About this file

Lighting Retrofit Project - Louis Pasteur Building and Middletown Armory

This is a Request for Quotation (RFQ) and supplemental conditions document issued by the State of Rhode Island for lighting retrofit projects at two facilities: the Louis Pasteur Building located at 25 Howard Avenue in Cranston, Rhode Island, and the RI Army National Guard Middletown Armory located at 106 Airport Access Road in Middletown, Rhode Island. The project encompasses the retrofit of 435 existing lighting fixtures at the Louis Pasteur Building and 132 existing lighting fixtures at the Middletown Armory facility with LED fixtures and networked lighting control systems. The retrofit scope includes seven fixture types at the Louis Pasteur Building (ranging from 1x4 recessed troffers to 8-foot wrap fixtures) and six fixture types at the Middletown Armory (including high bay fixtures, troffers, and wrap fixtures), with quantities specified in detailed installation schedules. A pre-bid meeting is scheduled for August 19, 2026, at 9:00 AM, beginning at the Middletown Armory location and immediately following at the Louis Pasteur Building. The expected project completion date is one year from issuance of the Purchase Order, with work conducted during second shift hours (3:00 PM to 11:00 PM, Monday through Friday) at the Louis Pasteur Building and first shift hours (7:30 AM to 3:30 PM, Tuesday through Friday) at the Middletown Armory, while both facilities remain operational.

All proposed fixtures must meet Rhode Island Energy incentive requirements and be approved by the design lights consortium (DLC) or EnergyStar certified, with alternate products permitted only if they match all technical specifications of the recommended Renova or equivalent fixtures and maintain consistent networked control systems throughout each project. Contractor pricing shall include unit pricing for each fixture type to establish baseline costs for potential quantity adjustments, with all project materials and labor subject to a three-year warranty and LED drivers warranted for a minimum of five years. The contractor is responsible for all material delivery, inventory management, disposal of removed fixtures and construction waste, proper recycling certification of lamps and ballasts per state and federal requirements, site cleanup, surface restoration, equipment provision, and electrical installation compliant with the National Electrical Code and NECA standards. All contractor personnel are required to pass background checks and display valid identification, with on-site supervisor presence required and the project manager or authorized decision-maker expected on-site at least three days per week. The owner will designate an official Project Manager prior to work commencement, and a Conex box storage location will be provided to the awarded contractor, with associated costs to be included in the bid.

View the file

Other files

File Type Posted
RFQ27006897_Oct_16_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_8_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_27_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_2_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFQ27006897_v2_Sep_3_26.pdf PDF
RFQ27006897_Sep_17_26_solicitation_doc.pdf PDF
RFQ27006897_Sep_16_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_28_26_solicitation_doc.pdf PDF
Q&A Center Items - RFQ27006897 - Addendum # 1.pdf PDF
RFQ27006897_Sep_11_26_solicitation_doc.pdf PDF
RFQ27006897 Louis Pasteur and Middletown Armory sow.pdf PDF
RFQ27006897_Sep_7_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_1_26_solicitation_doc.pdf PDF
RFQ27006897_Aug_7_26_solicitation_doc.pdf PDF
RFQ27006897_Sep_8_26_solicitation_doc.pdf PDF
RFQ27006897 A2.doc DOC document
Attachment C - Supplemental Conditions - V2.docx DOCX document
RFQ27006897_Oct_15_26_solicitation_doc.pdf PDF
RFQ27006897_Sep_10_26_solicitation_doc.pdf PDF
RFQ27006897_Oct_6_26_solicitation_doc.pdf PDF
RFQ27006897_Aug_10_26_solicitation_doc.pdf PDF
RFQ27006897 prebid sign in sheet.pdf PDF
RFQ27006897_Oct_9_26_solicitation_doc.pdf PDF
RFQ27006897 RI Army National Guard Middletown Armory Incentive Letter.pdf PDF
RFQ27006897 Louis Pasteur Bldg - Incentive Letter.pdf PDF
RFQ27006897_Oct_23_26_solicitation_doc.pdf PDF
RFQ27006897_Sep_24_26_solicitation_doc.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fixture Type Quantity Measure Type Equipment Description Maximum Wattage Minimum Lumens Fixture Description Part Number Cut Sheet Link Note

A 68 Replace Existing Fixture 1x4 LED Troffer w/ Networked Sensor 23 3,100

Renova 1x4 Recessed Troffer w/ Integrated Networked Sensor or approved equal

RVN-14-N-L030-UNV-DM-C40-AF-SVP https://www.renova.com/wp-content/uploads/2017/02/RL_Ovation_RVN_Cutsheet_1x4_12624.pdf

B 4 Replace Existing Fixture 2x2 LED Troffer w/ Networked Sensor 16 2,000

Renova 2x2 Recessed Troffer w/ Integrated Networked Sensor or approved equal

RVN-22-N-L020-UNV-DM-C40-AF-SVP https://www.renova.com/wp-content/uploads/2024/12/RL_Ovation_RVN_Cutsheets_2x2_12624.pdf

C 63 Replace Existing Fixture

2x4 LED Troffer Surface Mount w/

Networked Sensor 23 3,100

Renova 2x4 Troffer Surface Mounted w/Integrated Networked Sensor or approved equal

SVN-24-N-L030-UNV-DM-C40-AF-SVP https://www.renova.com/wp-content/uploads/2024/12/RL_Ovation_SVN_Cutsheets_2x4_12624.pdf

D 133 Replace Existing Fixture LED 4' Wrap w/ Networked Sensor 23 3,100

Renova 4' Wrap w/ Integrated Networked Sensor or approved equal SRW-4-N-L030-UNV-DM-C40-AF-PP-SVP https://www.renova.com/wp-content/uploads/2017/04/RL_LED_SRW_SpecSheet_43025.pdf

E 109 Replace Existing Fixture LED 8' Wrap w/ Networked Sensor 44 6,300

Renova 8' Wrap w/ Integrated Networked Sensor or approved equal SRW-8-N-L060-UNV-DM-C40-AF-PP-SVP https://www.renova.com/wp-content/uploads/2017/04/RL_LED_SRW_SpecSheet_43025.pdf

F 12 Replace Existing Fixture LED Drum w/ Networked Sensor 10 1370

RemPhos 11" Drum w/ Integrated Networked Sensor or approved equal RPT-DRU-12N-14L-XXK-WC-G2-A-OCBT https://assets.led-llc.com/spec-sheets/LED-Drum-Fixture-G2_Spec_Sheet.pdf

G 46 Retrofit Existing Fixture LED A19 Lamp 9 800

GreenCreative A Lamp or approved equal or approved equal 9A19DIM/840/R https://greencreative.com/wp-content/uploads/A-LAMP-Datasheet-Value-

Select-A-LAMP-Family-V110524.pdf

Performance Criteria Recommended Fixture Information

Attachment A - Fixture Schedule

Louis Pasteur

The Contractor will supply and install lighting fixtures and lighting controls as listed in the following schedule. Quantities and descriptions are provided solely for solicitation purposes.

Upon the award of the contract, the Contractor will verify the scope of work in accordance with Attachment C - Supplemental Conditions, Section 3.6.

The products listed have been selected and are recommended based on their technological feasibility, performance, efficiency, appearance, quality, and impact on project economics. Alternate products, which are equal in all aspects to those recommended, are encouraged and may be submitted for consideration as follows: Alternate products which are equal in all technical and performance aspects to those recommended are encouraged and may be considered. Use of controls or factory tuning to adjust equipment performance does not meet the requirement to be considered an alternate.

1. Alternate products must be proposed in writing during the designated "Question and Answer" period as defined in the bid solicitation. A product specification sheet designating exact catalog number, DLC Product ID, and performance data for each proposed alternate must be included. Failure to include any or all of this documentation in whole or in part is grounds for rejection of all submitted alternates.

2. To be considered as an alternate, the "Fixture Description" recommended in the provided Fixture Schedule must contain the phrase "or approved equal."

3. The Recommended Fixtures listed have been approved for incentives by Rhode Island Energy. Any alternate product must qualify for an incentive and either meet or exceed the requirements for a comparable incentive amount. Rhode Island Energy will review proposed alternates for energy efficiency and DLC compliance.

4. When reviewing the supporting data submitted for alternates, the Agency/Municipality will use, for comparison purposes, all the characteristics of the specified material or equipment as they appear in the manufacturer's published data, even if all such characteristics haven't been specifically mentioned in the Contract Documents. The

Agency/Municipality reserves the right to reject any proposed alternate product that fails to meet all the characteristics of the recommended product in its review.

5. For "Networked" fixtures, the use of alternates that include a different Networked control system must ensure that a single consistent control system is maintained for all relevant fixtures in the project.

Location Desc Bldg

ID

Floor QTY Description QTY Description Type Ceiling Hgt Mounting Hgt Ceiling Type Note

Project Wide Emergency Generator Circuits Maintain Existing

Emergency Circuits as

Required

If Applicable

Project Wide Local ON/Off Switching Replace w/ Networked

Switches in offices, classrooms, conference rooms

Program all networked switches, including scenes for classrooms

Project Wide Local Ceiling Sensors 0 Disconnect and Remove

Existing Ceiling Sensors.

Quantities for bidding purposes. Selected vendor will field verify.

Properly Terminate

Sensor Connections and

Remove Associated

Sensors, powerpacks etc. Re-establish line voltage circuits.

Project Wide Local Wall Sensors 0 Disconnect and Remove

Existing Wall Sensors.

Quantities for bidding purposes. Selected vendor will field verify.

Properly Terminate

Sensor Connections and

Remove Associated

Sensors, powerpacks etc. Re-establish line voltage circuits. Install

On/Off Switch.

Project Wide 389 Program (Commission )

Network Sensors.Quantities for bidding purposes.

Selected vendor will field verify.

Program all fixture mounted integral sensors and external networked sensors and room controllers.

Location

Location Desc Bldg

ID

Room # Floor QTY Description QTY Description Type Ceiling Hgt Mounting Hgt Ceiling Type Note

1 Waiting room Ground 2 4' Strip w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

2 Office Directors officeGround 4 2x4 Troffer w/ 3 Lamps 4 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

3 Kitchen 130 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard

4 Bathroom 132 Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 8-10 Hard

5 Bathroom Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

Attachment B - Installation Schedule

Louis Pasteur

The Contractor will supply and install lighting fixtures and lighting controls as listed in the following schedule. Quantities and descriptions are listed for solicitation purposes. Upon contract award the Contractor will verify the scope of work in accordance with Attachment C - Supplemental Conditions, Section 3.6.

