This document is a set of design and construction drawings prepared by the San Francisco Municipal Transportation Agency (SFMTA) for Precast ADA Accessibility Stops as part of the SFMTA-2027-01-FTA project. The drawings, designated as Attachment 1-A-1, provide detailed structural and architectural specifications for the precast concrete platforms and related components. The document includes foundation plans, platform plans, transverse and longitudinal elevations, and cross-sectional details for platform and ramp configurations across multiple installation locations. The technical drawings encompass reinforcing bar development and splice length schedules for normal weight concrete, details for concrete wall openings, pipe sleeves, foundation reinforcing patterns, and standard hook geometries for structural elements. The drawing set comprises 24 general sheets (TO213-ST-G01 through TO213-ST-G05) and detailed structural sheets (TO213-ST-01 through TO213-ST-24, plus TO213-ST-100), providing comprehensive specifications for bidders to understand the scope of precast platform procurement and installation requirements.
The drawings establish the design criteria, testing and inspection protocols, and detailed construction specifications necessary for qualified contractors to manufacture and supply precast ADA platforms for multiple Muni transit line locations throughout San Francisco. The technical documentation includes symbols, abbreviations, legends, building code compliance notes, structural steel specifications, and guidelines for non-shrink grout and post-installed anchors. These design drawings serve as the basis for bidders to prepare accurate cost estimates and project timelines for the procurement of standardized precast components that meet ADA accessibility requirements across the specified transit stations.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUNDATION NOTES
CONCRETE NOTES
REINFORCING BAR NOTES
BUILDING CODE
STRUCTURAL STEEL NOTES
GENERAL NOTES
MUNICIPAL TRANSPORTATION AGENCY
Attachment 1-A-1
DESIGN CRITERIA
TEST, INSPECTIONS AND OBSERVATIONS NOTES
TABLE OF SPECIAL INSPECTIONS
NON-SHRINK GROUT
SYMBOLS AND ABBREVIATIONS
POST-INSTALLED ANCHORS:
LEGENDS
MUNICIPAL TRANSPORTATION AGENCY
REINFORCING BAR DEVELOPMENT AND SPLICE LENGTH SCHEDULES - NORMAL WEIGHT CONCRETE
TYPICAL STANDARD HOOK EMBEDMENT FOR MAIN REINFORCING TYPICAL STANDARD HOOK GEOMETRY FOR STIRRUP, TIE AND HOOP
ADDED REINFORCING AT CONCRETE WALL OPENINGS
PIPE SLEEVE THROUGH CONCRETE WALL, PIER CAP, SLAB OR FOOTING TYPICAL DETAILS OF PIPES AT FOOTING
REINFORCING AROUND STRUCTURAL SLAB OR WALL OPENINGS
TYPICAL PLAN VIEWS OF CONCRETE WALLS AND FOOTINGS
TYPICAL REINFORCING AT WALL AND FOOTING ENDS, CORNERS, AND INTERSECTIONS TYPICAL REINFORCING AT INTERSECTIONS OF SLABS AND WALLS
FOUNDATION PLAN
FLATFORM PLAN
NOTES:
TRANSVERSE ELEVATION
LONGITUDINAL ELEVATION
LONGITUDINAL ELEVATION
TRANSVERSE SECTION AT PLATFORM
LOGITUDINAL SECTION
TRANSVERSE SECTION AT RAMP
FLATFORM PLAN
LONGITUDINAL ELEVATION
TRANSVERSE SECTION AT PLATFORM
LOGITUDINAL SECTION
FLATFORM PLAN
LONGITUDINAL ELEVATION
TRANSVERSE SECTION AT PLATFORM
LOGITUDINAL SECTION
FLATFORM PLAN
| Sheets and Views |
| TO213-ST-G01 |
| TO213-ST-G02 |
| TO213-ST-G03 |
| TO213-ST-G04 |
| TO213-ST-G05 |
| TO213-ST-01 |
| TO213-ST-02 |
| TO213-ST-03 |
| TO213-ST-04 |
| TO213-ST-05 |
| TO213-ST-06 |
| TO213-ST-07 |
| TO213-ST-08 |
| TO213-ST-09 |
| TO213-ST-10 |
| TO213-ST-11 |
| TO213-ST-12 |
| TO213-ST-13 |
| TO213-ST-14 |
| TO213-ST-15 |
| TO213-ST-16 |
| TO213-ST-17 |
| TO213-ST-18 |
| TO213-ST-19 |
| TO213-ST-20 |
| TO213-ST-21 |
| TO213-ST-22 |
| TO213-ST-23 |
| TO213-ST-24 |
| TO213-ST-100 |