2008_PSB25-1_THE RODERICK GROUP_03142025 - ITEM 9 CHECKLIST.pdf

PDF 157 KB Posted

Attached to
Open Market Construction-Related Professional Services IL|25-557THA-ENGCO-P-85517
Contract number
25-557THA-ENGCO-P-85517
Issued by
Illinois

About this file

This document is a PSB 25-1 Checklist for engineering services related to the Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355) Plaza Improvements, Phase II. The prime contractor is The Roderick Group, and the project is associated with the Illinois Department of Transportation (IDOT). The checklist evaluates the responsiveness and responsibility of the contractor, including various required submissions and compliance with diversity and vendor disclosure requirements.

The project involves engineering services with a Disadvantaged Business Enterprise (DBE) goal of 65% and a Veteran-Owned Small Business (VOSB) goal of 5%. The team composition includes key personnel such as Christine Watley (Project Manager), Yun Kim (Project Engineer), Matthew Toussaint (Roadway Designer), Peter Stephenson (Electrical Designer), and Carmen Dean (QC/QA), all of whom are licensed Professional Engineers in Illinois. The team breakdown shows the prime contractor (The Roderick Group) at 50%, with subconsultants including Innleadair LLC (5%), Atlas (10%), and GSG (5%), meeting the required 100% allocation and demonstrating compliance with prequalification requirements for highways and special services.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSB 25-1 Checklist

PSB 25-1

Item 09: I-25-2008 Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355), Plaza Improvements, Phase II Engineering Services

SI251- 119

Prime Firm or Team Name:

THE RODERICK GROUP

E-mail:

Required Items

Responsiveness/Responsible Yes, No or N/A Notes Statement of Interest Disclosures (Prime or TM-for each firm) Vendor Disclosure (Formerly Forms A) - (V.24.1) or IPG Active Registered Vendor Disclosure (Formerly Forms B) - (V23.1)

Exhibit F - VOSB - Utilization Plan and Letter of Intent

Firms and %

Exhibit H – DBE - Utilization Plan and Letter of Intent

Firms and %

Cure for Evaluation Yes, No or N/A Notes MUST total 100% Prime %

DBE %

Non-DBE %

SOI Team Grid - Accuracy

VOSB %

Self-Performance 40% (Prime or TM) Exhibit A - Key Personnel PSB # verify resumes are attached

List Key Personnel

Project Manager (IL Licensed Professional Engineer) Project Engineer (IL Licensed Professional Engineer) Roadway Designer (IL Licensed Professional Engineer) Electrical Designer (IL Licensed Professional Engineer) QC/QA (IL Licensed Professional Engineer)

IDOT Prequalified Prime or TM - Make comment if not prequalified. Attach prequalified/not prequalified report in eBuilder

Highways (Freeways) Prime Special Services (Electrical Engineering) Prime or Subconsultant

Special Services (Surveying) Prime or Subconsultant

Exhibit C _ WL file Prime or TM (each member)

Submitted?

Y/N % D/M/WBE Firm? MBE DBE Goal 65.00 VOSB/SDVOSB Firm? No Veteran Goal 5.00

Innleadair LLC 5%

The Rodderick 50% Atlas 10% GSG 5%

50% 15% 30% 5%

Christine Watley, PE, CCM

Yun Kim, PE

Matthew Toussaint, PE

Peter Stephenson, PE

Carmen Dean, PE

INNLEADAIRE IS SHOWING VOSB AND DBE

Must be present for Evaluation Yes, No or N/A Notes Board of Election (date s/be prior to PSB due date) Prime or (Prime or TM-for each firm)

Submitted?

Exhibit D – Availability of Key Project Personnel

Submitted?

DBE DBE Firm:Exhibit E - Partnering for Growth (Mentor Protege)

VOSB VOSB Firm:

Firm's Commitment Signature Submitted?

Terms and Conditions Submitted? Page 7 of TC not Completed

NA NA

NANA

File details come from the government source that posted it. Updated .