About this file

This is a standard construction specifications document issued by Sacramento County in California for use in procurement processes. The document establishes uniform construction standards and requirements applicable to county construction projects, including the Rio Consumnes Correctional Center potable water tank project. The specifications govern construction methodologies, material standards, quality assurance, and technical requirements for contractors bidding on Sacramento County projects. The document serves as the baseline technical reference for bidders to understand county expectations regarding construction practices, submittals, inspections, and compliance protocols. Response requirements include submission of sealed design drawings and calculations by a California-registered engineer, technical submittals as specified in Section 1.03 A of Technical Specifications 13 30 05, and completion of Appendix B requirements. The three lowest bidders are required to submit escrow bid documents as part of the award process. All work occurs within a secure correctional facility requiring background checks for all personnel, with security clearance completion required prior to attendance at the mandatory pre-bid meeting as detailed in Appendix C.

The specifications establish minimum contractor qualifications, particularly for tank contractors who must comply with Technical Specification 10 30 05 for strand wound prestressed concrete tanks. The document does not contain specific pricing information, set-asides, funding sources, or contract term details; these elements are addressed in the associated solicitation documents and special provisions. Contractors must demonstrate capability in site preparation, gravel road construction, water line installation, conduit placement, and all work necessary to connect the 350,000-gallon potable water tank to the existing water treatment facility while maintaining compliance with all Rio Consumnes Correctional Center regulations and security protocols throughout project execution.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .