RFQ27006893_Specifications.pdf
PDF 15 MB Posted
- Attached to
- URI Carothers Library Critical Power Upgrade
- Solicitation number
- RFQ27006893
- Issued by
- Providence County, Rhode Island
About this file
This is a Project Manual and Agreement Form for the Robert L. Carothers Library Electrical Service Upgrade at the University of Rhode Island Kingston Campus, involving the State of Rhode Island Department of Administration Division of Purchases, the University of Rhode Island Board of Trustees, and the University of Rhode Island as the user agency. The project encompasses replacement of critical electrical infrastructure including main transformers, switchgear, emergency/standby power systems, installation of temporary transformers, a screen wall around the equipment yard, and civil/site work for underground conduit routing. The project is designated as DA Job Number R0318-0070A and URI Job Number KC.G.CARO.2023.001, with the design agent identified as Tighe & Bond, Inc. The contract documents include detailed specifications organized into 33 divisions covering work from demolition and site preparation through electrical systems, HVAC, structural modifications, and landscaping. A pre-bid meeting is scheduled for August 12, 2026 at 10:00 AM at Carothers Library, 15 Lippitt Rd, Kingston, Rhode Island 02881. The contract will be executed under AIA Document A101-2017 as modified by the Owner and AIA Document A201-2007 General Conditions, with performance measured from the later of either the issuance of a Purchase Order or a notice to proceed issued by the User Agency.
The Contract Sum, liquidated damages per day of delay, retainage percentage, and substantial completion date remain to be determined and will be established in the final executed agreement. Progress payments will be made monthly based on Applications for Payment submitted to the Design Agent, with five percent retainage held through substantial completion and thereafter in accordance with Rhode Island General Laws Section 37-12-10.1. The Owner reserves the right to withhold three percent of the Contract Sum per Rhode Island General Laws Section 44-1-6 if the Contractor does not maintain a regular place of business in Rhode Island, until 30 calendar days after final completion. Payment will be made no later than the 30th working day following written approval by the Owner. The Contractor must pay subcontractors the full amount included for each within 10 working days of receipt of payment from the Owner. Final payment is contingent upon submission of final releases from all subcontractors and suppliers, as-built plans, warranties, manuals, and all closeout documents. The contract is governed by Rhode Island law, State of Rhode Island Procurement Regulations, and applicable federal and local law, with disputes resolved initially through the Purchasing Agent as Initial Decision Maker, followed by optional mediation and binding arbitration under the Public Works Arbitration Act.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standard Contract Documents-State Bid
Rev. 1/2/14
PROJECT MANUAL
Robert L. Carothers Library
Electrical Service Upgrade
University of Rhode Island
Kingston Campus
July 16, 2026
DA Job Number: R0318-0070A
URI Job Number: KC.G.CARO.2023.001
11083
JASON URSO
MECHANICAL07/16/2026
Rev. 1/2/14
Owner: University of Rhode Island, URI Board of Trustees, and the State of Rhode Island
In care of: Capital Program Design & Delivery
210 Flagg Road
Attn: Briana Pinheiro, OPM
Design Agent: Tighe & Bond, Inc.
53 Southampton Rd.
Westfield, MA 01085
413-562-1600
PROJECT MANUAL
Robert L. Carothers Library
Electrical Service Upgrade
Kingston Campus
DA Job Number: R0318-0070A
URI Job Number: KC.G.CARO.2023.001
Tighe & Bond, Inc. Standard Contract Documents-State Bid
Carothers Library Electrical Service Upgrade
KC.G.CARO.2023.001
Rev. 10/25/15 TABLE OF CONTENTS
7/16/2026 00 0110-1
DOCUMENT 00 0110 - TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0010 Cover
00 0050 Title Page
00 0110 Table of Contents
00 0115 List of Drawings
00 5200 Agreement Form
00 6140 Waiver of Lien Form
00 7000 General Conditions
00 7200 URI Standard Documents
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 Summary
01 1010 Attachment A – Site Utilization
01 1020 Attachment B – Fire Protection Impairment Form
01 1030 Attachment C – Abatement Plan
01 2000 Price and Payment Procedures
01 2010 Attachment A - Price and Payment Procedures
01 2020 Attachment B - MBE Utilization Form
01 2600 Contract Modification Procedures
01 3000 Administrative Requirements
01 3010 Attachment A – Administrative Requirements
01 3233 Photographic Documentation
01 3300 Submittal Procedures
01 3310 Attachment A – Submittal Procedures
01 3320 Attachment B – Small Project Changes
01 3529 Health & Safety
01 4000 Quality Requirements
01 4010 Attachment A – Quality Requirements
01 4020 Attachment B – Small Project Changes
01 5000 Temporary Facilities and Controls
01 5010 Attachment A – Temporary Facilities and Controls
01 5015 Temporary Project Signage
01 5640 Tree Protection and Preservation
01 6000 Product Requirements
01 6010 Attachment A – Product Requirements
01 7000 Execution Requirements
01 7010 Attachment A – Execution Requirements
01 7320 Waste Management
01 7330 Attachment A – Waste Management
01 7800 Closeout Requirements
01 7810 Attachment A – Closeout Requirements
01 7900 Demonstration and Training
7/16/2026 00 0110-2
DIVISION 02 – EXISTING CONDITIONS
02 3100 Subsurface Investigations
02 4119 Selective Demolition
02 8213 Asbestos Abatement
02 8433 Management of Assumed PCB Bulk Product Waste
02 8713 Hazardous Materials Abatement
DIVISION 03 – CONCRETE
03 1000 Concrete Forms and Accessories
03 2000 Concrete Reinforcement
03 3000.23 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 0120 Unit Masonry Cleaning
04 2200 Concrete Unit Masonry
DIVISION 05 – METALS
05 4000 Cold-Formed Metal Framing
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 1000 Rough Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 8413 Penetration Firestopping
07 9200 Joint Sealants
DIVISION 08 – OPENINGS
08 1113 Steel Doors and Frames
08 7100 Door Hardware
08 8000 Glass & Glazing
DIVISION 09 – FINISHES
09 2900 Gypsum Board
09 6519 Resilient Tile Flooring
09 9100 Painting
DIVISION 10 – SPECIALTIES
10 1400 Interior Signage
DIVISION 23 – HEATING, VENTILATION, AND AIR-CONDITIONING
23 0500 Basic HVAC Requirements
23 0529 Hangers & Supports for HVAC
23 0553 ID for HVAC
7/16/2026 00 0110-3
23 0700 HVAC Insulation
23 2113 Hydronic Piping
23 2300 Refrigerant Piping
23 8126 Split System AC Units
DIVISION 26 – ELECTRICAL
26 0500 Basic Electrical Requirements
26 0505 Minor Electrical Demolition
26 0513 Medium Voltage Cable
26 0519 Conductors and Cable
26 0526 Grounding and Bonding
26 0529 Electrical Hangers and Supports
26 0533.13 Conduit
26 0533.16 Boxes
26 0543 Ductbanks
26 0553 Electrical Identification
26 0800 Electrical Testing
26 1200 Dry Type Transformers
26 1219 Pad Mounted Distribution Transformers (Liquid Filled)
26 1300 Medium Voltage Padmount Switchgear
26 2413 Switchboards
26 2416 Panelboards
26 2726 Wiring Devices
