SECHQ1-16-R-0017_Amendment_000001.pdf
PDF 118 KB Posted
- Attached to
- EDGAR Redesign (ERD) Requirements Gathering
- Solicitation number
- SECHQ1-16-R-0017
- Issued by
-
Securities and Exchange Commission
About this file
Amendment 000001
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
SECHQ116R0017
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20549
MAIL STOP 4226
SEC-OA - 01
100 F STREET NE
IT - 01 SUPPORT BRANCH
OFFICE OF ACQUISITIONS
SECURITIES AND EXCHANGE COMMISSION
06/14/2016000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/10/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
EDGAR Redesign (ERD) Requirements Gathering
The purpose of Amendment 000001 to SECHQ1-16-R-0017 is to:
1. Incorporate Questions & Answers dated June 14, 2016;
2. Revise Section L.3.1, as shown on page 2; and
3. Revise Section M.3.1, as shown on page 3.
All other terms and conditions remain unchanged
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JOHN B. BOVA
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Page 59 of 67 RFP: SECHQ1-16-R-0017 page. Header/footer information (which does not include any information to be evaluated) may be included in the 1” margin space. Offerors’ proposals shall not exceed the page limitations set forth below.
Pages that exceed the maximum page limitation will not be evaluated.
L.3.1 Volume 1: Go/No-Go Factor The Offerors shall submit responses to the Go/No-Go Factors as detailed in Attachment 10 – Go/No-Go Factors Response Form. The Offerors shall clearly identify how the information provided in its response satisfies the Go/No-Go factor listed in Section M. The Offerors should provide sufficient supporting data on how they meet the Go/No-Go factors.
Offerors shall only submit one project for each Go/No-Go factor. Multiple projects cannot be combined to meet the criteria of a factor.
Offerors that receive a “Pass” rating on both of the Go/No-Go Factors can continue to participate in the RFP Response and submit the Technical Proposal and Price Proposal.
L.3.2 Proposal Instructions.
L.3.2 Format and Instructions Technical and Price Proposals
Offerors’ Technical and Price proposals shall consist of the following two (2) separate volumes with the maximum number of pages for each proposal volume as listed below. The minimum information required is described in the following sections. Any missing or incomplete information may result in a proposal being assessed as unacceptable. Failure to furnish a complete proposal at time of proposal submission may result in the proposal not being accepted by the Government for evaluation and being eliminated from consideration for award. The Technical Proposal volume requires both a description of approach and submittal of artifacts to show that Offerors have followed this approach in the past. Offerors are not expected to create new artifacts, merely to provide examples from previous contracts.
Volume Tab Title Page Limit
(if applicable)
I Technical Proposal
A.1 Cover Letter and Executive Summary 6
A.2 Exceptions and Deviations N/A
B.1 Methodologies
B.1.1 Program Management Methodology 30
B.1.2 Business Process Engineering Methodology 15
B.1.3 Analyses Methodology 10
B.1.4 Functional/Non-Functional Requirements Document (FRD) Creation Methodology
B.2 Technical Artifacts
B.2.1 Program Management Plan (PMP) Artifact (including an Integrated Master Schedule)
N/A
Page 66 of 67 RFP: SECHQ1-16-R-0017
Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
M.3 Evaluation Factors for Award
M.3.1 Go/No-Go Factor
The following Go/No-Go factors will be evaluated strictly on a pass/fail basis:
Go/No-Go Factor 1: The Prime Offeror shall have built a system/environment similar (or larger) in size, scope, and complexity as EDGAR in the last (5) five years? See Attachment 10 for criteria details related to size, scope, and complexity of EDGAR. Offerors must meet all of the criteria in order to receive a “Pass” rating.
Go/No-Go Factor 2: The Prime Offeror shall have completed a contract for gathering a full set of functional and non-functional requirements for a system/environment similar (or larger) in size, scope, and complexity as EDGAR in the last five (5) years? See Attachment 10 for criteria details related to size, scope, and complexity of EDGAR. Offerors must meet all of the criteria in order to receive a “Pass” rating.
M.3.2 Evaluation of Other Non-Price Factors
Factor 1: Technical Approach (as articulated in the technical proposal defined in Section L.3.2).
Each Offeror will be evaluated on its expertise, capabilities, and methodologies for program management, business process engineering, technical analysis, and creating a complete high-quality functional and non-functional requirements document. Each Offeror will also be evaluated on:
The extent to which its approach demonstrates an ability to meet or exceed the requirements of the Solicitation;
The creativity and innovation in its approach;
The maturity and completeness of its methodology; and Its capability to create the necessary documents in the time allotted for a system of this size, scope, and complexity.
Factor 2: Personnel. Each Offeror will be evaluated on the qualifications of its key personnel as related to the requirements of the Solicitation. Each Offeror will also be evaluated on:
The ability of its proposed organizational structure to complete all contract requirements within the designated period of performance;
The ability to recruit, train, and retain high quality personnel, including the turnover rate experienced by the business unit (The turnover rate is defined as the number of personnel who departed (regardless of reason) divided by the average number of personnel during the period); and
Its reach-back capabilities and approach to staffing expertise and support that is not needed on a fixed basis, including:
o The breadth and relevance of proposed labor categories for expertise and support not needed on a fixed basis;
o The approach for providing personnel with the technical and analytical capabilities as they are required; and o Any innovative approaches to providing staffing pools for expected requirements.
| sf30 |
| PRISM Amendment 0001 |
File details come from the government source that posted it. Updated .