This is a construction drawings package for the URI Carothers Library Electrical Service Upgrade project at the University of Rhode Island's Kingston Campus. The project encompasses replacement of critical power infrastructure, including demolition of existing transformers, switchgear, and emergency power systems, installation of a new 2500 kVA pad-mounted transformer with oil containment, a 550 kW diesel generator with sound attenuation enclosure, temporary electrical infrastructure, and comprehensive civil and site work. The scope includes demolition of concrete pads and equipment, installation of underground ductbank conduit routing beneath the loading dock drive, construction of a decorative screen wall with cast-in-place concrete and perforated aluminum panels, site restoration with sodding and landscaping, drainage modifications including manhole installation, and temporary fencing and erosion control measures. A pre-bid meeting is scheduled for August 12, 2026 at 10:00 AM at Carothers Library, 15 Lippitt Rd, Kingston, RI 02881. The drawings are marked as temporarily released for progress review only and are not intended for bidding or construction purposes.
The project includes extensive site coordination requirements, including notification to DigSafe at least 72 hours prior to any earth-moving operations, maintenance of emergency access to all properties, traffic control implementation, and coordination with the University regarding utility disconnections and building operations disruptions. The contractor bears responsibility for all utility damage repair or replacement costs, erosion and sedimentation control maintenance, temporary drainage management, and surface restoration including pavement and concrete sidewalk repairs. All demolition activities must comply with federal, state, and local environmental, safety, and health requirements, with specific attention to PCB waste management from transformer demolition and paint removal from the existing fuel tank. The project requires contractor-provided temporary electricity, shoring, and site safety measures consistent with OSHA standards, along with coordination with electrical contractors regarding power shutdown sequencing and timing of demolition work.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/15/2026/15/25 026026
Digitally signed by JASON URSO Date: 2026.07.15 09:40:20-04'00'
07/15/202615/215 026026
C-001
CIVIL GENERAL NOTES,
LEGEND & ABBREVIATIONS
THM/ALG
NR
NO SCALE
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-0
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-001.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
EROSION CONTROL AND RESOURCE AREA PROTECTION NOTES
1. PROVIDE ALL EROSION CONTROL MEASURES SHOWN, SPECIFIED, REQUIRED BY PERMIT, AND/OR REQUIRED BY THE ENGINEER PRIOR TO ANY CONSTRUCTION OR IMMEDIATELY UPON REQUEST. MAINTAIN SUCH CONTROL MEASURES UNTIL FINAL SURFACE TREATMENTS ARE IN PLACE AND/OR UNTIL PERMANENT VEGETATION IS ESTABLISHED. INSPECT AFTER EACH RAINSTORM AND DURING MAJOR STORM EVENTS TO CONFIRM THAT ALL SEDIMENTATION AND EROSION CONTROL MEASURES
REQUIRED ARE IN PLACE AND EFFECTIVE.
2. INSTALL SILT SACKS OR OTHER APPROVED SEDIMENTATION BARRIERS IN/AT ALL CATCH BASINS IN THE PROJECT AREA. CONTRACTOR TO REPAIR AND REPLACE AS
NEEDED.
3. COMPACT, STABILIZE, AND LOAM AND SEED SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND AS REQUIRED BY PERMITS. GRADE SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS TO A MAXIMUM SLOPE OF 3 HORIZONTAL TO 1 VERTICAL (3H:1V), WHERE POSSIBLE. PROVIDE BIODEGRADABLE EROSION CONTROL BLANKETS TO PREVENT EROSION WHERE SLOPES ARE STEEPER THAN 3H:1V.
4. RESTORE ALL DISTURBED VEGETATED AREAS WITH SOD TO ESTABLISH COVER AND STABILIZATION AS SOON AS POSSIBLE FOLLOWING DISTURBANCE. CONTRACTOR IS
RESPONSIBLE FOR WATERING SOD.
5. SETTLE OR FILTER ALL SILT-LADEN WATER FROM DEWATERING ACTIVITIES IN A SEDIMENTATION OR FILTER BAG TO REMOVE SEDIMENTS PRIOR TO RELEASE USING A
SEDIMENTATION OR FILTER BAG LOCATED DOWN-GRADIENT OF THE DEWATERED AREA.
6. REMOVE AND PROPERLY DISPOSE OF SILT TRAPPED AT BARRIERS IN UPLAND AREAS OUTSIDE BUFFER ZONES. REMOVE MATERIALS DEPOSITED IN ANY TEMPORARY SETTLING BASINS AT THE COMPLETION OF THE PROJECT. RESTORE ALL DISTURBED AREAS TO THEIR PRECONSTRUCTION CONDITION.
7. SWEEP, COLLECT, REMOVE AND DISPOSE OF ANY SEDIMENT TRACKED ONTO PUBLIC RIGHT-OF-WAYS AT THE END OF EACH DAY.
8. MAINTAIN AN ADDITIONAL SUPPLY OF EROSION CONTROL MEASURES ON-SITE FOR EMERGENCY REPAIRS.
9. STORE FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS IN A SECONDARY CONTAINER AND REMOVE TO A SECURE LOCKED AND COVERED AREA DURING NON-WORK
HOURS.
10. PROVIDE A SUPPLY OF ABSORBENT SPILL RESPONSE MATERIALS SUCH AS BOOMS, BLANKETS, AND OIL ABSORBENT MATERIALS AT THE CONSTRUCTION SITE AT ALL TIMES TO CLEAN UP POTENTIAL SPILLS OF HAZARDOUS MATERIALS. IMMEDIATELY REPORT SPILLS OF HAZARDOUS MATERIALS TO THE STATE ENVIRONMENTAL AGENCY AND THE
MUNICIPALITY WHERE THE WORK IS OCCURRING.
GENERAL NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING DIGSAFE AT 1-888-344-7233 AND OTHER UTILITY OWNERS IN THE AREA NOT ON THE DIGSAFE LIST AT LEAST 72 HOURS PRIOR TO ANY DIGGING, TRENCHING, ROCK REMOVAL, DEMOLITION, BORING, BACKFILLING, GRADING, LANDSCAPING, OR ANY OTHER EARTH MOVING
OPERATIONS.
2. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORT OF EXISTING UTILITIES AND REPAIR OR REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION, WHETHER ABOVE OR BELOW GRADE. REPLACE DAMAGED UTILITIES IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER AND AT NO COST TO THE PROPERTY
OWNER.
3. NOT ALL OF THE UTILITY SERVICES TO BUILDINGS ARE SHOWN. THE CONTRACTOR SHALL ANTICIPATE THAT EACH PROPERTY HAS SERVICE CONNECTIONS FOR THE
VARIOUS UTILITIES.
4. NOTIFY THE ENGINEER OF ANY UTILITIES IDENTIFIED DURING CONSTRUCTION THAT ARE NOT SHOWN ON THE DRAWINGS OR THAT DIFFER IN SIZE, DEPTH OR
MATERIAL.
5. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. IF FIELD CONDITIONS ARE OBSERVED THAT VARY SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS, IMMEDIATELY NOTIFY THE ENGINEER IN WRITING FOR RESOLUTION OF THE CONFLICTING INFORMATION.
6. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.
7. TIGHE & BOND ASSUMES NO RESPONSIBILITY FOR ANY ISSUES, LEGAL OR OTHERWISE, RESULTING FROM CHANGES MADE TO THESE DRAWINGS WITHOUT WRITTEN
AUTHORIZATION FROM TIGHE & BOND.
8. EXCAVATE ADDITIONAL TEST PITS TO LOCATE EXISTING UTILITIES AS DIRECTED OR APPROVED BY THE ENGINEER.
9. THE CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY, COORDINATION WITH THE OWNER, ALL SUBCONTRACTORS, AND WITH OTHER CONTRACTORS WORKING WITHIN THE LIMITS OF WORK, THE MEANS AND METHODS OF CONSTRUCTING THE PROPOSED WORK.
10. OBTAIN, PAY FOR AND COMPLY WITH PERMITS, NOTICES AND FEES NECESSARY TO COMPLETE THE WORK. ARRANGE AND PAY FOR NECESSARY INSPECTIONS AND
APPROVALS FROM THE JURISDICTIONAL AUTHORITIES.
11. SHORE UTILITY TRENCHES WHERE FIELD CONDITIONS DICTATE AND/OR WHERE REQUIRED BY LOCAL, STATE AND FEDERAL HEALTH AND SAFETY CODES.
12. PROTECT AND MAINTAIN ALL UTILITIES IN THE AREAS UNDER CONSTRUCTION DURING THE WORK. LEAVE ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THE CONTRACT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SAND AND SILT FROM
DISTURBED AREAS FROM ENTERING THE DRAINAGE SYSTEM.
13. NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICT, ERROR, AMBIGUITY, OR DISCREPANCY WITH THE PLANS OR BETWEEN THE PLANS AND ANY APPLICABLE LAW, REGULATION, CODE, STANDARD SPECIFICATION, OR MANUFACTURER'S INSTRUCTIONS.
14. EXCAVATE WITH EQUIPMENT SELECTED TO MINIMIZE DAMAGE TO EXISTING UTILITIES OR OTHER FACILITIES. HAND EXCAVATE AS NECESSARY TO LOCATE
UTILITIES AND AVOID DAMAGE.
15. TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK AND STAGING
AREAS AT THE COMPLETION OF EACH DAYS WORK.
16. NO OPEN TRENCHES WILL BE ALLOWED OVER NIGHT. THE USE OF ROAD PLATES TO PROTECT THE EXCAVATION WILL BE CONSIDERED UPON REQUEST, BUT
BACKFILLING IS PREFERRED.
17. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY TRAFFIC CONTROL/SAFETY DEVICES TO ENSURE SAFE VEHICULAR AND PEDESTRIAN ACCESS THROUGH THE WORK AREA, OR FOR SAFELY IMPLEMENTING DETOURS AROUND THE WORK AREA. PERFORM TRAFFIC CONTROL IN ACCORDANCE WITH THE CONTRACTOR'S
APPROVED TRAFFIC CONTROL PLAN.
18. MAINTAIN EMERGENCY ACCESS TO ALL PROPERTIES WITHIN THE PROJECT AREA AT ALL TIMES DURING CONSTRUCTION.
19. WHEN WORKING IN THE ROAD, PROVIDE THE OWNER AND LOCAL FIRE/POLICE/SCHOOL AUTHORITIES A DETAILED PLAN OF APPROACH INDICATING METHODS OF PROPOSED TRAFFIC ROUTING ON A DAILY BASIS. PROVIDE COORDINATION TO ENSURE COMMUNICATION AND COORDINATION BETWEEN THE OWNER, CONTRACTOR
AND LOCAL FIRE/POLICE/SCHOOL AUTHORITIES THROUGHOUT THE CONSTRUCTION PERIOD.
20. REMOVE AND DISPOSE OF ALL CONSTRUCTION-RELATED WASTE MATERIALS AND DEBRIS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND
FEDERAL LAWS.
21. THE TERM "DEMOLISH" USED ON THE DRAWINGS MEANS TO REMOVE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS.
22. THE TERM "ABANDON" USED ON THE DRAWINGS MEANS TO LEAVE IN PLACE AND TAKE APPROPRIATE MEASURES TO DECOMMISSION AS SPECIFIED OR NOTED ON
THE DRAWINGS.
23. ALL PROPOSED WORK MAY BE ADJUSTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE TO MEET EXISTING CONDITIONS.
24. TWO SURFICIAL SOIL SAMPLES WERE COLLECTED PROXIMATE TO THE ABOVEGROUND DIESEL FUEL STORAGE TANK (AST) AND LABORATORY ANALYZED FOR TOTAL PETROLEUM HYDROCARBONS (TPH) WITH RESULTS REPORTED BELOW THE LABORATORY METHOD REPORTING LIMIT (MRL). IF SIGNS OF CONTAMINATION (e.g.
ODORS, DISCOLORATION, DEBRIS, STAINING) ARE IDENTIFIED DURING EXCAVATION ACTIVITIES THE CONTRACTOR SHOULD NOTIFY THE ENGINEER AS SOON AS
POSSIBLE FOR FURTHER EVALUATION.
25. TELEVISION INSPECT EXISTING DRAINAGE PIPES TO BE MODIFIED PRIOR TO CONSTRUCTION. TELEVISION INSPECT PROPOSED DRAINAGE PIPE AFTER
INSTALLATION.
BASE PLAN NOTES
1. THE EXISTING CONDITIONS INFORMATION SHOWN ON THE DRAWINGS IS BASED ON THE FOLLOWING:
SURVEY DRAWINGS PROVIDED BY WSP USA INC. TITLED "EXISTING CONDITIONS URI CAROTHERS LIBRARY KINGSTON, RHODE ISLAND" AND DATED
SEPTEMBER 30, 2024.
SURVEY DRAWINGS PROVIDED BY HAGER GEOSCIENCE TITLED "GEOPHYSICAL SURVEY FOR UTILITIES & OBSTRUCTIONS ROBERT L. CAROTHERS LIBRARY
UNIVERSITY OF RHODE ISLAND KINGSTON, RI" AND DATED DECEMBER 2023.
2. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION (E.G., EXISTING UTILITIES) SHOWN ON THESE DRAWINGS IS NOT GUARANTEED AND SOME SUBSURFACE INFORMATION MAY NOT BE SHOWN. DETERMINE THE LOCATIONS AND ELEVATIONS OF ALL SUBSURFACE FEATURES WHICH MAY AFFECT CONSTRUCTION OPERATIONS BY TEST PIT OR OTHER METHODS, AS NECESSARY TO PREVENT DAMAGE TO UTILITIES AND OTHER SUBSURFACE FEATURES, AND/OR INTERRUPTIONS IN UTILITY SERVICE. PROVIDE DATA COLLECTED THROUGH THESE INVESTIGATIONS TO THE ENGINEER PRIOR TO CONSTRUCTING THE
PROPOSED IMPROVEMENTS.
3. THE DRAWINGS ARE BASED ON THE FOLLOWING DATUMS: HORIZONTAL-NAD83; VERTICAL-NAVD88
4. THE EXISTING CONDITIONS SHOWN ARE APPROXIMATE. FIELD VERIFY EXISTING CONDITIONS.
SURFACE RESTORATION NOTES
1. ALL PAVEMENT DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. PROTECT PROJECT FEATURES (E.G., WALLS, FENCES, MAIL BOXES, SIGNS, SIDEWALKS, CURBING, STAIRS, WALKWAYS, TREES, ETC.) FROM DAMAGE DURING CONSTRUCTION, INCLUDING
PROVIDING TEMPORARY SUPPORTS, WHEN APPROPRIATE.
3. IF REMOVAL OF PROJECT FEATURES IS REQUIRED IN ORDER TO PERFORM THE PROPOSED WORK, REMOVE THOSE SITE FEATURES ONLY UPON APPROVAL OF ENGINEER. REPLACE ALL REMOVED PROJECT FEATURES; NEW ITEMS SHALL BE EQUAL OR BETTER IN QUALITY AND CONDITION TO THE ITEMS REMOVED.
4. EXISTING SURVEY MONUMENTS DISTURBED BY THE CONTRACTOR SHALL BE REPLACED BY A LAND SURVEYOR LICENSED IN THE STATE IN WHICH THE WORK IS PERFORMED AT NO
ADDITIONAL COST TO THE OWNER.
5. COORDINATE THE ADJUSTMENT OF EXISTING UTILITY STRUCTURES WITH EACH RESPONSIBLE UTILITY OWNER PRIOR TO RECONSTRUCTION AND/OR PAVING OPERATIONS. RAISE ALL STRUCTURES TO FINISHED GRADES PRIOR TO THE END OF THE CONSTRUCTION SEASON AND PRIOR TO FINISHED PAVING.
6. REPAIR DISTURBED PAVED SURFACES AT THE END OF EACH WORK WEEK, UNLESS OTHERWISE APPROVED/REQUIRED BY THE OWNER.
7. PLACE TEMPORARY BITUMINOUS CONCRETE PAVEMENT AT DISTURBED PORTLAND CEMENT CONCRETE SIDEWALKS AND DRIVEWAYS AT THE END OF EACH WORK WEEK, UNLESS
OTHERWISE APPROVED/REQUIRED BY THE OWNER.
8. TRANSFER ALL TEMPORARY BENCHMARKS, AS NECESSARY.
9. RESTORE ALL AREAS DISTURBED BY THE CONTRACTOR BEYOND THE PAYLINE LIMITS TO ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
10. REGRADE ALL UNPAVED AREAS DISTURBED BY THE WORK AS REQUIRED. REPAIR/REPLACE PAVED SURFACES DISTURBED BY THE WORK IN-KIND, UNLESS OTHERWISE NOTED. RESTORE
SURFACES TO EXISTING OR PROPOSED CONDITIONS AS INDICATED ON THE DRAWINGS.
11. PROVIDE A SMOOTH, FLUSH TRANSITION BETWEEN ALL NEW AND EXISTING PAVEMENTS AND WALKING SURFACES.
EXISTING PROPOSEDDESCRIPTION
LIMITS OF WORK
INTERMEDIATE CONTOURS
INDEX CONTOURS
STORM DRAIN
SANITARY SEWER
WATER SERVICE
UNDERGROUND ELECTRIC
TELEPHONE LINE
STEAM LINE
CHAIN LINK FENCE
EDGE OF PAVEMENT
RETAINING WALL
EROSION CONTROL BARRIER
BOLLARD
DRAINAGE MANHOLE
CATCH BASIN
WATER SHUTOFF
ELECTRIC SERVICE MANHOLE
TELECOMMUNICATIONS MANHOLE
DECIDUOUS TREE
SAWCUT PAVEMENT
APPROXIMATE TRENCH LIMITS
ITEM TO BE DEMOLISHED
REMOVE & DISPOSE SIDEWALK/PAVEMENT
DEMOLISH LANDSCAPE AREA
CONCRETE SIDEWALK RESTORATION
PAVEMENT RESTORATION
E E
LEGEND ABBREVIATIONS
BGS BELOW GROUND SURFACE
BIT BITUMINOUS
CONC CONCRETE
DI DUCTILE IRON
DMH DRAINAGE MANHOLE
EQUIP EQUIPMENT
FFE FINISHED FLOOR ELEVATION
GFI GROUND FAULT CIRCUIT INTERRUPTER
INV INVERT
LBS POUNDS
LSA LANDSCAPED AREA
MIN MINIMUM
PVC POLYVINYLCHLORIDE
RCP REINFORCED CONCRETE PIPE
RWS STONE RETAINING WALL
SF SQUARE FOOT
TYP TYPICAL
WWF WELDED WIRE FABRIC
D
07/15/202615/2026026
07/15/2026
LIMIT OF CONCRETE REMOVAL.
