RFQ27006881 Life Safety and Fire Suppression Systems Bid Sheet.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- RFQ27006881
- Issued by
- Rhode Island
About this file
This is a bid sheet for Rhode Island's Department of Administration, Division of Capital Asset Management & Maintenance (DCAMM) soliciting fire alarm and fire suppression systems testing, repair, and maintenance services across multiple state facilities. The contract covers quarterly fire alarm testing, quarterly sprinkler testing, labor hours (both regular and overtime), annual/semi-annual specialized testing (kitchen hood systems, fire pump tests, obstruction tests, hydrostatic testing), and emergency on-call response services. Services are required across 11 major facility complexes including Pastore Center, Eleanor Slater-Zambarano Complex, Eleanor Slater-Pastore Complex, DLT Center General Complex, DLT West Warwick & Woonsocket locations, 50 Service Avenue in Warwick, Veteran's Home Complex, Capitol Hill Complex (including Powers Building, State Offices Building, Cannon Building, State House, and related facilities), Shepard Building, OSME Cumberland, and Southern Region facilities (Fire Academy, Bomb Squad, Stedman Government Center). The contract period runs from September 1, 2026 through June 30, 2031 (4 years and 10 months). The bid sheet contains 534 line items with quantities specified for each service and time period, requiring vendors to provide unit pricing and total pricing for each line item, with a grand total due for all testing services across the entire contract period.
The bid submission requires vendors to complete the Excel spreadsheet with unit prices and total prices for all line items and submit the completed bid sheet in the Attach Document section of the OSP (Online Solicitation Platform). Vendors must also include the bid total from the Excel spreadsheet in the Line Item section of OSP. A discount for parts can be offered as a percentage. The bid sheet does not specify response dates, due dates, site visits, bidder's meetings, or award dates within the document itself, as these details would typically be found in the solicitation's main RFQ document (RFQ27006881). All pricing should account for the five-year contract term with services distributed across multiple fiscal years for each facility location.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Alarm and Sprinkler test
BID SHEET
Solictation Number: RFQ27006881 Fire Alarm and Suppression Systems Repair, Inspection, and Maintenance
Attach Spreadsheet in the "Attach Document" Section of OSP. Include Bid total from Excel spreadsheet in the Line Item in OSP.
| Vendor Name: | |
| Contract Period 9/1/2026-6/30/2031 |
Section 1 Subsection 1
PASTORE CENTER
| Pastore Center=Barry Hall-Ben Rush-Cottage 41,42,43-Dmv-Facility Mgr Bldgs #61 & 84, | ||||||
| Harrington Hall-Hazard-Louis Pasteur-Mathias-Trade Shops# 86, 87 & 89 | ||||||
| Simpson Hall-Virks-560 Jefferson Blvd, Warwick, Central Power Plant | ||||||
| Line | Item Description | Term Dates | Quantity | Unit | UNIT Price | Total Price |
| 1 | Quarterly Fire Alarm Testing- Pastore Ctr | 9/1/2026-6/30/2027 | 4 | Quarter | ||
| 2 | Quarterly Fire Alarm Testing- Pastore Ctr | 7/1/2027-6/30/2028 | 4 | Quarter | ||
| 3 | Quarterly Fire Alarm Testing-Pastore Ctr | 7/1/2028-6/30/2029 | 4 | Quarter | ||
| 4 | Quarterly Fire Alarm Testing-Pastore Ctr | 7/1/2029-6/30/2030 | 4 | Quarter | ||
| 5 | Quarterly Fire Alarm Testing-Pastore Ctr | 7/1/2030-6/30/2031 | 4 | Quarter | ||
| 6 | Labor-Fire Alarm-Pastore Ctr | 9/1/2026-6/30/2027 | 100 | Hour | ||
| 7 | Labor-Fire Alarm-Pastore Ctr | 7/1/2027-6/30/2028 | 100 | Hour | ||
| 8 | Labor-Fire Alarm-Pastore Ctr | 7/1/2028-6/30/2029 | 100 | Hour | ||
| 9 | Labor-Fire Alarm-Pastore Ctr | 7/1/2029-6/30/2030 | 100 | Hour | ||
| 10 | Labor-Fire Alarm-Pastore Ctr | 7/1/2030-6/30/2031 | 100 | Hour | ||
| 11 | Overtime-Fire Alarm-Pastore Ctr | 9/1/2026-6/30/2027 | 50 | Hour | ||
| 12 | Overtime-Fire Alarm-Pastore Ctr | 7/1/2027-6/30/2028 | 50 | Hour | ||
| 13 | Overtime-Fire Alarm-Pastore Ctr | 7/1/2028-6/30/2029 | 50 | Hour | ||
| 14 | Overtime-Fire Alarm-Pastore Ctr | 7/1/2029-6/30/2030 | 50 | Hour | ||
| 15 | Overtime-Fire Alarm-Pastore Ctr | 7/1/2030-6/30/2031 | 50 | Hour | ||
| 16 | Emergency Fire Alarm On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour | ||
| 17 | DMV & Virks Annual fire pump test | 9/1/2026-6/30/2027 | 1 | Each | ||
| 18 | DMV & Virks Annual fire pump test | 7/1/2027-6/30/2028 | 1 | Each | ||
| 19 | DMV & Virks Annual fire pump test | 7/1/2028-6/30/2029 | 1 | Each | ||
| 20 | DMV & Virks Annual fire pump test | 7/1/2029-6/30/2030 | 1 | Each | ||
| 21 | DMV & Virks Annual fire pump test | 7/1/2030-6/30/2031 | 1 | Each | ||
| 22 | 5 year obstruction test listed bldg(s) | 9/1/2026-6/30/2031 | 1 | Each | ||
| 50 Service Ave Is Affiliated with Pastore Center | ||||||
| 23 | Quarterly fire alarm testing (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 4 | Quarter | ||
| 24 | Quarterly fire alarm testing (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 4 | Quarter | ||
| 25 | Quarterly fire alarm testing (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 4 | Quarter | ||
| 26 | Quarterly fire alarm testing (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 4 | Quarter | ||
| 27 | Quarterly fire alarm testing (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 4 | Quarter | ||
| 28 | Labor- Fire Alarm (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 100 | Hour | ||
| 29 | Labor-Fire Alarm (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 100 | Hour | ||
| 30 | Labor- Fire Alarm (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 100 | Hour | ||
| 31 | Labor- Fire Alarm (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 100 | Hour | ||
| 32 | Labor-Fire Alarm (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 100 | Hour | ||
| 33 | Overtime-Fire Alarm (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 50 | Hour | ||
| 34 | Overtime-Fire Alarm (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 50 | Hour | ||
| 35 | Overtime-Fire Alarm (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 50 | Hour | ||
| 36 | Overtime-Fire Alarm (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 50 | Hour | ||
| 37 | Overtime-Fire Alarm (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 50 | Hour | ||
| 38 | 5 year obstruction test | 9/1/2026-6/30/2031 | 1 | Each | ||
| 39 | Emergency Fire Alarm On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour |
| Section 1 Subsection 2 | ||||
| Pastore Center=Barry Hall-Ben Rush-Cottage 41,42,43-Dmv-Facility Mgr Bldgs #61 & 84, | ||||
| Harrington Hall-Hazard-Louis Pasteur-Mathias-Trade Shops# 86, 87 & 89 | ||||
| Simpson Hall-Virks-560 Jefferson Blvd, Warwick, Central Power Plant | ||||
| 40 | Quarterly sprinkler testing Pastore Ctr listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 41 | Quarterly sprinkler testing Pastore Ctr listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 42 | Quarterly sprinkler testing Pastore Ctr listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 43 | Quarterly sprinkler testing Pastore Ctr listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 44 | Quarterly sprinkler testing Pastore Ctr listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 45 | Labor-Sprinkler-Pastore Ctr | 9/1/2026-6/30/2027 | 100 | Hour |
| 46 | Labor-Sprinkler-Pastore Ctr | 7/1/2027-6/30/2028 | 100 | Hour |
| 47 | Labor-Sprinkler-Pastore Ctr | 7/1/2028-6/30/2029 | 100 | Hour |
| 48 | Labor-Sprinkler-Pastore Ctr | 7/1/2029-6/30/2030 | 100 | Hour |
| 49 | Labor-Sprinkler-Pastore Ctr | 7/1/2030-6/30/2031 | 100 | Hour |
| 50 | Overtime-Sprinkler-Pastore Ctr | 9/1/2026-6/30/2027 | 50 | Hour |
| 51 | Overtime-Sprinkler-Pastore Ctr | 7/1/2027-6/30/2028 | 50 | Hour |
| 52 | Overtime-Sprinkler-Pastore Ctr | 7/1/2028-6/30/2029 | 50 | Hour |
| 53 | Overtime-Sprinkler-Pastore Ctr | 7/1/2029-6/30/2030 | 50 | Hour |
| 54 | Overtime-Sprinkler-Pastore Ctr | 7/1/2030-6/30/2031 | 50 | Hour |
| 55 | Emergency Sprinkler On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour |
| 56 | Semi-Annual Harrington Hall Kitchen Hood Testing | 9/1/2026-6/30/2027 | 2 | Each |
| 57 | Semi-Annual Harrington Hall Kitchen Hood Testing | 7/1/2027-6/30/2028 | 2 | Each |
| 58 | Semi-Annual Harrington Hall Kitchen Hood Testing | 7/1/2028-6/30/2029 | 2 | Each |
| 59 | Semi-Annual Harrington Hall Kitchen Hood Testing | 7/1/2029-6/30/2030 | 2 | Each |
| 60 | Semi-Annual Harrington Hall Kitchen Hood Testing | 7/1/2030-6/30/2031 | 1 | Each |
| 61 | 5 year obstruction test Pastore Ctr listed bldg(s) | 9/1/2026-6/30/2031 | 1 | Each |
| 62 | Annual fire hydrant flow test | 9/1/2026-6/30/2027 | 1 | Each |
| 63 | Annual fire hydrant flow test | 7/1/2027-6/30/2028 | 1 | Each |
| 64 | Annual fire hydrant flow test | 7/1/2028-6/30/2029 | 1 | Each |
| 65 | Annual fire hydrant flow test | 7/1/2029-6/30/2030 | 1 | Each |
| 66 | Annual fire hydrant flow test | 7/1/2030-6/30/2031 | 1 | Each |
| 67 | One year flow test listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 68 | One year flow test listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 69 | One year flow test listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 70 | One year flow test listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 71 | One year flow test listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| Section 1 Subsection 3A | ||||
| Eleanor Slater-Zambarano Complex | ||||
| Affiliated With DCAMM Eleanor Slater Hospital | ||||
| Eleanor Slater Zambarano Hospital-Water treatment-Waste Water Treatment-Residential Tx Buildings I,II,III- Carpenters Shop | ||||
| 72 | Quarterly fire alarm testing Zambarano listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 73 | Quarterly fire alarm testing Zambarano listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 74 | Quarterly fire alarm testing Zambarano listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 75 | Quarterly fire alarm testing Zambarano listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 76 | Quarterly fire alarm testing Zambarano listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 77 | Labor-fire alarm-Zambarano | 9/1/2026-6/30/2027 | 100 | Hour |
| 78 | Labor-fire alarm-Zambarano | 7/1/2027-6/30/2028 | 100 | Hour |
| 79 | Labor-fire alarm-Zambarano | 7/1/2028-6/30/2029 | 100 | Hour |
| 80 | Labor-fire alarm-Zambarano | 7/1/2029-6/30/2030 | 100 | Hour |
| 81 | Labor-fire alarm-Zambarano | 7/1/2030-6/30/2031 | 100 | Hour |
| 82 | Overtime fire alarm-Zambarano | 9/1/2026-6/30/2027 | 50 | Hour |
| 83 | Overtime fire alarm-Zambarano | 7/1/2027-6/30/2028 | 50 | Hour |
| 84 | Overtime fire alarm-Zambarano | 7/1/2028-6/30/2029 | 50 | Hour |
| 85 | Overtime fire alarm-Zambarano | 7/1/2029-6/30/2030 | 50 | Hour |
| 86 | Overtime fire alarm-Zambarano | 7/1/2030-6/30/2031 | 50 | Hour |
| 87 | Emergency fire alarm On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour |
| Section 1 Subsection 3B | ||||
| Eleanor Slater-Zambarano Complex | ||||
| Affiliated With DCAMM Eleanor Slater Hospital | ||||
| Eleanor Slater Zambarano Hospital-Water treatment-Waste Water Treatment-Residential Tx Buildings I,II,III- Carpenters Shop | ||||
| 88 | Quarterly Sprinkler testing Zambarano listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 89 | Quarterly Sprinkler testing Zambarano listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 90 | Quarterly Sprinkler testing Zambarano listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 91 | Quarterly Sprinkler testing Zambarano listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 92 | Quarterly Sprinkler testing Zambarano listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 93 | One year flow Zambarano listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 94 | One year flow Zambarano listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 95 | One year flow Zambarano listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 96 | One year flow Zambarano listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 97 | One year flow Zambarano listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 98 | Labor-Sprinkler-Zambarano | 9/1/2026-6/30/2027 | 100 | Hour |
| 99 | Labor-Sprinkler-Zambarano | 7/1/2027-6/30/2028 | 100 | Hour |
| 100 | Labor-Sprinkler-Zambarano | 7/1/2028-6/30/2029 | 100 | Hour |
| 101 | Labor-Sprinkler-Zambarano | 7/1/2029-6/30/2030 | 100 | Hour |
| 102 | Labor-Sprinkler-Zambarano | 7/1/2030-6/30/2031 | 100 | Hour |
| 103 | Overtime-Sprinkler-Zambarano | 9/1/2026-6/30/2027 | 50 | Hour |
| 104 | Overtime-Sprinkler-Zambarano | 7/1/2027-6/30/2028 | 50 | Hour |
| 105 | Overtime-Sprinkler-Zambarano | 7/1/2028-6/30/2029 | 50 | Hour |
| 106 | Overtime-Sprinkler-Zambarano | 7/1/2029-6/30/2030 | 50 | Hour |
| 107 | Overtime-Sprinkler-Zambarano | 7/1/2030-6/30/2031 | 50 | Hour |
| 108 | Semi-Annual kitchen hood extinguishing system testing (Pastore & Zambarano Hospitals) | 9/1/2026-6/30/2027 | 2 | Each |
| 109 | Semi-Annual kitchen hood extinguishing system testing ( Pastore & Zambarano Hospitals) | 7/1/2027-6/30/2028 | 2 | Each |
| 110 | Semi-Annual kitchen hood extinguishing system testing (Pastore & Zambarano Hospitals) | 7/1/2028-6/30/2029 | 2 | Each |
| 111 | Semi-Annual kitchen hood extinguishing system testing ( Pastore & Zambarano Hospitals) | 7/1/2029-6/30/2030 | 2 | Each |
| 112 | Semi-Annual kitchen hood extinguishing system testing ( Pastore & Zambarano Hospitals) | 7/1/2030-6/30/2031 | 2 | Each |
| 113 | Annual main drain listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 114 | Annual main drain listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 115 | Annual main drain listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 116 | Annual main drain listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 117 | Annual main drain listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 118 | Annual fire hydrant flow test | 9/1/2026-6/30/2027 | 1 | Each |
| 119 | Annual fire hydrant flow test | 7/1/2027-6/30/2028 | 1 | Each |
| 120 | Annual fire hydrant flow test | 7/1/2028-6/30/2029 | 1 | Each |
| 121 | Annual fire hydrant flow test | 7/1/2029-6/30/2030 | 1 | Each |
| 122 | Annual fire hydrant flow test | 7/1/2030-6/30/2031 | 1 | Each |
| 123 | Quarterly fire department connections listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 124 | Quarterly fire department connections listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 125 | Quarterly fire department connections listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 126 | Quarterly fire department connections listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 127 | Quarterly fire department connections listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 128 | Semi-Annual STAT-X testing (Zambarano elevators) | 9/1/2026-6/30/2027 | 2 | Each |
| 129 | Semi-Annual STAT-X testing (Zambarano elevators) | 7/1/2027-6/30/2028 | 2 | Each |
| 130 | Semi-Annual STAT-X testing (Zambarano elevators) | 7/1/2028-6/30/2029 | 2 | Each |
| 131 | Semi-Annual STAT-X testing (Zambarano elevators) | 7/1/2029-6/30/2030 | 2 | Each |
| 132 | Semi-Annual STAT-X testing (Zambarano elevators) | 7/1/2030-6/30/2031 | 2 | Each |
| 133 | 5 year hydrostatic testing for FDCs ( Benton and Regan only) | 9/1/2026-6/30/2031 | 1 | Each |
| 134 | 5 year replacement of suppression gauges | 9/1/2026-6/30/2031 | 1 | Each |
| 135 | 3 year dry pipe testing | 9/1/2026-6/30/2031 | 1 | Each |
| 136 | 5 year obstruction testing | 9/1/2026-6/30/2031 | 1 | Each |
| 137 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour |
| Section 1 Subsection 3C |
| Eleanor Slater-Pastore Complex |
| Affiliated With DCAMM Eleanor Slater Hospital |
| Eleanor Slater Hospitals-Adolph Meyer, Benton, Regan |
| 138 | Fire Alarm Quarterly Testing listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 139 | Fire Alarm Quarterly Testing listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 140 | Fire Alarm Quarterly Testing listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 141 | Fire Alarm Quarterly Testing listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 142 | Fire Alarm Quarterly Testing listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 143 | Labor-Fire Alarm-listed bldg(s) | 9/1/2026-6/30/2027 | 100 | Hour |
| 144 | Labor-Fire Alarm-listed bldg(s) | 7/1/2027-6/30/2028 | 100 | Hour |
| 145 | Labor-Fire Alarm-listed bldg(s) | 7/1/2028-6/30/2029 | 100 | Hour |
| 146 | Labor-Fire Alarm-listed bldg(s) | 7/1/2029-6/30/2030 | 100 | Hour |
| 147 | Labor-Fire Alarm-listed bldg(s) | 7/1/2030-6/30/2031 | 100 | Hour |
| 148 | Overtime-Fire Alarm-listed bldg(s) | 9/1/2026-6/30/2027 | 50 | Hour |
| 149 | Overtime-Fire Alarm-listed bldg(s) | 7/1/2027-6/30/2028 | 50 | Hour |
| 150 | Overtime-Fire Alarm-listed bldg(s) | 7/1/2028-6/30/2029 | 50 | Hour |
| 151 | Overtime-Fire Alarm-listed bldg(s) | 7/1/2029-6/30/2030 | 50 | Hour |
| 152 | Overtime-Fire Alarm-listed bldg(s) | 7/1/2030-6/30/2031 | 50 | Hour |
| 153 | Quarterly sprinkler testing listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 154 | Quarterly sprinkler testing listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 155 | Quarterly sprinkler testing listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 156 | Quarterly sprinkler testing listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 157 | Quarterly sprinkler testing listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 158 | Labor listed bldg(s) | 9/1/2026-6/30/2027 | 100 | Hour |
| 159 | Labor listed bldg(s) | 7/1/2027-6/30/2028 | 100 | Hour |
| 160 | Labor listed bldg(s) | 7/1/2028-6/30/2029 | 100 | Hour |
| 161 | Labor listed bldg(s) | 7/1/2029-6/30/2030 | 100 | Hour |
| 162 | Labor listed bldg(s) | 7/1/2030-6/30/2031 | 100 | Hour |
| 163 | Overtime listed bldg(s) | 9/1/2026-6/30/2027 | 50 | Hour |
| 164 | Overtime listed bldg(s) | 7/1/2027-6/30/2028 | 50 | Hour |
| 165 | Overtime listed bldg(s) | 7/1/2028-6/30/2029 | 50 | Hour |
| 166 | Overtime listed bldg(s) | 7/1/2029-6/30/2030 | 50 | Hour |
| 167 | Overtime listed bldg(s) | 7/1/2030-6/30/2031 | 50 | Hour |
| 168 | Semi-Annual kitchen hood extingusing system testing (Adolph Meyer and Regan only) | 9/1/2026-6/30/2027 | 2 | Each |
| 169 | Semi-Annual kitchen hood extingusing system testing (Adolph Meyer and Regan only) | 7/1/2027-6/30/2028 | 2 | Each |
| 170 | Semi-Annual kitchen hood extingusing system testing (Adolph Meyer and Regan only) | 7/1/2028-6/30/2029 | 2 | Each |
| 171 | Semi-Annual kitchen hood extingusing system testing (Adolph Meyer and Regan only) | 7/1/2029-6/30/2030 | 2 | Each |
| 172 | Semi-Annual kitchen hood extingusing system testing (Adolph Meyer and Regan only) | 7/1/2030-6/30/2031 | 2 | Each |
| 173 | Annual fire pump flow test (Benton and Regan only) | 9/1/2026-6/30/2027 | 1 | Each |
| 174 | Annual fire pump flow test (Benton and Regan only) | 7/1/2027-6/30/2028 | 1 | Each |
| 175 | Annual fire pump flow test (Benton and Regan only) | 7/1/2028-6/30/2029 | 1 | Each |
| 176 | Annual fire pump flow test (Benton and Regan only) | 7/1/2029-6/30/2030 | 1 | Each |
| 177 | Annual fire pump flow test (Benton and Regan only) | 7/1/2030-6/30/2031 | 1 | Each |
| 178 | Annual main drain listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 179 | Annual main drain listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 180 | Annual main drain listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 181 | Annual main drain listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 182 | Annual main drain listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 183 | Annual fire hydrant listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 184 | Annual fire hydrant listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 185 | Annual fire hydrant listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 186 | Annual fire hydrant listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 187 | Annual fire hydrant listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 188 | Quarterly fire department connections listed bldg(s) | 9/1/2026-6/30/2027 | 4 | Each |
| 189 | Quarterly fire department connections listed bldg(s) | 7/1/2027-6/30/2028 | 4 | Each |
| 190 | Quarterly fire department connections listed bldg(s) | 7/1/2028-6/30/2029 | 4 | Each |
| 191 | Quarterly fire department connections listed bldg(s) | 7/1/2029-6/30/2030 | 4 | Each |
| 192 | Quarterly fire department connections listed bldg(s) | 7/1/2030-6/30/2031 | 4 | Each |
| 193 | Annual fire pump test listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 194 | Annual fire pump test listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 195 | Annual fire pump test listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 196 | Annual fire pump test listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 197 | Annual fire pump test listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 198 | Semi-Annual extingusing system testing (Regan only) | 9/1/2026-6/30/2027 | 2 | Each |
| 199 | Semi-Annual extingusing system testing (Regan only) | 7/1/2027-6/30/2028 | 2 | Each |
| 200 | Semi-Annual extingusing system testing (Regan only) | 7/1/2028-6/30/2029 | 2 | Each |
| 201 | Semi-Annual extingusing system testing (Regan only) | 7/1/2029-6/30/2030 | 2 | Each |
| 202 | Semi-Annual extingusing system testing (Regan only) | 7/1/2030-6/30/2031 | 2 | Each |
| 203 | One year flow test listed bldg(s) | 9/1/2026-6/30/2027 | 1 | Each |
| 204 | One year flow test listed bldg(s) | 7/1/2027-6/30/2028 | 1 | Each |
| 205 | One year flow test listed bldg(s) | 7/1/2028-6/30/2029 | 1 | Each |
| 206 | One year flow test listed bldg(s) | 7/1/2029-6/30/2030 | 1 | Each |
| 207 | One year flow test listed bldg(s) | 7/1/2030-6/30/2031 | 1 | Each |
| 208 | 5 year obstruction testing listed bldg(s) | 9/1/2026-6/30/2031 | 1 | Each |
| 209 | 5 year hydrostatic testing for FDCs ( Benton and Regan only) | 9/1/2026-6/30/2031 | 1 | Each |
| 210 | 5 year replacement of suppression gauges (Benton and Regan only) | 9/1/2026-6/30/2031 | 1 | Each |
| 211 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 1 Subsection 6 | ||||
| Affiliated with DCAMM Pastore Complex | ||||
| DLT- Center General Complex - Six Buildings | ||||
| 1511 Pontiac Avenue, Cranston | ||||
| 212 | Quarterly fire alarm testing (Center General Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 213 | Quarterly fire alarm testing (Center General Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 214 | Quarterly fire alarm testing (Center General Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 215 | Quarterly fire alarm testing (Center General Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 216 | Quarterly fire alarm testing (Center General Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 217 | Labor-Fire Alarm-Center General | 9/1/2026-6/30/2027 | 100 | Hour |
| 218 | Labor-Fire Alarm-Center General | 7/1/2027-6/30/2028 | 100 | Hour |
| 219 | Labor-Fire Alarm-Center General | 7/1/2028-6/30/2029 | 100 | Hour |
| 220 | Labor- Fire Alarm-Center General | 7/1/2029-6/30/2030 | 100 | Hour |
| 221 | Labor-Fire Alarm-Center General | 7/1/2030-6/30/2031 | 100 | Hour |
| 222 | Overtime-Fire Alarm-Center General | 9/1/2026-6/30/2027 | 50 | Hour |
| 223 | Overtime-Fire Alarm-Center General | 7/1/2027-6/30/2028 | 50 | Hour |
| 224 | Overtime-Fire Alarm-Center General | 7/1/2028-6/30/2029 | 50 | Hour |
| 225 | Overtime-Fire Alarm-Center General | 7/1/2029-6/30/2030 | 50 | Hour |
| 226 | Overtime-Fire Alarm-Center General | 7/1/2030-6/30/2031 | 50 | Hour |
| 227 | 5 year obstruction testing (DLT Center General) | 9/1/2026-6/30/2031 | 1 | Each |
| 228 | Emergency Fire Alarm On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 1 Subsection 7 | ||||
| Property is Affiliated with DCAMM Pastore Complex | ||||
| DLT- Center General Complex - Six Buildings | ||||
| 1511 Pontiac Avenue, Cranston | ||||
| 229 | Quarterly sprinkler testing (Center General Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 230 | Quarterly sprinkler testing (Center General Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 231 | Quarterly sprinkler testing (Center General Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 232 | Quarterly sprinkler testing (Center General Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 233 | Quarterly sprinkler testing (Center General Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 234 | Semi-Annual FM200 testing (Center General Complex) | 9/1/2026-6/30/2027 | 2 | Each |
| 235 | Semi-Annual FM200 testing (Center General Complex) | 7/1/2027-6/30/2028 | 2 | Each |
| 236 | Semi-Annual FM200 testing (Center General Complex) | 7/1/2028-6/30/2029 | 2 | Each |
| 237 | Semi-Annual FM200 testing (Center General Complex) | 7/1/2029-6/30/2030 | 2 | Each |
| 238 | Semi-Annual FM200 testing (Center General Complex) | 7/1/2030-6/30/2031 | 2 | Each |
| 239 | One year flow (Center General Complex) | 9/1/2026-6/30/2027 | 1 | Each |
| 240 | One year flow (Center General Complex) | 7/1/2027-6/30/2028 | 1 | Each |
| 241 | One year flow (Center General Complex) | 7/1/2028-6/30/2029 | 1 | Each |
| 242 | One year flow (Center General Complex) | 7/1/2029-6/30/2030 | 1 | Each |
| 243 | One year flow (Center General Complex) | 7/1/2030-6/30/2031 | 1 | Each |
| 244 | Labor-Center General Complex-Sprinkler | 9/1/2026-6/30/2027 | 100 | Hour |
| 245 | Labor-Center General Complex-Sprinkler | 7/1/2027-6/30/2028 | 100 | Hour |
| 246 | Labor-Center General Complex-Sprinkler | 7/1/2028-6/30/2029 | 100 | Hour |
| 247 | Labor-Center General Complex-Sprinkler | 7/1/2029-6/30/2030 | 100 | Hour |