Location Existing Conditions Proposed Measure

Project Wide

Location Specific

Proposed MeasureExisting ConditionsLocation

Attachment B - Installation Schedule v2.1 1 of 6

6 Alcove Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 8-10 Hard

7 Hallway Ground 29 1x4' Prismatic Troffer w/ 2 Lamps29 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

8 Office 129 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

9 Office 128 Ground 1 8' Wrap w/ 4 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

10 Office 133 Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

11 Office 133 Ground 1 Wall Sconce w/ 2 Lamps 1 LED Drum w/ Networked SensorF 12 12 Hard

12 Office 134 Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

13 Closet Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

14 Closet Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

15 Office 137 Ground 1 8' Wrap w/ 4 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

16 Storage Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 12 12 Hard

17 Womens Bathroom Ground 2 2x2 Troffer w/ 2 Lamps 2 2x2 LED Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

18 Mens Bathroom Ground 2 2x2 Troffer w/ 2 Lamps 2 2x2 LED Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

19 Office Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

20 Office Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Drop /Grid

21 Kitchen 124 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

22 Office Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

23 Hallway Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 12 12 Hard

25 Bathroom Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 12 12 Hard

26 Bathroom Ground 1 Wall Sconce w/ 1 Lamp 1 LED Drum w/ Networked SensorF 12 12 Hard

27 Closet 122 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

28 Closet 40 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

29 Office 141 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

30 Hallway Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 12 12 Hard

31 Bathroom Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard

32 Closet Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

33 Office 142 Ground 2 8' Wrap w/ 4 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

34 Vestibule Ground 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Drop /Grid

35 Office 119A Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

36 Office 119B Ground 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

37 Office 119B Ground 1 4' Strip w/ 1 Lamp 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

38 Office 101 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

39 Bathroom 101 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

40 Office 118 Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

41 Office 113 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

43 Office Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

44 Office 104 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Drop /Grid

45 Bathroom Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard

46 Office 106 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

47 Bathroom Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

48 Closet 105 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

49 Office 116 Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

50 Copy room Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

51 Bathroom Ground 1 LED Keyless Socket 1 Do Not Do 00 8-10 8-10 Hard

52 Office 107 Ground 3 8' Strip w/ 2 Lamps 3 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

53 Storage Ground 1 LED Keyless Socket 1 Do Not Do 00 8-10 8-10 Hard

54 Office 113 Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

55 Office 112 Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

56 Closet 112 Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Drop /Grid

Attachment B - Installation Schedule v2.1 2 of 6

57 Closet Ground 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Drop /Grid

58 Office 108 Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

59 Office 109 Ground 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

60 Conference Ground 3 8' Strip w/ 2 Lamps 3 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

61 Closet 111 Ground 1 Keyless socket W (1) 75w Lamp1 LED A19 Lamp G 8-10 8-10 Drop /Grid no Access - Estimated

62 Stairwell Ground 4 8' Wrap w/ 4 Lamps 4 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

63 Stairwell Ground 8 1x4' Surface Mounted Troffer w/ 2 Lamps8 4' LED Wrap w/ Networked SensorD 12 12 Hard

64 Stairwell Ground 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

65 Hallway 2nd 23 1x4' Prismatic Troffer w/ 2 Lamps23 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

67 Office 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Drop /Grid

68 Storage 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 12 12 Drop /Grid

69 Office 228 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

70 Storage 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 12 12 Hard

71 Bathroom 233 2nd 1 4' Wrap w/ 1 Lamp 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

72 Storage 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

73 Office 235 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

74 Office 236 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

75 Copy room 2nd 2 1x4' Surface Mounted Troffer w/ 2 Lamps2 4' LED Wrap w/ Networked SensorD 12 12 Hard

76 Office 238 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

77 Office 234 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

78 Office 225 2nd 3 8' Strip w/ 2 Lamps 3 8' LED Wrap w/ Networked SensorE 12 12 Hard

79 Office 239 2nd 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

80 Office 240 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

81 Office 241 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

82 Womens Bathroom 2nd 4 1x4' Prismatic Troffer w/ 2 Lamps4 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

83 Kitchen 2nd 3 1x4' Surface Mounted Troffer w/ 2 Lamps3 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

84 Closet 2nd 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

85 Open Office Reception 2nd 5 1x4' Prismatic Troffer w/ 2 Lamps5 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

86 Quiet room 2nd 2 1x4' Prismatic Troffer w/ 2 Lamps2 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

87 Room 244 244 2nd 8-10 8-10 Drop /Grid No Access

88 Office 234 2nd 3 1x4' Surface Mounted Troffer w/ 2 Lamps3 4' LED Wrap w/ Networked SensorD 12 12 Hard

89 Office 220 2nd 2 1x4' Surface Mounted Troffer w/ 2 Lamps2 4' LED Wrap w/ Networked SensorD 12 12 Hard

91 Office 201 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

92 Office 219 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

93 Storage 2nd 1 Drum w/ 2 Lamps 1 LED Drum w/ Networked SensorF 8-10 8-10 Hard

94 Office 218 2nd 3 1x4' Surface Mounted Troffer w/ 2 Lamps3 4' LED Wrap w/ Networked SensorD 12 12 Hard

95 Office 2nd 3 8' Strip w/ 2 Lamps 3 8' LED Wrap w/ Networked SensorE 12 12 Hard

96 Office 203 2nd 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

97 Office Michael Costello 2nd 3 1x4' Surface Mounted Troffer w/ 2 Lamps3 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

98 Office 204 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

99 Mens Bathroom 2nd 4 1x4' Prismatic Troffer w/ 2 Lamps4 4' LED Wrap w/ Networked SensorD 12 12 Hard

100 Closet 2nd 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard No Access - Estimated

101 copy area 2nd 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 12 12 Hard