DEMOLISH SIDEWALK TO NEAREST JOINT
MATCH LINE C-101
TEMPORARY UNDERGROUND ELECTRIC SERVICE
(REFER TO ELECTRICAL DRAWINGS)
APPROXIMATE TRENCH LIMITS FOR TEMPORARY ELECTRIC SERVICE
EROSION CONTROL
BARRIER (TYP)
LIMIT OF WORK
REFER TO ELECTRICAL DRAWINGS
FOR ELECTRICAL DEMOLITION
DEMOLISH CONCRETE EQUIPMENT
PAD WEST OF COOLING TOWER
(REFER TO STRUCTURAL DRAWINGS
FOR EXTENT OF PAD DEMOLITION)
DEMOLISH LSA
DEMOLISH TREE
DEMOLISH CONCRETE SIDEWALK
DEMOLISH FUEL TANK AND
ASSOCIATED FUEL TANK PIPING IN
ACCORDANCE WITH LOCAL AND
STATE REGULATIONS
(REFER TO ELECTRICAL DRAWINGS)
DEMOLISH 6" DI WATER LINE TO LIMIT
OF WORK. CAP PIPE AT LIMIT OF WORK
AND FILL WITH FLOWABLE FILL
DEMOLISH 8" PVC
DEMOLISH SECTION OF 24" RCP
DEMOLISH DMH
CUT AND CAP 6"
DI WATER LINE
REMOVE 24" RCP TO NEAREST BELL END
DEMOLISH BOLLARD
DEMOLISH DISTURBED
CONCRETE CURB FROM
CONDUIT INSTALLATION
DEMOLISH CHAIN LINK FENCE
DEMOLISH DISTURBED
CONCRETE CURB FROM
CONDUIT INSTALLATION
DEMOLISH BIT CONC PAVEMENT
DEMOLISH DISTURBED CONCRETE CURB
FROM CONDUIT INSTALLATION
SAWCUT PAVEMENT
DEMOLISH
CONCRETE CURB
DEMOLISH CONCRETE CURB
NOTES
1. REFER TO SPECIFICATIONS 02 87 13 HAZARDOUS/UNIVERSAL WASTE
MATERIALS MANAGEMENT AND 02 84 33 MANAGEMENT OF ASSUMED PCB
BULK PRODUCT WASTE FOR DETAILS REGARDING PAINT REMOVAL OF
PAINTED FUEL TANK.
PROTECT COOLING TOWER THROUGHOUT
DEMOLITION AND CONSTRUCTION
DEMOLISH TEMPORARY GENERATOR
(REFER TO ELECTRICAL DRAWINGS)
DEMOLISH PAD MOUNTED TRANSFORMERS
(REFER TO ELECTRICAL DRAWINGS)
DEMOLISH GENERATOR AND ASSOCIATED
CONDUIT AND CONDUCTORS FROM
GENERATOR TO LIBRARY
(REFER TO ELECTRICAL DRAWINGS)
DEMOLISH PORTION OF UNDERGROUND ELECTRIC
CONDUIT (REFER TO ELECTRICAL DRAWINGS)
DEMOLISH PRIMARY FEEDER CONDUCTORS
TO TRANSFORMERS. INTERCEPT AND
CLEAN CONDUIT FOR REUSE (REFER TO
ELECTRICAL DRAWINGS)
PAIR OF DOORS AND ADJACENT SINGLE DOOR
TO BE REMOVED AND PRESERVED FOR
REINSTALLATION (REFER TO ARCHITECTURAL
DRAWINGS)
DEMOLISH EXISTING WALL
(REFER TO STRUCTURAL PLANS)
CONTRACTOR TO PROVIDE A SECURE BARRIER
BETWEEN THE WORK ZONE AND ACTIVE COLLEGE
CAMPUS TO ALLOW PEDESTRIANS AND VEHICLES
TO BE REDIRECTED OUTSIDE OF THE WORK
ZONE. INSTALL URI BRAND SCRIM ON ALL
TEMPORARY FENCING
CONTRACTOR IS REQUIRED
TO MAINTAIN SAFE MEANS
OF EGRESS FROM EXIT
DOORS TO PUBLIC WAY AT
ALL TIMES DURING
CONSTURCTION
C-100
DEMOLITION & SITE
PREPARATION PLAN - 1
THM/ALG
NR
N
00 5' 10'
SCALE: 1" = 5'
1" = 5'
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-101.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
NOTES:
1. INSTALL SILTSACK IN CATCH BASINS DOWNGRADIENT OF PROJECT AREA.
2. COVER AND PROTECT COOLING TOWER WHEN THE COOLING TOWER IS SHUT DOWN FOR
THE HEATING SEASON AND UNCOVER WHEN THE COOLING TOWER IS OPERATIONAL FOR
THE COOLING SEASON. WE SUGGEST THE TOWER BE LOCKED OUT/TAGGED OUT WHILE
THE COVER IS IN PLACE. COORDINATE WHEN THE COVER SHOULD BE INSTALLED AND
REMOVED AND LOCK OUT/TAG OUT REQUIREMENTS WITH URI.
07/15/202615/2026026
MATCH LINE C-100
REFER TO ELECTRICAL DRAWINGS FOR
TEMPORARY ELECTRICAL EQUIPMENT. RESTORE
DISTURBED AREAS FROM TEMPORARY
EQUIPMENT WITH SOD LAWN. DEMOLISH
EQUIPMENT PADS ONCE TEMPORARY ELECTRIC
EQUIPMENT IS REMOVED
TEMPORARY CHAIN LINK FENCE
TEMPORARY DISTRIBUTION PANEL
(REFER TO ELECTRICAL DRAWINGS)
TEMPORARY PAD MOUNTED TRANSFORMER
ON TEMPORARY EQUIPMENT PAD.
COORDINATE EQUIPMENT PAD SIZE WITH
ELECTRICAL CONTRACTOR (REFER TO
ELECTRICAL DRAWINGS AND EXTERIOR
CONCRETE PAD DETAIL ON SHEET S-303)
TEMPORARY TRANSFORMER
(REFER TO ELECTRICAL DRAWINGS)
TEMPORARY DISTRIBUTION PANEL
(REFER TO ELECTRICAL DRAWINGS)
TEMPORARY UNDERGROUND
ELECTRIC SERVICE
(REFER TO ELECTRICAL DRAWINGS)
TEMPORARY UNDERGROUND
ELECTRIC SERVICE
(REFER TO ELECTRICAL DRAWINGS)
APPROXIMATE TRENCH
LIMITS FOR TEMPORARY
ELECTRIC SERVICE
C-101
DEMOLITION & SITE
PREPARATION PLAN - 2
THM/ALG
NR
N
00 5' 10'
SCALE: 1" = 5'
1" = 5'
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-101.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
NOTE:
1. INSTALL SILTSACK IN CATCH BASINS DOWNGRADIENT OF PROJECT AREA.
07/15/202615/2026026
E
E
E
E E
E
E
E
E
E
E
E E
E E
E E
E E
E
S
E
GENERATOR
FUEL TANK
GENERATOR
186.2 185.8
20'-0"±
D
D
LOAD
BANK
TRANSFORMER
NEW FACADE WALL
(SEE LANDSCAPE PLAN)
SWITCH ON CONC PAD
RESTORE ALL DISTURBED
AREAS WITH SOD LAWN
UNLESS OTHERWISE
SPECIFIED
LIMIT OF WORK
EROSION CONTROL
BARRIER (TYP)
UNDERGROUND ELECTRIC SERVICE
(REFER TO ELECTRICAL DRAWINGS)
SITE LUMINARY (TYP)
(REFER TO ELECTRICAL PLANS)
REPLACE CONCRETE SIDEWALK
GENERATOR
PLATFORM
GFI (REFER TO
ELECTRICAL DRAWINGS)
NEW MANHOLE TO BE INSTALLED IN
LINE WITH EXISTING DRAINAGE LINE.
INVERT TO BE CONFIRMED IN THE
FIELD. ESTIMATED INV OUT = 182.50
EXTEND 24" RCP
24" RCP
CONNECT 8" PVC TO EXISTING
OUTLET INVERT. EXISTING INVERT
TO BE CONFIRMED IN FIELD.
ESTIMATED INV OUT=182.50
SLOPE OF EXISTING DRAIN PIPE TO BE
MAINTAINED. TEST PITS TO BE PERFORMED
PRIOR TO CONSTRUCTION TO DETERMINE
THE DEPTH OF PIPE. CONFIRM PROPOSED
OUTLET IS BELOW EXISTING INLET.
DMH-1
INV IN=182.35 E
INV IN=182.35 SW
INV OUT=182.25 NW
WALL FOOTING (REFER TO
STRUCTURAL PLANS)
TEST PIT TO BE PERFORMED
PRIOR TO CONSTRUCTION TO
CONFIRM INVERTS
REFER TO LANDSCAPE PLANS
FOR WALL HEIGHT DETAILS
EXISTING DRAIN PIPE MAY BE
PLACED WITHIN PROPOSED
FOOTING (REFER TO
STRUCTURAL DRAWINGS)
BOLLARD
RESTORE DISTURBED
CONCRETE CURB FROM
PROPOSED ELECTRIC SERVICE
FENCE (REFER TO LANDSCAPE DRAWINGS)
REPLACE CONCRETE
SIDEWALK
RESTORE DISTURBED CONCRETE CURB
FROM PROPOSED ELECTRIC SERVICE
REPAVE BIT CONC PAVEMENT
RESTORE DISTURBED
CONCRETE CURB FROM
PROPOSED ELECTRIC
SERVICE
GROUNDING TRIAD (TYP)
(REFER TO ELECTRICAL PLANS)
DEPTHS OF EXISTING UTILITIES UNKNOWN.
CONTRACTOR TO PERFORM TEST PITS WHERE
PROPOSED CONDUIT WILL CROSS AN EXISTING
UTILITY AND REPORT TO THE ENGINEER (TYP)
DEPTHS OF EXISTING UTILITIES UNKNOWN.
CONTRACTOR TO PERFORM TEST PITS WHERE
PROPOSED CONDUIT WILL CROSS AN EXISTING
UTILITY AND REPORT TO THE ENGINEER (TYP)
DEPTHS OF EXISTING UTILITIES UNKNOWN.
CONTRACTOR TO PERFORM TEST PITS WHERE
PROPOSED CONDUIT WILL CROSS AN EXISTING
UTILITY AND REPORT TO THE ENGINEER (TYP)
CONTRACTOR TO FIELD VERIFY LOCATION
OF EXISTING ELECTRICAL CONDUIT
REPLACE CONCRETE CURB
REPLACE CONCRETE CURB
WHEELCHAIR RAMP
SEE DETAIL ON
SHEET C-502
TEMPORARY
GENERATOR
DOCKING STATION
HANDHOLE (REFER TO
ELECTRICAL DRAWINGS)
GRAVEL SURFACING (REFER TO
LANDSCAPE PLANS)
RIVER STONE MAINTENANCE STRIP
(REFER TO LANDSCAPE PLANS)
TEMPORARY EXTERIOR DOOR
(REFER TO ARCHITECTURAL PLANS)
REFER TO SHEET E-501
FOR ELECTRIC SERVICE
TRENCHING
REQUIREMENTS
CONDENSING UNIT
ON CONCRETE
EQUIPMENT PAD
(REFER TO HVAC
DRAWINGS AND
EXTERIOR
CONCRETE PAD
DETAIL ON SHEET
S-303)
APPROXIMATE
TRENCH LIMITS
FOR ELECTRIC
SERVICE
APPROXIMATE TRENCH LIMITS
FOR ELECTRIC SERVICE
APPROXIMATE TRENCH LIMITS FOR ELECTRIC SERVICE
APPROXIMATE TRENCH LIMITS
FOR ELECTRIC SERVICE
APPROXIMATE TRENCH LIMITS
FOR ELECTRIC SERVICE
APPROXIMATE
TRENCH LIMITS
FOR ELECTRIC
SERVICE
CONC PAD (REFER TO LANDSCAPE
AND STRUCTURAL DRAWINGS)
8" PVC
MULCHED BED
(REFER TO LANDSCAPE DRAWINGS)
C-102
CIVIL SITE PLAN
THM/ALG
NR
N
00 5' 10'
SCALE: 1" = 5'
1" = 5'
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-101.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
NOTES:
1. CONTRACTOR TO PROVIDE TEMPORARY DRAINAGE CONTROL WHILE DRAINAGE WORK
RELATING TO MANHOLES, CATCH BASINS, AND DRAINAGE PIPING IS IN PROGRESS.
2. COVER AND PROTECT COOLING TOWER WHEN THE COOLING TOWER IS SHUT DOWN
FOR THE HEATING SEASON AND UNCOVER WHEN THE COOLING TOWER IS
OPERATIONAL FOR THE COOLING SEASON. WE SUGGEST THE TOWER BE LOCKED
OUT/TAGGED OUT WHILE THE COVER IS IN PLACE. COORDINATE WHEN THE COVER
SHOULD BE INSTALLED AND REMOVED AND LOCK OUT/TAG OUT REQUIREMENTS
WITH URI.
07/15/202615/2026026
SOD LAWN
SCARIFY SOIL
BETWEEN SUBGRADE
AND PLANTING SOIL
FINISH GRADE
6" MIN TOP SOIL OR PLANTING SOIL
PREPARED SUBGRADE
C-501
CIVIL DETAILS
THM/ALG
NR
NO SCALE
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-5
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-500.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
DEPTH=2'
SILTSACK MANUFACTURED BY:
ACF ENFIRONMENTAL
2831 CARDWELL ROAD
RICHMOND, VIRGINIA 23237
DUMP STRAP
DUMP STRAP
1" REBAR FOR BAG
REMOVAL FROM INLET
SILTSACK ®OR
APPROVED EQUAL
AS
NEEDED
ASNEEDED
EROSION CONTROL BARRIER - GRASS AREAS
NO SCALE
SILTSACK
NO SCALE
PLAN SECTION
WORK ZONE
FLOW WORK ZONE
AREA TO BE
PROTECTED
AREA TO BE
PROTECTED
WOOD STAKES*-TYP.
2"x2"x2'-0"
WOOD STAKES
FOR WATTLES*
STRAW WATTLE
3"
SECTION
WORK ZONE
ISOMETRIC
FLOW
AREA TO BE PROTECTED
WORK ZONE AREA TO BE PROTECTED
FLOW
SAND BAG
STRAW WATTLE 9"
1' MIN
OVERLAP
SANDBAG EVERY 10 FEET ±
STRAW WATTLE
EROSION CONTROL BARRIER - PAVED AREAS
NO SCALE
4" CONC.
8" PROCESSED
GRAVEL SUB-BASE
W.W.F. 6x6 W4xW4
CONCRETE SIDEWALK RESTORATION
NO SCALE
NOTES:
1. INSTALL SILTSACK IN CATCH BASINS DOWNGRADIENT OF PROJECT AREA.
STANDARD
MANHOLE RUNG
A
SECTION A
API
PE
D
IA
4"
M
IN
6"
70"Ø
M U
LT
IP
LE
S
2"
O R
8" A S R
EQ
U
IR
ED
48"Ø
6"
5 1/8"
24"Ø
5"
4"
1/ 4"
P
IP
E D
IA
M
ET
ER
SS CLAMP
GROUT
SECTION B-B
RUBBER BOOT
2 PIPE LENGTH
B
B
FRAME & COVER
FRAME TO BE SET IN FULL BED OF MORTAR
ADJUST TO GRADE WITH NOT MORE THAN 12" OF
BRICK MASONRY OR CONCRETE GRADING RINGS
STANDARD MANHOLE RUNG
(SEE DETAIL BELOW)
24"x48" ECCENTRIC PRECAST
MANHOLE CONE
SPIGOT & BELL REINFORCEMENT
SHALL BE CONNECTED TO
BARREL REINFORCEMENT
FLAT SLAB TOP FOR
SHALLOW MANHOLES
SEAL ALL JOINTS WITH APPROVED
PRE-FORMED GASKET MATERIAL
(SEE SPECIFICATIONS)
MONOLITHIC BASE
TOP STEP TO BE
20" MAX. BELOW
TOP OF FRAME
SHAPE INVERT WITH
CONCRETE FILL (3000 PSI)
COPOLYMER POLYPROPYLENE
PLASTIC 12" GRADE 60 STEEL
REINFORCEMENT
4"
8"
16"
14"
15 716"
48" PRECAST DRAIN MANHOLE
NO SCALE
30"
40"
8"
30" DIA
MINIMUM WEIGHT: 240 LBS.
"D
IA
MINIMUM WEIGHT: 200 LBS.
3"
1/
8"
NOTES:
1. FRAME AND COVER SHALL BE PROVIDED
FROM THE SAME MANUFACTURER.
2. LETTERING SHALL BE CAST INTO COVERS
AS SPECIFIED.
STANDARD MANHOLE COVER
STANDARD MANHOLE FRAME
MANHOLE FRAME & COVER
NO SCALE
*STAKES TO BE SPACED
AT 4-5' O.C.
9"
SOD LAWN
NO SCALE
1 1/2" HMA TOP COURSE
COMPACTED PROCESSED GRAVEL
2 1/2" HMA BINDER COURSE
NOTES:
1. APPLY BITUMINOUS SEALANT ALONG ALL PAVEMENT SAWCUT
LINES AND BUILDING INTERFACE
6"
BITUMINOUS CONCRETE PAVEMENT
NO SCALE
07/15/202615/2026026
C-502
CIVIL DETAILS - 2
THM/ALG
NR
NO SCALE
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -C
-5
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-C-500.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
6" 2'
M
IN
TRENCH WIDTH
(SEE NOTE 3)
"D
6"
NOTES:
1. FOR PIPES LESS THAN 24" IN DIAMETER
THE TRENCH WIDTH SHALL BE 5.0'. FOR
PIPES 24" IN DIAMETER AND GREATER,
TRENCH WIDTH SHALL BE THE PIPE
DIAMETER + 3.0'.
UTILITY WARNING TAPE
MARKED "DRAIN" OR
"SEWER" AS APPROPRIATE
PREVIOUSLY EXCAVATED MATERIAL
8" MAX. STONE DIAMETER
4" CRUSHED STONE
STORM DRAIN
CONTRACTOR TO PROVIDE TRENCH
BOX, SHEETING OR OTHER MEANS
ACCORDING TO OSHA STANDARDS.
THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL SAFETY
REQUIREMENTS ACCORDING TO OSHA.
TYPICAL DRAIN TRENCH SECTION
NO SCALE
7"
6" M
A X
V A R
IE
S
6"
NOTES:
1. CONSTRUCT CURBING IN SECTIONS NOT TO EXCEED 10 FEET IN
LENGTH. NO SECTION SHALL BE LESS THAN 6 FEET IN LENGTH.
PRECAST CONCRETE CURB AND SIDEWALK RESTORATION
NO SCALE
HMA DRIVEWAY/PARKING
PRECAST CONCRETE
R=1"
R=1 4"
4"
PER FT.
EXPANSION JOINT
W/SEALER
HMA SIDEWALK
1' -8
M
IN
8"
EXIST
COMPACTED
GRAVEL BASE
INTERLOCKING DOWEL PIN
#4 REBAR (TYP)
SAWCUT EXISTING HMA
CEM CONC (TYP)
6"
(TYP)
12" COMPACTED PROCESSED GRAVEL
9" M
IN
CEM CONC (TYP)
8" COMPACTED PROCESSED GRAVEL
4" CONC.
1'
MIN
1'
MIN
MATCH EXISTING BASE COURSES
12" MIN GRAVEL SUBBASE SAW CUT EDGE, CLEAN
AND COAT WITH RS-1
EMULSION IMMEDIATELY
PRIOR TO CONSTRUCTING
NEW PAVEMENT
MATCH EXISTING PAVEMENT
TYPE AND THICKNESS
(4" MIN)
EXISTING
UNDISTURBED
BASE COURSE
EXCAVATED TRENCH
(SEE ELECTRICAL DETAILS)
SECTION VIEW
PLAN VIEW
CUT WITH
PAVEMENT SAW LEAVE EXISTING
BASE COURSE
UNDISTURBED
LIMIT OF
EXCAVATED
TRENCH
ROADWAY TRENCH PATCH
NO SCALE
FIN. GRADESLOPE SLOPE
4' -6
4'
-0
6"
1'-6" DIA
4,000 PSI CONCRETE
6" DIA, SCH 40 STEEL PIPE,
CONC FILLED BOLLARD,
PAINT SAFETY YELLOW (TYP)
SLOPE TOP OF CONC
FILL FOR DRAINAGE
6" DIAMETER STEEL BOLLARD
NO SCALE
TYPICAL WHEELCHAIR RAMP
NO SCALE
6.
0'
4.
0'
M
IN
7.
5%
P
RE
F.
8.
0% M
AX
6.5' 6.5'3.0' MIN.
7.5% PREF.
8.0% MAX.7.5% PREF.
8.0% MAX.
EDGE OF ROADWAY
1'
* TOLERANCE FOR CONSTRUCTION 0.5%±
FLUSH SURFACE
"LEVEL LANDING" 1.5%*
SLOPE FOR DRAINAGE
DETECTABLE WARNING PANEL
CEM
CONC
WALK
CEM
CONC
WALK
6" R
EV
EA
L
6' -0
TERMINAL OR CORNER POST ASSEMBLY
10'-0" (TYP)
2' x 1' GALVANIZED STEEL
END STABILIZER BRACKET
2" A
PP
R O
X
BRACE TUBE AT CORNER &
TERMINAL POSTS (TYP)
TENSION BAR (TYP)
TERMINAL STRAPS
AT 12" INTERVALS
CORNER POST OR
TERMINAL POST (3" DIA)
TOP RAIL
TOP OF CHAIN LINK EXPANSION SLEEVE (TYP)
FABRIC 2" DIAMOND MESH
INTERWOVEN WIRE 9 GAUGE TOP &
BOTTOM SELVAGE TWISTED
BOTTOM RAIL (1 21
32" DIA)
2' x 1' GALVANIZED STEEL
LINE STABILIZER BRACKET BRACE BAND
LINE POST (2 12" DIA)
10'-0" (MAX) 10'-0" (MAX)
6' TEMPORARY CHAIN LINK FENCE
NO SCALE
1.
5%
P
RE
F.
1.
6%
M
AX
1.
5%
P
RE
F.
1.
6% M
AX
NOTES:
1. INSTALL URI BRAND SCRIM ON ALL TEMPORARY FENCING.
07/15/202615/2026026
D
D
F2
F1
P1
P1
A1
F2
F1
A1
F2
W1
F1
A1
F2
W1
P1
P2
W2
U1
F4
U2
U1
F2
L4L4
L3
L4
L1
A2
W3
LIMIT OF WORK.
REFER TO CIVIL
DWGS
AX
AX
AX
AX
2' -0
2'
-0
2'-0"
2' -0
2'-0"
R
EF
ER
T
O D
ET
AI
LS
F
O R
PO
ST
S
PA
C
IN
G
4" CLEAR, MAX.
(6) EQUAL PANELS
4" C
LE
AR
M
AX
CL
FENCE POSTS TO
ALIGN WITH
CENTERLINE OF
UTILITY SCREEN POST
EDGE OF SPREAD
FOOTING OF WALL - SEE
STRUCTURAL DWGS
6"
L1
L1L3
L1
L2
L2
CL
A3
P3
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -L
-0
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-L-001.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
L-100
LANDSCAPE MATERIALS AND
LAYOUT PLAN
GH
JF
00 5' 10'
SCALE: 1" = 5'
1" = 5'
TAG DESCRIPTION DETAIL
PAVING
REFER TO CIVIL DWGS FOR PAVING -
RIVER STONE MAINTENANCE STRIP
GRAVEL SURFACING
CONCRETE PAD AT CHAIN LINK GATE. SEE
STRUCTURAL DWGS -
SITE FURNISHINGS
METAL UTILITY SCREEN
METAL LANDSCAPE EDGE
CHAIN LINK FENCE AND GATE
BOLLARD - SEE CIVIL DWGS -
LIGHTING AND ELECTRIC
LIGHT - SEE ELECTRICAL DWGS -
LIGHT SWITCH - SEE ELECTRICAL DWGS -
LIGHT OUTLET - SEE ELECTRICAL DWGS -
GROUNDING TRIAD - SEE ELECTRICAL
DWGS -
PLANTING
LAWN - SEE CIVIL -
EXISTING TREE - DEMO AND REMOVE
STUMP. SEE CIVIL DRAWINGS -
MULCHED BED - 2" THICK -
WALLS AND SLABS
CAST IN PLACE CONCRETE RETAINING
WALL, SEE STRUCTURAL DWGS. -
UTILITY SLAB - SEE STRUCTURAL DWGS -
EXISTING WALL TO REMAIN -
UTILITIES
MANHOLE, SEE CIVIL DWGS -
AREA DRAIN, SEE CIVIL DRAWINGS -
COOLING TOWER - EXISTING TO REMAIN -
TRANSFORMER - SEE ELECTRICAL DWGS -
GENERATOR AND LOAD BANK - SEE
ELECTRICAL DWGS -
AX
A1 1 L-203
A2 2 L-203
A3
F1 1-2 L-200
F2 3 L-203
F3 4 L-203
F4
L1
L2
L3
L4
P1
P2
P3
W1
W2
W3
U1
U2
U3
U4
U5
LAYOUT NOTES:
1. REVIEW DRAWINGS TO DETERMINE THE TOTAL SCOPE AND COORDINATION OF
WORK. EMPLOY A LICENSED SURVEYOR OR REGISTERED CIVIL ENGINEER TO VERIFY
AND LAYOUT GRADES, LINES AND DIMENSIONS SHOWN ON DRAWINGS. VERIFY
EXISTING GRADES AND ELEVATIONS OF ADJACENT SITE CONDITIONS WITH
ELEVATIONS ON DRAWINGS PRIOR TO BEGINNING WORK. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO REPORT DISCREPANCIES TO THE OWNER'S REPRESENTATIVE
IMMEDIATELY AND RECEIVE WRITTEN INSTRUCTIONS PRIOR TO PROCEEDING WITH
CONSTRUCTION.
2. USE ONE SINGLE BENCHMARK FOR WORK.
3. LINES ARE PARALLEL OR PERPENDICULAR TO LINES FROM WHICH THEY ARE
MEASURED UNLESS OTHERWISE NOTED.
4. DIMENSIONS ARE TO FACE OF CURB, WALL FACE, EDGE OR CENTER LINE OF
IMPROVEMENT AS NOTED.
07/15/202615/2026026
07/15/20265/2/2/202602626
L-200
4C/5C L-200
NOTES: SEE 4/L-200 AND 5/L-200
FOR UTILITY SCREEN SUPPORT
STRUCTURE AND PANEL ELEVATIONS
4B/5B L-200
4A/5A L-200
4F/5F L-200
4D/5D L-200
4E/5E L-200
PERFORATED PANELS - FOLDED PERFORATED
POWDERCOATED ALUMINUM PANELS.
MODULE TYPE AND ORIENTATION VARIES.
PANEL ATTACHMENT TABS - MANUFACTURER TO
PROVIDE ENGINEERING FOR SIZE, QUANTITY,
AND LOCATION TO SUPPORT PANELS.
WELD ATTACHMENT TABS TO PANELS.
MANUFACTURER TO COORDINATE WELD
LOCATION WITH PERFORATION PATTERN
BEAM - ALUMINUM 6" X 6" HSS. WELD
ATTACHMENT TABS TO BEAM
ATTACHMENT TAB TO BE FASTENED TO
COLUMN. PROVIDE RUBBER SPACER/WASHER.
CAST IN PLACE CONCRETE WALL WITH
INTEGRAL COLOR AND SANDBLAST
FINISH- SEE STRUCTURAL DWGS.
