of a registered Architect or Engineer, licensed by the State of California. Wet sign, stamp and include the license expiration date on each sheet of the drawings.

The designer and/or contractor is required to review the design documents for technical accuracy and constructability. Government review is for functional adequacy only. Approval of the design documents by the Government does not relieve the designer/contractor of the responsibilnies in providing a complete and accurate set of plans, specifications and design calculations for the project.

Provide wrH:ten responses to all government design review comments in accordance with the Southwest Division (SWDIV) Guide For Architectural Engineering (AlE) firms.

Prepare drawing format and content according to the SWDIV Guide For AlE firms. The Public Works Office will return incomplete construction documents submitted for plan review. Do not use adhesive transparencies (sticky backs) on plans submitted for final approval.

Site development, parking, building accessibility and building interiors are to conform to the Americans with Disabilities Act (ADA) for handicap accessibility requirements.

All designs are to comply with NationaVFederal, State and local building codes including:

• Uniform Building Code (UBC) and Uniform Fire Code (UFC)

• Uniform Mechanical Code (UMC) Uniform Plumbing Code (U PC)

• National Fire Protection Association (NFPA)

• National Electric Code (NEC)

• Americans with Disabilities Act (ADA)

• Specific Military Handbooks

When the work shown on the plans is completed, the Architect or Engineer of record is to provide Record Drawings (As-Builts) in accordance with of the SWDIV guide for AlE firms.

Base Exterior Archnecture Plan Camp Pendleton, California Marine Corps Base

10-1

10.2 Submittal Matrix

Submit tal Concept Design Reguir ements Matrix

Development Submittal

No.of sets i

I 10

•••••.• ~.~ ..••.••.•••.•• 10

~ 5 i;

;·· ••• 1 ~

~Ii ", .... ".

air~~.·.

~\'{111l

':t

>~t:i::i ~~~I

I~~i

::i

• 30 days

Base Exterior Architecture Plan Camp Pendleton, California Marine Corps Base

Set Size

8%" X 1111

8%" X 1111

8%" X 1111

8%" X 1111

16" X 20

Construction Special Notes Document Submittal

No.of sets Set Size

10 % size See 10.5 for a check list of minimum information required.

Provide Title Block per Section

10.6 in the upper right corner of board.

10 % size

10 % size

10 % size

10 % size

10 % size

10 % size If required by code analysis

1 Prepared according to the latest edition on one of the following formats:

· Specsintact (Navy)

· AlA

· CSI

10 Y2 size Required for projects under construction during the period between Sept. 15 - April 15.

3 Prepared by a California

Licensed Civil Engineer.

30 days Provide written response to the government design review per the SWDIV. AlE Guide.

10-2

10.3 Signage Requirements

Submit five copies of a Comprehensive Sign Package to the PWO (Code 304) for review and approval before sign fabrication and installation. The sign package is to include exterior and interior signage, graphic descriptions of size, shape, design, materials, colors, lettering, lighting, and installation methods. Include accurate locations proposed for all signage.

10.4 Facilities Management System (FMS)

Applicability: FMS interface is required for all buildings with one or more of the following items;

Air Handling (All Types) Radiant Heat Systems Mech. Pumping System (HW, CW, CHW, etc.)

Boiler Systems Exterior Lighting Electrical Meters Gas Meters Solar Systems Security Systems (By Zone) Fire Alarm Systems (By Zone) Fire Alarm Panels (By Zone) Security Alarm Panels Domestic Hot Water Systems Sewage Pumping/Handling Systems Potable Water Pumping/Handling Systems Refrigeration Equipment Training Tanks/Pools and Related Equip.

Weather Data for Building Control Hazardous Alarms and Equipment Alarms of all types, including secondary containment monitoring, oily waste, etc.

Landscape Irrigation Generators

Notes 1 . Depending on Application

MONITOR

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

CONTROL

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

2. Point of contact for technical questions, points of connections and trunk line locations is Arthur J. Rahn, Engineer-Account Executive, Honeywell.

Base Exterior Architecture Plan Camp Pendleton, California

10-3

10.5 Site Plan Preparation Guidelines

10.5 A. Site Survey of Improvements

Show all existing and proposed improvements including:

1. Proposed project limits or boundaries.

2. Names, widths and centerline of bordering streets and alleys.

3. Existing and proposed topography.

4. Existing and proposed curbs, access aprons, sidewalks and landscape.

5. All utilities and proposed routes or rerouting.

6. Identification of all existing and proposed buildings or structures, their uses, and number of stories.

7. Distances from the street to the nearest building or structure.

8. Distance from the centerline of the street to the proposed building.

9. Distance between buildings and structures to streets or project boundaries.

10. Heights and types of all fences and walls.

11. North arrow and drawing scale.

12. Show all easements or security setbacks.

13. Show any existing survey hubs, pipes, or similar permanently installed survey monuments.

10.5 B. Traffic Circulation Study

Provide a study and impact to the proposed project on surrounding existing Base vehicle circulation and traffic.

Base Exterior Architecture Plan Camp Pendleton, California Marine Corps Base

10-4

/" Centtit' I irJ8 ----------- of Street

STREET

CUFtB

SIDEWALK 10'

Survey Market ..

60' P.L.

It:

= E b ~w~

__ - -= .. 20' ___ --__ --_-__ ---04

Figure 10.5 - 1: Typical Site Plan Layout

10.6 Color Board Title Block

Note: Place the Color Board Title Block in the upper right hand corner of 16" x 20" board.

AlE FIRM DEPARTMENT 0pTCi~CI C We> tfK§TIc:,~GFfel~ COMMAND

MARINE CORPS BASE CAMP PENDLETON CA

PLANNER DATE COLOR AND MATERIAL BOARD

PLANNING DIRECTOR PROJECT TITLE AND LOCATION

APPROVED CAT CODE SIZE NAVFAC DWG NO

PUBLIC WORKS OFFICER DATE

SATISFACTORY TO SCALE CONTRACT NO BOARD NO

TITLE DATE

of

10.7 Drawing I Sheet Title Block

Note: Place the Drawing I Sheet Title Block in the lower right hand side of the drawing.

AlE FIRM DEPARTMENT 0pTCi~rl C We>tf({§TIc:,~GFfel~ COMMAND

MARINE CORPS BASE CAMP PENDLETON CA

ENGINEER IN CHARGE DATE SHEET TITLE

DESIGN MANAGER PROJECT TITLE AND LOCATION

APPROVED CAT CODE SIZE NAVFAC DWG NO

PUBLIC WORKS OFFICER DATE

SATISFACTORY TO SCALE CONTRACT NO SHEET NO

TITLE DATE

of i."~"~'-""'.'...... Base Exterior Architecture Plan ~ Camp Pendleton, California

10-5

File details come from the government source that posted it. Updated .