| 248 | Labor-Center General Complex-Sprinkler | 7/1/2030-6/30/2031 | 100 | Hour |
| 249 | Overtime- Center General Complex-Sprinkler | 9/1/2026-6/30/2027 | 50 | Hour |
| 250 | Overtime- Center General Complex-Sprinkler | 7/1/2027-6/30/2028 | 50 | Hour |
| 251 | Overtime- Center General Complex-Sprinkler | 7/1/2028-6/30/2029 | 50 | Hour |
| 252 | Overtime- Center General Complex-Sprinkler | 7/1/2029-6/30/2030 | 50 | Hour |
| 253 | Overtime- Center General Complex-Sprinkler | 7/1/2030-6/30/2031 | 50 | Hour |
| 254 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| 255 | 3 Year Dry System Testing | 7//1/2026-6/30/2029 | 1 | Each |
| 256 | 3 Year Dry System Testing | 7/1/2029-6/30/2032 | 1 | Each |
| 257 | 5 Year Replacement of Suppression Gauges | 9/1/2026-6/30/2031 | 1 | Each |
| Section 1 Subsection 8 | ||||
| 258 | Quarterly fire alarm testing DLT West Warwick & Woonsocket | 9/1/2026-6/30/2027 | 50 | Quarter |
| 259 | Quarterly fire alarm testing DLT West Warwick & Woonsocket | 7/1/2027-6/30/2028 | 50 | Quarter |
| 260 | Quarterly fire alarm testing DLT West Warwick & Woonsocket | 7/1/2028-6/30/2029 | 50 | Quarter |
| 261 | Quarterly fire alarm testing DLT West Warwick & Woonsocket | 7/1/2029-6/30/2030 | 50 | Quarter |
| 262 | Quarterly fire alarm testing DLT West Warwick & Woonsocket | 7/1/2030-6/30/2031 | 50 | Quarter |
| 263 | Labor-Fire Alarm-1330 Main St, West Warwick Office | 9/1/2026-6/30/2027 | 100 | Hour |
| 264 | Labor-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2027-6/30/2028 | 100 | Hour |
| 265 | Labor-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2028-6/30/2029 | 100 | Hour |
| 266 | Labor-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2029-6/30/2030 | 100 | Hour |
| 267 | Labor- Fire Alarm-1330 Main St, West Warwick Office | 7/1/2030-6/30/2031 | 100 | Hour |
| 268 | Overtime-Fire Alarm-1330 Main St, West Warwick Office | 9/1/2026-6/30/2027 | 50 | Hour |
| 269 | Overtime-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2027-6/30/2028 | 50 | Hour |
| 270 | Overtime-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2028-6/30/2029 | 50 | Hour |
| 271 | Overtime-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2029-6/30/2030 | 50 | Hour |
| 272 | Overtime-Fire Alarm-1330 Main St, West Warwick Office | 7/1/2030-6/30/2031 | 50 | Hour |
| 273 | Labor-Fire Alarm-DLT Woonsocket | 9/1/2026-6/30/2027 | 100 | Hour |
| 274 | Labor-Fire Alarm-DLT Woonsocket | 7/1/2027-6/30/2028 | 100 | Hour |
| 275 | Labor-Fire Alarm-DLT Woonsocket | 7/1/2028-6/30/2029 | 100 | Hour |
| 276 | Labor-Fire Alarm-DLT Woonsocket | 7/1/2029-6/30/2030 | 100 | Hour |
| 277 | Labor- Fire Alarm-DLT Woonsocket | 7/1/2030-6/30/2031 | 100 | Hour |
| 278 | Overtime-Fire Alarm-DLT Woonsocket | 9/1/2026-6/30/2027 | 50 | Hour |
| 279 | Overtime-Fire Alarm-DLT Woonsocket | 7/1/2027-6/30/2028 | 50 | Hour |
| 280 | Overtime-Fire Alarm-DLT Woonsocket | 7/1/2028-6/30/2029 | 50 | Hour |
| 281 | Overtime-Fire Alarm-DLT Woonsocket | 7/1/2029-6/30/2030 | 50 | Hour |
| 282 | Overtime-Fire Alarm-DLT Woonsocket | 7/1/2030-6/30/2031 | 50 | Hour |
| 283 | Emergency Fire Alarm On-Call Response for Incident/Repair | 9/1/2026-6/30/31 | 100 | Hour |
| Section 1 Subsection 9 | ||||
| Affiliated with DCAMM Pastore Complex | ||||
| 284 | Quarterly sprinkler testing (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 285 | Quarterly sprinkler testing (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 286 | Quarterly sprinkler testing (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 287 | Quarterly sprinkler testing (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 288 | Quarterly sprinkler testing (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 289 | Annual Flow tests (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 1 | Each |
| 290 | Annual Flow tests (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 1 | Each |
| 291 | Annual Flow tests (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 1 | Each |
| 292 | Annual Flow tests (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 1 | Each |
| 293 | Annual Flow tests (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 1 | Each |
| 294 | BI Annual Test(50 Service Ave,Warwick) Inergen Supression System | 9/1/2026-6/30/2027 | 2 | Each |
| 295 | BI Annual Test(50 Service Ave,Warwick) Inergen Supression System | 7/1/2027-6/30/2028 | 2 | Each |
| 296 | BI Annual Test(50 Service Ave,Warwick) Inergen Supression System | 7/1/2028-6/30/2029 | 2 | Each |
| 297 | BI Annual Test(50 Service Ave,Warwick) Inergen Supression System | 7/1/2029-6/30/2030 | 2 | Each |
| 298 | BI Annual Test(50 Service Ave,Warwick) Inergen Supression System | 7/1/2030-6/30/2031 | 2 | Each |
| 299 | Labor-Sprinkler (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 100 | Hour |
| 300 | Labor-Sprinkler (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 100 | Hour |
| 301 | Labor-Sprinkler (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 100 | Hour |
| 302 | Labor-Sprinkler (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 100 | Hour |
| 303 | Labor-Sprinkler (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 100 | Hour |
| 304 | Overtime-Sprinkler (50 Service Ave,Warwick) | 9/1/2026-6/30/2027 | 50 | Hour |
| 305 | Overtime-Sprinkler (50 Service Ave,Warwick) | 7/1/2027-6/30/2028 | 50 | Hour |
| 306 | Overtime-Sprinkler (50 Service Ave,Warwick) | 7/1/2028-6/30/2029 | 50 | Hour |
| 307 | Overtime-Sprinkler (50 Service Ave,Warwick) | 7/1/2029-6/30/2030 | 50 | Hour |
| 308 | Overtime-Sprinkler (50 Service Ave,Warwick) | 7/1/2030-6/30/2031 | 50 | Hour |
| 309 | 5 year obstruction testing (50 Service Ave.) | 9/1/2026-6/30/2031 | 1 | Each |
| 310 | Emergency Sprinkler On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 1 Subsection 10 | ||||
| DCAMM Veteran's Home | ||||
| 311 | Quarterly fire alarm testing (Veteran’s Home Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 312 | Quarterly fire alarm testing (Veteran’s Home Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 313 | Quarterly fire alarm testing (Veteran’s Home Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 314 | Quarterly fire alarm testing (Veteran’s Home Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 315 | Quarterly fire alarm testing (Veteran’s Home Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 316 | Labor -(Veteran’s Home Complex)-480 Metacom Avenue | 9/1/2026-6/30/2027 | 100 | Hour |
| 317 | Labor -(Veteran’s Home Complex)-480 Metacom Avenue | 7/1/2027-6/30/2028 | 100 | Hour |
| 318 | Labor -(Veteran’s Home Complex)-480 Metacom Avenue | 7/1/2028-6/30/2029 | 100 | Hour |
| 319 | Labor -(Veteran’s Home Complex)-480 Metacom Avenue | 7/1/2029-6/30/2030 | 100 | Hour |
| 320 | Labor -(Veteran’s Home Complex)-480 Metacom Avenue | 7/1/2030-6/30/2031 | 100 | Hour |
| 321 | Overtime-480 Metacom Avenue | 9/1/2026-6/30/2027 | 50 | Hour |
| 322 | Overtime-480 Metacom Avenue | 7/1/2027-6/30/2028 | 50 | Hour |
| 323 | Overtime-480 Metacom Avenue | 7/1/2028-6/30/2029 | 50 | Hour |
| 324 | Overtime-480 Metacom Avenue | 7/1/2029-6/30/2030 | 50 | Hour |
| 325 | Overtime-480 Metacom Avenue | 7/1/2030-6/30/2031 | 50 | Hour |
| 326 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 1 Subsection 11 | ||||
| DCAMM Veteran's Home | ||||
| 327 | Quarterly sprinkler testing (Veteran’s Home Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 328 | Quarterly sprinkler testing (Veteran’s Home Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 329 | Quarterly sprinkler testing (Veteran’s Home Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 330 | Quarterly sprinkler testing (Veteran’s Home Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 331 | Quarterly sprinkler testing (Veteran’s Home Complex) | 7/1/2030-6/30/2031 | 1 | Quarter |
| 332 | 1 year flow & Fire Pump Test (Veteran’s Home Complex) | 9/1/2026-6/30/2027 | 1 | Each |
| 333 | 1 year flow & Fire Pump Test (Veteran’s Home Complex) | 7/1/2027-6/30/2028 | 1 | Each |
| 334 | 1 year flow & Fire Pump Test (Veteran’s Home Complex) | 7/1/2028-6/30/2029 | 1 | Each |
| 335 | 1 year flow & Fire Pump Test (Veteran’s Home Complex) | 7/1/2029-6/30/2030 | 1 | Each |
| 336 | 1 year flow & Fire Pump Test (Veteran’s Home Complex) | 7/1/2030-6/30/2031 | 1 | Each |
| 337 | Overtime- Veteran’s Home Complex | 9/1/2026-6/30/2027 | 50 | Hour |
| 338 | Overtime- Veteran’s Home Complex | 7/1/2027-6/30/2028 | 50 | Hour |
| 339 | Overtime- Veteran’s Home Complex | 7/1/2028-6/30/2029 | 50 | Hour |
| 340 | Overtime- Veteran’s Home Complex | 7/1/2029-6/30/2030 | 50 | Hour |
| 341 | Overtime- Veteran’s Home Complex | 7/1/2030-6/30/2031 | 50 | Hour |
| 342 | BI Annual Ansul Test -1 (one) Dry System and the 6 (six) Denlar Hoods | 9/1/2026-6/30/2027 | 2 | Hour |
| 343 | BI Annual Ansul Test-1 (one) Dry System and the 6 (six) Denlar Hoods | 7/1/2027-6/30/2028 | 2 | Hour |
| 344 | BI Annual Ansul Test-1 (one) Dry System and the 6 (six) Denlar Hoods | 7/1/2028-6/30/2029 | 2 | Hour |
| 345 | BI Annual Ansul Test-1 (one) Dry System and the 6 (six) Denlar Hoods | 7/1/2029-6/30/2030 | 2 | Hour |
| 346 | BI Annual Ansul Test-1 (one) Dry System and the 6 (six) Denlar Hoods | 7/1/2030-6/30/2031 | 2 | Hour |
| 347 | Annual fire hydrant testing (Veteran's Home Complex) | 7/1/2030-6/30/2031 | 1 | Hour |
| 348 | 5 year obstruction testing (Veteran's Home Complex) | 9/1/2026-6/30/2031 | 1 | Each |
| 349 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 1A | ||||
| Capitol Hill Complex | ||||
| Powers Building-State Offices Building-Cannon Building- State House- | ||||
| VMA-State Lab-Bicentennial Building-Cranston Street Armory- Arrigan Center | ||||
| 350 | Quarterly fire alarm testing (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 351 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 352 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 353 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 354 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 355 | Quarterly sprinkler testing (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 356 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 357 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 358 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 359 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 360 | Labor-Capitol Hill Complex Alarm | 9/1/2026-6/30/2027 | 100 | Hour |
| 361 | Labor-Capitol Hill Complex Alarm | 7/1/2027-6/30/2028 | 100 | Hour |
| 362 | Labor-Capitol Hill Complex Alarm | 7/1/2028-6/30/2029 | 100 | Hour |
| 363 | Labor-Capitol Hill Complex Alarm | 7/1/2029-6/30/2030 | 100 | Hour |
| 364 | Labor-Capitol Hill Complex Alarm | 7/1/2030-6/30/2031 | 100 | Hour |
| 365 | Overtime-Capitol Hill Complex Alarm | 9/1/2026-6/30/2027 | 50 | Hour |
| 366 | Overtime-Capitol Hill Complex Alarm | 7/1/2027-6/30/2028 | 50 | Hour |
| 367 | Overtime-Capitol Hill Complex Alarm | 7/1/2028-6/30/2029 | 50 | Hour |
| 368 | Overtime-Capitol Hill Complex Alarm | 7/1/2029-6/30/2030 | 50 | Hour |
| 369 | Overtime-Capitol Hill Complex Alarm | 7/1/2030-6/30/2031 | 50 | Hour |
| 370 | BI Annual Test Inergen Supression System | 9/1/2026-6/30/2027 | 2 | Each |
| 371 | BI Annual Test Inergen Supression System | 7/1/2027-6/30/2028 | 2 | Each |
| 372 | BI Annual Test Inergen Supression System | 7/1/2028-6/30/2029 | 2 | Each |
| 373 | BI Annual Test Inergen Supression System | 7/1/2029-6/30/2030 | 2 | Each |
| 374 | BI Annual Test Inergen Supression System | 7/1/2030-6/30/2031 | 2 | Each |
| 375 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 1B/1C | ||||
| Capitol Hill Complex | ||||
| Powers Building-State Offices Building-Cannon Building- State House- | ||||
| VMA-State Lab-Bicentennial Building-Cranston Street Armory- Arrigan Center | ||||
| 376 | Quarterly sprinkler testing (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 377 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 378 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 379 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 380 | Quarterly sprinkler testing (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 381 | Quarterly fire alarm testing (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 382 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 383 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 384 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 385 | Quarterly fire alarm testing (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 386 | Annual fire pump test (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 1 | Each |
| 387 | Annual fire pump test (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 1 | Each |
| 388 | Annual fire pump test (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 1 | Each |
| 389 | Annual fire pump test (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 1 | Each |
| 390 | Annual fire pump test (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 1 | Each |
| 391 | Annual Flow tests (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 1 | Each |
| 392 | Annual Flow tests (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 1 | Each |
| 393 | Annual Flow tests (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 1 | Each |
| 394 | Annual Flow tests (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 1 | Each |
| 395 | Annual Flow tests (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 1 | Each |
| 396 | Labor- (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 100 | Hour |
| 397 | Labor- (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 100 | Hour |
| 398 | Labor- (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 100 | Hour |
| 399 | Labor- (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 100 | Hour |
| 400 | Labor- (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 100 | Hour |
| 401 | Overtime- (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 50 | Hour |
| 402 | Overtime- (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 50 | Hour |
| 403 | Overtime- (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 50 | Hour |
| 404 | Overtime- (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 50 | Hour |
| 405 | Overtime- (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 50 | Hour |
| 406 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 50 | Hour |
| Section 2 Subsection 1D | ||||
| 407 | BI Annual Ansul Test (Powers Building Cafeteria) | 9/1/2026-6/30/2027 | 2 | Each |
| 408 | BI Annual Ansul Test (Powers Building Cafeteria) | 7/1/2027-6/30/2028 | 2 | Each |
| 409 | BI Annual Ansul Test (Powers Building Cafeteria) | 7/1/2028-6/30/2029 | 2 | Each |
| 410 | BI Annual Ansul Test (Powers Building Cafeteria) | 7/1/2029-6/30/2030 | 2 | Each |
| 411 | BI Annual Ansul Test (Powers Building Cafeteria) | 7/1/2030-6/30/2031 | 2 | Each |
| 412 | BI Annual Ansul Test (State House Cafeteria) | 9/1/2026-6/30/2027 | 2 | Each |
| 413 | BI Annual Ansul Test (State House Cafeteria) | 7/1/2027-6/30/2028 | 2 | Each |
| 414 | BI Annual Ansul Test (State House Cafeteria) | 7/1/2028-6/30/2029 | 2 | Each |
| 415 | BI Annual Ansul Test (State House Cafeteria) | 7/1/2029-6/30/2030 | 2 | Each |
| 416 | BI Annual Ansul Test (State House Cafeteria) | 7/1/2030-6/30/2031 | 2 | Each |
| 417 | BI Annual Test (Inergen Supression System) | 9/1/2026-6/30/2027 | 2 | Each |
| 418 | BI Annual Test (Inergen Supression System) | 7/1/2027-6/30/2028 | 2 | Each |
| 419 | BI Annual Test (Inergen Supression System) | 7/1/2028-6/30/2029 | 2 | Each |
| 420 | BI Annual Test (Inergen Supression System) | 7/1/2029-6/30/2030 | 2 | Each |
| 421 | BI Annual Test (Inergen Supression System) | 7/1/2030-6/30/2031 | 2 | Each |
| 422 | Labor- (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 100 | Hour |
| 423 | Labor- (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 100 | Hour |
| 424 | Labor- (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 100 | Hour |
| 425 | Labor- (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 100 | Hour |
| 426 | Labor- (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 100 | Hour |
| 427 | Overtime- (Capitol Hill Complex) | 9/1/2026-6/30/2027 | 50 | Hour |
| 428 | Overtime- (Capitol Hill Complex) | 7/1/2027-6/30/2028 | 50 | Hour |
| 429 | Overtime- (Capitol Hill Complex) | 7/1/2028-6/30/2029 | 50 | Hour |
| 430 | Overtime- (Capitol Hill Complex) | 7/1/2029-6/30/2030 | 50 | Hour |
| 431 | Overtime- (Capitol Hill Complex) | 7/1/2030-6/30/2031 | 50 | Hour |
| 432 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 1E Shepard Building | ||||
| 433 | Quarterly sprinkler testing (Shepard Building) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 434 | Quarterly sprinkler testing (Shepard Building) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 435 | Quarterly sprinkler testing (Shepard Building) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 436 | Quarterly sprinkler testing (Shepard Building) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 437 | Quarterly sprinkler testing (Shepard Building) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 438 | Quarterly fire alarm testing (Shepard Complex) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 439 | Quarterly fire alarm testing (Shepard Complex) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 440 | Quarterly fire alarm testing (Shepard Complex) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 441 | Quarterly fire alarm testing (Shepard Complex) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 442 | Quarterly fire alarm testing (Shepard Complex) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 443 | Annual fire pump test (Shepard Building) | 9/1/2026-6/30/2027 | 1 | Each |
| 444 | Annual fire pump test (Shepard Building) | 7/1/2027-6/30/2028 | 1 | Each |
| 445 | Annual fire pump test (Shepard Building) | 7/1/2028-6/30/2029 | 1 | Each |
| 446 | Annual fire pump test (Shepard Building) | 7/1/2029-6/30/2030 | 1 | Each |
| 447 | Annual fire pump test (Shepard Building) | 7/1/2030-6/30/2031 | 1 | Each |
| 448 | Annual Flow tests (Shepard Building) | 9/1/2026-6/30/2027 | 1 | Each |
| 449 | Annual Flow tests (Shepard Building) | 7/1/2027-6/30/2028 | 1 | Each |
| 450 | Annual Flow tests (Shepard Building) | 7/1/2028-6/30/2029 | 1 | Each |
| 451 | Annual Flow tests (Shepard Building) | 7/1/2029-6/30/2030 | 1 | Each |
| 452 | Annual Flow tests (Shepard Building) | 7/1/2030-6/30/2031 | 1 | Each |
| 453 | Labor- (Shepard Building) | 9/1/2026-6/30/2027 | 100 | Hour |
| 454 | Labor- (Shepard Building) | 7/1/2027-6/30/2028 | 100 | Hour |
| 455 | Labor- (Shepard Building) | 7/1/2028-6/30/2029 | 100 | Hour |
| 456 | Labor- (Shepard Building) | 7/1/2029-6/30/2030 | 100 | Hour |
| 457 | Labor- (Shepard Building) | 7/1/2030-6/30/2031 | 100 | Hour |
| 458 | Overtime- (Shepard Building) | 9/1/2026-6/30/2027 | 50 | Hour |
| 459 | Overtime- (Shepard Building) | 7/1/2027-6/30/2028 | 50 | Hour |
| 460 | Overtime- (Shepard Building) | 7/1/2028-6/30/2029 | 50 | Hour |
| 461 | Overtime- (Shepard Building) | 7/1/2029-6/30/2030 | 50 | Hour |
| 462 | Overtime- (Shepard Building) | 7/1/2030-6/30/2031 | 50 | Hour |
| 463 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 1F OSME Cumberland | ||||
| 464 | Quarterly sprinkler testing (OSME Cumberland) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 465 | Quarterly sprinkler testing (OSME Cumberland) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 466 | Quarterly sprinkler testing (OSME Cumberland) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 467 | Quarterly sprinkler testing (OSME Cumberland) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 468 | Quarterly sprinkler testing (OSME Cumberland) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 469 | Quarterly fire alarm testing (OSME Cumberland) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 470 | Quarterly fire alarm testing (OSME Cumberland) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 471 | Quarterly fire alarm testing (OSME Cumberland) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 472 | Quarterly fire alarm testing (OSME Cumberland) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 473 | Quarterly fire alarm testing (OSME Cumberland) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 474 | Annual fire pump test (OSME Cumberland) | 9/1/2026-6/30/2027 | 1 | Each |
| 475 | Annual fire pump test (OSME Cumberland) | 7/1/2027-6/30/2028 | 1 | Each |
| 476 | Annual fire pump test (OSME Cumberland) | 7/1/2028-6/30/2029 | 1 | Each |
| 477 | Annual fire pump test (OSME Cumberland) | 7/1/2029-6/30/2030 | 1 | Each |
| 478 | Annual fire pump test (OSME Cumberland) | 7/1/2030-6/30/2031 | 1 | Each |
| 479 | Annual Flow tests (OSME Cumberland) | 9/1/2026-6/30/2027 | 1 | Each |
| 480 | Annual Flow tests (OSME Cumberland) | 7/1/2027-6/30/2028 | 1 | Each |
| 481 | Annual Flow tests (OSME Cumberland) | 7/1/2028-6/30/2029 | 1 | Each |
| 482 | Annual Flow tests (OSME Cumberland) | 7/1/2029-6/30/2030 | 1 | Each |
| 483 | Annual Flow tests (OSME Cumberland) | 7/1/2030-6/30/2031 | 1 | Each |
| 484 | Labor- (OSME Cumberland) | 9/1/2026-6/30/2027 | 100 | Hour |
| 485 | Labor- (OSME Cumberland) | 7/1/2027-6/30/2028 | 100 | Hour |
| 486 | Labor- (OSME Cumberland) | 7/1/2028-6/30/2029 | 100 | Hour |
| 487 | Labor- (OSME Cumberland) | 7/1/2029-6/30/2030 | 100 | Hour |
| 488 | Labor- (OSME Cumberland) | 7/1/2030-6/30/2031 | 100 | Hour |
| 489 | Overtime- (OSME Cumberland) | 9/1/2026-6/30/2027 | 50 | Hour |
| 490 | Overtime- (OSME Cumberland) | 7/1/2027-6/30/2028 | 50 | Hour |
| 491 | Overtime- (OSME Cumberland) | 7/1/2028-6/30/2029 | 50 | Hour |
| 492 | Overtime- (OSME Cumberland) | 7/1/2029-6/30/2030 | 50 | Hour |
| 493 | Overtime- (OSME Cumberland) | 7/1/2030-6/30/2031 | 50 | Hour |
| 494 | Emergency On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 4 | ||||
| Affiliated With DCAMM Pastore Center-Southern Region | ||||
| RI Fire Academy-RI Bomb Squad-Stedman Government Center | ||||
| 495 | Quarterly fire alarm testing (Southern Region) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 496 | Quarterly fire alarm testing (Southern Region) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 497 | Quarterly fire alarm testing (Southern Region) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 498 | Quarterly fire alarm testing (Southern Region) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 499 | Quarterly fire alarm testing (Southern Region) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 500 | Labor-Fire Alarm-Southern Region | 9/1/2026-6/30/2027 | 100 | Hour |
| 501 | Labor-Fire Alarm-Southern Region | 7/1/2027-6/30/2028 | 100 | Hour |
| 502 | Labor-Fire Alarm-Southern Region | 7/1/2028-6/30/2029 | 100 | Hour |
| 503 | Labor-Fire Alarm-Southern Region | 7/1/2029-6/30/2030 | 100 | Hour |
| 504 | Labor-Fire Alarm-Southern Region | 7/1/2030-6/30/2031 | 100 | Hour |
| 505 | Overtime-Fire Alarm-Southern Region | 9/1/2026-6/30/2027 | 50 | Hour |
| 506 | Overtime-Fire Alarm-Southern Region | 7/1/2027-6/30/2028 | 50 | Hour |
| 507 | Overtime-Fire Alarm-Southern Region | 7/1/2028-6/30/2029 | 50 | Hour |
| 508 | Overtime-Fire Alarm-Southern Region | 7/1/2029-6/30/2030 | 50 | Hour |
| 509 | Overtime-Fire Alarm-Southern Region | 7/1/2030-6/30/2031 | 50 | Hour |
| 510 | Emergency Fire Alarm-On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| Section 2 Subsection 5 | ||||
| DCAMM Pastore Center-Southern Region | ||||
| RI Fire Academy-RI Bomb Squad-Stedman Government Center | ||||
| 511 | Quarterly sprinkler testing (Southern Region) | 9/1/2026-6/30/2027 | 4 | Quarter |
| 512 | Quarterly sprinkler testing (Southern Region) | 7/1/2027-6/30/2028 | 4 | Quarter |
| 513 | Quarterly sprinkler testing (Southern Region) | 7/1/2028-6/30/2029 | 4 | Quarter |
| 514 | Quarterly sprinkler testing (Southern Region) | 7/1/2029-6/30/2030 | 4 | Quarter |
| 515 | Quarterly sprinkler testing (Southern Region) | 7/1/2030-6/30/2031 | 4 | Quarter |
| 516 | Annual fire pump test, (Southern Region) | 9/1/2026-6/30/2027 | 1 | Each |
| 517 | Annual fire pump test, (Southern Region) | 7/1/2027-6/30/2028 | 1 | Each |
| 518 | Annual fire pump test, (Southern Region) | 7/1/2028-6/30/2029 | 1 | Each |
| 519 | Annual fire pump test, (Southern Region) | 7/1/2029-6/30/2030 | 1 | Each |
| 520 | Annual fire pump test, (Southern Region) | 7/1/2030-6/30/2031 | 1 | Each |
| 521 | Annual Flow tests (Southern Region) | 9/1/2026-6/30/2027 | 1 | Each |
| 522 | Annual Flow tests (Southern Region) | 7/1/2027-6/30/2028 | 1 | Each |
| 523 | Annual Flow tests (Southern Region) | 7/1/2028-6/30/2029 | 1 | Each |
| 524 | Annual Flow tests (Southern Region) | 7/1/2029-6/30/2030 | 1 | Each |
| 525 | Annual Flow tests (Southern Region) | 7/1/2030-6/30/2031 | 1 | Each |
| 526 | Labor-Sprinkler-(Southern Region) | 9/1/2026-6/30/2027 | 100 | Hour |
| 527 | Labor-Sprinkler-(Southern Region) | 7/1/2027-6/30/2028 | 100 | Hour |
| 528 | Labor-Sprinkler-(Southern Region) | 7/1/2028-6/30/2029 | 100 | Hour |
| 529 | Labor-Sprinkler-(Southern Region) | 7/1/2030-6/30/2031 | 100 | Hour |
| 530 | Overtime-Sprinkler-(Southern Region) | 9/1/2026-6/30/2027 | 50 | Hour |
| 531 | Overtime-Sprinkler-(Southern Region) | 7/1/2027-6/30/2028 | 50 | Hour |
| 532 | Overtime-Sprinkler-(Southern Region) | 7/1/2028-6/30/2029 | 50 | Hour |
| 533 | Overtime-Sprinkler-(Southern Region) | 7/1/2030-6/30/2031 | 50 | Hour |
| 534 | Emergency Sprinkler On-Call Response for Incident/Repair | 9/1/2026-6/30/2031 | 100 | Hour |
| TOTAL AMOUNT FOR TESTING FOR LINES 1 THROUGH 534 | GRAND TOTAL |
Discount for Parts in percentage %
Sheet2
| Yes |
| No |
image1.gif image2.gif
File details come from the government source that posted it. Updated .