About this file

This is a Janitorial Specifications document (Schedule B.1) issued by the State of Michigan through the Michigan Procurement portal for Request for Proposal No. 220000000135, which seeks janitorial and grounds maintenance services for eight roadside parks located in the Superior Region. The services encompass comprehensive daily cleaning tasks including toilet building sanitation (floors, fixtures, walls, and tissue replenishment), grounds maintenance (litter removal, trash barrel emptying, picnic table and grill cleaning), and cleaning of ancillary structures such as map cases, well shelters, and sidewalks. Weekly tasks include concrete floor scrubbing and louver cleaning, while bi-weekly activities involve vault deodorant application. Additional responsibilities include seasonal spring and fall cleanup activities, graffiti removal and covering, and toilet vault pumping and maintenance. The contractor must complete daily toilet building cleaning by 10:00 a.m. and empty trash containers daily, with all debris disposed of at registered Class II landfills.

The contractor is responsible for supplying all cleaning materials, equipment, and replenishable supplies including toilet tissue, plastic trash liners, hand sanitizer (minimum 65% alcohol), paint/stain for graffiti coverage, and graffiti removal products, while the State provides vault toilet deodorant chemical. The contractor must furnish and maintain all necessary equipment such as mops, buckets, brooms, brushes, and pump-up sprayers, and must be licensed through the Michigan Department of Environment, Great Lakes, and Energy to handle septage waste removal. All cleaning supplies and equipment are subject to the Program Manager's approval and inspection to ensure compliance with local, state, and federal codes. Vault pumping must be performed at season's end and within five business days of the Program Manager's request, with effluent disposal required at MDEGLE-approved facilities.

View the file

Other files

File Type Posted
Schedule C - Gros Cap Roadside LSS.xlsx XLSX spreadsheet
Schedule C - Epouphette Roadside LSS.xlsx XLSX spreadsheet
Schedule C - Cut River Roadside LSS.xlsx XLSX spreadsheet
Schedule C - Houghton Co Keweenaw Scenic Turnout LSS.xlsx XLSX spreadsheet
RFP Superior Region 8 Roadside Parks.docx DOCX document
Schedule C - Houghton County Memorial Airport LSS.xlsx XLSX spreadsheet
Schedule C - Detour Roadside LSS.xlsx XLSX spreadsheet
Schedule E - Site Visit Affidavit Superior.docx DOCX document
Sch A Roadside Park janitorial & grounds.docx DOCX document
Schedule C - St. Ignace Overlook Roadside LSS.xlsx XLSX spreadsheet
Schedule C - Luce County Flowing Well Roadside LSS.xlsx XLSX spreadsheet
Sch B2 Roadside Parks Grounds Maint specs.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

SCHEDULE B.1 – JANITORIAL SPECIFICATIONS

Michigan.gov/MiProcurement

SCHEDULE B.1 – JANITORIAL SPECIFICATIONS

Request for Proposal (RFP) No. 220000000135 Janitorial/Grounds Maintenance Services for (8) Roadside Parks in the Superior Region

ROADSIDE PARK JANITORIAL REQUIREMENTS

1. Daily (each service day) Tasks

1.1. Toilet building. Toilet building including floors, stools, seats, and walls must be cleaned and toilet tissue refilled prior to 10:00 a.m.

A. Close building to public.

B. Clean cobwebs from inside and outside of building.

C. Sweep floor.

D. Remove or cover toilet tissue to keep dry during cleanup.

E. Wash inside walls with a non-abrasive detergent/disinfectant.

F. Using a pump-up sprayer, spray toilet seat, lid, and toilet riser with detergent/disinfectant. Apply solution liberally; allow to dwell for five minutes.

G. After five minutes dwell time, scrub inside and outside of toilet riser with a long handled, stiff bristle brush; if the interior is fiberglass use a cloth or sponge to remove disinfectant.

H. Using the pump-up sprayer, rinse walls, toilet seat, lid and riser with clean water.

I. Mop floor with detergent/disinfectant.

J. Remove all excess water from floor surfaces.

K. Remove and/or cover graffiti on walls by staining/painting on wood surfaces or using an acetone-based graffiti remover on fiberglass walls.

L. Resupply toilet tissue.

M. Refill hand sanitizer dispensers.

N. Report any damages or problems to the MDOT Program Manager.

1.2. Grounds Cleaning

A. Pick up litter and debris, including paper, cigarette butts, and animal droppings, from the grounds and parking areas and/or parking lots. Properly dispose of debris.

B. Sweep curb.

C. Empty trash barrels; disinfect barrels if soiled. Replace plastic bags/liners in trash barrels.

D. Clean picnic tables with detergent/disinfectant and rinse.

E. Remove ashes and clean picnic grills/stoves. Properly dispose of ashes.

F. Sweep concrete slabs in picnic areas.

1.3. Map Case

A. Clean plexiglass with a mild soap and water. Do not use harsh chemicals or abrasive materials – DO NOT scratch plexiglass.

B. Remove any notices that have been placed by individuals or businesses that are not official MDOT materials.

C. Remove cobwebs in and around structures.

D. Sweep concrete around display structure.

E. Remove or cover graffiti on stained/painted surfaces and plexiglass.

1.4. Well Shelter

A. Clean the hand pump (or faucet/basin if present).

B. Clean and sanitize drinking fountain (if present).

C. Clean concrete slab and pump base.

D. Remove cobwebs from structure.

E. Cover graffiti on stained/painted surfaces.

1.5. Sidewalks

A. Sweep all paved sidewalk surfaces clean of debris.

B. Remove weeds or grass growing in sidewalk cracks. Weeds must be hand pulled.

2. Weekly Tasks

2.1. Toilet building

A. Scrub concrete floor with a stiff swivel scrub brush and detergent/disinfectant. Rinse floor thoroughly with clean water.

B. Clean all louvers.

3. Bi-weekly Tasks

3.1. Vault deodorant

A. For each toilet vault, apply vault deodorant per the instructions on the vault deodorizer container. Use separate sprayers for applying vault deodorants and cleaner/disinfectants. Frequency and amount of product may be adjusted by the Program Manager.

B. Vault toilet deodorant chemical will be supplied by the State. Contractor is responsible for picking up product at a location determined by the Program Manager. A Safety Data Safety Sheet (SDS) will be provided by the Program Manager or their designee. The Contractor is responsible for following all label directions and instructions detailed in the Contract. The Program Manager reserves the right to increase or decrease the product amount to be used if odorous conditions persist

4. Miscellaneous Activities

4.1. Graffiti

A. The Contractor must cover and/or remove all graffiti on toilet building and other structures, posts, signs, etc. Graffiti must be covered or removed each service day.

1) Graffiti on stained or painted surfaces must be stained or painted. The stain or paint shall be applied in a professional manner. The Contractor shall post signs warning visitors of wet stain or paint. The Contractor will supply the stain or paint required.

2) Ink and marker graffiti on fiberglass surfaces shall be removed with an acetone-based paint remover. All paint remover residue must be immediately cleaned/rinsed off from fiberglass surfaces. Abrasive cleaners shall not be used for graffiti removal.

4.2. Trash removal and disposal

A. The Contractor must provide all trash container bags/liners; liners must be of adequate size for use in 55-gallon trash barrels (furnished by the State).

B. Trash barrels must be emptied each service day and bags of trash must be disposed of by the Contractor. Dumpsters are not provided at the park; bags of trash/refuse must be removed each service day and may not be kept in the park overnight.

C. The Contractor must dispose of trash/refuse at a registered Class II landfill. Proof of disposal at a licensed Class II landfill must be provided to the Program Manager upon request.

4.3. Toilet vaults

A. The Contractor is responsible for pumping toilet vaults and disposal of effluent. Pumping of the vaults must be performed at the end of the season, and as requested by the Program Manager during the season. When requested by the Program Manager, vault pumping shall be completed within five (5) business days of request.

1) Contractor (or subcontractor, if applicable) must be licensed through Michigan Department of Environment, Great Lakes, and Energy (MDEGLE) to remove and transport septage waste.

2) Removing a concrete lid to access the clean-out port is often required. If there is no clean-out port, the vault shall be pumped through the opening inside the toilet building.

3) Any solid matter, such as rocks, bottles, cans, etc., shall be removed as much as possible and properly disposed of by the Contractor.

4) Disposal of all effluent shall be through a MDEGLE approved septage waste receiving facility in accordance with state and federal laws.

B. The Contractor is responsible for “recharging” the toilet vaults after each pumping that may occur during the season. “Recharging” procedure:

1) Add approximately two inches of fresh water to cover the bottom of the vault (approximately 100 gallons) after each pumping.

2) Mix a half (1/2) gallon of vault deodorant with two and a half (2-1/2) gallons of water and spray inside the vault after each pumping during the season. Spray the entire mixture inside the vault.

3) Add a quarter gallon of vault deodorant directly into the 100 gallons of water in the tank.

5. Spring/Fall clean-up

5.1. Grounds Cleaning – Spring and Fall

A. Sweep building roofs in the spring and fall to remove dirt, leaves, needles, etc.

5.2. Toilet vaults – Spring

A. Before opening in the spring, add to the vault approximately two inches (approximately 100 gallons) of fresh water to cover the bottom of the tank.

B. For each vault, mix a half (1/2) gallon of vault deodorant with two and a half (2-1/2) gallons of water and spray inside the vault during the first day of opening.

5.3. Toilet vaults – Fall

A. Pump the vault dry.

B. For each vault, mix a half (1/2) gallon of vault deodorant with two and a half (2-1/2) gallons of water and spray inside the vault.

6. Supplies and Equipment Requirements

6.1. Cleaning Supplies

A. The Contractor shall provide all cleaning supplies and materials.

B. All supplies and materials necessary for cleaning must meet the Program Manager’s approval.

C. The Program Manager shall have the right to inspect all cleaning supplies and materials used in performing Contract Activities. Any supplies or materials which do not comply with local, state and federal codes, or with the Contract, may be rejected.

6.2. Replenishable supplies

The party responsible for providing replenishable supplies is as follows:

Replenishable Item
Provided by
Toilet tissue
Contractor
Plastic Trash Can Liners
Contractor
Hand sanitizer; must be at least 65% alcohol
Contractor
Vault toilet deodorant chemical
Contractor
Paint/stain for covering graffiti
Contractor
Other graffiti removal/coverage products
Contractor

7. Equipment Requirements A. The Contractor shall furnish, operate and maintain suitable and adequate equipment necessary to perform all tasks in an acceptable manner. Equipment includes, but is not limited to, mops, buckets, brooms, brushes, and pump-up sprayers.

B. The Program Manager shall have the right to inspect all equipment to be used in performing Contract Activities. Equipment which does not comply with local, state, and federal codes, or with the Contract, may be rejected.

image1.png