RFQ UST Removal_TonysExxon_Final_2019.06.pdf
PDF 40 KB Posted
- Attached to
- Addendum 4 Tony's Exxon UST removal Logan County
- Solicitation number
- ARFQ 0313 DEP1900000091 5
- Issued by
- Lewis County, West Virginia
About this file
This is a Request for Quotation (RFQ) issued by the West Virginia Department of Environmental Protection for underground storage tank (UST) removal services at Tony's Exxon (WV ID# 2302929) located at 4224 Old Logan Road, Henlawson, Logan County, West Virginia. The project involves the excavation and extraction of two 6,000-gallon gasoline USTs and one 8,000-gallon UST along with associated piping and ancillary equipment. Vendors must provide all necessary personnel, labor, materials, and equipment to complete the work, with approximately 100 tons of material requiring removal and disposal. Additional over-excavation may be necessary depending on field screening results and site conditions. A pre-bid meeting was scheduled for June 17, 2019 at 10:00 a.m. at WVDEP Headquarters located at 601 57th Street, SE, Charleston, West Virginia 25304. The vendor must obtain a Right of Entry Agreement from the landowner prior to commencing work and work under the direction of an on-site project manager regarding the extent of excavation.
The scope of work requires vendors to segregate contaminated and non-contaminated soils during UST extraction, conduct field screening, and place all contaminated and uncontaminated soils and debris on 6-mil black plastic to prevent runoff until materials are properly managed. All work must comply with OSHA standards and be performed by a Class B Certified Person as required by West Virginia regulations. Vendors are responsible for all permits, licenses, and associated fees related to the project. Payment to the vendor will be made upon invoice submittal in accordance with the contract terms. The document does not specify a contract award date, performance period, contract term, or pricing structure within the provided excerpt.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tony’s Exxon (WV ID# 2302929) UST Removal
Logan County, West Virginia
STATE OF WEST VIRGINIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
UNDERGROUND STORAGE TANKS
4/15/2019
Table of Contents
1. Definitions/Reference Specifications
2. Project Information
2.1 Pre-bid meeting
2.2 Location/Site Description
2.3 Directions to the site
2.4 Preferred Scope of Work
3. Work Performance Period
4. Contract Term
5. General Requirements
5.1 Desired Services and Mandatory Requirements
5.2 Class B Certified Person
5.3 OSHA
5.4 Inspections
5.5 Personal Protective Equipment (PPE)
5.6 Templates
6. Technical Specifications
6.1. Mobilization and Demobilization
6.2. Labor
6.3. Equipment and Supplies
6.4 Excavation
6.5 Removal and Disposal
6.6 Backfill and Reclamation
7. Payment
4.1 Payment to Vendor
4.2 Invoice Submittals
8. Permits, Licenses and Fees
9. Additional Information and Requirements
9.1 Exposure to Petroleum Contamination and Other Hazardous Materials
9.2 Lab Charges
9.3 Right of Entry
1.0 DEFINITIONS/ REFERENCE SPECIFICATION
1.1 The terms listed below shall have the meanings assigned to them below. Additional definitions can be found in Section 2 of the Department of Environmental Protection’s Standard Specifications for Construction and Reclamation.
1.1.1. “Desired Service" or “Desired Services" means the list of items identified below.
1.1.2. “EPA” refers to the Environmental Protection Agency
1.1.3. “LEL” means Lower Explosive Limit
1.1.4. “PPE” means Personal Protective Equipment
1.1.5. “UST” means Underground Storage Tank
1.1.6. “WVDEP” means West Virginia Department of Environmental Protection
1.1.7. “ASTM” refers to the American Society of Testing and Material Specifications, Latest Edition unless otherwise noted.
1.1.8. “OSHA” shall be understood to mean The Occupational Safety and Health
Administration and the standards set in the Occupational Safety and Health Act of 1970.
1.1.9. “Vendor” shall be understood to mean the successful bidder and or firm or corporation undertaking the execution of the work under the terms of these specifications.
1.1.10. “Agency” means the West Virginia Department of Environmental Protection
1.1.11. “BTEX” means Benzene, Toluene, Ethylbenzene, Xylene
1.1.12. “MTBE” means Methyl Tertiary Butyl Ether
1.1.13. “TBA” means Tert-Butyl Alcohol
1.1.14. “CAGD” means Corrective Action Guidance Document
2.0 PROJECT INFORMATION
2.1 PRE-BID MEETING
A pre-bid meeting will be held at the WVDEP Headquarters located at 601 57th St, SE, Charleston, WV 25304 on Monday, June 17, 2019 @ 10:00am.
2.2 LOCATION/SITE DESCRIPTION
Tony’s Exxon
WV ID# 2302919
4224 Old Logan Road, Henlawson, WV
This project will involve, but is not limited, to removal of abandoned Underground
Storage Tanks (USTs) and associated ancillary equipment.
2.3 DIRECTIONS TO THE SITE
From the U S Post Office in Logan, WV located at 400 Hudgins Street: head north on Hudgins Street toward Railroad Ave. Hudgins Street turns left and becomes Hinchman Street, travel approximately 200 feet and turn right onto Cole Street. Travel approximately 30 feet and turn left onto Bridge Street. Travel approximately 4—feet and turn left onto Dingess Street. Travel approximately 1/10 of a mile and turn right onto Water Street. Travel approximately 2/10 of a mile and turn right onto WV- 10/Old Logan Road. Travel approximately 4 miles to 4224 Old Logan Road, Henlawson, WV.
2.4 PREFERRED SCOPE OF WORK
2.4.1 Ensure a Right of Entry Agreement has been obtained from the land owner prior to the start of the contract.
2.4.2 Excavate and Extraction of UST/Piping from the ground by providing all necessary personnel, labor, materials, equipment and excavator to extract two (2) 6,000-gallon gasoline USTs and one (1) 8,000-gallon UST and associated piping.
Approximately 100 tons of material will require removal and disposal. This is including any additional over excavation depending on field screenings and site conditions. Work with the on-site project manager to determine if and how much excavation is appropriate.
2.4.3 Segregate obviously contaminated and non-contaminated soils during UST extraction, field screen and segregate contaminated and uncontaminated soils. Ensure contaminated and uncontaminated soils/debris is placed on and covered by 6-mil black plastic to prevent runoff of material until soil/debris is properly managed.
2.4.4 UST vapor purging (<10% LEL), cleaning and disposal which shall include the labor, materials, equipment and transportation to purge, clean and dispose of extracted UST and associated piping. UST vapors shall be purged to less than 10% LEL and sludge cleaned from the tank must be stored, transported and disposed of in DOT 17-C drums.
2.4.5 Remove and dispose of contaminated soil, water and other nonhazardous materials by providing the personnel, labor, equipment, DOT 17-C drums, and materials to properly dispose of petroleum contaminated and uncontaminated debris, water Rinsate, product and site soils at an appropriate disposal facility. The vendor will be responsible for the storage, transportation and disposal of all contaminated and uncontaminated materials associated with this work directive.
2.4.6 Perform confirmation sampling which shall be collected at the following locations: four (4) wall samples (one (1) from each pit wall), one (1) tank bottom sample, one (1) sample every fifteen (15) feet along piping runs, and one (1) sample under each fuel dispenser. Samples shall be analyzed for BTEX, MTBE, TBA and Lead using EPA methods 8260B as per Agency CAGD.
2.4.7 Backfill excavated area Provide the necessary labor, material, and equipment to backfill the excavation; including compaction of backfill.
2.4.8 Reclaim disturbed areas by providing labor, material and equipment necessary to reclaim the disturbed UST, piping and associated areas.
2.4.9 A report is to be written and submitted utilizing the WVDEP CAGD templates and shall contain a site assessment report that details the event and contains, at a minimum, the following: sampling procedures, laboratory analysis reports, data tables comparing the results of soil and/or groundwater samples with established standards (CAGD), and conclusions.
3.0 WORK PERFORMANCE PERIOD
The “Contract Period” for this project is 90 days calendar days commencing on the date as defined in the Notice to Proceed letter. This period is defined as the amount of contract time allowed by the WVDEP for substantial completion of the project.
The “Contract Period” shall comply with Standard Specifications for Construction and Reclamation, Section 14 - Determination and Extension of Contract Time.
Work shall not begin at the site until a Notice To Proceed has been issued. All field work must be scheduled with the assigned WVDEP personnel 72 hours prior to work commencing.
4.0 CONTRACT TERM
The “Contract Term” for the project is 3 months commencing on the date as defined in the Notice to Proceed letter. The Contract Term defines the beginning and end dates of the contract and shall remain valid beyond the “Contract Period” for administrative purposes.
5.0 GENERAL REQUIRMENTS
5.1 Desired Services and Mandatory Requirements: Vendor shall provide Agency with the Desired Services listed below. Desired services are for a one-time UST removal event. Desired Services must meet or exceed the mandatory requirements as shown below.
5.1.1 The Vendor shall provide all services to permanently properly close by removal or closure in place one or more underground storage tanks varying in sizes at a single facility as described in the purpose and scope section of this request for quotation.
5.1.2 UST closures shall be in accordance with all Federal and State regulations, and closure guidance provided by the WVDEP.
5.1.3 The successful Vendor must have an individual present at the UST facility to exercise supervisory control over the closure (removal/close in place).
5.2 The Vendor must have a "Class B" WVDEP certified person on site during closures of USTs as required by State Regulations (33CSR30) and WVDEP closure guidance documents. (Vendor must provide "Class B" certification information as directed on Attachment A.)
5.3 Vendor's site essential personnel shall have completed the mandatory 40-hour health and safety training course, with annual refresher, in accordance with the requirements of the Occupational Safety and Health Administration 29CFR 1910.120. (Vendor must provide OSHA training information as directed on Attachment A.)
5.4 WVDEP also reserves the right to inspect the equipment at any time before or after it is delivered to the site. If WVDEP deems the equipment to be unsatisfactory, or if WVDEP determines the equipment to be unsatisfactory in a subsequent inspection, then Vendor shall immediately remove the equipment from the site and obtain replacement equipment that is satisfactory to WVDEP. Frequent breakdowns of the equipment may be cause for finding the equipment unsatisfactory.
5.5 The cost of personal protective equipment (PPE) must be included in the Vendor’s cost for any line item that may expose the worker to any such hazards.
5.5.1 OSHA requires the use of personal protective equipment (PPE) to reduce employee exposure to hazards when engineering and administrative controls are not feasible or effective in reducing these exposures to acceptable levels.
Employers are required to determine if PPE should be used to protect their workers.
5.6 All boring/drilling, monitoring well installation and abandonment activities must be done in accordance with §47CSR59 “Monitoring Well Regulations” and §47CSR60 “Monitoring Well Design Standards”. (Vendor must provide Monitoring Well Driller certification information as directed on Attachment A.)
5.7 Templates are to be used for document submittals.
6.0 TECHNICAL SPECIFICATIONS
6.1 Mobilization and demobilization
This item shall include all transportation cost of equipment to and from site. This item shall be lump sum price. (This item does not include transportation of contaminated liquids to disposal facility or transportation of Direct Push Equipment to and from site.).
(Per lump sum).
6.2 Laborer
This person shall be capable of doing physical tasks such as, but not limited to, sample collection, data collection, tank cleaning, decontamination procedures, and field reconnaissance. Rate includes travel, lodging (if necessary), and per diem (Per hour ).
6.3 Equipment and Supplies
6.3.1. DOT 17-C Drums
This item shall be an approved DOT 17-C 55-gallon drum (Each).
6.3.2 Backhoe Loader (Cat 416 type or equivalent)
This item shall include loader, fuel, operator and all associated operating costs (Per day).
6.3.3 Excavator (Cat 315 type or equivalent)
This item shall include excavator, fuel, operator and all associated operating costs (Per day).