CONCRETE UTILITY PAD - SEE
STRUCTURAL DWGS.
RIVER STONE MAINTENANCE STRIP
BASE PLATE - WELD TO COLUMN, 14" X
14" X 1" THK ALUMINUM
SITE LUMINAIRE - SEE ELECTRICAL DWGS
FINISH GRADE - SEE CIVIL
ELECTRICAL CONDUIT - SEE ELECTRICAL DWGS
NOTE: UTILITY SCREEN TO BE GROUNDED. REFER TO
ELECTRICAL DWGS. UTILITY SCREEN MANUFACTURER TO
PROVIDE ANCHORAGE REACTIONS PRIOR TO FINAL
DESIGN.
LIGHT SWITCH AND
OUTLET - REFER TO
ELECTRICAL DWGS
FOR LOCATION.
PROVIDE 1/4" GAP BETWEEN PANELS
1-2 L-202
L-201
UTILITY SCREEN COLUMN
BASEPLATE
NTS
CL
14"
CAST IN PLACE
CONCRETE WALL
AND FOUNDATION
COLUMN, TYP.
ALUMINUM, 6" X 6" HSS.
WELD CAP TO TOP OF
MEMBER
BEAM, TYP. - ALUMINUM, 6"
X 6" HSS.
4'-0", TYP.,
UNLESS
NOTED
3'-0"3'-0" 3'-0"3'-0"
NOTE: CONTRACTOR TO COORDINATE ATTACHMENT AND WIRING OF LUMINAIRES,
OUTLET AND SWITCH TO SUPPORT STRUCTURE WITH UTILITY SCREEN MANUFACTURER.
MANUFACTURER TO PROVIDE NECESSARY ACCOMMODATIONS FOR ATTACHMENT OF
LUMINARIES, OUTLET AND SWITCH. REFER TO ELECTRICAL DRAWINGS FOR PRODUCT
DATA ON LUMINAIRES, OUTLET(S), SWITCH(S), AND GROUNDING. 1
L-201
BEAM TO COLUMN
ATTACHMENT
A: 3'-9"
C: 3'-6"
B
0"
CL
CL
CENTERLINE OF COLUMN
CENTERLINE OF BEAM
DIMENSIONS:
A - MEASURED FROM CENTERLINE OF BEAM TO
CENTERLINE OF BEAM
B - MEASURED FROM TOP OF SCREEN TO TOP OF WALL
C - TOP OF WALL TO CENTERLINE OF 1ST BEAM
CL CL
CL
CL
CL
CL
ELEVATION A ELEVATION B ELEVATION C ELEVATION D ELEVATION E ELEVATION F
FINISH GRADE
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -L
-2
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-L-200.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
L-200
LANDSCAPE DETAIL
JF
GH
COLUMN
BEAM
CONCRETE WALL - SEE STRUCTURAL DWGS
PANEL 'C'
ADJACENT
PANEL.
PATTERN
VARIES. SEE
ELEVATIONS.
ATTACHMENT TAB TO BE FASTENED TO
COLUMN. PROVIDE RUBBER
SPACER/WASHER.
WELD ATTACHMENT TABS TO PANELS.
MANUFACTURER TO COORDINATE WELD LOCATION
WITH PERFORATION PATTERN
COLUMN
BEAM
CONCRETE WALL - SEE STRUCTURAL DWGS
PANEL VARIES. PANEL 'A'
SHOWN. REFER TO ELEVATIONS.
ATTACHMENT TAB TO BE FASTENED TO
COLUMN. PROVIDE RUBBER
SPACER/WASHER.
PANEL 'D'
ATTACHMENT TAB TO BE
FASTENED TO COLUMN.
PROVIDE RUBBER
SPACER/WASHER.
ADJACENT
PANEL.
PATTERN
VARIES. SEE
ELEVATIONS.
WELD ATTACHMENT TABS TO
PANELS. MANUFACTURER TO
COORDINATE WELD LOCATION
WITH PERFORATION PATTERN
PROVIDE 14" GAP
BETWEEN
PANELS
PROVIDE 14" GAP
BETWEEN
PANELS
COLUMN
BEAM
CONCRETE WALL - SEE STRUCTURAL DWGS
WELD ATTACHMENT TABS
TO PANELS.
MANUFACTURER TO
COORDINATE WELD
LOCATION WITH
PERFORATION PATTERN
ADJACENT
PANEL.
PATTERN
VARIES. SEE
ELEVATIONS.
PROVIDE 14" GAP
BETWEEN
PANELS
PANEL 'D' PANEL 'A' / 'B' / 'C' PANEL 'E'
BASE PLATE BASE PLATE
BASE PLATE
VARIES.
1" CLEAR MIN.
BEAM - 6X6 ALUMINUM
HSS
WEEP HOLES - 1/2"
DIA, 12" O.C.
BEAM ATTACHMENT TAB -
WELD TO BEAM, FASTEN TO
COLUMN
BEAM ATTACHMENT TAB -
WELD TO BEAM, FASTEN TO
COLUMN
COLUMN CAP -
WELD TO
COLUMN
PANEL ATTACHMENT PLATE -
WELD TO PERFORATED
PANEL, FASTEN TO COLUMN
SCALE: 1' = 1"-0'
PERFORATION PATTERN
7' -8
/8
PANEL 'D' AND 'E': 6'-6"
PANEL 'B': 6'-0"
PANEL 'A' AND 'C': 4'-0"
NOTE:
PATTERN SHOWN FOR REFERENCE ONLY. FINAL PATTERN TBD. MANUFACTURER TO PROVIDE
PERFORATION SIZE AND DENSITY CRITERIA TO DESIGN TEAM BASED ON SCREEN
ENGINEERING; DESIGN TEAM WILL PROVIDE CAD FILE OF PATTERN TO MANUFACTURER. ALL
PANELS TO SHARE SAME PATTERN BUT WITH DIFFERENT EXTENTS
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -L
-2
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-L-200.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
L-201
SCALE: 1' = 1"-0'
BEAM TO COLUMN ATTACHMENT
LANDSCAPE DETAIL
JF
GH
PANEL 'D' PANEL 'A' PANEL 'B' PANEL 'C' PANEL 'E'
PANEL 'D' - CORNER PANEL
316 "
R1" , TYP.
16"
A B C D E F G
1'-01116 "
A= 85.2° B= 145.2° C= 89.1° D= 100.0° E= 124.9° F= 101.2° G= 107.2°
13 16
1'-2 1 16 "
7 3 4 "
4'-0"
PANEL 'A': NON-FOLDED PANEL
6 516 "
8 1 2 "
1'-1
1' -0
1 4
1' -1
11 16
8 1 2 "
A
B
C
D
E
F G
R1", TYP.
PANEL 'B': FOLDED PANEL
OVERALL UNFOLDED LENGTH: 6'-0"
A= 90.0° B= 90.0° C= 108.6° D= 63.3° E= 26.0° F= 71.2° G= 90.0°
8 716 "
7 3 4 " 61
4"
8 1 2 "
A
B C
D
E
R1", TYP.
PANEL 'C': FOLDED PANEL
OVERALL UNFOLDED LENGTH: 4'-0"
A= 101.6° B= 103.6° C= 79.0° D= 76.8° E= 90.0°
OVERALL UNFOLDED LENGTH: 7'-0"
PANEL 'E' - CORNER PANEL
OVERALL UNFOLDED LENGTH: 7'-0"
B C DA
E
F G
H
A= 80.4° B= 92.8° C= 123.3° D= 98.3° E= 93.2° F= 71.2° G= 85.5° H= 100.2°
1 8
9 1 16 "
1'-3 916 "
8"
7 916 "
7 3 4 "
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -L
-2
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-L-200.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
L-202
LANDSCAPE DETAIL
JF
GH
3/4" CRUSHED STONE BASE
SCALE: 1" = 1'-0"
RIVER STONE MAINTENANCE STRIP
4"
COMPACTED SUBGRADE
6"
1-1/2" WASHED RIVER ROCK
CONTINUOUS DRAINAGE
SAND
ADJACENT MATERIAL
VARIES. MAINTENANCE
STRIP SHOWN. SEE PLANS.
2" MIN.
4" MIN.
FILTER FABRIC
6" 3/4" WASHED
CRUSHED STONE
COMPACTED SUBGRADE
FILTER FABRIC
SCALE: 1" = 1'-0"
GRAVEL SURFACING
SCALE: 1" = 1'-0"
METAL LANDSCAPE EDGE
CAST IN PLACE CONCRETE
WALL - SEE STRUCTURAL
DWGS
12" DEEP ALUMINUM
STAKES TO LOCK INTO
PREFORMED LOOPS ON
EDGING
METAL LANDSCAPE EDGE
METAL LANDSCAPE EDGE
STAKES
NOTES:
1. CORNERS - CUT BASE EDGING UP HALFWAY AND FOR A CONTINUOUS CORNER.
2. FOLLOW MANUFACTURER'S INSTRUCTION ON STAKING AND STAKE SPACING
3. USE GRADE TRANSITIONS PER MANUFACTURER'S RECOMMENDATION WHERE
NEEDED.
NOTES:
1. FINAL SIZES AND DIMENSIONS FOR FENCE POSTS, RAILS, FABRICS, CONNECTORS AND FOUNDATION SIZES AND DIMENSIONS ARE TO BE DETERMINED BY THE CONTRACTOR USING THE CHAIN LINK FENCE WIND LOAD GUIDE FOR
THE SELECTION OF LINE POSTS AND LINE POST SPACING.
2. FENCE FRAMEWORK MEMBERS & FITTINGS SHALL BE GALVANIZED STEEL COATED WITH FUSION-BONDED VINYL
COATING TO MATCH FENCE FABRIC COATING
3. REFER TO ELECTRICAL DRAWINGS FOR GROUNDING. CONTRACTOR TO COORDINATE.
EQ
U
AL
EQ
U
AL
L
L
8'-0" MAX, SPACED EVENLY. SEE PLANS.
TIE FENCE FABRIC TO ALL POSTS &
RAILS @ 12" O.C. W/ PVC COATED TIE
WIRES
1-5/8" (1.66" O.D.) TOP RAIL AND
BRACING WITH TRUSS ROD
ASSEMBLY
TOP OF FENCE SHALL BE LEVEL, WHEN
GRADE CHANGES, FENCE SHALL
FOLLOW GRADE
2-1/2" GALV. STEEL
POSTS - CORNER &
TERMINAL
2" GRID - PVC BLACK
COATED CLF FABRIC
SHALL BE 6 GAUGE CORE
CLASS 2B MESH.
BOTTOM RAIL TO
MATCH TOP RAIL
CONCRETE FOUNDATION
COMPACTED GRAVEL SUBBASE
COMPACTED ORDINARY FILL OR
UNDISTURBED SUBGRADE
GALV. STEEL POST CAP
WITH EYE TOP LOOP
CAP
FINISH GRADE
C RAIL
C POST
1 5/8" GALV. STEEL POSTS
WITH GALV. STEEL POST CAP
2"
2"
VARIES. SEE PLANS.
EQUAL
EQUAL
L
HORIZONTAL
BRACE RAIL -
WELD TO
FRAME
C RAIL
1 5/8" GALV. STEEL
POSTS
GATE LATCH:
GALVANIZED STEEL TO
TO MATCH TERMINAL
POST CAP
GATE FRAME:
GALVANIZED
STEEL BLACK
PVC COATED TO
MATCH POSTS
ADJUSTABLE TRUSS
ROD - 38" DIAMETER
MESH FABRIC:
2" GRID - PVC
BLACK COATED
FABRIC
TENSION BAR:
BLACK PVC COATED
GALV. STEEL BAR @
TERMINAL POST (TYP.)
BRACE BANDS:
GALVANIZED STEEL
BLACK PVC COATED
BAND TIE FENCE
FABRIC TO ALL POSTS
& RAILS @ 12" O.C.
(TYP.)
GATE POST:
GALVANIZED STEEL
TERMINAL POSTS
(3.5" DIA. MIN.)
GATE HINGE:
GALVANIZED STEEL
BLACK PVC COATED
TO MATCH POSTS
(TYP.)
GATE POST CAP:
BLACK PVC COATED
GALV. STEEL TO
MATCH TERMINAL
POST CAP
4' -0
6" 6"
CONCRETE FOOTING
6" 4"
EXPANSION JOINT
COMPACTED
GRAVEL
SUBBASE
6"
FENCE POST
CAST IN PLACE
CONCRETE WALL -
SEE STRUCTURAL
DWGS
6"
FENCE OVER TERRA FIRMA GATE OVER CONCRETE SLAB GATE POST ADJACENT TO WALL
8' -0
8' -0
LC
TYPICAL EXTERIOR
SLAB - SEE
STRUCTURAL DWGS
4"
6"
TYPICAL EXTERIOR
SLAB - SEE
STRUCTURAL DWGS
GATE POST WITH WELDED
BASE PLATE - SURFACE
MOUNTED TO SLAB
WHERE FENCE POST IS ON
CONCRETE PAD, PROVIDE
BASEPLATE AND SURFACE
MOUNT, SIMILAR TO GATE
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -L
-2
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-L-200.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
L-203
LANDSCAPE DETAIL
JF
GH
07/15/202615/21 026026
DEMOLISH
CONCRETE PADS
SUPPORTING
PRIMARY SWITCHES
DEMOLISH EXISTING WALL
(FROM SLAB UP). EXTENT OF
DEMOLITION PENDING OWNERS
PROPOSED SCREENWALL.
SELECTIVELY
DEMOLISH
EXISTING PAD,
FOUNDATION,
AND FOOTING
20'-0"±
SAWCUT EXISTING PAD
BEYOND CRACKED PORTION
KEY PLAN
REFERENCE POINT
ADDITIONAL DEMOLITION
OF EXISTING SLAB TO
ACCOMMODATE EXISTING
PIPE, SEE S-301
2'-9"±
2'-6"±
PROJECT
SCOPE
KEY PLAN
REFERENCE
POINT
SD-100
STRUCTURAL DEMOLITION
SITE PLAN
AS SHOWN
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -S
D -1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-SD-100.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
STRUCTURAL DEMOLITION SITE PLAN
SCALE: 1"=5'
DEMOLITION NOTES:
1. COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL, SAFETY AND HEALTH REQUIREMENTS REGARDING THE RENOVATION OR DEMOLITION OF STRUCTURES AND OTHER SITE FEATURES AND RECYCLING OR DISPOSAL OF DEMOLITION DEBRIS, AS APPLICABLE.
2. INSPECT AND DISCUSS WITH OWNERS REPRESENTATIVE CONDITION OF CONSTRUCTION TO BE SELECTIVELY DEMOLISHED. REVIEW AREAS WHERE
EXISTING CONSTRUCTION IS TO REMAIN AND REQUIRES PROTECTION.
3. CONDUCT SELECTIVE DEMOLITION WORK IN A MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF OWNER'S NORMAL OPERATIONS.
PROVIDE MINIMUM OF (2) WEEKS ADVANCE NOTICE TO OWNER OF DEMOLITION ACTIVITIES WHICH WILL IMPACT OWNER'S NORMAL OPERATIONS.
4. MAINTAIN EXISTING UTILITIES, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING DEMOLITION OPERATIONS.
5. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED BEFORE STARTING SELECTIVE DEMOLITION OPERATIONS. PERFORM
LOCK-OUT/TAG-OUT PROCEDURES AS NECESSARY.
6. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQ'D BY NEW CONSTRUCTION AND AS INDICATED. USE METHODS REQ'D
TO COMPLETE THE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS:
7. IF UNANTICIPATED MECHANICAL, ELECTRICAL OR STRUCTURAL ELEMENTS WHICH CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE
ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT TO ENGINEER IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM ENGINEER, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL
JOB PROGRESS.
8. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY AND LEGALLY.
9. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY SELECTIVE DEMOLITION OPERATIONS. RETURN
ADJACENT AREAS TO CONDITION EXISTING BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN.
10. CONTRACTOR OR SUBCONTRACTOR SHALL NOT ACTIVATE OR DEACTIVATE ANY EQUIPMENT OR DEVICES. COORDINATE WITH OWNER.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY AND/OR PERMANENT RELOCATION OF PIPE, CONDUIT AND WIRE, OR OTHER
UTILITIES NECESSARY FOR DEMOLITION OF EXISTING EQUIPMENT, OR INSTALLATION OF NEW STEEL FRAMING.
12. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING NEEDED TO SAFELY PERFORM SELECTIVE DEMOLITION.
13.REFER TO SPECIFICATIONS 028713 HAZARDOUS/UNIVERSAL WASTE MATERIALS MANAGEMENT AND 028433 MANAGEMENT OF ASSUMED
PCB BULK PRODUCT WASTE FOR DETAILS REGARDING PAINT REMOVAL OF PAINTED CONCRETE WALL
14. COORDINATE TIMING OF ALL DEMOLITION WORK WITH ELECTRICAL CONTRACTOR.
MOB, SCP
MOB, JF
00 5' 10'
SCALE: 1" = 5'
KEY PLAN
SCALE: 1"=80'
A
SD-101
B
SD-101
A
SD-101
A
SD-101
B
SD-101
SD-101
STRUCTURAL DEMOLITION
WALL SECTIONS
AS SHOWN
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
:7 /1
4/
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -S
D -1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-SD-100.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
MOB, SCP
MOB, JF
SECTIONA
SD-100 SCALE: 1"=1'-0"
9' -4
6.
G R A D
E V A R
IE
S
4' -0
M
IN
CMU WALL, CONCRETE
FOUNDATION WALL, AND SLAB
TO BE REMOVED FOR
INSTALLATION OF NEW WORK
#5 BAR, 2 PER BLOCK
(TYP.) TO BE REMOVED
9' -4
6.
G R A D
E V A R
IE
S
4' -0
M
IN
CMU WALL AND A PORTION OF
THE CONCRETE FOUNDATION
WALL TO BE REMOVED FOR
INSTALLATION OF NEW WORK
#5 BAR, 2 PER BLOCK
(TYP.) TO BE REMOVED
T/ W
A
LL
8.
SAWCUT AND REMOVE WALL
1'-0" BELOW TOP OF SLAB.
