This is an Addendum #1 Revision Notice to Contractors issued by the County of Sacramento for a construction project to design and build a new 350,000-gallon prestressed concrete potable water tank at the Rio Consumnes Correctional Center (RCCC). The scope of work includes site preparation and construction of a gravel access road surrounding the tank, installation of water lines and conduit to connect the tank to the existing water treatment facility, and submission of design drawings and calculations sealed by a registered California engineer suitable for obtaining building permits. The project was released for bid on September 1, 2026, with a mandatory pre-bid meeting scheduled for September 16, 2026, at 10:00 a.m. at 12500 Bruceville Road, Elk Grove, California. Attendance at the pre-bid meeting is mandatory, and contractors must submit security background checks to enter the facility. The deadline for submitting pre-bid questions is September 30, 2026, at 2:00 p.m., with responses due by October 7, 2026, at 2:00 p.m. Sealed bids are due electronically on October 15, 2026, at 2:00 p.m. through the Sacramento County Electronic Bidding Portal, with automatic online bid opening at 2:01 p.m.
The estimated construction cost is $4,906,288.00. A Class A California contractor license is required, and bidders must be registered with the California Department of Industrial Relations. Bid security must be submitted as a bid bond, certified check, or cashier's check equal to ten percent of the bid amount. The successful bidder must provide performance and payment bonds each equal to 100 percent of the contract price. Prevailing wage requirements apply in accordance with California Labor Code sections 1720 and 1770. The three low bidders must submit escrow bid documents. The contract basis for award is the base bid only, with no consideration of additive or deductive items. Additional requirements include compliance with the California Air Resources Board Advanced Clean Fleets regulations for qualifying vehicles and submission of an Iran Contracting Act Disclosure Form certification. All responses must be submitted electronically; bids submitted by hand, fax, email, or postal carrier will not be accepted.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO CONTRACTORS
RIO CONSUMNES CORRECTIONAL CENTER NEW POTABLE
WATER TANK
County of Sacramento
9660 Ecology Lane
Sacramento, CA 95827
RELEASE DATE: September 1, 2026
DEADLINE FOR QUESTIONS: September 30, 2026
RESPONSE DEADLINE: October 15, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d
NOTICE TO CONTRACTORS
Rio Consumnes Correctional Center New Potable Water Tank
1. Introduction
2. Notice to Contractors
3. Pricing Proposal
4. Vendor Submissions
Attachments:
A - Contract 4689 - RCCC New Potable Water Tank - Drawings
B - Contract 4689 - RCCC New Potable Water Tank - Technical Specifications
C - Contract 4689 - RCCC New Potable Water Tank - Special Provisions
D - Contract 4689 - RCCC New Potable Water Tank - Appendix A
E - Contract 4689 - RCCC New Potable Water Tank - Appendix B
F - Contract 4689 - RCCC New Potable Water Tank - Appendix C
G - Contract 4689 - RCCC New Potable Water Tank - Appendix D
H - Contract 4689 - RCCC New Potable Water Tank - Appendix E
I - Contract 4689 - RCCC New Potable Water Tank - Appendix F
L - Contract 4689 - RCCC New Potable Water Tank - Appendix G
M - Contract 4689 - RCCC New Potable Water Tank - Appendix H
P - Sacramento County - StandardConstructionSpecs - Rev Nov 2024
Notice to Contractors #4689 Title: Rio Consumnes Correctional Center New Potable Water Tank
1. Introduction
1.1. Summary
The County of Sacramento ("County") is soliciting Bids from a qualified Tank Contractor ("Contractor") to provide design and construction services to construct a new 350,000 gallon potable water prestressed concrete tank at the Rio Consumnes Correctional Center ("RCCC"). The Contractor will complete site preparation and construction of a gravel access road surrounding the proposed tank. The Contractor will also install the proposed water lines and conduit to connect the tank to the existing water treatment facility. The Contractor will be required to submit design drawings and calculations for the proposed tank and foundation suitable for obtaining building permits sealed by an Engineer registered in the State of California.
This work will take place within a secure correctional facility. Background checks will be required to enter the facility. All regulations set forth by the facility shall be followed throughout the duration of the project. Security Background checks are required for all persons attending the mandatory pre-bid meeting. Follow the instruction on Appendix C for completing the background check.
• Tank contractor must meet the minimum requirements as specified in the Technical
Specification 10 30 05 Strand Wound, Prestressed Concrete Tank attached to this solicitation.
• Provide at time of bid the submittals listed in Section 1.03 A of Technical Specifications, 13 30
05 and Appendix B of the Special Provisions.
o The three low bidders shall submit escrow bid documents.
1.2. Contact Information
Any inquiries or requests regarding this solicitation must be submitted via OpenGov. Contact with unauthorized County personnel during the selection process may result in disqualification.
Project Contact:
Jennifer Shively
Associate Architect-Engineer
Email: shivelyj@saccounty.gov
Phone: (916) 876-6630
Procurement Contact:
Terry Keys
Sr Contract Services Officer
Email: keyst@saccounty.gov
Phone: (916) 876-6367
Department:
DGS: CAPSD - Construction mailto:shivelyj@saccounty.gov tel:(916)876-6630 mailto:keyst@saccounty.gov tel:(916)876-6367
Department Head:
Joshua Green
Department Director
1.3. Timeline
Release Project Date September 1, 2026
Pre-Bid Meeting (Mandatory) September 16, 2026, 10:00am
12500 Bruceville Road, Elk Grove, CA 95757 -
Security Background Check Submission Required
Question Submission Deadline September 30, 2026, 2:00pm
Question Response Deadline October 7, 2026, 2:00pm
Bid Submission Deadline October 15, 2026, 2:00pm
Online through OpenGov
2. Notice to Contractors
2.1. ADVERTISEMENT SUMMARY
Notice is hereby given that the Board of Supervisors of the County of Sacramento will receive sealed bids for the following project:
BID DATE: Thursday, October 15, 2026
SUBMIT BIDS TO: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO
COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT
THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL
AUTOMATICALLY OCCUR ONLINE AT 2:01 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.
Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.
FOR: Rio Consumnes Correctional Center New Potable Water Tank
CONTRACT NUMBER: 4689
ESTIMATED CONSTRUCTION COST: $4,906,288.00
CONTRACTOR LICENSE REQUIRED: Class A
PRE-BID QUESTIONS DUE VIA Q&A: Date: Wednesday, September 30, 2026 No later than: 2:00 pm
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: Installation of a 350,000 gallon prestressed concrete water tank with necessary site preparation for a gravel access road surrounding the tank and installation of water lines and conduit to connect the tank to the existing water treatment facility.
BASIS FOR AWARD: The basis for award shall be base bid only, with no additive or deductive items, or no consideration of additive or deductive items.
CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to
Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the
Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.
• Contract Documents are available at: SacCountyEbids
• The Standard Construction Specifications, which are incorporated by reference in the Contract
Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.
https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://secure.procurenow.com/portal/saccounty https://saccountyspecs.saccounty.gov/Pages/default.aspx
2.2. MANDATORY PRE-BID MEETING
A mandatory pre-bid meeting will be held on Wednesday, September 16, 2026, at 10:00 am, 12500
Bruceville Road, Elk Grove, CA 95757 - Security Background Check Submission Required. The project engineers will be present to provide a project summary and to answer questions.
Attendance of the Pre-Bid Conference is MANDATORY for this project. The mandatory pre-bid conference and walk-through will be held for the purpose of reviewing questions regarding the project.
A representative of the prime Contractor must be in attendance and sign the log. A representative of the
County will be present to review the project with the bidders, allow bidders to walk the site and to answer questions. Bids received from bidders who do not attend this meeting will be deemed non-responsive.
2.3. BID GUARANTEES
Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the
Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.
2.4. BONDS
The successful bidder shall be required to execute a material and labor Payment Bond and Performance
Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.
Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The
Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.
2.5. LICENSE REQUIREMENTS
Award of this contract requires a valid California contractor's license with the classification identified above.
Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.
2.6. LABOR COMPLIANCE PROGRAM
The County of Sacramento received final approval from the Director of California Department of
Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor
Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.
This is a Construction project in accordance with Labor Code section 1771.5.
Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the
Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700
Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.
2.7. ADVANCED CLEAN FLEETS REGULATION
Vehicles with a gross vehicle weight rating greater than 8,500 lbs. and light-duty package delivery vehicles operated in California may be subject to the California Air Resources Board
(CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, see CARB Advanced
Clean Fleets and Advanced Clean Fleets Regulation & Advisories | California Air Resources
Board.
The apparent low bidder shall provide copies of valid Certificates of Reported Compliance as described in California Code of Regulations, title 13, ("13 CCR") section 2449(n) for the bidder’s fleet, and fleets of any listed subcontractors, of vehicles subject to 13 CCR section 2449 which may be use in performance of this project.
If the apparent low bidder’s fleet, or any subcontractor’s fleet, is exempt or is not subject to the regulation bidder shall clearly indicate the applicable exemption in the bidder’s response. For more information, see CARB Advanced Clean Fleets Regulation Exemptions and Extensions
Overview | California Air Resources Board.
Certificates of Reported Compliance and/or exemptions must be submitted by the apparent low bidder by 4:00PM on Monday following Bid Opening and must be received by the County prior to contract award.
https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview
2.8. QUESTIONS
Direct pre-bid questions to the Project Manager, Jennifer Shively, via the Q&A tab in the portal. ALL PRE-
BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Wednesday, September 30, 2026 BY
2:00 pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.
The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.
By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: June 16, 2025.
Clerk of the Board
3. Pricing Proposal
BASE BID
Please refer to contract drawings and Section 3-3 Award of Contract in the Special Provisions for further detail regarding bid items.
Line Item Description Quantity Unit of
Measure Unit Cost Total
BASE BID LINE ITEMS
1 BASE BID 1 LUMP SUM
2 ELECTRONIC CONTROLS
COORDINATION WITH AGENCY
1 ALLOWANCE $90,000.00
TOTAL
4. Vendor Submissions
4.1. What form of Bid Guarantee will Contractor be submitting?* Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the
County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.
☐ Scanned copy of Fully Executed Bid Bond
☐ E-bid Bond (Use Surety 2000)
☐ Cashier's or Certified Check
☐ Cash
*Response required
4.2. Bid Guarantee
Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.
4.3. E-Bid Bond
Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid
Bond
4.4. Non-collusion Declaration*
The undersigned declares:
I am an authorized representative with binding authority for my company, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.
☐ Please confirm
*Response required
4.5. Designation of Subcontractors - Unit Price Contracts*
Please download the below documents, complete, and upload.
• DESIGNATION_OF_SUBCONTRACTO...
*Response required
4.6. Bid Item Percentage Listing on Designation of Subcontractor form* Bidder shall certify that the bidder entered the PERCENTAGE OF BID ITEM SUBCONTRACTED in Column
(C) of the Designation of Subcontractor form NOT the percentage of total bid.
☐ Please confirm
*Response required
4.7. Bidder certifies they understand the post-bid submittals specified and required on this project and will comply with the timeline for submission. *
☐ Please confirm
*Response required
4.8. Additional Submittals Required With Bid*
Attach all additional submittals specified in the Special Provisions Section 1.01-A of Technical
Specifications 13 30 05.
*Response required
4.9. Iran Contracting Act Disclosure Form *
(California Public Contract Code, sections 2202-2208)
When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:
A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section
2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or
B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).
To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of
$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)
https://government-project.s3.us-west-2.amazonaws.com/14260/4c72069d-701a-4f52-9d88-093a99683f23_DESIGNATION_OF_SUBCONTRACTORS.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4CQATQBZO%2F20260924%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260924T190222Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEBMaCXVzLXdlc3QtMiJHMEUCIHGq5By%2FGrWv3dJzWZlLxxB%2Ffzjcb%2FAbyHxYWgNK0gm1AiEAhwaID3TzaVSyYT%2FaoqO9KQ8w5HCy6IGpdRmwtKRVMwUqlQUI2%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDL4V48ApaBObjMCr4SrpBBIavV6FhnCRDyqq%2BW759MjFSwoLDhpB%2FKoNg%2FwbXUZy7VtHb%2FZ%2FUgJWBaxmnoP977pqI30IQo%2BXFCczVl%2BIcbuIIPj3F1nTCcnEjTQm%2B8YygA2i8178jRnmDkJbohvk0t1Db1l7dSazfmc5lTW4ln4OlOhorZA0V3KnblXK6%2FMgHbsZFlIIVYvjj%2B57%2BVLCKjAtwgHr8ivRH11t3Gai%2FTiteUpM611vCQWYxbCSCqBI3jfrKocopTNdcerMmVWicAuDQ9zIOa%2FaQf%2FqNH0AelZjN1xrQZz5H0Iw3pNgt1RyM28lysCpRaLuLzKGbtgB3rkjEh2YoK1a7JXuyA%2F%2FbNPFflC1cljDU2kvVFzzCirJPGwjkiHE3NZbCZaBjFLtx3wXE%2FedUggpBjaec874Q8SdoTVgfSuGv0K4eLysPS7fkco8axLE14NTwqnsCg0kM5I6iIsFffhjd3nb8Ackbsn5Kr19BVj8egHzPv77dbzTAp%2B6MWuWUudqprzRiOpCGntJnpN2jiPHE%2BKntZ%2BsBsW%2Bidaf6XdZu48Uf4KTUubNQHPjV5ByzOjj8xDntz4j09Z7XP%2FF3W7r%2BbzFx2Ooqw5F0jozxzumeEOyVdMh%2B%2FRAFkjVNil1MsHnHZrF2rs4otjvL9xkPAd8ihhkY9AvXVIPkkygc1VEwhYzV3GuYw1ssIo2Ox6De%2FRyTGC7XJTCaolO1xwjNkvfhomdI0DETnhs%2FDOUlmt%2FQqRp4QxLTKHkFTJCxem0A0ozwRKun1RPz%2B5PFx2iF54fgdnkVf6xqJmdjMusrXEOoFQgDzk5cPAK%2BZaxnuLHcTQMMMzT1dUGOpkB6ByNryXs2i4yFC5VpXOHEW33sou4jsSPoj4OrTNcvR9avxgfrStYnDgFsN0Q7GelJVNYn8OlFx4oXydpvcriZJPd03QCUbG0N2X7lm9LO0%2BwyVZtJGDbEMzbi64HI%2FfLsL0h81QbuyKlVfGS%2FfZBU1ClfXPrrob0ByYXHGO%2BJcL1lAOC3Suy2SaVwnvukc0VRxEiDiCdbIwj&X-Amz-Signature=a8fd6b30de1a51d6d8d73ce9d232a47218c29b31ee63adcda5b55c0f649b33a7&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22DESIGNATION_OF_SUBCONTRACTORS.docx%22&x-id=GetObject
OPTION #1 - CERTIFICATION
I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.
OPTION #2 – EXEMPTION
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select
"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.
☐ Certification
☐ Exemption
*Response required
4.10. Type of Business*
☐ C Corporation
☐ S Corporation
☐ Limited Liability C Corporation
☐ Partnership
☐ Limited Liability Partnership
☐ Sole Proprietor/Individual
☐ Other
*Response required
4.11. Type your Legal Company Name Here*
State your Company's Name Here. This will be verified against the California Secretary of State's
Website.
*Response required
4.12. Secretary of State Entity Number*
Provide your Entity Number from the CA Secretary of State. If not registered in CA, provide the Entity
Number from your registered state.
*Response required
4.13. Contractors State License Board (CSLB) License Expiration Date * Enter your CSLB license expiration date:
4.14. California Department of Industrial Relations Registration* Please enter your Public Works Contractor Registration Number. This will be verified against the state database.
*Response required
4.15. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information for the contract manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.*
Signatory: name, title, email
Contract manager/admin: name, phone, email
*Response required
4.16. PaymentWorks Contact*
Please provide the name and e-mail for a finance point-of-contact for your firm that will receive an invitation to complete the vendor registration process on the County's PaymentWorks portal.
To clarify, if you are set-up with other agencies using PaymentWorks, that information is not available to the County, so you must complete this process for the County.
*Response required
4.17. I hereby certify under penalty of perjury that the above statements are true.*
☐ Please confirm
| 1. Introduction |
| 1.1. Summary |
| 1.2. Contact Information |
| 1.3. Timeline |
| 2. Notice to Contractors |
| 2.1. ADVERTISEMENT SUMMARY |
| 2.2. MANDATORY PRE-BID MEETING |
| 2.3. BID GUARANTEES |
| 2.4. BONDS |
| 2.5. LICENSE REQUIREMENTS |
| 2.6. LABOR COMPLIANCE PROGRAM |
| 2.7. ADVANCED CLEAN FLEETS REGULATION |
| 2.8. QUESTIONS |
| 3. Pricing Proposal |
| 4. Vendor Submissions |
| 4.1. What form of Bid Guarantee will Contractor be submitting?* |
| 4.2. Bid Guarantee |
| 4.3. E-Bid Bond |
| 4.4. Non-collusion Declaration* |
| 4.5. Designation of Subcontractors - Unit Price Contracts* |
| 4.6. Bid Item Percentage Listing on Designation of Subcontractor form* |
| 4.7. Bidder certifies they understand the post-bid submittals specified and required on this project and will comply with the timeline for submission. * |
| 4.8. Additional Submittals Required With Bid* |
| 4.9. Iran Contracting Act Disclosure Form * |
| 4.10. Type of Business* |
| 4.11. Type your Legal Company Name Here* |
| 4.12. Secretary of State Entity Number* |
| 4.13. Contractors State License Board (CSLB) License Expiration Date * |
| 4.14. California Department of Industrial Relations Registration* |
| 4.15. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information for the contract manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.* |
| 4.16. PaymentWorks Contact* |
| 4.17. I hereby certify under penalty of perjury that the above statements are true.* |