26 2816 Switches and Circuit Breakers
26 3213 Packaged Engine Generator System (Diesel Fuel)
26 5100 LUMINAIRE
26 3600 Automatic Switches
DIVISION 31 – EARTHWORK
31 0513 Borrow Material
31 1000 Site Clearing
31 2300 Excavation, Backfill, Compaction, and Dewatering
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 0516 Stone Surfacing
32 1216.18 Bituminous Concrete Pavement
32 1613.23 Precast Concrete Curb
32 1623 Portland Cement Sidewalks
32 3000 Site Furnishings
32 3113 Chain Link Fences
32 3119 Metal Decorative Screen
32 9115 Planting Soils
32 9200 Lawns and Grasses
7/16/2026 00 0110-4
DIVISION 33 – UTILITIES
33 0130.11 Television Inspection of Pipelines
33 0135 Breaking Into Existing Manholes and Catch basins
33 0531 Polyvinyl Chloride (PVC) Pipe and Fittings
33 0597.23 Underground Warning Tape
33 0830 Testing of Sanitary Sewer and Storm Drainage Systems
333913 Manholes and Catch Basins
33 4413.33 Reinforced Concrete Pipe
END OF DOCUMENT
Robert L. Carothers Library Electrical Service Upgrade
Rev. 1/2/14 LIST OF DRAWINGS
July 16, 2026 00 0115-1
DOCUMENT 00 0115 - LIST OF DRAWINGS
Dwg. No. Drawing Title __
General G-001 Cover Sheet
G-002 Sheet Index
Civil C-001 Civil General Notes, Legend & Abbreviations C-100 Demolition & Site Preparation Plan-1 C-101 Demolition & Site Preparation Plan-2 C-102 Civil Site Plan C-501 Civil Details C-502 Civil Details-2
Landscape Architecture L-100 Landscape Materials and Layout Plan L-200 Landscape Detail
L-201 Landscape Detail
L-202 Landscape Detail
L-203 Landscape Detail
Architectural A-001 Architectural Egress Plan
AD-101 Architectural Partial Floor Demolition Plan - Lower Level A-101 Architectural Partial Floor Plan – Lower Level
A-401 Architectural West Building Partial Elevation
A-402 Architectural Main Elec Room Interior Elevations
A-403 Architectural Secondary Elec Room Ceiling Plan and DTLS
A-601 Architectural Door Schedule and Details
Structural S-001 Structural General Notes
SD-100 Structural Demolition Site Plan
SD-101 Structural Demolition Wall Sections
S-100 Structural Slab Plan
S-101 Structural Partial Demolition and Floor Plans – Lower Level
S-301 Structural Foundation Plans
S-302 Structural Details and Sections -1
S-303 Structural Details and Sections -2
HVAC
H-001 HVAC Legend, General Notes, and Schedules
HD-101 HVAC Demolition Ground Floor Piping Plan
H-101 HVAC Ground Floor Piping Plan
Robert L. Carothers Library Electrical Service Upgrade
Rev. 1/2/14 LIST OF DRAWINGS
July 16, 2026 00 0115-2
H-501 HVAC Details and Control Diagrams
Electrical E-001 Electrical Legend
E-002 Electrical General Notes
ED-003 Electrical Demolition One-Line Diagram -1
ED-004 Electrical Demolition One-Line Diagram -2
ED-100.1 Electrical Demolition Site Plan South
ED-100.2 Electrical Demolition Site Plan North
ED-101 Electrical Demolition Ground Floor Plan
ED-102 Lighting Demolition Ground Plan
E-003 Electrical One-Line Diagram -1
E-004 Electrical One-Line Diagram -2
E-005 Electrical One-Line Diagram -3
E-006 Electrical Schedules -1
E-007 Electrical Schedules -2
E-008 Electrical Schedules -3
E-009 Electric Schedules 4
E-100 Electrical Site Plan
E-101 Electrical Power Ground Floor Plan
E-102 Electrical Lighting Ground Floor Plan
E-501 Electrical Details -1
E-502 Electrical Details -2
E-503 Electrical Details -3
Fire Alarm FAD-101 Fire Alarm Demolition Ground Floor Plan
FA-101 Fire Alarm Ground Floor Plan
END OF DOCUMENT
AGREEMENT FORM
00 5200-1
DOCUMENT 00 5200 – AGREEMENT FORM
PART 1 – GENERAL
1.1 The Agreement Form to be utilized on this project is AIA Document A101-2007 as amended, a copy of which follows this page.