REPAIR REMAINING SURFACE
AS NECESSARY PER REPAIR
DETAILS TO PROVIDE
CONSISTENT SURFACE
1' -0
SECTIONB
SD-100 SCALE: 1"=1'-0"
CONTRACTOR TO
TEMPORARILY SUPPORT
WALL BELOW GRADE FOR
CONSTRUCTION OF NEW
ADJACENT FOUNDATION
PRIMARY 4 WAY SWITCH
PAD, SEE EXTERIOR PAD
DETAIL ON S-303
NEW FACADE
WALL
20'-3"±
23'-11"±
SAW CUT EXISTING SLAB
BEYOND SIGNIFICANT
CRACKING CONTRACTOR
TO VERIFY EXISTING COOLING TOWER
SUPPORT SLAB TO REMAIN
1/2" PREMOLDED JOINT
FILLER WITH SEALENT
GENERATOR
GENERATOR
FUEL TANK
29'-6"±
26'-6"±
KEY PLAN
REFERENCE POINT
CONCRETE EQUIPMENT PAD
FOR CONDENSING UNIT,
SEE EXTERIOR PAD DETAIL
ON S-303 (REFER TO HVAC
DRAWINGS FOR LOCATION)
2'-2"
4' -2
MATCH HEIGHT OF
EXISTING SLAB
T/ WALL
EL 187.00'
T/ WALL
EL 187.00'
T/ EXISTING SLAB
EL 186.00' +/-
T/ SLAB
EL 186.00' +/-
T/ WALL
EL 187.00'
T/ WALL
EL 187.00'
T/ WALL
EL 187.00'
T/ SLAB
EL 186.00' +/-
PROVIDE 2"
WEEPHOLES @
48" OC (TYP)
1/4"/FT SLOPE
1/4"/FT SLOPE
T/ SLAB
EL 186.00' +/-
6" EQUIPMENT PAD,
SEE TYPICAL
EQUIPMENT PAD
DETAIL ON S-303
6" EQUIPMENT PAD,
SEE TYPICAL
EQUIPMENT PAD
DETAIL ON S-303
1/ 4"
/F T
S
LO
PE
T/ WALL
EL 186.00'±
20'-0"±
SEE SHEET S-301 FOR DIMENSIONS
AND TYPICAL EXTERIOR CONCRETE
PAD DETAIL ON S-303 FOR DETAILS
PROVIDE 12" COMPRESSIBLE
FILLER AT INTERFACE OF
SLAB AND FROSTWALL
200KW
LOAD
BANK
PROJECT
SCOPE
KEY PLAN
REFERENCE
POINT
S-100
STRUCTURAL SLAB PLAN
AS SHOWN
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
7/
/2
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -S
-1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-S-100.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
MOB, SCP
MOB, JF
STRUCTURAL SLAB PLAN
SCALE: 1"=5'
PLAN NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS OF EXISTING
STRUCTURAL ELEMENTS AND THEIR RELATIVE LOCATIONS
2. CONTRACTOR TO COORDINATE EQUIPMENT SIZE AND LOCATION
WITH ELECTRICAL DRAWINGS AND EQUIPMENT SPECIFICATIONS
3. SPECIFIC PAD SIZE AND EQUIPMENT LOCATIONS PENDING
SCREEN WALL SELECTION BY OWNER AND INTERACTIONS WITH
EQUIPMENT CLARENCE REQUIREMENTS
4. SCREEN WALL FOUNDATION CANNOT BE PLACED UNTIL SCREEN
WALL SHOP DRAWINGS INCLUDING ANCHORAGE HAVE BEEN
SUBMITTED AND APPROVED. FOUNDATION SUBJECT TO
ADJUSTMENT UNTIL APPROVED ANCHORAGE IS PROVIDED.
00 5' 10'
SCALE: 1" = 5'
KEY PLAN
SCALE: 1"=80'
SCREEN WALL FOUNDATION FINISH NOTES:
1. CONCRETE RETAINING WALL TO HAVE COLOR ADDITIVES AND
ABRASIVE FINISH
2. CONTRACTOR SHALL SUBMIT PRODUCT DATA AND A 6" X 6" SAMPLE(S)
REPRESENTATIVE OF THE SELECTED COLOR ADDITIVES WITH VARYING
DEGREES OF ABRASIVE-BLASTED FINISH FOR APPROVAL BY OWNER'S
REPRESENTATIVE AND LANDSCAPE ARCHITECT.
3. COLOR ADDITIVES: PIGMENT TO BE MANUFACTURED BY DAVIS
COLORS, DAVISCOLORS.COM, CONCENTRATED PIGMENTS SPECIALLY
PROCESSED FOR MIXING INTO CONCRETE AND COMPLYING WITH
ASTM C979, PIGMENT COLOR TBD, AS APPROVED BY OWNER'S
REPRESENTATIVE AND LANDSCAPE ARCHITECT.
4. ABRASIVES: SELECT ABRASIVE AND GRADATION NEEDED TO ACHIEVE
THE APPROVED FINISH. ABRASIVE MUST BE FREE FROM FOREIGN
MATTER. FINE PARTICLES SHALL BE NO SMALLER THAN THOSE
RETAINED ON A #40 MESH SCREEN. IF INDUSTRIAL SAND IS TO BE
USED, WASHED INDUSTRIAL SAND (RIVER SAND) ONLY SHALL BE
ACCEPTED.
6 7
ED-100.1
ELECTRICAL DEMOLITION
SITE PLAN SOUTH
AS SHOWN
THIS DOCUMENT IS RELEASED
TEMPORARILY FOR PROGRESS REVIEW
ONLY. IT IS NOT INTENDED FOR
BIDDING OR CONSTRUCTION PURPOSES.
CONSTRUCTION
DOCUMENTS
MARK DATE DESCRIPTION
Pl ot te d
O n:
Ju l 1
5, 6-
7:
am B y:
R
W ill ou gh by La st S av ed
:7 /1
4/
Ti gh e
B on d:
J:
\R \R
U R I\
C ar ot he rs L ib ra ry
0A
E le ct ri ca l S er vi ce
U pg ra de
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \R
-0
A -E
D -1
.1
.d w g
SCALE:
PROJECT NO:
FILE:
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DATE: JULY 16, 2026
R0318-070A
R0318-070A-ED-100.1.dwg
JLC
Kingston, Rhode Island
Robert L.
Carothers Library Electrical Service Upgrade
University of Rhode Island
RAK, SG
AL, MR
N
ELECTRCAL DEMOLITION SITE PLAN
SCALE: 1"=4'
KEY NOTES:
DEMOLISH EXISTING 208V 500KVA T-14 AND 480V 1500KVA T-13 PAD MOUNT TRANSFORMERS
INCLUDING RESPECTIVE SETS OF CONDUCTORS. REUSE PORTION OF UNDERGROUND CONDUITS FOR
NEW STANDBY GENERATOR DISTRIBUTION.
DEMOLISH GENERATOR AND ASSOCIATED CONDUIT AND CONDUCTORS FROM GENERATOR TO LIBRARY.
DEMOLISH PRIMARY FEEDER CONDUCTORS TO TRANSFORMERS. INTERCEPT AND CLEAN CONDUIT FOR
REUSE.
INTERCEPT AND CLEAN EXISTING SERVICE CONDUITS FOR REUSE. ALL REUSED CONDUITS MUST BE CLEANED TO REMOVE DEBRIS AND VERIFIED CLEAR BY MANDREL TESTING OR EQUIVALENT INSPECTION.
DAMAGED OR BLOCKED CONDUITS MUST BE REPLACED.
DEMOLISH FUEL TANK PIPING.
DEMOLISH TANK AND ASSOCIATED FUEL PIPING.
DISCONNECT AND REMOVE TEMPORARY GENERATOR AND ASSOCIATED CONDUCTORS. TEMPORARY
GENERATOR SHALL BE TURNED OVER TO THE UNIVERSITY.
ED-100.2
00 4' 8'
SCALE: 1" = 4'
DEMOLITION NOTES
1. REFER TO SPECIFICATION 028433 MANAGEMENT OF ASSUMED PCB BULK PRODUCT WASTE FOR DETAILS
REGARDING TRANSFORMER DEMOLITION.
2. DISCONNECT AND REMOVE THE EXISTING ELECTRICAL SERVICES TO FACILITATE THE NEW ELECTRIC SERVICE UPGRADE PROJECT. COORDINATE ALL NECESSARY AND REQUIRED POWER SHUTDOWN(S) AND ACCESS TO THE MAIN ELECTRIC ROOM AND IT'S EQUIPMENT WITH THE OWNER PRIOR TO WORK.
COORDINATE EXACT PHASING OF ALL DEMOLITION WORK WITH THE OWNER PRIOR TO COMMENCEMENT.
WORK MAY NEED TO BE PERFORMED DURING OFF HOURS TO AVOID CONFLICTS TO NORMAL BUILDING
OPERATIONS AND FUNCTIONS.
3. REFER TO SEQUENCE OF CONSTRUCTION PART OF SPECIFICATION 260500 - BASIC ELECTRICAL
REQUIREMENTS PRIOR TO ALL WORK
07/15/2026/15/2026026
TEMPORARY PRIMARY
TRANSFORMER FEEDER.
PROVIDE (1) SET OF 15KV,
#2/0 MV-105. PER URI
MEDIUM VOLTAGE
STANDARDS.
MAIN ELECTRICAL
ROOM. 039
SEE ED-101 FOR
CONTINUATION.
S
P
SEE ED-101 FOR
CONTINUATION.
(3)SETS OF 500KCMIL (XHHW-1)
AND (3) 3/0AWG GROUND IN
(3)4" SCHEDULE 40 PVC
CONDUIT WITH (1) 4" SPARE
CONDUIT
TMP21
TMP41
ED-100.2
ELECTRICAL DEMOLITION
SITE PLAN NORTH
AS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .