Rio_Consumnes_Correctional_Center_New_Potable_Water_Tank_(Addendum_#2_Revision).pdf

PDF 391 KB Posted

Attached to
Rio Consumnes Correctional Center New Potable Water Tank
Solicitation number
4689
Issued by
Sacramento County, San Francisco City, California

About this file

This addendum to a Notice to Contractors for the County of Sacramento concerns design and construction services for a new 350,000-gallon potable water prestressed concrete tank at Rio Consumnes Correctional Center. The County is soliciting sealed bids from qualified tank contractors to complete site preparation, construct a gravel access road surrounding the tank, and install water lines and electrical conduit connecting the tank to the existing water treatment facility. The contractor must submit design drawings and calculations sealed by a California-registered engineer suitable for obtaining building permits. A mandatory pre-bid meeting is scheduled for September 16, 2026, at 10:00 a.m. at 12500 Bruceville Road, Elk Grove, California, with attendance required for bid responsiveness. The deadline for pre-bid questions is September 30, 2026, at 2:00 p.m., with County responses due by October 14, 2026. Sealed bids must be submitted electronically through the Sacramento County Electronic Bidding Portal no later than October 22, 2026, at 2:00 p.m., with automatic online bid opening at 2:01 p.m. The contract duration is 380 calendar days from execution, with liquidated damages of $4,778 per day for delays. All personnel entering the secure correctional facility must complete background security clearance at least five business days prior to entry.

The estimated construction cost is $4,906,288, with bid security required at ten percent of the aggregate bid amount in the form of a bid bond, certified check, cashier's check, or cash payable to the Treasurer of Sacramento County. The successful bidder must provide performance and payment bonds each equal to 100 percent of the contract price from a corporate surety acceptable to the County. A valid California Class A contractor license is required, and the contractor must meet minimum qualifications including at least ten years of experience designing and constructing AWWA D110 Type I strand-wound prestressed concrete tanks, with five of those tanks located in seismic zones with specified acceleration parameters and in successful service for at least five years. The contractor must operate two operable automated strandwrapping systems and two operable automated shotcrete machines with continuous electronic monitoring capability. Prevailing wage requirements apply under California Labor Code sections 1720 and 1770. The three lowest bidders must submit escrow bid documents. The project is subject to California's Advanced Clean Fleets regulation for vehicles with gross vehicle weight ratings exceeding 8,500 pounds, requiring certificates of compliance submission within four hours of bid opening. Contractors must comply with CALGreen waste diversion mandates requiring 65 percent minimum recycling of construction and demolition debris and submit waste management and erosion-control plans.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO CONTRACTORS

RIO CONSUMNES CORRECTIONAL CENTER NEW POTABLE

WATER TANK

County of Sacramento

9660 Ecology Lane

Sacramento, CA 95827

RELEASE DATE: September 1, 2026

DEADLINE FOR QUESTIONS: September 30, 2026

RESPONSE DEADLINE: October 22, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d

NOTICE TO CONTRACTORS

Rio Consumnes Correctional Center New Potable Water Tank

1. Introduction

2. Notice to Contractors

3. Pricing Proposal

4. Vendor Submissions

Attachments:

A - Contract 4689 - RCCC New Potable Water Tank - Drawings

B - Contract 4689 - RCCC New Potable Water Tank - Technical Specifications

C - Contract 4689 - RCCC New Potable Water Tank - Special Provisions

D - Contract 4689 - RCCC New Potable Water Tank - Appendix A

E - Contract 4689 - RCCC New Potable Water Tank - Appendix B

F - Contract 4689 - RCCC New Potable Water Tank - Appendix C

G - Contract 4689 - RCCC New Potable Water Tank - Appendix D

H - Contract 4689 - RCCC New Potable Water Tank - Appendix E

I - Contract 4689 - RCCC New Potable Water Tank - Appendix F

L - Contract 4689 - RCCC New Potable Water Tank - Appendix G

M - Contract 4689 - RCCC New Potable Water Tank - Appendix H

P - Sacramento County - StandardConstructionSpecs - Rev Nov 2024

Notice to Contractors #4689 Title: Rio Consumnes Correctional Center New Potable Water Tank

1. Introduction

1.1. Summary

The County of Sacramento ("County") is soliciting Bids from a qualified Tank Contractor ("Contractor") to provide design and construction services to construct a new 350,000 gallon potable water prestressed concrete tank at the Rio Consumnes Correctional Center ("RCCC"). The Contractor will complete site preparation and construction of a gravel access road surrounding the proposed tank. The Contractor will also install the proposed water lines and conduit to connect the tank to the existing water treatment facility. The Contractor will be required to submit design drawings and calculations for the proposed tank and foundation suitable for obtaining building permits sealed by an Engineer registered in the State of California.

This work will take place within a secure correctional facility. Background checks will be required to enter the facility. All regulations set forth by the facility shall be followed throughout the duration of the project. Security Background checks are required for all persons attending the mandatory pre-bid meeting. Follow the instruction on Appendix C for completing the background check.

• Tank contractor must meet the minimum requirements as specified in the Technical

Specification 10 30 05 Strand Wound, Prestressed Concrete Tank attached to this solicitation.

• Provide at time of bid the submittals listed in Section 1.03 A of Technical Specifications, 13 30

05 and Appendix B of the Special Provisions.

o The three low bidders shall submit escrow bid documents.

1.2. Contact Information

Any inquiries or requests regarding this solicitation must be submitted via OpenGov. Contact with unauthorized County personnel during the selection process may result in disqualification.

Project Contact:

Jennifer Shively

Associate Architect-Engineer

Email: shivelyj@saccounty.gov

Phone: (916) 876-6630

Procurement Contact:

Terry Keys

Sr Contract Services Officer

Email: keyst@saccounty.gov

Phone: (916) 876-6367

Department:

DGS: CAPSD - Construction mailto:shivelyj@saccounty.gov tel:(916)876-6630 mailto:keyst@saccounty.gov tel:(916)876-6367

Department Head:

Joshua Green

Department Director

1.3. Timeline

Release Project Date September 1, 2026

Pre-Bid Meeting (Mandatory) September 16, 2026, 10:00am

12500 Bruceville Road, Elk Grove, CA 95757 -

Security Background Check Submission Required

Question Submission Deadline September 30, 2026, 2:00pm

Question Response Deadline October 14, 2026, 2:00pm

Bid Submission Deadline October 22, 2026, 2:00pm

Online through OpenGov

2. Notice to Contractors

2.1. ADVERTISEMENT SUMMARY

Notice is hereby given that the Board of Supervisors of the County of Sacramento will receive sealed bids for the following project:

BID DATE: Thursday, October 22, 2026

SUBMIT BIDS TO: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO

COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT

THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL

AUTOMATICALLY OCCUR ONLINE AT 2:01 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.

Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.

FOR: Rio Consumnes Correctional Center New Potable Water Tank

CONTRACT NUMBER: 4689

ESTIMATED CONSTRUCTION COST: $4,906,288.00

CONTRACTOR LICENSE REQUIRED: Class A

PRE-BID QUESTIONS DUE VIA Q&A: Date: Wednesday, September 30, 2026 No later than: 2:00 pm

PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: Installation of a 350,000 gallon prestressed concrete water tank with necessary site preparation for a gravel access road surrounding the tank and installation of water lines and conduit to connect the tank to the existing water treatment facility.

BASIS FOR AWARD: The basis for award shall be base bid only, with no additive or deductive items, or no consideration of additive or deductive items.

CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to

Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the

Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.

• Contract Documents are available at: SacCountyEbids

• The Standard Construction Specifications, which are incorporated by reference in the Contract

Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.

https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training https://secure.procurenow.com/portal/saccounty https://saccountyspecs.saccounty.gov/Pages/default.aspx

2.2. MANDATORY PRE-BID MEETING

A mandatory pre-bid meeting will be held on Wednesday, September 16, 2026, at 10:00 am, 12500

Bruceville Road, Elk Grove, CA 95757 - Security Background Check Submission Required. The project engineers will be present to provide a project summary and to answer questions.

Attendance of the Pre-Bid Conference is MANDATORY for this project. The mandatory pre-bid conference and walk-through will be held for the purpose of reviewing questions regarding the project.

A representative of the prime Contractor must be in attendance and sign the log. A representative of the

County will be present to review the project with the bidders, allow bidders to walk the site and to answer questions. Bids received from bidders who do not attend this meeting will be deemed non-responsive.

2.3. BID GUARANTEES

Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the

Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.

2.4. BONDS

The successful bidder shall be required to execute a material and labor Payment Bond and Performance

Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.

Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The

Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.

2.5. LICENSE REQUIREMENTS

Award of this contract requires a valid California contractor's license with the classification identified above.

Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.

No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.

2.6. LABOR COMPLIANCE PROGRAM

The County of Sacramento received final approval from the Director of California Department of

Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor

Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.

This is a Construction project in accordance with Labor Code section 1771.5.

Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the

Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700

Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.

2.7. ADVANCED CLEAN FLEETS REGULATION

Vehicles with a gross vehicle weight rating greater than 8,500 lbs. and light-duty package delivery vehicles operated in California may be subject to the California Air Resources Board

(CARB) Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, see CARB Advanced

Clean Fleets and Advanced Clean Fleets Regulation & Advisories | California Air Resources

Board.

The apparent low bidder shall provide copies of valid Certificates of Reported Compliance as described in California Code of Regulations, title 13, ("13 CCR") section 2449(n) for the bidder’s fleet, and fleets of any listed subcontractors, of vehicles subject to 13 CCR section 2449 which may be use in performance of this project.

If the apparent low bidder’s fleet, or any subcontractor’s fleet, is exempt or is not subject to the regulation bidder shall clearly indicate the applicable exemption in the bidder’s response. For more information, see CARB Advanced Clean Fleets Regulation Exemptions and Extensions

Overview | California Air Resources Board.

Certificates of Reported Compliance and/or exemptions must be submitted by the apparent low bidder by 4:00PM on Monday following Bid Opening and must be received by the County prior to contract award.

https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets/advanced-clean-fleets-regulation-advisories https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview https://ww2.arb.ca.gov/resources/fact-sheets/advanced-clean-fleets-regulation-exemptions-and-extensions-overview

2.8. QUESTIONS

Direct pre-bid questions to the Project Manager, Jennifer Shively, via the Q&A tab in the portal. ALL PRE-

BID QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Wednesday, September 30, 2026 BY

2:00 pm. Questions received after that time will not be answered. Responses will be by addenda to the bid documents.

The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

By order of the Board of Supervisors of the County of Sacramento, Sacramento County, California, dated: June 16, 2025.

Clerk of the Board

3. Pricing Proposal

BASE BID

Please refer to contract drawings and Section 3-3 Award of Contract in the Special Provisions for further detail regarding bid items.

Line Item Description Quantity Unit of

Measure Unit Cost Total

BASE BID LINE ITEMS

1 BASE BID 1 LUMP SUM

2 ELECTRONIC CONTROLS

COORDINATION WITH AGENCY

1 ALLOWANCE $90,000.00

TOTAL

ADDITIVE ALTERNATES

Please refer to contract drawings and Section 3-3 Award of Contract in the Special Provisions for further detail regarding additive alternate bid items.

Line Item Description Quantity Unit of

Measure Unit Cost Total

ADD-1 DESIGN, PERMIT, FURNISH, AND

INSTALL NEW STEEL TANK IN PLACE

OF EXISTING STEEL TANK PER

TECHNICAL SPECIFICATIONS

1 LUMP SUM

ADD-2 DEMOLISH AND DISPOSE OF EXISTING

STEEL TANK AND RELATED

APPURTENANCES NECESSARY TO

CONSTRUCT ADD-1

1 LUMP SUM

ADD-3 DESIGN, PERMIT, FURNISH, AND

INSTALL PIPING TO POINTS OF

CONNECTION AND ELECTRONIC

CONTROLS FOR NEW STEEL TANK IN

ADD-1 NOT OTHERWISE COVERED IN

PLANS OR SPECIFICATIONS

1 ALLOWANCE $100,000.00

TOTAL

4. Vendor Submissions

4.1. What form of Bid Guarantee will Contractor be submitting?* Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the

County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.

☐ Scanned copy of Fully Executed Bid Bond

☐ E-bid Bond (Use Surety 2000)

☐ Cashier's or Certified Check

☐ Cash

*Response required

4.2. Bid Guarantee

Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.

4.3. E-Bid Bond

Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid

Bond

4.4. Non-collusion Declaration*

The undersigned declares:

I am an authorized representative with binding authority for my company, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.

☐ Please confirm

*Response required

4.5. Designation of Subcontractors - Unit Price Contracts*

Please download the below documents, complete, and upload.

• DESIGNATION_OF_SUBCONTRACTO...

*Response required

4.6. Bid Item Percentage Listing on Designation of Subcontractor form* Bidder shall certify that the bidder entered the PERCENTAGE OF BID ITEM SUBCONTRACTED in Column

(C) of the Designation of Subcontractor form NOT the percentage of total bid.

☐ Please confirm

*Response required

4.7. Bidder certifies they understand the post-bid submittals specified and required on this project and will comply with the timeline for submission. *

☐ Please confirm

*Response required

4.8. Additional Submittals Required With Bid*

Attach all additional submittals specified in the Special Provisions Section 1.01-A of Technical

Specifications 13 30 05.

*Response required

4.9. Iran Contracting Act Disclosure Form *

(California Public Contract Code, sections 2202-2208)

When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:

A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section

2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or

B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).

To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of

$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)

https://government-project.s3.us-west-2.amazonaws.com/14260/4c72069d-701a-4f52-9d88-093a99683f23_DESIGNATION_OF_SUBCONTRACTORS.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4GQUW5KCY%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T150945Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEF4aCXVzLXdlc3QtMiJHMEUCIQChuqS5H0c9NvGMDPCh7CLq5cbFJjnpjAcdkookc%2FNcNAIgDrAHU%2BG64u7tvs2RlN9PgZu7Utk4V1gxVNmI68ra4e8qjAUIJxACGgw4OTIzNjQ2ODc2NzIiDIzjEtsVqRANLtf17yrpBIkboj741pa4mS4IM%2BKkM3gdkVROiqWu4fQfRE2EMyJ587trCuLXGpXYtZ3cGq%2F7cJiF2qtuOeTZruYp%2F%2F58qGJxt8fOUM1OHToDb2Q6VjWADHwxRnJPvtVZDCjoR9dI8Zod9KOCeikos7OpQo5G0yiZbVITrIUlJOliPhYRD57iUtsH0cEnqSUaHOzGgOoogkf5L7YQntfrD%2FvSG%2FrPkvYVDwEMVz7PuS1mCrc1WMKVlFE4CFu3%2BF%2B8qmBLIxNRnkxw2VYSNXA9j94N6T5kUQAMOhrja1B0xeTzyPircS2kum%2BF9RF3upHBZcebekWlKbOjTygHla%2F7Bfd2MGJb8PPhVzFmz%2Bpv32HkM%2F97tdMPCkkDIoEai3pBvDfARy2huILxta3TWDuiVlVY9%2BSNV3GA8YlwLrNr0RcA41QxUNhew0L5cYW7LbCoOEZnMxwVuJPRqZ%2BxMunXD%2Bk3PUk9Z84so1zV3ZQPraea2788YAqQh9GKDNZB6eQv15RyuUT6SEE6Zy0cf%2BixOoMsSMLvAMr4UKjjzbDhkQ4gx08RRYxPsxVhmj3xMPjcjpgCbl6M9KjqiUgtPwwfMZ3JOS2KWMbNue3fyIvLCI0OwxFOSXh6I2XnrGklF3j%2BAQ61hy0daoFzMHAwIhvCwlgLrjkd%2F7%2BaI2NhysBa9U7h0Mrmmdp%2FdECEIA%2FPSxtovwdHc50k5Zvqh811CtUDeVNABceQ7TeBFPr9hoFPjJUenh%2FfGLjB9Vm65QDuBDbGlEGnridkojdc4%2FxY8NiL7ZvtgnOJKbNCODxFshgyJNA1cd4VhSKq29%2BDTncfRY1nMMu6ntYGOpkBmsv%2BvaDHfla0D9zH%2BjfArvoOS9ynqEUCB0K%2BhWqsAEbnEmZiHsaPY62x%2F4%2FA8cXR70iqDzrl26t3NcFcHsbxyhlBvwWokWHr8lAq7eo%2F8PRrdjZyricfaQwA2f2pnEFXZ5nzmDphi2tMlhmfNGG%2B4%2FXsjpkvWsNcpvAxpSvGGF92NUfoioSkWCIG42m1fiLCz4lnV8QZqW5l&X-Amz-Signature=9d286a5179c9e76f445763a80ca3c1c5d18acf9ebc12e2d2bbc5abdaf5e73839&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22DESIGNATION_OF_SUBCONTRACTORS.docx%22&x-id=GetObject

OPTION #1 - CERTIFICATION

I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.

OPTION #2 – EXEMPTION

Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select

"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.

☐ Certification

☐ Exemption

*Response required

4.10. Type of Business*

☐ C Corporation

☐ S Corporation

☐ Limited Liability C Corporation

☐ Partnership

☐ Limited Liability Partnership

☐ Sole Proprietor/Individual

☐ Other

*Response required

4.11. Type your Legal Company Name Here*

State your Company's Name Here. This will be verified against the California Secretary of State's

Website.

*Response required

4.12. Secretary of State Entity Number*

Provide your Entity Number from the CA Secretary of State. If not registered in CA, provide the Entity

Number from your registered state.

*Response required

4.13. Contractors State License Board (CSLB) License Expiration Date * Enter your CSLB license expiration date:

4.14. California Department of Industrial Relations Registration* Please enter your Public Works Contractor Registration Number. This will be verified against the state database.

*Response required

4.15. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information for the contract manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.*

Signatory: name, title, email

Contract manager/admin: name, phone, email

*Response required

4.16. PaymentWorks Contact*

Please provide the name and e-mail for a finance point-of-contact for your firm that will receive an invitation to complete the vendor registration process on the County's PaymentWorks portal.

To clarify, if you are set-up with other agencies using PaymentWorks, that information is not available to the County, so you must complete this process for the County.

*Response required

4.17. I hereby certify under penalty of perjury that the above statements are true.*

☐ Please confirm

1. Introduction
1.1. Summary
1.2. Contact Information
1.3. Timeline
2. Notice to Contractors
2.1. ADVERTISEMENT SUMMARY
2.2. MANDATORY PRE-BID MEETING
2.3. BID GUARANTEES
2.4. BONDS
2.5. LICENSE REQUIREMENTS
2.6. LABOR COMPLIANCE PROGRAM
2.7. ADVANCED CLEAN FLEETS REGULATION
2.8. QUESTIONS
3. Pricing Proposal
4. Vendor Submissions
4.1. What form of Bid Guarantee will Contractor be submitting?*
4.2. Bid Guarantee
4.3. E-Bid Bond
4.4. Non-collusion Declaration*
4.5. Designation of Subcontractors - Unit Price Contracts*
4.6. Bid Item Percentage Listing on Designation of Subcontractor form*
4.7. Bidder certifies they understand the post-bid submittals specified and required on this project and will comply with the timeline for submission. *
4.8. Additional Submittals Required With Bid*
4.9. Iran Contracting Act Disclosure Form *
4.10. Type of Business*
4.11. Type your Legal Company Name Here*
4.12. Secretary of State Entity Number*
4.13. Contractors State License Board (CSLB) License Expiration Date *
4.14. California Department of Industrial Relations Registration*
4.15. Provide the full contact name, title, and e-mail of the signatory for your firm. Provide contact information for the contract manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.*
4.16. PaymentWorks Contact*
4.17. I hereby certify under penalty of perjury that the above statements are true.*