2008 Item 9 Voting Tally.pdf
PDF 224 KB Posted
- Contract number
- 25-557THA-ENGCO-P-85517
- Issued by
- Illinois
About this file
This document is a Consultant Selection Committee report from the Illinois Tollway, dated April 30, 2025, specifically for Item 9 I-25-2008 covering Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355) Plaza Improvements, Phase II Engineering Services. The document details a competitive selection process involving 12 different consulting and engineering firms, with some designated as Disadvantaged Business Enterprises (DBE) and others participating in the P4G program. The selection process involved multiple voting rounds with silent voting by the committee.
The selection process resulted in three top firms being chosen: The Roderick Group, Gasperec Elberts Consulting, LLC/Innleadair LLC, and Epstein, A. & Sons Intern., Inc. The firms were evaluated across multiple rounds, with voting summaries showing their progression. Notably, the firms' DBE and P4G status was tracked, indicating potential preference or requirements for minority or small business participation. The document represents a structured procurement process for engineering services related to infrastructure improvements on two major Illinois tollways, with a focus on transparent and competitive selection of consulting firms.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Selection Date: April 30, 2025
PSB 25-1
Item 9 I-25-2008 Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355), Plaza Improvements; Phase II Engineering Services
Round Voting (Silent) Number Firm DBE P4G Nominated Firms Round 1 Round 2 Round 3
1 Atlas Technical Consultants LLC No No SE3, LLC 5 3 EPSTEIN, A. & SONS INTERN., INC. 1
B.L.A., INC. DBA BOLLINGER, LACH
No Yes Gasperec Elberts Consulting, LLC/Innleadair
LLC 5 5
THE RODERICK GROUP
Bravo Company Engineering
No No
THE RODERICK GROUP
5 6 Gasperec Elberts Consulting, LLC/Innleadair LLC 2
4 CHIN, R. M. & ASSOC., INC. Yes No EPSTEIN, A. & SONS INTERN., INC. 6 5 CIORBA GROUP, INC. No No 6 EPSTEIN, A. & SONS INTERN., INC. No Yes
Gasperec Elberts Consulting, LLC/Innleadair LLC
Yes/Yes No/Yes
GSG Material Testing, Inc. dba the HOH Group, Inc. Yes No
9 MILHOUSE ENG. & CONSTRUCTION, INC. Yes Yes 10 SE3, LLC Yes No 11 SINGH & ASSOC., INC. Yes No Firms Round 1 Round 2 Round 3 12 THE RODERICK GROUP Yes No 1 THE RODERICK GROUP 4
Gasperec Elberts Consulting, LLC/Innleadair LLC 2
EPSTEIN, A. & SONS INTERN., INC.
Consultant Selection Committee
Suggested Firms Nomination
Round
Top 3 Voting Summary
Illinois Tollway
Round 2
File details come from the government source that posted it. Updated .