END OF DOCUMENT
Tighe & Bond, Inc.
Carothers Library Electrical Service Upgrade
Issue Date
Document A101® – 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
Init.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete A101®–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201®–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
AGREEMENT made as of the day of in the year (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address, telephone and facsimile numbers, and website)
State of Rhode Island, acting by and through the Department of Administration, Division of Purchases,One Capitol Hill, Second Floor Providence, Rhode Island 02908-5855
401.578.8100 (telephone); 401.574.8387 (facsimile) www.puchasing.ri.gov and The University of Rhode Island Board of Trustees 35 Campus Avenue, Green Hall Kingston, Rhode Island 02881 on behalf of the User Agency:
(Name, legal status, address, telephone and facsimile numbers, and website)
The University of Rhode Island 45 Upper College Road Kingston, Rhode Island 02881
401.874.1000 (telephone) and the Contractor:
(Name, legal status, address, telephone and facsimile numbers, and website) for the following Project:
(Name, location and detailed description)
The Design Agent:
The Owner and Contractor agree as follows.
Init.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
(Paragraph Deleted)
The Owner and Contractor agree as follows.
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
EXHIBIT A INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General Conditions, Supplementary Conditions (if any), and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. No part of the Work shall be performed by Subcontractors without the Owner’s prior written consent.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be the later of: (i) the issuance of the Purchase Order by the Owner; and (ii) the (Paragraph Deleted) date set forth in a notice to proceed issued by the User Agency.
(Paragraphs Deleted)
§ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
§ 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work:
(Check one of the following boxes and complete the necessary information.)
[ ] Not later than ( ) calendar days from the date of commencement of the Work.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
[ ] By the following date:
§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates:
Portion of Work Substantial Completion Date
§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. Subject to additions and deductions as provided in the Contract Documents, the Contract Sum shall be:
§ 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum:
Item Price
§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement.
(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.)
Item Price Conditions for Acceptance
§ 4.3 Allowances, if any, are specified in the Bid Proposal Form and are included in the Contract Sum.
(Paragraph Deleted)
(Table Deleted)
§ 4.4 Unit prices, if any, are specified in the Bid Proposal Form and include all costs, including without limitation, labor, materials, services, regulatory compliance, overhead, and profit necessary for the completion of the Work. Unit prices shall be used for both additions to, and deletions from the Work.
§ 4.5 Liquidated damages, if any:
(Insert terms and conditions for liquidated damages, if any.)
.1 In the event that there is one date for Substantial Completion of the Work, the Contractor shall pay the Owner the sum stipulated in this Section 4.5.1 as liquidated damages, and not as a penalty, for each calendar day of delay until the Work is substantially complete: $________________.
.2 In the event that the Project is scheduled to be completed in phases, and there is more than one date for Substantial Completion of the Work, the Contractor shall pay the Owner an aggregate amount equal to the sums stipulated in this Section 4.5.2 as liquidated damages, and not as a penalty, for each calendar day of delay until the Work for each phase is substantially complete:
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
Phase Liquidated Damages Sum
.3 The Owner and the Contractor have reasonably determined the sums set forth in this Section 4.5 to be a fair estimate of the Owner’ actual damages which are difficult to ascertain in the event of delay.
§ 4.6 Other:
(Paragraph Deleted)
The Owner shall not be liable to the Contractor or any Subcontractor for claims or damages of any nature caused by or arising out of any delays. The sole remedy against the Owner for delays shall be the allowance of additional time for completion of the Work.
ARTICLE 5 PAYMENTS
§ 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Design Agent by the Contractor and Certificates for Payment issued by the Design Agent and approved by the Owner in writing, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month.
§ 5.1.3 The Owner shall make payment of the certified amount, less retainage, to the Contractor not later than the 30 th working day following written approval by the Owner.
(Paragraph Deleted)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved by the Design Agent and the Owner in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Design Agent and the Owner may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2007, General Conditions of the Contract for Construction as modified by the Owner, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
§ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work;
.2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and
.3 That portion of Construction Change Directives that the Design Agent determines, in the Design Agent’s professional judgment, to be reasonably justified.
§ 5.1.6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
.2 The amount, if any, for Work that remains uncorrected and for which the Design Agent has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
A201–2007 as modified by the Owner;
.3 For Work performed or defects discovered since the last payment application, any amount for which the Design Agent may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2007 as modified by the Owner; and
.4 Retainage withheld pursuant to Section 5.1.7.
§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: five (5%) percent.
(Paragraph Deleted)
§ 5.1.7.1.1 Deleted.
(Paragraph Deleted)
§ 5.1.7.2 Deleted.
(Paragraph Deleted)
§ 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
(Paragraph Deleted)
The amount of five (5%) percent shall be retained by the Owner through the date of Substantial Completion of the Work and then after the date of Substantial Completion of the Work in accordance with R.I. Gen. Laws § 37-12- 10.1.
§ 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201–2007 as modified by the Owner.
§ 5.1.9 Except with the Owner’s prior written approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.1.10 Within 10 working days of receipt of any progress payment from the Owner, the Contractor must pay its Subcontractors the full amount included for each such Subcontractor within the Contractor’s Application for Payment in accordance with the provisions of AIA A201 – 2007, General Conditions of the Contract for Construction as modified by the Owner.
§ 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, less the amount withheld pursuant to § 5.1.7.3, shall be made by the Owner to the Contractor when:
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2007 as modified by the Owner, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Design Agent and approved in writing by the Owner;
.3 the Contractor has submitted its final release and final releases from all of its Subcontractors and suppliers in a form acceptable to the Owner; and
4 the Contractor has submitted to the Owner all close-out documents, including without limitation, all as-built plans, warranties, manuals, and other materials set forth in the Contract Documents.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 working days after the issuance of the Design Agent’s final Certificate for Payment and written approval by the Owner.
§ 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due in accordance with the provisions of “Prompt Payment by Department of Administration,” R.I. Gen. Laws §§ 42-11.1-1 et seq.
§ 5.4 Owner’s Rights § 5.4.1 The Owner shall have the right to deduct from any payments due to the Contractor the amount of any unpaid obligations owed to the State of Rhode Island by the Contractor, including without limitation, any and all unpaid taxes, the amount of any claim against the Contractor arising out of this Agreement, or any amount on account of any other reason permitted by applicable law.
§ 5.5 Pursuant to R.I. Gen. Laws § 44-1-6, the Owner shall withhold payment from the Contractor if the Contractor does not maintain a regular place of business in Rhode Island in the amount of three (3%) percent of the Contract Sum until 30 calendar days after Final Completion and compliance by the Contractor with the requirements of such section. The three (3%) percent withheld pursuant to R.I. Gen. Laws § 44-1-6 is not considered retainage which is held pursuant to § 5.1.7.
(Paragraph Deleted)
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 Initial Decision Maker Claims shall be referred to the Initial Decision Maker for initial decision. The Purchasing Agent appointed pursuant to the provisions of the “State Purchases Act,” R.I. Gen. Laws § 37-2-1 et seq., will serve as the Initial Decision Maker in accordance with the provisions of the State Purchases Act, State of Rhode Island Procurement Regulations, and this Section 6.1. An initial decision shall be required as a condition precedent to binding dispute resolution pursuant to Section 6.3 of any Claim arising prior to the date final payment is due.
§ 6.2 Mediation For any Claim not resolved by the Initial Decision Maker procedures set forth in Section 6.1, and prior to the implementation of the binding dispute resolution procedures set forth in Section 6.3, the Contractor shall have the option to pursue mediation, exercisable by written notice to the Owner within 30 calendar days of an Initial Decision. In the event of the exercise of such option by the Contractor, the Owner and the Contractor shall attempt to select a mediator, and in the event that the Owner and the Contractor cannot agree on a mediator, either party may apply in writing to the Presiding Justice of the Providence County Superior Court, with a copy to the other, with a request for the court to appoint a mediator, and the costs of the mediator shall be borne equally by both parties.
(Paragraph Deleted)
§ 6.3 Binding Dispute Resolution For any Claim not resolved by the Initial Decision Maker procedures set forth in Section 6.1, or mediation at the option of the Contractor pursuant to Section 6.2, the method of binding dispute resolution shall be determined in accordance with the provisions of the “Public Works Arbitration Act,” R.I. Gen. Laws §§ 37-16-1 et seq.
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2007, as modified by the Owner. The Contract may also be terminated by the Owner: (i) in the event of the unavailability of appropriated funds; (ii) in the absence of a determination of continued need; or (iii) as otherwise provided in the State of Rhode Island Procurement Regulations General Conditions of Purchase or other applicable law.
§ 7.1.1 Deleted.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
§ 7.2 The Work may be suspended by the Owner as provided in: (i) the State of Rhode Island General Conditions of Purchase Regulation or other applicable law; or (ii) Article 14 of AIA Document A201–2007 as modified by the Owner.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2007 or another Contract Document, the reference refers to: (i) the AIA Document A201 – 2007 or other Contract Document as modified by the Owner; and (ii) that provision in the AIA Document A201 – 2007 as modified by the Owner or other Contract Document as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 Representatives for the Owner § 8.2.1 The Owner’s representative:
(Name, title, address, email address, and other information for the preferred methods of contact)
State of Rhode Island, acting by and through the Department of Administration Division of Purchases One Capitol Hill Providence, Rhode Island 02903 James H. Libby, AIA, NCARB, LEED AP
401.712.3091 (telephone)
§ 8.2.2 The User Agency’s representative:
(Name, title, address, email address, and other information for the preferred methods of contact)
The University of Rhode Island Capital Program Design & Delivery 210 Flagg Rd., Suite 204 Kingston, Rhode Island 02881 James H. Libby, AIA, NCARB, LEED AP
401.712.3091 (telephone)
§ 8.2.3 The Design Agent’s representative:
§ 8.3 The Contractor’s representative:
§ 8.4 Neither the Owner’s nor the Contractor’s representative nor the Design Agent’s representative shall be changed without 10 working days’ prior notice to the other party.
§ 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in the Solicitation and elsewhere in the Contract Documents.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
§ 8.5.2 The Contractor shall provide bonds as set forth in the Solicitation and elsewhere in the Contract Documents.
§ 8.6 Deleted.
§ 8.7 Other provisions:
§ 8.7.1 The Contractor represents and warrants to the Owner, in addition to any other representations and warranties of the Contractor elsewhere in the Contract Documents:
.1 The Contractor and its Subcontractors are each financially solvent, able to pay their debts as they mature, and possess sufficient working capital to perform their obligations under the Contract Documents.
.2 The Contractor and its Subcontractors are each able to furnish the tools, materials, equipment, and labor required to complete the Project as required under the Contract Documents.
.3 The Contractor and each Subcontractor are authorized to do business in the State of Rhode Island and are properly licensed by all necessary governmental authorities having jurisdiction over them and over the Work and the Project.
.4 The execution of this Agreement and its performance is within its duly authorized powers.
.5 The Contractor has visited the site of the Project, familiarized itself with the local and special conditions under which the Work is to be performed, and correlated its observations with the requirements of the Contract Documents.
.6 The Contractor possesses the requisite level of experience and expertise in the business administration, construction, and superintendence of projects of the size, complexity, and nature of the Project, and it will perform the Work with the care, skill, and diligence of a contractor possessing such experience and expertise.
§ 8.7.2 The representations and warranties of the Contractor in this Section 8.7 and elsewhere in the Contract Documents will survive the execution and delivery of this Agreement, any termination of this Agreement, and the final completion of the Work.
§ 8.7.3 Any Change Orders or other Modifications must be approved in writing by the Owner.
§ 8.7.4 The Owner is the State of Rhode Island, acting by and through its Department of Administration, Division of Purchases, and therefore, pursuant to the provisions of R.I. Gen. Laws § 34-28-31, mechanics liens may not be placed against the Project.
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 This Agreement is comprised of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, as modified by the Owner
.2 Deleted.
.3 AIA Document A201™–2007, General Conditions of the Contract for Construction, as modified by the Owner.
.4 Deleted.
.5 Drawings
The Drawings are included in the Solicitation and are available on the Division of Purchases website at www.purchasing.ri.gov.
.6 Specifications
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
The Specifications are included in the Solicitation and are available on the Division of Purchases website at www.purchasing.ri.gov.
.7 Addenda, if any, issued pursuant to the Solicitation form a part of the Solicitation and are available on the Division of Purchases website at www.purchasing.ri.gov.
.8 Supplementary and other Conditions of the Contract, including without limitation, the State of Rhode Island General Conditions of Purchase Regulation.
.9 Other documents listed below:
.1 The Solicitation, issued by the Owner, including without limitation, the Invitation to Bid, the Instructions to Bidders, the Specifications and Drawings, any Addenda, and the Bid Checklist.
.2 The Bid Proposal, including without limitation, the Bid Form and the Bidder Certification Cover Form.
(Paragraph Deleted)
.3 The Purchase Order issued by the Owner.
.4 Contractor’s Initial Milestone Schedule.
§ 9.2 This Agreement and the Contract Documents are subject to, and governed by, the laws of the State of Rhode Island, including all procurement statutes and regulations (available at www.purchasing.ri.gov), and applicable federal and local law, all of which are fully incorporated into this Agreement by this reference.
§ 9.3 In the event of any conflict between or among the Contract Documents, or any Contract Documents and any provision of the State of Rhode Island Procurement Regulations and/or any other provision of the Rhode Island General Laws, the State of Rhode Island Procurement Regulations and the Rhode Island General Laws shall control.
ARTICLE 10 BENEFITS OF AGREEMENT
§ 10.1 The User Agency is a disclosed third-party beneficiary of this Agreement and shall have all of the rights and benefits hereunder to which such a party is entitled. Nothing contained in this Agreement shall create a contractual relationship with, or a cause of action in favor of, any other third party against the Owner or the User Agency.
§ 10.2 This Agreement shall be binding on the Contractor and its successors and assigns; provided, however, that the Contractor may not assign its rights nor delegate its responsibilities under this Agreement without the Owner’s prior written consent.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
This Agreement is entered into as of the day and year first written above; provided, however, that this Agreement shall not become a valid, binding, and enforceable contract unless and until the Owner shall have issued a Purchase Order.
THE STATE OF RHODE ISLAND, acting by and through its Department of Administration, Division of Purchases
OWNER (Signature) CONTRACTOR (Signature)
Abby Benson Vice President, Division of Administration and Finance, University of Rhode Island
(Printed name and title) (Printed name and title)
Additions and Deletions Report for AIA® Document A101® – 2017
This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text.
Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 08:08:07 ET on 02/12/2026.
