PRIME-SUB_FORM_for_Contractors.xls

XLS spreadsheet 38 KB Posted

Attached to
El Portal Vehicular Beach Access Ramp
Solicitation number
26-B-59IF
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for Volusia County, Florida's competitive sealed bid solicitation (ITB 25-B-##XX, Contract C-2014) for the El Portal Vehicular Beach Access Ramp reconstruction project in Daytona Beach Shores. Bidders are required to complete and submit this form as part of their bid package, with failure to do so resulting in a non-responsive bid determination. The form requires prime contractors to identify all proposed subcontractors and assign dollar values and percentage of work for each discipline, including demolition and hauling, site security fencing, excavation and grading, coffer dam and dewatering, sheet pile installation, concrete work, pavement paint and marking, signage, testing, surveying, and any additional disciplines not listed. The total bid amount must be allocated across the prime contractor and all subcontractors, with green-shaded cells requiring manual entry of dollar values and percentages that must total 100 percent. The form will be used to track contractor composition and determine local preference eligibility in accordance with the solicitation requirements.

The form imposes several mandatory requirements on bidders. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any changes to proposed subcontractors during project execution require prior written approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow modifications to the total submitted base bid pricing. The form serves a dual purpose: documenting subcontractor participation for project execution and calculating local preference scoring where applicable. All dollar values entered must align with the total bid price submitted on the Bid Form/Price Sheet, with automatic calculation of percentages to ensure accuracy and compliance with bid requirements.

View the file

Other files

File Type Posted
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx XLSX spreadsheet
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_03.23.2026_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.docx DOCX document
Exhibit_D_-_Construction_Plans_26-B-59IF_-_REVISED_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp_(Addendum_#1_Revision).pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-59IF_-_REVISED_03.10.2026.pdf PDF
El_Portal_Vehicular_Beach_Access_Ramp.pdf PDF
Exhibit_L_-_Installation_Floater_Affidavit_26-B-59IF.docx DOCX document
Exhibit_K_-_Federal_Contract_Provisions_26-B-59IF.pdf PDF
Exhibit_J_-_FDEP_Permit_26-B-59IF.pdf PDF
Exhibit_I_-_Survey_26-B-59IF.pdf PDF
Exhibit_H_-_Geotechnical_Report_26-B-59IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-59IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures_26-B-59IF.pdf PDF
Exhibit_E_-_Technical_Specifications_26-B-59IF.pdf PDF
Exhibit_D_-_Construction_Plans_26-B-59IF.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-59IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-59IF.xls XLS spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-59IF.pdf PDF
Drawings_-_EL_PORTAL.pdf PDF
2026-02-03_Final_Design_Tech_Specs.pdf PDF
4_-_Geotechnical_Report.pdf PDF
3_-_Survey.pdf PDF
1_-_FDEP_CCCL_VO002489_AR_FO.pdf PDF
2026-02-04_Bid_Schedule_-_EL_PORTAL.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Demolition and Hauling$ - 00.00%
Site Security Fencing$ - 00.00%
Excavation Grading and Site Work$ - 00.00%
Coffer Dam and Dewatering$ - 00.00%
Sheet Pile Installation$ - 00.00%
Concrete$ - 00.00%
Pavement Paint and Marking$ - 00.00%
Signage$ - 00.00%
Testing$ - 00.00%
Surveyor$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%