This is an incentive offer letter from the Rhode Island Energy Efficiency Program (administered by The Narragansett Electric Company d/b/a Rhode Island Energy) to the State of Rhode Island Department of Mental Health, Rehabilitation & Hospital (MHRH) for energy efficiency upgrades at the Louis Pasteur Building located at Pontiac Avenue Pole 193 in Cranston, Rhode Island. The project encompasses lighting control and LED retrofit measures across multiple facility areas, including 63A Lighting Controls with integral fixture-mounted dual sensors and controllers, 88B LED indoor troffers (1x4, 2x2, and 2x4 configurations), and 89 LED linear ambient lighting. The installation comprises ten separate lighting control installations ranging from 3 to 6,390 kilowatt-hour (kWh) annual savings and six separate LED troffer installations producing between 486 and 14,199 kWh in annual savings, plus thirteen LED linear ambient lighting installations generating between 81 and 23,026 kWh in annual savings. The incentive offer letter was issued on December 11, 2025, with an acceptance deadline of 90 days from the letter date. Installation may commence upon return of the signed Acceptance Form, with Rhode Island Energy reserving the right to conduct post-installation inspections and document the completed work for public awareness purposes.
The total authorized incentive offer is $37,955.00, with total annual energy savings of 101,494 kWh and $16,746.46 in annual dollar savings. The simple payback period is 5.2 years. Installation of equipment must be completed between January 1, 2025, and December 15, 2025, with applications postmarked by December 20, 2025. Rhode Island Energy will make reasonable efforts to pay the incentive within 45 days of completing installation verification and reviewing required documentation, including detailed invoices of materials, labor, and equipment costs. The customer (MHRH) is required to hire a licensed contractor for equipment installation and must comply with all federal, state, and local laws. The customer acknowledges responsibility for determining that equipment design and engineering complies with applicable laws, codes, and industry standards, while Rhode Island Energy disclaims liability for design adequacy, safety compliance, or energy savings guarantees. The incentive payment is contingent upon successful post-inspection verification by Rhode Island Energy.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rhode Island Energy Efficiency Program Email: energyefficiency@rienergy.com Phone: 1-855-RIE-1108
Dec 11, 2025
Project Information Site Information Billing Account 7824636005
STATE OF RI DEPT OF MHRH
PONTIAC AVE POLE 193
CRANSTON, RI 02920
App Reference # LCI_177888
Initiated Date 10/21/2025
Application # LCI_177888
George Sfinarolakis
STATE OF RI DEPT OF MHRH
1 CAPITAL HL
PROVIDENCE, RI 02908
RE: Incentive Offer - Rhode Island Energy Commercial and Industrial Energy Efficiency Program
Dear George Sfinarolakis
To take advantage of this offer, please follow these steps:
1) Accept
To accept this offer and reserve funding, please complete and sign the attached Acceptance Form. All forms must be returned to Rhode Island Energy within 90 days of the date of this letter.
The signed Acceptance Form serves as your acknowledgement of this offer letter, and confirms your intention to proceed with some or all of the project(s) outlined on page 2. All terms and conditions outlined in this letter apply.
2) Install
Installation may begin as soon as the Acceptance Form is returned to Rhode Island Energy.
Please notify Rhode Island Energy if construction cannot be completed within the timeframe identified or the project is revised or terminated. Any revised projects will be re-evaluated. An extension will be granted, if warranted; and the incentive offer will be adjusted accordingly.
3) Post Inspect and Document
Prior to issuing the incentive, Rhode Island Energy reserves the right to inspect the completed project. Please email dlford@rienergy.com when the energy efficiency measures are installed. Rhode Island Energy reserves the right to photograph and/or document the installation for purposes of general public awareness, to conduct limited prearranged site visits, and to access non-proprietary data regarding the actual energy performance of the site.
Thank you for participating in the Rhode Island Energy Efficiency Program. We look forward to working with you.
Sincerely, Michael Cunningham
Rhode Island Energy Representative
Phone: 1-855-RIE-1108
Acceptance Form Form must be completed in its entirety.
Project Information Installation Site Information Facility Name: STATE OF RI DEPT OF MHRH
PONTIAC AVE POLE 193
CRANSTON, RI 02920
Billing Account# 7824636005
Reference # LCI_177888
Contact Name: George Sfinarolakis
Business Phone#
Email: george.sfinarolakis@nergy.ri.gov
Federal Tax ID#
Check One: Incorporated Not Incorporated Exempt
*Please provide a copy of IRS Form W-9 that coincides with Federal Tax ID # listed above Estimated Project Start Date : ________________ Estimated Project Completion Date : __________________
Description of Measure kWh Savings therm Savings
Annual $ Savings
Authorized Incentive
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
92 0 $15.14 $220.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers 6 0 $.92 $110.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers 39 0 $6.47 $385.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
3,834 0 $632.65 $6,435.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
3,541 0 $584.30 $4,125.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
2,749 0 $453.55 $3,410.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
62 0 $10.27 $55.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
56 0 $9.25 $275.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers
6,390 0 $1,054.41 $5,225.00
63A - Lighting Controls - Integral Fixture Mounted Dual Sensors and Controllers 850 0 $140.23 $495.00
88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 1,647 0 $271.81 $660.00 88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 11,984 0 $1,977.31 $3,420.00 88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 686 0 $113.26 $240.00 88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 14,199 0 $2,342.85 $2,460.00 88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 486 0 $80.22 $60.00 88B - Lighting - LED Indoor Troffers: 1x4, 2x2, and 2x4 3,866 0 $637.84 $1,260.00 89 - Lighting - LED Linear Ambient 112 0 $18.53 $80.00 89 - Lighting - LED Linear Ambient 162 0 $26.77 $80.00 89 - Lighting - LED Linear Ambient 237 0 $39.12 $80.00 89 - Lighting - LED Linear Ambient 14,377 0 $2,372.20 $3,840.00
89 - Lighting - LED Linear Ambient 3,784 0 $624.41 $720.00 89 - Lighting - LED Linear Ambient 674 0 $111.20 $120.00 89 - Lighting - LED Linear Ambient 150 0 $24.71 $40.00 89 - Lighting - LED Linear Ambient 81 0 $13.38 $40.00 89 - Lighting - LED Linear Ambient 23,026 0 $3,799.22 $3,280.00 89 - Lighting - LED Linear Ambient 3,548 0 $585.39 $360.00 89 - Lighting - LED Linear Ambient 212 0 $35.01 $40.00 89 - Lighting - LED Linear Ambient 1,198 0 $197.68 $160.00 89 - Lighting - LED Linear Ambient 1,560 0 $257.40 $200.00 89 - Lighting - LED Linear Ambient 1,884 0 $310.94 $80.00
Total 101,494 0 $16,746.46 $37,955.00
Total Project Cost
Incentive Offer
$37,955.00 Project cost less Incentive
Simple Payback (Years)
5.2
Select Payee: Account Holder Installation Contractor
Installation Contractor Information Contactor Name
Street
City State Zip
Phone Email
By signing this Acceptance Form, I am acknowledging receipt of the offer letter and confirm my intention to proceed with some or all of the project(s) outlined above. I am aware of and agree to the Terms & Conditions and Minimum Requirements Document (s). This offer is valid through the end of the project completion date provided above, or until program funds are depleted.
Customer Signature: Job Title and Company:
Printed Name: Date:
Return signed document to :
Michael Cunningham mhcunningham@rienergy.com
Diane Ford dlford@rienergy.com
Phone: 1-855-RIE-1108
Commercial & Industrial Efficiency Program
CUSTOMER TERMS AND CONDITION
1. The Customer agrees to participate in the Commercial and Industrial Efficiency Program offered by The Narragansett Electric Company d/b/a Rhode Island Energy pursuant to the terms and conditions (“Terms and Conditions”), set forth below.
2. Definitions:
“Application” means the Commercial & Industrial Energy Efficiency Program Application to be fully completed by the Customer.
“Customer” means a commercial or industrial customer maintaining an account for service with Rhode Island Energy who satisfies the Program requirements.
“Equipment” means the proposed energy efficiency measure.
“Incentive” or “Incentives” means a payment equal to the incentive amount indicated in the Program Materials.
'Rhode Island Energy' means The Narragansett Electric Company d/b/a Rhode Island Energy.
“Premises” means the Customer’s commercial or industrial business facility.
“Program” means the Commercial & Industrial Energy Efficiency Program.
“Program Materials” means the documents and information provided by Rhode Island Energy, including, without limitation, Program guidelines and requirements, application forms, terms and conditions, and other materials regarding the Program.
3. Customer Eligibility Requirements and Representations and Warranties:
(a) Customer shall submit a completed Application.
(b) Customer is (1) a customer of Rhode Island Energy and (2) the owner of the Premises or has express authority to have the Equipment installed on the Premises.
(c) Customer’s participation in the Program shall be governed by these Terms and Conditions.
(d) Customer shall hire its own licensed contractor to install the Equipment.
(e) Equipment installed by Customer’s contractor complies with the Program requirements and all federal, state and local laws.
(f) Customer will receive an Incentive following the completion of a post-inspection by Rhode Island Energy and submission to Rhode Island Energy of all required documentation as detailed in the Program Materials, including, without limitation detailed invoices of all materials, labor and equipment costs.
4. Pre and Post Installation Verification
The Customer agrees to allow Rhode Island Energy or its agent to access to the Premises to perform verification of installed Equipment.
5. Incentive Payment:
Rhode Island Energy will make reasonable efforts to pay the Incentive to the Customer within 45 days of completing the installation verification and reviewing the required documentation submitted by the Customer.
6. Installation Schedule Requirements:
Installation of Equipment must be completed between 01/01/2025 and 12/15/2025. Applications must be postmarked by 12/20/2025.
7. Eligibility, Modification and Termination:
Once the Customer responds to the offer letter sent by Rhode Island Energy, the Customer is contacted by Rhode Island Energy or its agent regarding eligibility and participation. Rhode Island Energy retains the right, in its sole discretion, at any time, to limit participation by any Customer, and to deny or terminate, participation by any Customer. Rhode Island Energy may, in its sole discretion, at any time and without notice, terminate (for convenience or cause) these Terms and Conditions and/or the Customer’s participation in the Program or modify the Program or these Terms and Conditions. Program expenditures, requirements and eligibility, may be canceled or modified by Rhode Island Energy, in its sole discretion, at any time without notice.
8. Publicity of Customer Participation:
The Customer grants to Rhode Island Energy the right to collect, use and reference for promotional and regulatory purposes the Customer’s use of the Equipment, energy savings and other data related to the Customer’s participation in the Program. Rhode Island Energy shall keep Customer’s information in strict confidence, shall exercise reasonable care to maintain the confidentiality, and shall not disclose the Customer’s information to any third party without the prior written consent of the Customer, except to Rhode Island Energy representatives and employees who have a need to know and to the extent expressly permitted by these Terms and Conditions.
9. Indemnification:
The Customer shall indemnify, defend and hold harmless the Rhode Island Energy, its affiliates and their contractors officers, directors, employees, agents, and representatives (collectively, “Indemnified Parties”) from and against any and all claims, damages, losses and expenses (including reasonable attorneys' fees and costs incurred to enforce this indemnity) arising out of the Customer’s participation in the Program in connection with these Terms and Conditions except to the extent caused by the negligence or willful misconduct of any of the Indemnified Parties.
10. Disclaimer/Warranties/Liability:
Except as expressly stated herein, Rhode Island Energy makes no other representations, warranties or guarantees in connection with the Program. In no event shall Rhode Island Energy be liable for any special, indirect, incidental, penal, punitive or consequential damages of any nature in connection with the Program and these Terms and Conditions.Rhode Island Energy is not responsible for any tax liability in connection with Incentive payments to Customers. Neither Rhode Island Energy nor any of its employees, agents, contractors, or subcontractors is/are responsible for determining that the design or engineering of the Equipment is proper or complies with any particular laws, codes, or industry standards. Rhode Island Energy does not make any representations of any kind regarding the benefits or energy savings to be achieved by Equipment or the adequacy or safety of the Equipment. The Customer understands and agrees that Rhode Island Energy is not a manufacturer of, or regularly engaged in the sale or distribution of, or an expert with regard to, the Equipment or any related work. Rhode Island Energy and its agent shall not perform any kind of safety, code or other compliance review. Neither Rhode Island Energy nor its agent shall be responsible for performing any work in connection with the installation of the Equipment. The provisions of this section shall survive the termination, cancellation or completion of the Customer’s participation in the Program.
11. General Provisions:
These Terms and Conditions do not grant any rights to any third parties. These Terms and Conditions shall be interpreted and enforced according to the laws of the State of Rhode Island. In the event of any conflict or inconsistency between these Terms and Conditions and any Program Materials, these Terms and Conditions shall be controlling. There shall be no amendment to these Terms and Conditions or any Program Materials unless such is made by Rhode Island Energy.