102 Office 206 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 12 12 Hard

103 Office 206 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

104 Office 207 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

105 Office 207 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 12 12 Hard

106 Closet 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

107 Bathroom 2nd 1 Drum w/ 2 Lamps 1 LED Drum w/ Networked SensorF 8-10 8-10 Drop /Grid

Attachment B - Installation Schedule v2.1 3 of 6

108 Conference 211 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

109 Office 210 2nd 3 1x4' Surface Mounted Troffer w/ 2 Lamps3 4' LED Wrap w/ Networked SensorD 12 12 Hard

110 Closet 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

111 Office 213 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

112 Office 214 2nd 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 12 12 Hard

113 Closet 2nd 1 1x4' Surface Mounted Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

114 Stairwell 2nd 6 1x4' Surface Mounted Troffer w/ 2 Lamps6 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

115 Stairwell 2nd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 15 15 Hard

116 Stairwell 2nd 1 1x4' Prismatic Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

117 Stairwell South 2nd 5 1x4' Surface Mounted Troffer w/ 2 Lamps5 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

118 Stairwell South 2nd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Hard

119 Open Office 329 3rd 3 2x4 Troffer w/ 3 Lamps 3 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Hard

120 Conference 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Hard

121 Bathroom 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

122 copy area 331 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

123 Open Office 332 3rd 4 2x4 Troffer w/ 4 Lamps 4 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

124 Open Office 333 3rd 4 2x4 Troffer w/ 4 Lamps 4 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

125 Office 327 3rd 3 2x4 Troffer w/ 4 Lamps 3 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

126 Office 326 3rd 3 2x4 Troffer w/ 4 Lamps 3 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

127 Storage 326 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

128 Office 335 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

129 Office 324 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

130 Office 336 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

131 Office 323 3rd 1 2x4 Troffer w/ 3 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

132 Office 337 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

133 Office 338 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

134 Kitchen 320 3rd 2 2x4 Troffer w/ 3 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

135 Bathroom 321 3rd 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard No Access - Estimated

136 Reception 339 3rd 5 1x4' Prismatic Troffer w/ 2 Lamps5 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

137 Office 3rd 2 1x4' Prismatic Troffer w/ 2 Lamps2 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

138 Office 340 3rd 2 1x4' Prismatic Troffer w/ 2 Lamps2 1x4 LED Troffer w/ Networked SensorA 8-10 8-10 Drop /Grid

139 Womens Bathroom 3rd 4 1x4' Prismatic Troffer w/ 2 Lamps4 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

140 Closet 3rd 1 LED Keyless Socket 1 Do Not Do 00 8-10 8-10 Drop /Grid

141 Office 318 3rd 1 2x4 Troffer w/ 3 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Drop /Grid

142 Bathroom 3rd 1 Drum w/ 1 Lamp 1 LED Drum w/ Networked SensorF 8-10 8-10 Drop /Grid

143 Office 317 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 8-10 Hard

144 Open Office 301 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

145 Open Office 3rd 2 2x4 Troffer w/ 4 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 12 Hard

146 Office 316 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 12 Hard

147 Office 315 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 12 Hard

148 Kitchen 314 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 8-10 12 Hard

149 Office 303 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

150 Office 304 3rd 2 2x4 Troffer w/ 4 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

151 Mens Bathroom 3rd 4 1x4' Prismatic Troffer w/ 2 Lamps4 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

152 Closet 3rd 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Drop /Grid No Access - Estimated

153 copy area 3rd 1 8' Wrap w/ 4 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Drop /Grid

154 Open Office 305 3rd 4 2x4 Troffer w/ 4 Lamps 4 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

155 Open Office 311 3rd 3 2x4 Troffer w/ 4 Lamps 3 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

156 Closet 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

Attachment B - Installation Schedule v2.1 4 of 6

157 Office 3rd 3 2x4 Troffer w/ 4 Lamps 3 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

158 Storage 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

159 Storage 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

160 Bathroom 3rd 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Drop /Grid

161 Open Office 3rd 2 2x4 Troffer w/ 4 Lamps 2 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

162 Office 3rd 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

164 Office 437 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

165 Open Office 428 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

166 Office 441 4th 1 2x4 Troffer w/ 4 Lamps 1 2x4 LED Troffer Surface Mount w/ Networked SensorC 12 12 Hard

167 Office 439 4th 2 1x4' Prismatic Troffer w/ 2 Lamps2 4' LED Wrap w/ Networked SensorD 12 12 Hard

168 Office 430 4th 1 1x4' Prismatic Troffer w/ 2 Lamps1 4' LED Wrap w/ Networked SensorD 12 12 Hard

169 Bathroom 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

170 Office 429 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

171 Office 427 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

172 Conference 4th 4 4' Wrap w/ 2 Lamps 4 4' LED Wrap w/ Networked SensorD 12 12 Hard

173 Hallway North ring 4th 4 4' Wrap w/ 2 Lamps 4 4' LED Wrap w/ Networked SensorD 12 12 Hard

174 Hallway Eaves 4th 2 Drum w/ 2 Lamps 2 LED Drum w/ Networked SensorF 8-10 8-10 Hard

175 Attic Eaves 4th 2 Keyless socket W (1) 60w Lamp2 LED A19 Lamp G 8-10 8-10 Hard

176 Hallway 4th 1 Wall Sconce w/ 1 Lamp 1 LED Drum w/ Networked SensorF 8-10 8-10 Hard

177 Side room 4th 1 LED Keyless Socket 1 Do Not Do 00 8-10 8-10 Hard

178 Side room 4th 4 Keyless socket W (1) 60w Lamp4 LED A19 Lamp G 8-10 8-10 Hard

179 Side room 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

180 Entry hallway north 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

181 Office Kelsi bravo 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

182 Kitchen 428 4th 4 4' Wrap w/ 2 Lamps 4 4' LED Wrap w/ Networked SensorD 12 12 Hard

183 Office 419 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

184 Hallway 4th 1 LED Drum 1 Do Not Do 00 12 12 Hard

185 Storage 4th 1 Drum w/ 1 Lamp 1 LED Drum w/ Networked SensorF 12 12 Hard

186 Hallway 4th 4 4' Wrap w/ 2 Lamps 4 4' LED Wrap w/ Networked SensorD 12 12 Hard

187 Office 403 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

188 Custodian Closet 4th 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard

189 Bathroom 405 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

189 Office 407 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

190 Closet 408 4th 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 12 12 Hard

191 Office 416 4th 1 4' Wrap w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 12 12 Hard

192 Storage 415 4th 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 12 12 Hard

193 Hallway South eaves4th 3 LED Drum 3 Do Not Do 00 12 12 Hard

194 Condemned mechanical 4th 2 Keyless socket W (1) 60w Lamp2 LED A19 Lamp G 12 12 Hard

195 Attic eaves 4th 2 Keyless socket W (1) 60w Lamp2 LED A19 Lamp G 12 12 Hard

196 Hallway Lower 5 8' Strip w/ 1 Lamp 5 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

197 Hallway Lower 4 8' Strip w/ 2 Lamps 4 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

198 Storage 008 Lower 2 4' Wrap w/ 2 Lamps 2 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

199 Storage 006 Lower 3 Keyless socket W (1) 60w Lamp3 LED A19 Lamp G 8-10 8-10 Hard

200 Old Med room 010 Lower 1 Drum w/ 2 Lamps 1 LED Drum w/ Networked SensorF 8-10 8-10 Hard

201 Old Med room 010 Lower 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

202 Old Med room 010 Lower 2 8' Wrap w/ 4 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

203 Old Med room 010 Lower 1 4' Strip w/ 4 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

204 Old nurse area 010 Lower 3 Keyless socket W (1) 60w Lamp3 LED A19 Lamp G 8-10 8-10 Hard

205 Storage 011 Lower 3 8' Strip w/ 2 Lamps 3 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

Attachment B - Installation Schedule v2.1 5 of 6

206 Storage Sprinkler room Lower 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

207 Old generator Lower 5 4' Strip w/ 2 Lamps 5 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

208 Electrical Room Lower 1 2x4 Troffer w/ 2 Lamps 1 4' LED Wrap w/ Networked SensorD 8-10 8-10 Hard

209 Electrical Lower 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

210 High voltage 013 Lower 1 8' Strip w/ 2 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

211 Pump room Lower 1 8' Strip w/ 4 Lamps 1 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

212 Elevator equipment Lower 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

213 Kitchen Lower 8 8' Strip w/ 2 Lamps 8 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

214 Hallway off kitchen Lower 1 Keyless socket W (1) 60w Lamp1 LED Drum w/ Networked SensorF 8-10 8-10 Hard

215 Hallway Lower 1 Keyless socket W (1) 60w Lamp1 LED Drum w/ Networked SensorF 8-10 8-10 Hard

216 Hallway off kitchen Lower 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

217 Lockers /kitchen office Lower 1 Keyless socket W (1) 60w Lamp1 LED A19 Lamp G 8-10 8-10 Hard

219 Open Office 232 Lower 2 8' Strip w/ 2 Lamps 2 8' LED Wrap w/ Networked SensorE 8-10 8-10 Hard

220 Conference Lower 3 4' Wrap w/ 2 Lamps 3 4' LED Wrap w/ Networked SensorD 12 12 Hard

222 Exterior Building Lower 4 LED Wall Pack 4 Do Not Do 00 12 12 Hard

223 Exterior Building Lower 2 LED Flood 2 Do Not Do 00 12 12 Hard

224 Exterior Building Lower 2 LED Wall Pack 2 Do Not Do 00 12 12 Hard

Attachment B - Installation Schedule v2.1 6 of 6

Fixture Type Quantity Measure Type Equipment Description Maximum Wattage Minimum Lumens Fixture Description Part Number Cut Sheet Link Note

A 5 Replace Existing Fixture LED 2x2 Troffer w/ Networked Sensor 16 2,000

Renova LED 2x2 Troffer Surface Mount w/Networked Sensor or approved equal

SVN22-N-L020-UNV-DM-C40-AF-SNS21x https://www.renova.com/wp-content/uploads/2024/12/RL_Ovation_SVN_Cutsheets_2x2_12624.pdf

B 24 Replace Existing Fixture LED 2x4 Troffer w/ Networked Sensor 23 3,000

Renova LED 2x4 Troffer w/Networked Sensor or approved equal RVN-24-N-L030-UNV-DM-C40-AF-SNS21x https://www.renova.com/wp-content/uploads/2025/09/RL_Ovation_RVN_Cutsheets_2x4_9325.pdf

C 71 Replace Existing Fixture LED 4' Wrap w/ Networked Sensor 24 3,000

Renova LED 4' Wrap w/Networked Sensor or approved equal SRW-4-N-L030-UNV-DM-C40-AF-PP-SNS21x https://www.renova.com/wp-content/uploads/2017/04/RL_LED_SRW_SpecSheet_43025.pdf

D 10 Replace Existing Fixture LED 8' Wrap w/ Networked Sensor 44 6,200

Renova LED 8' Wrap w/Networked Sensor or approved equal SRW-8-N-L060-UNV-DM-C40-AF-PP-SNS21x https://www.renova.com/wp-content/uploads/2017/04/RL_LED_SRW_SpecSheet_43025.pdf

E 2 Replace Existing Fixture LED Canopy w/ Photocell 20 3,000

Renova LED Canopy w/Photocell or approved equal CP-12L-LFKS-BR-PC https://www.renova.com/wp-content/uploads/2025/07/RENOVA_CP_CutSheet_72225.pdf

F 20 Replace Existing Fixture LED High Bay w/ Networked Sensor 97 14,000

Renova LED High Bay w/ Networked Sensor or approved equal HBLSR-181512L-4K5K-SNH211 https://www.renova.com/wp-content/uploads/2024/08/RENOVA_HBLSR_CutSheet_080224.pdf

Performance Criteria Recommended Fixture Information

Attachment A - Fixture Schedule

RI Army National Guard - Middletown Armory - 106 Airport Access Rd, Middletown, RI

The Contractor will supply and install lighting fixtures and lighting controls as listed in the following schedule. Quantities and descriptions are provided solely for solicitation purposes.

Upon the award of the contract, the Contractor will verify the scope of work in accordance with Attachment C - Supplemental Conditions, Section 3.6.

The products listed have been selected and are recommended based on their technological feasibility, performance, efficiency, appearance, quality, and impact on project economics. Alternate products, which are equal in all aspects to those recommended, are encouraged and may be submitted for consideration as follows: Alternate products which are equal in all technical and performance aspects to those recommended are encouraged and may be considered. Use of controls or factory tuning to adjust equipment performance does not meet the requirement to be considered an alternate.

1. Alternate products must be proposed in writing during the designated "Question and Answer" period as defined in the bid solicitation. A product specification sheet designating exact catalog number, DLC Product ID, and performance data for each proposed alternate must be included. Failure to include any or all of this documentation in whole or in part is grounds for rejection of all submitted alternates.

2. To be considered as an alternate, the "Fixture Description" recommended in the provided Fixture Schedule must contain the phrase "or approved equal."

3. The Recommended Fixtures listed have been approved for incentives by Rhode Island Energy. Any alternate product must qualify for an incentive and either meet or exceed the requirements for a comparable incentive amount. Rhode Island Energy will review proposed alternates for energy efficiency and DLC compliance.

4. When reviewing the supporting data submitted for alternates, the Agency/Municipality will use, for comparison purposes, all the characteristics of the specified material or equipment as they appear in the manufacturer's published data, even if all such characteristics haven't been specifically mentioned in the Contract Documents. The

Agency/Municipality reserves the right to reject any proposed alternate product that fails to meet all the characteristics of the recommended product in its review.

5. For "Networked" fixtures, the use of alternates that include a different Networked control system must ensure that a single consistent control system is maintained for all relevant fixtures in the project.

Location Desc Bldg ID Floor QTY Description QTY Description Type Ceiling Hgt Mounting Hgt Ceiling Type Note

Project Wide Emergency Generator

Circuits

Maintain Existing Emergency

Circuits as Required

Project Wide Local ON/Off Switching Maintain Local On/Off Switches

Project Wide Local Ceiling Sensors 0 Disconnect and Remove Existing

Ceiling Sensors. Quantities for bidding purposes. Selected vendor will field verify.

Project Wide Local Wall Sensors 0 Disconnect and Remove Existing

Wall Sensors. Quantities for bidding purposes. Selected vendor will field verify.

Project Wide 130 Program (Commission ) Network

Sensors.Quantities for bidding purposes. Selected vendor will field verify.

Line # Location Desc Bldg ID Floor QTY Description QTY Description Type Ceiling Hgt Mounting Hgt Ceiling Type Note

1 Garage Ground 20 High Bay w/ 4 Lamps 20 LED High Bay w/ Networked Sensor F 25 25 Exposed

2 Under mezzanine Ground 15 Work Lights 5 LED 4' Wrap w/ Networked Sensor C 8-10 8-10 Exposed need new wire piped

4 Supply office Ground 13 4' Strip w/ 2 Lamps 13 LED 4' Wrap w/ Networked Sensor C 12 12 Exposed

5 Back supply room Ground 2 4' Strip w/ 2 Lamps 2 LED 4' Wrap w/ Networked Sensor C 12 12 Exposed

6 Supply office Ground 2 4' Strip w/ 1 Lamp 2 LED 4' Wrap w/ Networked Sensor C 12 12 Exposed

7 Old vault Ground 2 4' Strip w/ 2 Lamps 2 LED 4' Wrap w/ Networked Sensor C 25 25 Hard

8 Hallway Ground 4 4' Strip w/ 2 Lamps 4 LED 4' Wrap w/ Networked Sensor C 12 12 Hard

9 Storage 9210 Ground 1 8' Strip w/ 4 Lamps 1 LED 8' Wrap w/ Networked Sensor D 12 12 Hard

10 Storage 9212 Ground 2 8' Strip w/ 4 Lamps 2 LED 8' Wrap w/ Networked Sensor D 12 12 Hard

11 Storage 9214 Ground 2 8' Strip w/ 4 Lamps 2 LED 8' Wrap w/ Networked Sensor D 12 12 Hard

12 Storage 9215 Ground 2 8' Strip w/ 4 Lamps 2 LED 8' Wrap w/ Networked Sensor D 12 12 Hard

13 Storage 9216 Ground 1 4' Wrap w/ 2 Lamps 1 LED 4' Wrap w/ Networked Sensor C 8-10 8-10 Hard

14 Hallway Ground 3 4' Wrap w/ 1 Lamp 3 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

15 Storage 203 Ground 4 4' Strip w/ 1 Lamp 4 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

16 Electrical Closet Ground 1 Jelly Jar w/ LED Lamp 1 Do Not Do Anything To This Fixture 00 12 8-10 Hard

17 Computer/Server Ground 2 4' Strip w/ 1 Lamp 2 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

18 Mechanical Closet Ground 4 4' Strip w/ 1 Lamp 4 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

19 Kitchen Ground 3 8' Wrap w/ 4 Lamps 3 LED 8' Wrap w/ Networked Sensor D 12 8-10 Hard

20 Kitchen Ground 1 4' Wrap w/ 2 Lamps 1 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

Location Existing Conditions Proposed Measure

Project Wide

Location Specific

Proposed MeasureExisting ConditionsLocation

Attachment B - Installation Schedule

RI Army National Guard - Middletown Armory - 106 Airport Access Rd, Middletown, RI

The Contractor will supply and install lighting fixtures and lighting controls as listed in the following schedule. Quantities and descriptions are listed for solicitation purposes. Upon contract award the

Contractor will verify the scope of work in accordance with Attachment C - Supplemental Conditions, Section 3.6.

Attachment B - Installation Schedule v2.1 1 of 2

21 Kitchen sink room Ground 3 4' Wrap w/ 2 Lamps 3 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

22 Hallway Ground 5 4' Wrap w/ 1 Lamp 5 LED 4' Wrap w/ Networked Sensor C 12 8-10 Hard

23 Womens Bathroom Ground 3 LED Flat Panel 3 Do Not Do Anything To This Fixture 00 8-10 8-10 Drop /Grid

24 Womens Bathroom Ground 1 LED Vapor Tight 1 Do Not Do Anything To This Fixture 00 8-10 8-10 Drop /Grid

25 Mens Bathroom Ground 3 4' Wrap w/ 2 Lamps 3 LED 4' Wrap w/ Networked Sensor C 8-10 8-10 Drop /Grid

26 Classroom Ground 10 2x4 Troffer w/ 3 Lamps 10 LED 2x4 Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

27 Locker room 107 Ground 7 4' Strip w/ 1 Lamp 7 LED 4' Wrap w/ Networked Sensor C 12 8-10 Exposed

28 Training team room Ground 5 4' Strip w/ 1 Lamp 5 LED 4' Wrap w/ Networked Sensor C 12 8-10 Exposed

29 Locker room off big locker area Ground 5 4' Strip w/ 1 Lamp 5 LED 4' Wrap w/ Networked Sensor C 12 8-10 Exposed

30 Lobby hallway Ground 5 2x2 Troffer w/ 2 Lamps 5 LED 2x2 Troffer w/ Networked SensorA 12 8-10 Exposed Surface Mounted

31 Open Office ODB Ground 3 2x4 Troffer w/ 3 Lamps 3 LED 2x4 Troffer w/ Networked SensorB 12 8-10 Exposed

32 Office SGM Ground 1 2x4 Troffer w/ 3 Lamps 1 LED 2x4 Troffer w/ Networked SensorB 12 8-10 Exposed

33 Office CO Ground 2 2x4 Troffer w/ 3 Lamps 2 LED 2x4 Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

34 Locker/storage Ground 4 2x4 Troffer w/ 3 Lamps 4 LED 2x4 Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

35 Locker Ground 3 2x4 Troffer w/ 3 Lamps 3 LED 2x4 Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid

36 Closet 106 Ground 1 2x4 Troffer w/ 3 Lamps 1 LED 2x4 Troffer w/ Networked SensorB 8-10 8-10 Drop /Grid NA. Restricted. Estimated