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
(Name, legal status, address and other information)address, telephone and facsimile numbers, and website)
State of Rhode Island, acting by and through the Department of Administration, Division of Purchases,One Capitol Hill, Second Floor Providence, Rhode Island 02908-5855
401.578.8100 (telephone); 401.574.8387 (facsimile) www.puchasing.ri.gov and The University of Rhode Island Board of Trustees 35 Campus Avenue, Green Hall Kingston, Rhode Island 02881 on behalf of the User Agency:
The University of Rhode Island 45 Upper College Road
(Name, legal status, address and other information)address, telephone and facsimile numbers, and website)
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
The Architect:Design Agent:
(Name, legal status, address and other information)address, telephone and facsimile numbers, and website)
The Owner and Contractor agree as follows.
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, (General Conditions, Supplementary Conditions (if any), and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. No part of the Work shall be performed by Subcontractors without the Owner’s prior written consent.
§ 3.1 The date of commencement of the Work shall be:
(Check one of the following boxes.)be the later of: (i) the issuance of the Purchase Order by the Owner; and (ii) the
[ ] The date of this Agreement.
[ ] A date set forth in a notice to proceed issued by the Owner.User Agency.
[ ] Established as follows:
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D)
(Insert a date or a means to determine the date of commencement of the Work.)
If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement.
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be ($ ), subject Subject to additions and deductions as provided in the Contract Documents.Documents, the Contract Sum shall be: $____________.
§ 4.3 Allowances, if any, included in the Contract Sum:are specified in the Bid Proposal Form and are included in the Contract Sum.
(Identify each allowance.)
Item Price
§ 4.4 Unit prices, if any:
(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)any, are specified in the Bid Proposal Form and include all costs, including without limitation, labor, materials, services, regulatory compliance, overhead, and profit necessary for the completion of the Work. Unit prices shall be used for both additions to, and deletions from the Work.
Item Units and Limitations Price per Unit ($0.00)
.1 In the event that there is one date for Substantial Completion of the Work, the Contractor shall pay the Owner the sum stipulated in this Section 4.5.1 as liquidated damages, and not as a penalty, for each calendar day of delay until the Work is substantially complete: $________________.
.2 In the event that the Project is scheduled to be completed in phases, and there is more than one date for Substantial Completion of the Work, the Contractor shall pay the Owner an aggregate amount equal to the sums
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D) stipulated in this Section 4.5.2 as liquidated damages, and not as a penalty, for each calendar day of delay until the Work for each phase is substantially complete:
Phase Liquidated Damages Sum
.3 The Owner and the Contractor have reasonably determined the sums set forth in this Section 4.5 to be a fair estimate of the Owner’ actual damages which are difficult to ascertain in the event of delay.
(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.)The Owner shall not be liable to the Contractor or any Subcontractor for claims or damages of any nature caused by or arising out of any delays. The sole remedy against the Owner for delays shall be the allowance of additional time for completion of the
Work.
§ 5.1.1 Based upon Applications for Payment submitted to the Architect Design Agent by the Contractor and Certificates for Payment issued by the Architect, Design Agent and approved by the Owner in writing, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:month.
§ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the day of a month, the The Owner shall make payment of the amount certified amount, less retainage, to the Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than ( ) days after the Architect receives the Application for Payment.30th working day following written approval by the Owner.
(Federal, state or local laws may require payment within a certain period of time.)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved by the Design Agent and the Owner in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of
Additions and Deletions Report for AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 08:08:07 ET on 02/12/2026 under Order No.3104238454 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA3D) values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect Design Agent and the Owner may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2017, A201™–2007, General Conditions of the Contract for Construction, Construction as modified by the Owner, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s Design Agent determines, in the Design Agent’s professional judgment, to be reasonably justified.
.2 The amount, if any, for Work that remains uncorrected and for which the Architect Design Agent has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay;A201–2007 as modified by the Owner;
.4 .3 For Work performed or defects discovered since the last payment application, any amount for which the Architect Design Agent may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017; A201–2007 as modified by the Owner; and
.5 .4 Retainage withheld pursuant to Section 5.1.7.
§ 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: five (5%) percent.
(Insert a percentage or amount to be withheld as retainage from each Application for…