Attachment_4 _E-1.pdf

PDF 14 KB Posted

Attached to
HANDRAILS FOR USS MAINE MEMORIAL
Solicitation number
P15PS00451
Issued by

About this file

Section E

View the file

Other files

File Type Posted
Clarifications_2.pdf PDF
Sol_P15PS00451_Amd_000005.pdf PDF
Sol_P15PS00451_Amd_000004.pdf PDF
ANC_Railing_Contract_Drawings_(REVISED_SET_032715).pdf PDF
Clarifications.pdf PDF
Sol_P15PS00451_Amd_000003.pdf PDF
Sol_P15PS00451_Amd_000002.pdf PDF
Sol_P15PS00451_Amd_000001.pdf PDF
Attachment_6 _G-1.pdf PDF
Attachment_1 _B-1.pdf PDF
Attachment_10 _M-1.pdf PDF
Sol_P15PS00451.pdf PDF
Mast_of_the_Maine_Handrails_Spec.pdf PDF
Attachment_5 _F-1.pdf PDF
Attachment_7 _H-1.pdf PDF
Attachment_2 _C-1.pdf PDF
Attachment_8 _J-1.pdf PDF
ANC_903_120001B_Railing_Contract_Drawings_(SET).pdf PDF
Attachment_9 _L-1.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Attachment_3 _D-1.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

SECTION E

INSPECTION AND ACCEPTANCE

E-1

National Park Service Solicitation Number P15PS00451

1. INSPECTION AND ACCEPTANCE

All service and work performed under this contract shall be subject to inspection and acceptance by the designated Contracting Officer's Representative (COR at any time during performance. If the

COR determined that services, work or materials being furnished do not meet the required standards, the Government reserves the right to have the work performed elsewhere, charging the Contractor with costs involved, subject to the provisions of FAR 52.249-8. Final acceptance of all work will be at the work site.

2. INSPECTION OF CONSTRUCTION

(FAR 52.246-12) (AUG 1996)

A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

C. Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

Attachment 4

SECTION E

INSPECTION AND ACCEPTANCE

E-2

National Park Service Solicitation Number P15PS00451

E. The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the

Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The

Contractor shall promptly segregate and remove rejected material from the premises.

G. If the Contractor does not promptly replace or correct rejected work, the Government may--

(1) By contract or otherwise, replace or correct the work and charge the cost to the

Contractor; or

(2) Terminate for default the Contractor's right to proceed.

H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.

Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.