PRIME-SUB_FORM_for_Contractors.xls
XLS spreadsheet 38 KB Posted
- Attached to
- El Portal Vehicular Beach Access Ramp
- Solicitation number
- 26-B-59IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form document issued by Volusia County, Florida for Contract C-2014 under Invitation for Bid 25-B-##XX, requiring all bidders to identify proposed subcontractors and their allocated work percentages for the El Portal Vehicular Beach Access Ramp reconstruction project. Bidders must complete and return the form to avoid non-responsive bid designation. The form requires comprehensive disclosure of all subcontractors proposed to perform work on the project, with the prime contractor responsible for ensuring all subcontractors maintain appropriate licenses. The anticipated subcontractor disciplines identified include demolition and hauling, site security fencing, excavation and grading, cofferdam and dewatering, sheet pile installation, concrete work, pavement paint and marking, signage, testing, and surveying. The form allocates dollar values and percentage allocations across prime and subcontractor work, with the total bid price (including performance and payment bonds if applicable) reconciled to match the bid price sheet submission. All green-shaded cells must be completed with contractor dollar values and work percentages, while other cells calculate automatically, with the total work percentage equaling 100 percent.
The form will be used to track local contractor composition and subcontractor participation; however, the related solicitation indicates no local preference provisions apply due to FEMA funding restrictions. The document does not establish specific set-asides for disadvantaged or small businesses, though federal requirements mandate affirmative contracting efforts with such firms. No incumbent vendors are identified. The estimated project cost is $1,464,420.00, with bidders required to submit a bid bond equal to 5 percent of total bid price and, upon award, provide Payment and Performance Bonds equal to 100 percent of contract price per Florida Statute 255.05. The project is funded through FEMA and subject to Davis-Bacon Act wage standards, domestic material preferences under Florida Statute 255.0993, and compliance with Clean Air Act and Byrd Anti-Lobbying Amendment requirements.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition and Hauling | $ - 0 | 0.00% | |
| Site Security Fencing | $ - 0 | 0.00% | |
| Excavation Grading and Site Work | $ - 0 | 0.00% | |
| Coffer Dam and Dewatering | $ - 0 | 0.00% | |
| Sheet Pile Installation | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Pavement Paint and Marking | $ - 0 | 0.00% | |
| Signage | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| Surveyor | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .