Question_and_Answers_-_07-05-16.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
EDGAR Redesign (ERD) Requirements Gathering
Solicitation number
SECHQ1-16-R-0017
Issued by

About this file

Questions and Answers 7/5/2016

View the file

Other files

File Type Posted
Question_and_Answers_-_7-21-16.pdf PDF
SECHQ1-16-R-0017_Amendment_000006.pdf PDF
SECHQ1-16-R-0017_Amendment_000005.pdf PDF
Question_and_Answers_-_7-20-16.pdf PDF
Amendment_000005_Track_Changes.pdf PDF
Question_and_Answers_-_7-14-16.pdf PDF
SECHQ1-16-R-0017_Amendment_000004.pdf PDF
SECHQ1-16-R-0017_Amendment_000003.pdf PDF
SECHQ1-16-R-0017_Amendment_000002.pdf PDF
Attachment_3_Past_Performance_Questionnaire_2016-06-30.docx DOCX document
Revised_RFP-000002_with_Track_Changes.pdf PDF
Revised_RFP-000002_Conformed.pdf PDF
SECHQ1-16-R-0017_Amendment_000001.pdf PDF
Questions_and_Answers_-_6-14-16.pdf PDF
Amendment_000001_Track_Changes.pdf PDF
Attachment_11_-_Question_and_Answer_Template.xlsx XLSX spreadsheet
Attachment_7_NDA-Contractor-Personnel.pdf PDF
Attachment_4_EDGAR_Submissions.doc DOC document
Attachment_3_Past_Performance_Questionnaire.doc DOC document
Attachment_8_Certification_by_Corporations.pdf PDF
Attachment_1_Monthly_Board_Presentation_Template.docx DOCX document
Attachment_2_Capabilities_List.docx DOCX document
Attachment_5_EDGAR_Architecture _Subsystems _and_Services.doc DOC document
Attachment_10_Go_No_Go_Response_Form.docx DOCX document
Attachment_6_NDA-Contractor-Entity.pdf PDF
Attachment_9_SEC_6019_01_Attachment_-_Mandatory_Training_for_Contactor_Personnel.pdf PDF
SECHQ1-16-R-0017.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Template SECHQ1-16-R-0017 Questions and Answers (Q&A) - Amendment 000002

Document ReferenceSection ReferenceParagraphPagesQuestionAnswer
RFPWould the SEC please clarify whether the Senior Program Manager and the Senior Technical Program Manager are required to possess two certifications: (1) PMP or PgMP and (2) FAC-C/FAC-C-IT or DAWIA PM Level 3 certification. Or is the intent behind the requirement that the managers possess at least one of the four named certifications?Program managers should possess at least one of the four named certifications. Please see revised Section H.10.
RFPWould the SEC please provide required qualifications for the proposed Business Process Engineering Lead?Offerors should propose qualifications for the Business Process Engineering Lead.
RFPWould the SEC please confirm whether the Facilitator is required to possess the qualifications currently listed under “Project Manager Level III”, or if the “Project Manager Level III” position is an additional, sixth key personnel position?H.10 has been revised to add qualifications for the Facilitator(s). Qualifications previously listed for the Project Manager Level III are not required for the Facilitator role.
RFPB.1, 1.1Program Management Methodology61We request that all references to a Program Management "artifact" be removed from this requirement. This artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended.The RFP has been revised to show the SEC's intent to receive an actual PMP for the ERD Requirements Gathering program rather than an artifact from a previous project.
RFPB.1, 1.2Business Process Engineering Methodology61We request that all references to a Business Process Engineering "artifact" be removed from this requirement. This artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended.See revised section L.3.3.B.2 of the RFP.
RFPB.1, 1.4Functional/Non-Functional Requirements
Document (FRD) Creation Methodology61We request that all references to a Functional/Non-Functional Requirements
Document (FRD) "artifact" be removed from this requirement. This artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended.See revised section L.3.3.B.2 of the RFP.
RFPB.2, 2.1Program Management Plan Artifact62In support of mission critical systems similar to EDGAR, we have developed a Program Management Plan and Integrated Master Schedule. Our Program Management Plan and Integrated Master Schedule are deliverables under contract to the government. Once delivered, the government owns all the rights to these artifacts. Since this artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended. To provide any of these artifacts would be a breach of our government contracts. Recommend the government delete this requirement.See revised section L.3.3.B.2 of the RFP.
RFPB.2, 2.2Functional/Non-Functional Requirements
Document Artifact62In support of mission critical systems similar to EDGAR, we have developed a Functional/Non-Functional Requirements Document. Our Functional/Non-Functional Requirements Documents a deliverable under contract to the government. Once delivered, the government owns all the rights to these artifacts. Since this artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended. To provide any of these artifacts would be a breach of our government contracts. Recommend the government delete this requirement.See revised section L.3.3.B.2 of the RFP.
RFPB.2, 2.3Business Process Engineering Artifact62In support of mission critical systems similar to EDGAR, we have developed a Business Process Engineering artifact. Our Business Process Engineering artifact is a deliverable under contract to the government. Once delivered, the government owns all the rights to these artifacts. Since this artifact was developed in support of a mission critical system, the government will not allow us to use it for any purpose other than the one for which it was intended. To provide any of these artifacts would be a breach of our government contracts. Recommend the government delete this requirement.See revised section L.3.3.B.2 of the RFP.
RFPH.10 6010.01Key Personnel41Please provide the qualifications or certifications required for the Business Processing Engineering Lead Labor Category.Offerors should propose qualifications for the Business Process Engineering Lead.
RFPH.10 6010.01Key Personnel42Please provide the qualifications or certifications required for the Facilitator Labor Category.Please see section H.10 of the revised RFP
RFPH.10 6010.01Key Personnel41Would the SEC consider substituting experience in lieu of a Masters Degree for the Senior Program Manager?No.
RFPH.10 6010.01Key Personnel41Would the SEC consider substituting experience in lieu of a Bachelors Degree for the Senior Technical Program Manager?No.
RFPH.10 6010.01Key Personnel41-42Would the SEC consider substituting experience in lieu of a Bachelors Degree for the Senior Technical Writer?No. No change to RFP.
RFPH.10 6010.01Key Personnel40-42There are 5 key personnel position identified followed by descriptions for six categories. Is the Project Manager Level III also considered key?The PM Level III has now been removed from H.10.
RFPH.10 6010.01Key Personnel40-41Is the list of key personnel intended to be limited to 5 or 6 positions or are these key labor categories? For example, if we propose 2 facilitators, should both be designated as key?All facilitator positions shall be designated as key. See revised H.10 of the RFP.
RFPTab CPersonnel62Offerors are asked to list and describe "the labor categories proposed under CLINs 0002, 0004, and 0006 for Expertise and Support Not Needed On A Fixed Basis." Does the SEC intend for the offeror to create labor categories and identify the minimum requirements for personnel to fill those positions?Offerors shall propose labor categories. The Contractor is responsible for managing qualifications.
RFP: SECHQ1-16-R-0017C.4.2.1.2 and F.3 4003.01315 and 33In Section C.4.2.1.2 Integrated Master Schedule (IMS) the Government states the "schedule is to be provided to the COR no later than one (1) month from the contract start date." However, in Section F.3 4003.0 Schedule of Deliverables states the IMS is due 45 days after contract award. Please confirm when the IMS is due.The IMS is due 45 calendar days from the contract start date. C.4.2.1.2 has been revised.
RFPH.10 6010.01Key Personnel41The Senior Program Manager position and the Senior Technical Program Manager require the following certifications: PMP or PgMP, FAC-C/FAC-C-IT or DAWIA PM Level 3. Would the SEC consider substituting additional years of experience or a specific degree (e.g., MBA, MS in Computer Science) in lieu of the required certifications?No.
RFPH.10 6010.01Key Personnel42The Project Manager Level III position requires the following certifications: PMP, FAC-C/FAC-C-IT or DAWIA PM Level 2 or above. Would the SEC consider substituting additional years of experience or a specific degree (e.g., MBA, MS in Computer Science) in lieu of the required certifications?No.
RFPTab DPast Performance63The RFP references Attachment 4 "Past Performance Statement" and Attachment 4 "Past Performance Questionnaire." Attachment 4 as issued appears to be the EDGAR Submission form. Please clarify the intent of these instructions.Please see revised RFP, and revised Attachment 3, included in Amendment 000002.
RFPL.3Proposal Submission58Will the SEC allow Offeror's to utilize another font type other than Times New Roman for graphics?Yes. Offerors are responsible for ensuring that text in graphics is legible, and adheres to the font size restrictions in the RFP.
RFPL.3, B.1, B.2Proposal Instructions58, 60, and 62Please confirm that responding only to the Statement of Work Sections called out in sections L.3, B.1, and B.2 would be responsive to the RFP requirements and be considered a compliant response. If not, will the SEC please provide additional guidance in how it expects offerors to responds to the statement of work within the RFP structure of section L.Offeror's proposals should include a comprehensive response to the entire solicitation.