PSB-25-1 Item 7 Singh Checklist.pdf

PDF 509 KB Posted

Attached to
Open Market Construction-Related Professional Services IL|25-557THA-ENGCO-P-85517
Contract number
25-557THA-ENGCO-P-85517
Issued by
Illinois

About this file

This document is a PSB 25-1 Checklist for a professional engineering services contract for the Tri-State Tollway (I-94/I-294) Plaza Improvements, Phase II project. The prime contractor is Singh & Associates, Inc., and the contract is associated with the Illinois Department of Transportation (IDOT). The checklist evaluates the responsiveness and responsibility of the contractor, including various required submissions and compliance with diversity and veteran-owned business goals.

The contract involves engineering services for highway improvements, with a Disadvantaged Business Enterprise (DBE) goal of 77% and a Veteran-Owned Small Business (VOSB) goal of 3%. The prime contractor, Singh & Associates, will perform 62% of the work, with additional participation from American (4%), Vaughn (5%), and GSG (6%) firms. Key personnel include Carl Gutowski as Project Manager, Brian Doubek as Project Engineer, Vytas Pelegrinias as Roadway Designer, Rashesh Patel as Electrical Designer, and Andrew Walton as QC/QA, all of whom are Illinois Licensed Professional Engineers. The firm is prequalified in Highways (Freeways) and Special Services (Electrical Engineering and Surveying).

View the file

Other files

File Type Posted
2006_Singh_GS-DD_Packet_07212025.pdf PDF
PSB 25-1_Final~1.pdf PDF
2008 Item 9 Voting Tally.pdf PDF
PSB 25-1 AddendumNo2 02212025.pdf PDF
NOA-2011-Lakeshore-3_Signed.pdf PDF
NOA-4988-WBK Engineering-2_Signed.pdf PDF
EM_SPO_DP_2008-CiorbaGroupInc_07312025.pdf PDF
EM_CEI_MB_2008-CiorbaGroupInc_07312025.pdf PDF
2008_FDS_Packet.pdf PDF
IPG Active Registered Vendor Disclosure - Formerly Forms B v.23.1~33.docx DOCX document
PSB 25-1_AddendumNo1-02182025.pdf PDF
NOA-4764-GlobetrottersEngineering-2_Signed.pdf PDF
25.1_VOSB Goal Facilitation.pdf PDF
NOA-4764-GlobetrottersEngineering-1_Signed.pdf PDF
2006_FDS_Packet.pdf PDF
NOA-2012-ThomasEngineering-1_Signed.pdf PDF
NOA-2011-Lakeshore-1_Signed.pdf PDF
PJF_I-25-2008 Item9~1.pdf PDF
I-25-2006 Notice of Award.pdf PDF
2006 Item 7 Voting Tally.pdf PDF
NOA-2011-Lakeshore-2_Signed.pdf PDF
PSB 25-1 AddendumNo3 03062025.pdf PDF
2008_Roderick_GS-DD_Packet_07222025.pdf PDF
Vendor Disclosure - Formerly Forms A-v.24.1.docx DOCX document
PJF_I-25-2006 Item7~1.pdf PDF
2008_PSB25-1_THE RODERICK GROUP_03142025 - ITEM 9 CHECKLIST.pdf PDF
NOA-4988-WBK Engineering-1_Signed.pdf PDF
I-25-2008 Notice of Award.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSB 25-1 Checklist

PSB 25-1

Item 07: I-25-2006 Tri-State Tollway (I-94/I-294), Plaza Improvements, Phase II Engineering Services

SI251- 71

Prime Firm or Team Name:

SINGH & ASSOC., INC.

E-mail:

Required Items

Responsiveness/Responsible Yes, No or N/A Notes Statement of Interest Disclosures (Prime or TM-for each firm) Vendor Disclosure (Formerly Forms A) - (V.24.1) or IPG Active Registered Vendor Disclosure (Formerly Forms B) - (V23.1)

Exhibit F - VOSB - Utilization Plan and Letter of Intent

Firms and %

Exhibit H – DBE - Utilization Plan and Letter of Intent

Firms and %

Cure for Evaluation Yes, No or N/A Notes MUST total 100% Prime %

DBE %

Non-DBE %

SOI Team Grid - Accuracy

VOSB %

Self-Performance 40% (Prime or TM) Exhibit A - Key Personnel PSB # verify resumes are attached

List Key Personnel

Project Manager (IL Licensed Professional Engineer) Project Engineer (IL Licensed Professional Engineer) Roadway Designer (IL Licensed Professional Engineer) Electrical Designer (IL Licensed Professional Engineer) QC/QA (IL Licensed Professional Engineer) IDOT Prequalified Prime or TM - Make comment if not prequalified. Attach prequalified/not prequalified report in eBuilder Highways (Freeways) Prime Special Services (Electrical Engineering) Prime or Subconsultant

Special Services (Surveying) Prime or Subconsultant

Exhibit C _ WL file Prime or TM (each member)

Submitted?

Must be present for Evaluation Yes, No or N/A Notes

Y/N % D/M/WBE Firm? DBE DBE Goal 77.00 VOSB/SDVOSB Firm? VOSB Veteran Goal 3.00

Prime not VOSB

Carl Gutowski

Brian Doubek

Vytas Pelegrimas

Rashesh Patel Andrew Walton

Innldr 3% No U-Plan submitted

Singh 62%, American 4%, Vaughn 5%, GSG 6%, no uplan submitted

Board of Election (date s/be prior to PSB due date) Prime or (Prime or TM-for each firm)

Submitted?

Exhibit D – Availability of Key Project Personnel

Submitted?

DBE DBE Firm:Exhibit E - Partnering for Growth (Mentor Protege)

VOSB VOSB Firm:

Firm's Commitment Signature Submitted?

Terms and Conditions Submitted?

N/A

File details come from the government source that posted it. Updated .