About this file
This is a Prime/Subcontractor Form required by Volusia County, Florida for the El Portal Vehicular Beach Access Ramp reconstruction project (Contract C-2014, ITB 25-B-##XX). Bidders must identify all proposed subcontractors and allocate the total bid price across the prime contractor and each subcontractor by discipline. The anticipated subcontractor disciplines include demolition and hauling, site security fencing, excavation and grading, coffer dam and dewatering, sheet pile installation, concrete, pavement painting and marking, signage, testing, and surveying. The form requires that all green-shaded cells be completed with dollar values and work percentages, with the total percentage equaling 100 percent. Failure to complete and return this form may result in a non-responsive bid. The prime contractor remains responsible for ensuring all subcontractors maintain appropriate licenses, and any changes to subcontractors during project completion require prior written approval from the County Project Manager, though such changes cannot alter the total submitted base bid pricing.
The form will be used to determine local preference and track contractor composition across identified disciplines. Bidders must submit their total bid price, which should match the amount listed on the bid price sheet and include performance and payment bonds if applicable. The form includes blank rows for additional subcontractors whose disciplines are not listed in the anticipated requirements. The County reserves the right to seek clarification regarding subcontractors but will not permit modifications to pricing. This submission requirement applies to a project with an estimated construction cost of $1,464,420.00 and a 150-day completion period, with bids due by April 9, 2026, at 3:00 p.m. through the County's eProcurement Portal.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition and Hauling | $ - 0 | 0.00% | |
| Site Security Fencing | $ - 0 | 0.00% | |
| Excavation Grading and Site Work | $ - 0 | 0.00% | |
| Coffer Dam and Dewatering | $ - 0 | 0.00% | |
| Sheet Pile Installation | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Pavement Paint and Marking | $ - 0 | 0.00% | |
| Signage | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| Surveyor | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |