Sol_P15PS00451_Amd_000002.pdf

PDF 84 KB Posted

Attached to
HANDRAILS FOR USS MAINE MEMORIAL
Solicitation number
P15PS00451
Issued by

About this file

P15PS00451

View the file

Other files

File Type Posted
Clarifications_2.pdf PDF
Sol_P15PS00451_Amd_000005.pdf PDF
Sol_P15PS00451_Amd_000004.pdf PDF
ANC_Railing_Contract_Drawings_(REVISED_SET_032715).pdf PDF
Clarifications.pdf PDF
Sol_P15PS00451_Amd_000003.pdf PDF
Sol_P15PS00451_Amd_000001.pdf PDF
Attachment_6 _G-1.pdf PDF
Attachment_1 _B-1.pdf PDF
Attachment_10 _M-1.pdf PDF
Sol_P15PS00451.pdf PDF
Mast_of_the_Maine_Handrails_Spec.pdf PDF
Attachment_5 _F-1.pdf PDF
Attachment_7 _H-1.pdf PDF
Attachment_2 _C-1.pdf PDF
Attachment_8 _J-1.pdf PDF
ANC_903_120001B_Railing_Contract_Drawings_(SET).pdf PDF
Attachment_4 _E-1.pdf PDF
Attachment_9 _L-1.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Attachment_3 _D-1.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P15PS00451

x x

3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

WA2

Frederick MD 21704 4801A Urbana Pike DOI, NPS, Historic Pres Trng Ctr

PWA

Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting

03/02/2015000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/02/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to make the following clarifications and changes to the

Scope of Work and Specifications and to attach the Pre-Bid Walk through sign in sheet. See attached REVISED SPECIFICATIONS and PRE-BID Sign In Sheet. The clarifications and changes to the Scope of Work and Specifications are as follows:

1. Paragraphs 2.3, 2.4, and 2.6.1 of the specifications are hereby deleted.

2. Paragraph 3.2 of the specification is revised to post spacing to be 6' on center to match the drawings.

3. Paragraph 2.6.2.1 is revised to indicate the direction of the No. 4 satin finish shall be circumferential rather than along the length of the pipe.

4. Section C, 1.2 Scope of Work is modified to add the following: Pipe collars in the

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Sheila Rushlow

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

P15PS00451/000002

same material as the railings shall be provided by the Contractor. The Collars shall be 3/8" thick, with a beveled edge, with an outside diameter 1/2" larger than the diameter of the post hole. The Collars shall be mounted so the top of the collar is flush with the top of the concrete. Collars shall be installed with adhesive if a clean weld joint is not feasible.

5. Section C, 1.2 Scope of Work, Item D is modified to add the following: There shall be no site work performed on Friday, May 22, 2015 or

Memorial Day, Monday, May 25, 2015.

6. Section C, 1.2 Scope of Work is modified to add the following: Farragut Drive will be reconstructed starting in April 2015 and completed in August 2015. The Contractor may have limited or no access to the site via

Farragut Drive. In the event Farragut Drive is completely inaccessible, the Contractor shall access the site via Memorial Drive.

7. Section C, 1.2 Scope of Work is modified to add the following: Contractor shall not be responsible for the existing concrete damage at the four existing post holes where concrete cracks were observed at the 3/10/2015 pre-proposal walkthrough.

8. Section C, 1.2 Scope of Work is modified to add the following: Where the drawings specify 2"

OD pipe, 1 1/2 " nominal dimension pipe which has a 1.9" diameter is acceptable.

Period of Performance: 04/15/2015 to 06/25/2015

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .