Section_L_Attachment_2F.pdf
PDF 103 KB Posted
- Attached to
- Research, Engineering, Mission Integration Services (REMIS) Federal contract opportunity
- Solicitation number
- NNJ17584385R
About this file
Section L Attachment 2F
View the file
Other files for this federal contract opportunity
Show all 50
Research, Engineering, Mission Integration Services (REMIS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section L, Attachment L-2F
National Aeronautics and
REMIS-TO- 06
Space Administration Date
Johnson Space Flight Center Johnson Space Flight Center, Texas
REMIS
TASK ORDER RFP
ISS Parts Purchase
Funding Organization: (ISS Program) Task Order Manager: (NASA/JSC) Technical Monitor: (NASA/JSC)
Type of Task Order: Firm Fixed Price
1.0 INTRODUCTION
The International Space Station (ISS) Program is asking the Offerors to utilize their commercial approaches defined in their response to REMIS-PM-01, Commercialization Approach (CA) to purchase and deliver flight parts to NASA.
NASA has a need to be able to procure parts in support of new payload hardware requests, payload facility sustaining, technology demonstration, and vehicle sustaining. There are a wide range of parts that ISS will need to procure, and this Task Order (TO) provides a subset of those hardware needs.
2.0 REQUIREMENTS
The Offeror shall provide the equivalent, space flight fidelity hardware for the parts listed in Table 1. The Offeror shall provide a delivery date and price in their response to this RFP.
Table 1: Parts List
Part Number:
Part Name: Part Description:
Quantity: Delivery Date:
Price ($): New Part Number:
New Part Name:
1F15940-
Ethernet User Cable - ISL
ISL Ethernet Cable (15 meter)
Per Figure 1
N/A JEM-EF Payload Interface Unit (PIU) Adapter High Rate Data Link Cable (20 feet)
683- Integrated Hose MTL Supply, 3 63461-4 Assemblies – R- OGS Rack
ECLSS
683- Integrated Hose MTL Return, 3 63461-5 Assemblies – R- OGS Rack
ECLSS
683- Integrated Hose H2/N2 Vent, 3 63461-9 Assemblies – R- OGS Rack
ECLSS
683- 56836-
Integrated Hose Assemblies
CO2 Vent Hose 3
683- Hose Assembly, Water Hose 6 98815 CWC-I Offload Assembly 2352720- Valve Selector Air Selector 4 1-1 ORU Outline Valve
(Honeywell) 683- Coupling, Quick QD (Parker) 10 16348- Disconnect, Water Supply, 219 Fluid, Self- 1/2 Inch, Female
Sealing, Internal (for EXPRESS MTL Supply hoses, qty. 2 required per hose)
683- Coupling, Quick QD (Parker) 10 16348- Disconnect, Water Return, 247 Fluid, Self- 1/2 Inch, Female
Sealing, Internal (for EXPRESS MTL Return hoses, qty. 2 required per hose)
683- Coupling, Quick QD (Parker) 4 16348- Disconnect, MTL Water 1248 Fluid, Self- Supply, 1/2 Inch, Sealing, Internal Male (mounts to
EXPRESS
payload)
683- Coupling, Quick QD (Parker) 4 16348- Disconnect, MTL Water 1249 Fluid, Self- Return, 1/2 Inch, Sealing, Internal Male (mounts to
EXPRESS
payload)
RE2800-
Coupling Quick Disconnect Fluid
FQDC (MOOG) 10
96M5244 Portable Fan Portable Fan 10 0-1 Assembly Assembly
Figure 1: Japanese Experiment Module – External Facility (JEM-EF) Payload Interface Unit (PIU) Adapter Fiber Optic Cable
For each hardware delivery, the hardware provider shall provide an update to the table with the part number per their unique cage code, cross reference their new part number to the original part number in Table 1, and provide the new part name associated with the part, if applicable.
The Offeror may propose options for cost efficiency to procure a quantity buy that meets the supplier’s minimum lot buy requirement.
The Offeror shall provide a new top level drawing with those new part numbers.
3.0 STATEMENT OF WORK
All mandatory sections of the Statement of work (SOW) apply to this Task Order (TO).
4.0 DELIVERABLES AND DELIVERY SCHEDULE
The Offeror shall respond with their proposed delivery date for the parts and fill in Table 1 with their response.
5.0 PRODUCTS
Table 1 – Data
The Offerors are allowed to propose their corporate standards (the proposal shall define the format of their delivery) in delivering the data required below:
No. Item 1 Top level assembly drawing for each part 2 Certificate of Flight Certification for each part
Table 2 – Reviews/Support
The Offerors are allowed to propose their corporate standards (the proposal shall define the functions and objectives) in meeting the reviews required below:
1 Acceptance Review
Table 3 – Hardware and Software
1 Flight Hardware – per Table 1
Table 4 – DRDs/Additional Information
6.0 DELIVERY INSTRUCTIONS
Authorized Government personnel shall accept all products delivered via DD Form 1149.
National Aeronautics and Space Administration Johnson Space Flight Center Central Receiving, Bldg. 420 Johnson Space Flight Center, TX 77058
Applicable FAR and NASA FAR Supplement property administration clauses in the blanket contract are applicable to this TO in addition to any clauses in this TO.
Final acceptance will be via DD-250.
7.0 GOVERNMENT FURNISHED PROPERTY (GFP)
NASA facilities required to support Electromagnetic Interface (EMI), power quality, ISS avionics integration, and NBL testing are provided by NASA and cost accounted for by
NASA.
Applicable FAR and NASA FAR Supplement property administration clauses in the blanket contract are applicable to this TO in addition to any clauses in this TO
8.0 COST
The Offeror shall provide their proposed cost in accordance with the cost and pricing instructions and templates in Section L.
9.0 FEE EVALUATION PLAN
N/A
10.0 TASK ORDER PLAN (TOP) EVALUATION CRITERIA
The Offeror’s TOP shall include their commercial approach to the requirements listed in this TOR. At a minimum, the TOP shall address, but not be limited to, the information listed by section in paragraph 10.1, TOP Minimum Contents. The Offeror’s TOP will be evaluated using the evaluation criteria listed in paragraph 10.2, TOP Selection Plan.
10.1 TOP MINIMUM CONTENTS
1. Cost
a. Estimate labor hours,
b. Other direct costs and indirect costs required to deliver products,
c. Estimate of labor categories,
d. Total funding required by fiscal year. Provide funding need dates for an incremental milestone funding approach (identifying long-lead funding items).
2. Proposed technical approach.
a. Approach to testing and verification, including test standards/margins used.
Testing proposed to meet safety and performance requirements. Highlight component, subsystem, and system level testing. Identify potential options for reducing test costs.
b. Technical risks to meeting cost/schedule.
3. Schedule
a. The schedule delivered as part of the TOP shall be of sufficient detail to ensure that the technical team reviewing the proposals clearly understands the total approach being proposed by the Offerors.
10.2 TOP SELECTION PLAN
The Offeror’s TOP will be evaluated as indicated below:
1. Cost 60%
2. Technical approach 30%
3. Schedule 10%
Attachment 1
Government Furnished Equipment Lists
(List all hardware we plan to make available)
Item # Hardware Part # Quantity
Attachment 2
Title
Document # Title
| TASK ORDER RFP |
| Funding Organization: (ISS Program) Task Order Manager: (NASA/JSC) Technical Monitor: (NASA/JSC) |
| 1.0 INTRODUCTION |
| 2.0 REQUIREMENTS |
| Table 1: Parts List |
| 3.0 STATEMENT OF WORK |
| 4.0 DELIVERABLES AND DELIVERY SCHEDULE |
| 5.0 PRODUCTS |
| 7.0 GOVERNMENT FURNISHED PROPERTY (GFP) |
| 8.0 COST |
| 9.0 FEE EVALUATION PLAN |
| 10.0 TASK ORDER PLAN (TOP) EVALUATION CRITERIA |
| 10.1 TOP MINIMUM CONTENTS |
| 10.2 TOP SELECTION PLAN |
| Attachment 1 |
| Attachment 2 |
File details come from the government source that posted it. Updated .