37 Exterior Building Ground 10 LED Flood 10 Do Not Do Anything To This Fixture 00 8-10 8-10 Drop /Grid

38 Exterior Building Ground 2 Recessed w/ 1 Lamp 2 LED Canopy w/ Photocell E 8-10 8-10 Drop /Grid Cover Existing Recessed

39 Exterior Building Ground 1 LED Wallpack 1 Do Not Do Anything To This Fixture 00 8-10 8-10 Drop /Grid

40 Exterior Building - New BuildingGround New Building - LED Do Not Do Anything To This Fixture 00 8-10 8-10 Drop /Grid

Attachment B - Installation Schedule v2.1 2 of 2

Pg. 1 of 9 Attachment C - Supplemental Conditions V3

Attachment C - Supplemental Conditions Project: Louis Pasteur Date: 6/29/2026

Table of Contents

1. General Description of the Work

1.1 Project Documents Listing

2. Working Conditions

2.1 Operation of Facility

2.2 Schedule

2.3 Safety

2.4 Identification

2.5 Working Hours

2.6 Access to Work Area

2.7 Protection of Property

2.8 On-Site Storage

2.9 On-Site Parking

2.10 Special Working Conditions

2.11 Supervision

3. Pre-Construction Requirements

3.1 Project Personnel Listing

3.2 Project Schedule

3.3 Schedule of Project Values

3.4 Schedule of Fixture Unit Prices

3.5 Materials Submittals

3.6 Permits and Licenses

3.7 Hazard Response Plan

3.8 Pre-Construction Report

4. Installation

4.1 General Installation

4.2 Removal and Disposal

4.3 Recycling

4.4 Material Handling

4.5 Equipment

4.6 Fastening and Suspension

4.7 Electrical

4.8 Surface Restoration

4.9 Cleaning

4.10 Hazardous Materials

4.11 Control systems

5. Warranty

6. Project Completion

6.1 Closeout Meeting

6.2 Closeout Documents

6.3 Training and Commissioning

6.4 Backup Stock/Spare Parts

Pg. 2 of 9

6.5 Additional Requirements

1.0 General Description of the Work

• Upgrade of the existing lighting system including luminaires and lighting controls to improve the quality of the working environment and reduce energy consumption and maintenance costs at the Louis Pasteur and Middletown Armory facilities.

• Upgrade the existing lighting fixtures and lighting controls as listed in Attachment A - Fixture Schedule and Attachment B - Installation Schedule across both buildings.

• Provide all necessary supervision, installation personnel, equipment and materials to complete the work in a professional and timely manner as defined in Attachment A - Fixture Schedule, Attachment B - Installation Schedule and Attachment C - Supplemental Conditions (this document).

• Provide a 3-year warranty for all parts and labor associated with the project.

• Provide As-Built Documentation and Closeout Procedures as defined in

Attachment C - Supplemental Conditions (this document).

1.1 Project Documents Listing – The following are included in the contract documents:

• Attachment A - Fixture Schedule for both buildings

• Attachment B - Installation Schedule for both buildings

• Attachment C - Supplemental Conditions (this document)

• Project Bid Form, Listing Base Bid Price and Alternate Bid Price (if applicable).

▪ The pre-approved incentives are considered a form of payment by the Owner. Any future changes to the pre-approved incentives would remain a form of payment by the Owner towards the total cost of the project.

• All documents submitted as required by the Owner

• Invitation to Bid

2.0 Working Conditions

2.1 Operation of Facility - The facility will remain open and occupied. Normal business will be conducted concurrent with the contractor’s work.

Contractor will make every effort to minimize disruption of the operation of the facility.

2.2 Schedule - The work shall proceed as established in the Project Schedule as determined in Section 3.2

2.2.1 Expected project completion date is: 1 year from issuance of Purchase Order

Pg. 3 of 9

2.3 Safety - Safety is of the utmost importance. Contractor will provide for the protection of its personnel as well as the protection of Agency workers and the general public. Contractor will supply all protective equipment, signage, barricades, etc. required to maintain a safe working environment at all times.

Contractor shall comply with safety requirements and practices in accordance with Agency requirements and Occupational Safety and Health Administration (OSHA). Active work areas shall be clearly marked with safety cones or similar signage.

2.4 Identification - Contractor will maintain a daily log of all personnel and visitors on site. All contractor personnel will display identification at all times when on site.

2.4.1 Additional identification and sign-in requirements for this project include the following: All contractor personnel working on the job site must complete a background check and have their BCI (background check from the RI Attorney General’s Office) sent to the project manager for each agency (RI Army National Guard and DCAMM) prior to being on-site. For the Middletown Armory site, Contractors will be given the information for the facility manager/POC, who they will need to check-in and out with each work day. This POC will also be the only way contractors can get inside the building. A valid driver’s license will be required.

2.5 Working Hours - Standard working hours for this project are as follows:

For Louis Pastuer Building, second shift 3pm-11pm, Monday through Friday For the Middletown Armory Building, first shift 7:30am-3:30pm, Tuesday through Friday

2.6 Access to Work Area – On-site agency personnel will provide Contractor access to the work area in accordance with the Schedule of Work submitted by Contractor. Changes and adjustments to the Schedule should be requested as far in advance as is practical. The owner will make every effort to accommodate such changes but cannot guarantee access for schedule change requests submitted with less than 24 hr. notice.

2.7 Protection of Property - Contractor will provide all equipment, coverings, etc. required for the protection of facilities and personal property located in the construction area. Contractor will identify any specific property that requires protection by others in the Pre-Construction Report as defined in Section 3.8.

2.8 On-Site Storage - The security of all project material is the sole responsibility of Contractor until installation is completed and accepted.

Pg. 4 of 9

2.8.1 On-site storage is available as follows: On-site storage is not available. A location for a Conex box will be provided to the awarded contractor who should carry those costs in their bid.

2.9 On-Site Parking - Contractor personnel will park in designated areas only or in public spaces. Daily parking for construction vehicles will be in designated areas only. No overnight parking of construction vehicles is permitted.

2.10 Special Working Conditions – Contractor will ensure that all project personnel are properly informed of and in compliance with any additional requirements for working in specified areas or conditions.

2.11 Supervision - The Owner will designate Project Manager prior to the start of work. The Owner Project Manager will be the primary point of contact for all matters related to the project. Contractor will provide on-site supervision whenever work is in progress. Site supervisor(s) must be identified in the Project Personnel Listing (Section 3.1) and provide emergency contact information to the Owner Project Manager and Facility Contact. The on-site supervisor will meet daily with designated facility contact(s) to coordinate current and future work. On-site supervisor will attend meetings as requested by the Agency Project Manager. It is requested that the Project Manager or otherwise authorized decision-maker of the contractor be on site during construction at least 3 days per week.

3.0 Pre-Construction Requirements - Upon execution of a contract and issuance of a Purchase Order and prior to the ordering of materials, the Contractor will transmit to the Owner Project Manager the following:

3.1 Project Personnel Listing - Provide name, title, and contact information for Primary Contractor contact, Contractor’s On-Site Supervisor, Construction Foreman.

3.2 Project Schedule– Provide an installation schedule in sufficient detail to facilitate coordination with facility personnel to expedite the work.

3.3 Schedule of Project Values – Provide a schedule of project phases and associated contract values.

3.4 Schedule of Fixture Unit Prices –Provide a schedule of unit pricing for the installation of fixtures listed in Attachment A. This schedule will establish unit pricing for potential changes in installed quantities and adjustments to the final price per the contract documents.

Pg. 5 of 9

3.5 Materials Submittals – Provide technical data specification sheets for all materials to be installed in the project for review and approval. Proposed materials shall be consistent with bid specifications. Changes to the materials specifications required by special field conditions or technical requirements should be listed separately with supporting documentation. Prior to ordering materials, the Contractor shall verify the quantity, voltage, color, temperature, diffuser, controls and mounting hardware as specified and appropriate for the intended use and receive approval to order from Owner Project Manager.

3.6 Permits and Licenses - Contractor will obtain and pay for all necessary permits required prior to the commencement of work. Such permits shall be properly displayed at the work site and a copy transmitted to the Owner Project Manager. Contractor will deliver to the Owner Project Manager a copy of the Contractor’s or subcontractor’s State of Rhode Island Electrician’s License or any other License or certification required for the project work.

3.7 Hazard Response Plan – Contractor will provide a detailed procedure to be implemented in the event of any of the following conditions:

• Broken Lamps

• Broken Lamp Containing Mercury

• Discovery of a Ballast Containing PCB

3.8 Pre-Construction Report – Contractor will verify the scope of work as listed in Attachment B Installation Schedule and include in the report any discrepancy in quantities or required changes to the specification. The Contractor will inspect the facility and report any existing condition that will impact the contractor’s work schedule or that may require correction prior to the ordering of materials for review by the Owner Project Manager. Once any requested changes have been reviewed and approved/rejected this scope will constitute the final scope of work for the project on which materials orders shall be based.

4.0 Installation

4.1 General Installation - All new fixtures, retrofits, and accessories shall be installed in a workmanlike manner to industry standard and in compliance with all applicable codes. Installation shall comply with the manufacturer instructions and ensure warranty requirements are met. Work shall be continuous per the established Project Schedule, see Section 3.2.

4.2 Change Orders – During construction, if the Contractor encounters a situation that requires a deviation from the scope of work finalized during the pre-construction phase of the project, they should immediately notify the Owner Project Manager of the issue and provide a proposed

Pg. 6 of 9 solution/workaround. No work should be done outside of the agreed upon scope without prior written approval from Owner Project Manager and any work outside the agreed upon scope completed by Contractor without prior written approval is done at their risk and may not be compensated and/or may need to be revisited if the approved solution/workaround differs from actions taken by Contractor.

4.3 Removal and Disposal - Contractor is responsible for the proper disposal of all materials and equipment removed, construction waste, packaging materials, and trash. Contractor will supply disposal receptacles and may not use the facility’s waste receptacles or systems. Space for a dumpster will be coordinated with awarded contractor by Owner Project Manager during pre-construction process.

4.4 Recycling - Contractor will provide for the proper recycling of lamps and ballasts as required by local, state, and federal laws. Certification of recycling documentation will be transmitted to the Owner Project Manager upon completion of the project.

4.5 Material Handling - Contractor is responsible for the delivery, off-loading, inventory, storage, and distribution of the project material. Owner personnel cannot receive material deliveries on behalf of the Contractor.

4.6 Equipment - Contractor will provide all ladders, staging, lifts, and equipment required for the safe completion of the work. No Owner-owned equipment may be utilized by Contractor. All equipment operators must carry valid certification as required for the equipment being operated.

4.7 Fastening and Suspension - All fixtures will be installed in accordance with the manufacturer’s instructions and shall meet requirements of all codes in force. Fasteners of high quality and sufficient quantity shall be employed to ensure proper installation. Secondary suspension, if required, shall be in accordance with local and state building code in force.

4.8 Electrical - Fixtures shall be installed in accordance with NEMA standards and requirements of the National Electrical Code pertaining to installation of interior lighting fixtures and with applicable portions of NECA's "Standard of Installation." All electrical components shall be RoHS compliant.

Certification: New and/or Retrofit Fixtures, Electrical Components, Devices, Accessories, and Sensors & Controls and associated components shall be listed and UL labeled and marked for intended location and application and comply with current National Electric Code. All fixtures and retrofits shall be listed with Design Lights Consortium (DLC), or EnergyStar.

4.9 Surface Restoration - Contractor will restore any surface damaged during installation to match existing conditions. Unfinished areas exposed by

Pg. 7 of 9 installation shall also be restored to match surrounding conditions by Contractor. Surface restoration includes but is not limited to:

patching/covering all holes and exposed above ceiling areas; painting exposed and/or damaged ceiling areas or other spaces damaged by Contractor during…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .