Section_L_Attachment_L-2D.docx

DOCX document 68 KB Posted

Attached to
Research, Engineering, Mission Integration Services (REMIS) Federal contract opportunity
Solicitation number
NNJ17584385R
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

Section L Attachment L-2D

View the file

Other files for this federal contract opportunity

Other files attached to Research, Engineering, Mission Integration Services (REMIS), newest first.
File Type Posted
Section_L_Rev._E.docx DOCX document
SF30_-_Amendment_6_-_Signed.pdf PDF
SF30_-_Amendment_5_-_Signed.pdf PDF
Section_L_Attachment_L-2F_Rev._A.docx DOCX document
Q54_and_higher_Final.docx DOCX document
Section_L_Rev._C.docx DOCX document
REMIS_CPFF_(IDIQ).xlsx XLSX spreadsheet
Section_L_Rev._B.docx DOCX document
Section_L_Attachment_L-2C_Rev._A.docx DOCX document
Amendment_1_-_REMIS.pdf PDF
Section_L_Rev._A.docx DOCX document
Section_L_Attachment_L-2A__Rev._A.docx DOCX document
Section_L_Attachment_L-2G_Rev._A.docx DOCX document
Section_L_Attachment_L-2D_Rev._A.docx DOCX document
Section_I_.docx DOCX document
Section_L_Attachment_L-2C_.docx DOCX document
Section_J_Attachment_J-6.pdf PDF
Section_L_Attachment_L-2G.docx DOCX document
Section_H_.docx DOCX document
Section_L_Attachment_L-2A_.docx DOCX document
Section_L_.docx DOCX document
Section_E.docx DOCX document
Section_J_Attachment_J-12.pdf PDF
Section_J_Attachment_J-10.pdf PDF
Section_C.docx DOCX document
Section_J_Attachment_J-9.pdf PDF
Section_K.doc DOC document
Section_J_Attachment_J-8.pdf PDF
Section_J_Attachment_J-7.pdf PDF
Questions_and_Answers_for_DRFP_Final.pdf PDF
REMIS_Pre-proposal_Conference_Registration_sign-in_sheet.pdf PDF
Section_L_Rev_2.pdf PDF
Section_J_Attachment_J-1_R1.pdf PDF
Section_M_R.1.pdf PDF
Section_L_R.1_.pdf PDF
Section_M.pdf PDF
Section_L_Attachment_2E.pdf PDF
Section_D.pdf PDF
Section_J_Attachment_J-12.pdf PDF
Section_L_Attachment_2F.pdf PDF
Section_L_Attachment_2G.pdf PDF
Section_L_.pdf PDF
Section_J_Attachment_J-10.pdf PDF
Section_L_Attachment_3_FFP_IDIQ_.xlsx XLSX spreadsheet
Table_of_Contents.pdf PDF
Section_L_Attachment_3_Cover_Page.pdf PDF
Section_L_Attachment_3_CPFF_(IDIQ).xlsx XLSX spreadsheet
SF33.pdf PDF
Section_J_Attachment_J-8.pdf PDF
Section_K.pdf PDF
Show all 50

Research, Engineering, Mission Integration Services (REMIS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L Attachment L-2D

National Aeronautics and

REMIS-TO-04

Space Administration Date

Johnson Space Flight Center Johnson Space Flight Center, Texas

REMIS

TASK ORDER RFP

Reverse Osmosis Hardware

Funding Organization: ISS Program Task Order Manager: (NASA JSC) Technical Monitor: (NASA JSC)

Type of Task Order: Cost Plus Fixed Fee with Deductions

1.0 INTRODUCTION

The International Space Station (ISS) Program is asking the Offerors to utilize their commercial approaches defined in their response to DRD REMIS-PM-01, Commercialization Approach (CA), to develop Reverse Osmosis (RO) Hardware.

In support of the NASA Exploration initiatives, it is highly desirable to have a capability to purify recycled water for drinking purposes. Current systems require significant logistics support to perform this function. NASA desires technology development for water purification that will be sustainable for Exploration purposes. The intent of this Task Order is to demonstrate technology that will enable a sustainable means for recycling water on human Exploration missions.

2.0 REQUIREMENTS

NASA requests development of a standalone RO water processing system for technology demonstration on the ISS. The system design should take into account the potential incorporation of the system as an initial processor in a full water processing system design for an exploration spacecraft.

1. The RO system shall receive a combination of urine distillate and humidity condensate and shall remove the majority of inorganics and nonvolatile organics. The offeror’s proposal shall provide a definition of the percent (%) reduction of the concentration of each of the following contaminants from the inlet water:

a. Inorganic contaminants;

b. Nonvolatile organic contaminants;

c. Semi-volatile organic contaminants (such as siloxanes).