6.3.4 Compact Track Loader (Bobcat T190 type or equivalent)
This item shall include loader, fuel, operator and all associated operating costs (Per day).
6.3.5 Combustible Gas/Oxygen Meter
This item is for the use of a hand held portable fully calibrated Combustible Gas/Oxygen Meter for detecting combustible hydrocarbon gases and oxygen.
Must be capable of detecting LEL (lower explosive limit) and oxygen in percentages. This line item includes meter, calibration kit and all other accessories necessary to accurately detect combustible hydrocarbon gases and percentage of oxygen (Per day).
6.3.6 Organic Vapor Analyzer
This item is for the use of a hand-held portable Photo Ionization Detector (PID).
Must have the standard 10.6 eV lamp and be able to measure volatile organic compounds such as benzene. This line item includes meter, calibration kit and all other accessories necessary to accurately detect volatile organic compounds with 1-PPM detection (Per day).
6.4 Excavation
6.4.1. Cutting and Removal of Asphalt or Concrete
This item shall include all labor, material, equipment, transportation and all other ancillary equipment necessary to cut and remove asphalt or concrete before excavation (Per sq. ft.).
6.4.2 Purge vapors from UST to <10% LEL
This item shall include all certified Class B personnel time, labor, material, equipment, and all other ancillary equipment necessary to purge vapors from the UST to less than 10% LEL (Per each tank).
6.4.3 Excavation and extraction of UST/ Piping From the Ground
This item shall include all certified Class B personnel time, labor, material, equipment, and all other ancillary equipment necessary to excavate and extract the UST and associated piping from the ground (Per 1,000-gallon tank volume).
6.4.4 Cut Opening and Clean Sludges from UST
This item shall include all certified Class B personnel time, labor, material, equipment, DOT drums, and all other ancillary equipment necessary to cut and clean the UST (Per each tank).
6.4.5 Segregate and Stockpile Petroleum Contaminated Soils
This item shall include the segregation of contaminated vs. uncontaminated soils and stockpile contaminated soils/debris on site on 6-mil black plastic and cover with 6-mil black plastic in a manner to prevent runoff of contaminated material. This item shall include all labor, material, equipment and all other ancillary equipment necessary to segregate and stockpile the contaminated soil (Per ton).
6.5 Removal and Disposal
6.5.1 Removal and Disposal of Petroleum contaminated Water, Rinsate and/or Product
This item will include all certified Class B personnel time, labor, equipment (i.e. vacuum truck), materials, manifests and disposal/recycling costs associated with the removal and recycling/disposal of petroleum-contaminated water and/or product. This item also includes water used for decontamination purposes. Does not include transportation cost of these liquids. Transportation costs is listed under 6.5.2. The vendor shall provide approved DOT-17C drums for containing the petroleum contaminated water for recycling/disposal, if needed. This line item will not be paid until vendor provides submittal of proper disposal tickets (Per gallon).
6.5.2 Transportation of Petroleum Contaminated Water, Rinsate, and/or product to disposal facility
This item will include all costs for transporting the petroleum-contaminated liquids from the site to a proper disposal and/or recycling facility (Per mile based upon direct road mileage from the site to the disposal facility).
6.5.3 Dispose/Scrap Cleaned UST
This item shall include all labor, equipment, material, manifests, transportation and disposal/scrap/recycling costs for proper disposal of cleaned UST. This line item will not be paid until vendor provides submittal of proper disposal tickets (Per each tank).
6.5.4 Dispose of Tank Cleaning Sludges
This item shall include all certified Class B personnel time, labor, equipment, materials, manifests and disposal/recycling costs associated with the removal and disposal of tank cleaning sludges. This line item will not be paid until vendor provides submittal of proper disposal tickets (Per approved DOT drum).
6.5.5 Proper Disposal of Non-Hazardous Materials
Load, transport and properly dispose of non-hazardous materials such as broken concrete slabs, piping, etc., at a state approved landfill and supply disposal receipts.
Unit price includes loader operator time, truck driver time, transportation to landfill, landfill-tipping fees and all other cost (including any labor) for loading, transporting and properly disposing of the non-hazardous materials. This line item will not be paid until vendor provides submittal of proper disposal tickets (Per ton).
6.5.6 Disposal of Petroleum-Contaminated Soil at a State Approved Landfill
Load, transport and properly dispose of petroleum-contaminated soil at a state approved landfill and supply manifests, in accordance with all Federal, State and Local laws. Unit price also includes sampling and analysis, loader, loader operator time, trucks, truck driver time, transportation to landfill, landfill-tipping gees and all other cost (including any labor) for loading, transporting and properly disposing of the petroleum contaminated soil. This line item will not be paid until vendor provides submittal of proper disposal tickets (Per ton).
6.5.7 IDW Disposal
This item shall include all personnel time, labor, equipment, materials, transportation, manifests and disposal/recycling costs associated with the removal and disposal of any non-hazardous derived waste associated with assessments (Per approved DOT drum).
6.5.8 Canopy Removal and Disposal
This item shall include all personnel time, labor, equipment, materials, transportation, manifests/disposal tickets with the removal and proper disposal of the canopy (Per each).
6.6 Backfill and Reclamation
6.6.1 Backfill Excavation with Soil or Soil-like Material
This item shall include the amount of clean soil or soil-like material necessary to properly backfill the excavation with five (5) to six (6) feet of compacted material to meet Tier 2 action levels, when necessary. This item shall also include all labor, material, equipment, manifests, and all other ancillary equipment necessary to properly backfill and compact material in the excavation (Per ton).
6.6.2 Backfill Excavation with Crusher Run
This item shall include the amount of crusher run necessary to properly cover the soil or soil like material used in the backfill of the excavation including compaction of backfill material. This item shall also include all labor, material, equipment, manifests, and all other ancillary equipment necessary to properly backfill and compact material in the excavation (Per ton).
6.6.3 Asphalt Disturbed Area
This item shall include all labor, material, equipment, transportation and all other ancillary equipment necessary to asphalt disturbed excavation area. Asphalt area with 2 lifts of 2 inches of wearing 1 asphalt after compaction. Mill edges (Per sq. ft.).
7.0 PAYMENT
7.1 Payment to Vendor
Payment to the vendor will be made on the basis of the items and unit process established in the bid sheet for this Contract.
7.2 Invoice Submittal
The Vendor shall submit an invoice within 30 days after the completion of work and must contain Project Name, Project Number, LUST number (if one has been assigned), WV ID number, performance period (beginning and ending date work was performed). The Notice to Proceed date shall be the beginning of the performance period. The State may retain ten percent (10%) of each invoice –to guarantee that all conditions of the contract have been met.
This retainage may be held for a period of six (6) months. However, final payment (except for any retainage which may be held) will only be made after all work and reports specified in this contract are delivered and accepted by the State. All invoices shall show labor and other expenses incurred during the billing period, work accomplished during the billing period and the work yet to be accomplished. Invoices showing costs (unit prices) not clearly identifiable will not be paid. No payment(s) will be authorized for any work incurred as a result of any error on the part of the Vendor.
8.0 PERMITS, LICENSES, and FEES
8.1 It will be the responsibility of the Vendor to obtain any and all permits necessary to complete the work described in this contract. This includes Federal, State and local permits necessary. No bid item.
9.0 ADDITIONAL INFORMATION & REQUIREMENTS
9.1 Exposure to Petroleum Contamination and Other Hazardous Materials
The State hereby notifies the Vendor that work is to be performed on property where the Vendor’s employees may be exposed to petroleum contamination and other hazardous materials.
9.2 Lab Charges
Lab charges are not a part of this contract. All lab charges shall be direct billed to WVDEP.
It shall be the responsibility of the Vendor to coordinate with the WVDEP contract laboratory to obtain all necessary sample containers, coolers, chain of custody forms, ice, etc., and to deliver the samples to the laboratory.
9.3 Right of Entry
WVDEP will obtain the necessary right of entry from the owner prior to initiating work at the facility.