2. The system shall be capable of operating at a minimum pressure of 55-60 psig and a flowrate of 11-13 lbm/day, processing up to 11 liters of urine distillate and humidity condensate water per day at a recovery rate of at least 85%.

3. A means to regenerate the membrane in-situ is highly desired.

4. The ISS demonstration shall be located in an EXpedite the PRocessing of Experiments to Space Station (EXPRESS) Rack.

5. The system shall meet the requirements of SSP 57000 Rev R, Pressurized Payloads Interface Requirements Document. Double middeck locker size is the desired target.

6. For the ISS demonstration, the influent water will either be provided on-orbit in:

a. An ISS water storage bag at ambient pressure (reference JSC-65683, Interface Definition Document [IDD] for the Iodine Compatible Water Containers [ICWC]), or

b. Provided directly from the wastewater bus at a positive pressure of 8 psig via interface to Quick Disconnect (QD) part number 505101-1229 (vendor: Parker Hannifin Corp).

The RO system shall be compatible with both influent water interfaces. Use of adapters is acceptable.

7. The effluent water shall be either:

a. Distributed into an ISS water storage bag (reference JSC-65683), or

b. Distributed directly into the wastewater bus via interface to QD part number 505101-1229 (vendor: Parker Hannifin Corp). The system will have to overcome the 8 psig pressure of the wastewater bus.

The RO system shall be compatible with both effluent water interfaces. Use of adapters is acceptable.

8. To validate the on-orbit system performance, a means to collect samples of the effluent water shall be provided via a connector that must interface to connector part number 415067 (vendor: B Braun, Bethlehem, PA).

9. The brine generated by the RO system shall be collected and distributed into a water storage bag provided as Government Furnished Equipment (GFE) by NASA. The Offeror shall be responsible to ensure that the bag is not overfilled. The water bag interfaces are defined in JSC- 65683.

10. Because NASA desires the RO system to be used as a technology demonstration pathfinder for potential future use in exploration systems, it is desirable that the amount of logistics for crew time and upmass for consumables and spares be minimal. Therefore, the Offerors shall provide an estimate of the yearly RO operations maintenance hours and upmass for consumables and Orbital Replacement Units (ORUs) used.

11. The RO system shall have an on-orbit operational design life of 2 years.

12. The Contractor shall provide all data rights as required by Section I, Clause I.A.1, Data Rights Notice.

3.0 STATEMENT OF WORK

In accordance with the Statement of Work (SOW), sections 2.0 through 4.0 and their subsections, this Task Order (TO) is requiring Offerors to deliver the RO hardware system utilizing the Offeror’s Commercialization Approach, per REMIS-PM-01.

SOW paragraphs 2.2, 2.2.1, 2.3, 2.4, 2.6, 3.0, 3.1, 3.2, and 3.3 may be satisfied utilizing processes defined in the Offeror’s CA, upon acceptance of the CA by the Government.

This TO is requiring offerors to:

1. Provide support for up to 180 additional calendar days after the first hardware unit is delivered to NASA to support the hardware flight, installation and initial operations. This includes being available to address any training questions. The support requested for this phase is limited to 150 hours.

2. Provide a 1 year warranty after delivery of the hardware to NASA.

a. Provide a replacement to NASA within 6 months or as negotiated with NASA.

3. Define any launch requirements, including any launch orientation requirements.

4. Define any special shipping and handling requirements.

5. Perform all the necessary integration functions to integrate the RO system on ISS.

4.0 DELIVERABLES AND DELIVERY SCHEDULE

A requirements review with the NASA will be required within 60 days of authorization. All products and deliverables are due to NASA 365 days following TO award.

5.0 PRODUCTS

Table 1 – Data The Offerors are allowed to propose their corporate standards (the proposal shall define the format of their delivery) in delivering the data required below:

No.
Item
1
Full set of drawings and schematics
2
Parts List to the level of items that are ORUs
3
Software Requirements Specification
4
Hardware Requirements Specification
5
Safety Data and associated products needed to close Hazard Reports.
6
Verification Products
7
Inputs for Training, Installation and Operations Procedures

Table 2 - Reviews/Support The Offerors are allowed to propose their corporate standards (the proposal shall define the functions and objectives) in meeting the reviews required below:

No.
Item
1
System Requirements Review
2
At least one design review
3
Safety reviews
4
Acceptance review
5
Support On-orbit Installation and Initial Operations of the hardware
6
Support training and ISS integration testing

Table 3 – Hardware and Software

No.
Item
1
Flight Hardware– one set, with a requirement to be delivered to NASA
2
One set of flight-like training hardware
3
Hardware/Software to support ISS integration testing, if the Offeror prefers not to use

flight hardware for this purpose

4
ORUs/consumables – propose sufficient ORUs/consumables to support on-orbit operations for 2 years. It is desirable that the hardware does not have limited life items that drive continuous replenishment of the hardware (for example, sensors that must be replaced or recalibrated frequently using crew time).
5
Flight Software (source code and executable)

Table 4 – DRDs/Additional Information

No.
Item
1
REMIS-PC-01: NF533 Monthly/Quarterly Cost Reporting
2
REMIS-CM-01: Configuration Management Plan
3
REMIS-PM-02: Organizational Conflict of Interest (OCI) Avoidance Plan
4
REMIS-SI-01: Engineering Technical Documentation

Include the following products as a minimum:

· Requirements Document

· Applicable verification, safety certification, and flight certification

· Training and procedures inputs

· Drawings

· Parts List

6.0 DELIVERY INSTRUCTIONS

Authorized Government personnel shall accept all products delivered via DD Form 250.

National Aeronautics and Space Administration Johnson Space Flight Center Central Receiving, Bldg. 420 Johnson Space Flight Center, TX 77058

Applicable FAR and NASA FAR Supplement property administration clauses in the blanket contract are applicable to this TO in addition to any clauses in this TO.

Authorized Government personnel shall accept all products delivered via a DD Form 1149 with final acceptance via DD-250 which will occur after on-orbit demonstration of the requirements in section 2.0.

7.0 GOVERNMENT FURNISHED PROPERTY (GFP)

The available GFP hardware used for RO is listed in Attachment 1, Government Furnished Equipment List. If the contractor believes that there is additional existing hardware/software, etc. that can benefit the cost effectiveness of their proposed technical approach, propose the additional hardware updates to Attachment 1.

NASA facilities required to support both Electromagnetic Interface (EMI) and power quality and EXPRESS interfaces are provided by NASA and cost accounted for by NASA.

8.0 COST

The Offeror shall provide their proposed cost/price in accordance with the cost and pricing instructions and templates in Section L.

9.0. FEE EVALUATION PLAN

Fixed Fee with deductions for developing and integrating the awarded science payload:

1. 50% of the fee pool will be available for meeting the schedule to support launch.

2. The remaining 50% of the fee pool is available for mission success on orbit.

3. Cost Control. The contractor shall be held accountable for maintaining cost control and as such, for each 1% of cost overrun, 1% of fee shall be deducted from the total fee pool available.

10.0 TASK ORDER PLAN (TOP) EVALUATION CRITERIA

The Offerors TOP shall include their commercial approach to the requirements listed in this TOR. At a minimum, the TOP shall address, but not be limited to, the information listed by section in paragraph 10.1. The Offerors TOP will be evaluated using the evaluation criteria listed in paragraph 10.2, TOP Selection Plan.

10.1 TOP MINIMUM CONTENTS

1. Cost

a. Please follow the instruction in Section L for cost/price inputs as part of Volume II of your proposal.

2. Proposed technical approach

a. Summary of design solution, including proposed design parameters, and safety concerns, power and data requirements.

b. Approach to testing and verification, including test standards/margins used. Testing proposed to meet safety and performance requirements. Highlight component, subsystem, and system level testing. Identify potential options for reducing test costs.

c. Technical risks to meeting cost/schedule.

3. Schedule

a. The schedule delivered as part of the TOP shall be of sufficient detail to ensure that the technical team reviewing the proposals clearly understands the total approach being proposed by the Offerors.

10.2 TOP SELECTION PLAN

The Offeror’s TOP will be evaluated as indicated below:

For RFP purposes refer to Section M for evaluation criteria. Each individual TO will have it’s own unique grading criteria in the cost, schedule, and technical areas post contract award.

Attachment 1

Government Furnished Equipment List

On-Orbit:

Item #
Hardware
Part #
Quantity
1
EXPRESS Power Cable

As needed

2
EXPRESS Data Cable

As needed

3
EXPRESS MTL Coolant Line (if

needed)

(if required)

For integration into the flight hardware:

Item #
Hardware
Part #
Quantity
1
EXPRESS Power Connector that

interfaces to EXPRESS Power Cable

As needed

2
EXPRESS Data Connector that

interfaces to EXPRESS Data Cable

As needed

3
EXPRESS Moderate Temperature Loop (MTL) QDs (inlet and outlet)

that interface to EXPRESS MTL Coolant lines

As needed

4
Single Middeck Lockers (if needed –

NASA does not have a Double side by side Middeck Locker)

2 (if required) image1.jpeg

File details come from the government source that posted it. Updated .