Specification_Section_01_33_29_Attachment_2_TPC_Checklist_Inspected_TS.pdf

PDF 77 KB Posted

Attached to
Construction of a Instrument Development Facility Federal contract opportunity
Solicitation number
NNG17607163R
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

Specification Section 01 33 29 Attachment 2 TPC Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Construction of a Instrument Development Facility, newest first.
File Type Posted
IDF_Selection_Statement_Signed.pdf PDF
IDF_Amendment_0007.pdf PDF
20171214_Perf_Drain_System_and_Waterproofing.pdf_--_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_MH-101_-_FIRST_FLOOR_MECHANICAL_HVAC_PLAN_revised.pdf_kms2.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_M-801_-_MECHANICAL_SCHEDULES_revised.pdf_-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_26_revised.pdf_-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_13_revised.pdf_-_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_MH-101_-_FIRST_FLOOR_MECHANICAL_HVAC_PLAN_revised-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_00_00_revised.pdf_-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_25_revised.pdf_-_kms.pdf PDF
NASA_GSFC_IDF_Amendment_0006.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_05_93_revised.pdf_-_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_M-801_-_MECHANICAL_SCHEDULES_revised.pdf_-_kms.pdf PDF
IDF_RFP_No._80GSFC17R0009_-__Amendment_0005.pdf PDF
NASA_IDF_Duct_Tables.pdf PDF
IDF_RFP_Amendment_0004.pdf PDF
IDF_RFP_No._80GSFC17R0009_Amendment_0003.pdf PDF
QL_drawings_Showing_Furniture_for_Installation_TS.pdf PDF
Section_09_06_90_Attachment_A__Finish_Legend_Alternatives_Inspected_TS.pdf PDF
Attachment_2_Drawings_Informational_Purposes_Only.pdf PDF
Specification_Section_01_33_29_Attachment_1_HPSB_Checklist_Inspected_TS.pdf PDF
IDF_Site_Visit_Sign_in_Sheet.pdf PDF
IDF_Site_Visit_Question_and_Answers-Clean.pdf PDF
RFP_No._80GSFC17R0009_IDF_Questions_and_Answers_1-73.pdf PDF
Question_Due_Date_Extension.pdf PDF
IDF_Amendment_0002.pdf PDF
ATTACHMENT_4_General_Wage_Decision_MD170058,_Modification_No._10.pdf PDF
RFP_No._80GSFC17R0009_Amendment_000001.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_COMPILED_-_final.pdf PDF
SF1442_final.pdf PDF
Goddard_IDF_Site_Visit_Registration_Form_final.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_1_COMPILED_final.pdf PDF
Enclosure_1_-_IDF_QASP-Scanned_-_final.pdf PDF
ATTACHMENT_3_BUILDING_INFORMATION_MODELING_SCOPE_OF_SERVICES_-_Final.pdf PDF
Exhibit_1-Pricing-Cleaned_-_final.pdf PDF
IDF_RFP_Cover_Letter_Scanned_final.pdf PDF
Exhibit_2-Subcontracting_Goals-_Cleaned_-_final.pdf PDF
ATTACHMENT_9_NASA_Instrument_Development_Facility_Geotechnical_Report_-_final.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_COMPILED_-_final.pdf PDF
IDF_RFP_No._80GSFC17R0009_-_Sections_B-M_FINAL.pdf PDF
ATTACHMENT_8_MDE_Permit_-_Final.pdf PDF
ATTACHMENT_7_PIV_Attachment-Cleaned_-_final.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED 2009 for New Construction and Major Renovation

Project Scorecard

NASA Goddard IDF Bldg 37

60 4 3 43 LEED 2009 for New Construction and Major Renovation 100% Submittal 6/3/16

Y L U N

18 8 Possible Points 26 11 1 3 Indoor Environmental Quality Possible Points 15

Y L U N Y L U N

Y Prereq 1 Construction Activity Pollution Prevention Y Prereq 1 Minimum IAQ Performance

1 Credit 1 Site Selection 1 Y Prereq 2 Environmental Tobacco Smoke (ETS) Control

5 Credit 2 E Development Density & Community Connectivity 5 1 Credit 1 Outside Air Delivery Monitoring 1

1 Credit 3 Brownfield Redevelopment 1 1 Credit 2 Increased Ventilation 1

6 Credit 4.1 E Alternative Transportation, Public Transportation Access 6 1 Credit 3.1 Construction IAQ Management Plan, During Construction 1

1 Credit 4.2 E Alternative Transportation, Bicycle Storage & Changing Rooms 1 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1

3 Credit 4.3 E Alternative Transportation, Low Emitting & Fuel Efficient Vehicles 3 1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1

2 Credit 4.4 E Alternative Transportation, Parking Capacity 2 1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1

1 Credit 5.1 E Site Development, Protect or Restore Open Space 1 1 Credit 4.3 Low-Emitting Materials, Flooring Systems 1

1 Credit 5.2 E Site Development, Maximize Open Space 1 1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1

1 Credit 6.1 R E Stormwater Design, Quantity Control 1 1 Credit 5 Indoor Chemical & Pollutant Source Control 1

1 Credit 6.2 E Stormwater Design, Quality Control 1 1 Credit 6.1 Controllability of Systems, Lighting 1

1 Credit 7.1 E Heat Island Effect, Non-Roof 1 1 Credit 6.2 Controllability of Systems, Thermal Comfort 1

1 Credit 7.2 E Heat Island Effect, Roof 1 1 Credit 7.1 Thermal Comfort, Design 1

1 Credit 8 1 1 Credit 7.2 Thermal Comfort, Verification 1

1 Credit 8.1 E Daylight & Views, Daylight 75% of Spaces 1

6 4 Water Efficiency Possible Points 10 1 Credit 8.2 E Daylight & Views, Views for 90% of Spaces 1

Y L U N

Y Prereq 1 Water Use Reduction, 20% Reduction 2 3 1 Innovation & Design Process Possible Points 6

4 Credit 1 4 Y L U N

2 Credit 2 R E 2 1 Credit 1.1 Innovation IPM 1

2 2 Credit 3 R E Water Use Reduction, Reduce by 30, 35 or 40% 4 1 Credit 1.2 Innovation Green Cleaning 1

1 Credit 1.3 Exemp Perf EAc3 BECx 1

14 2 19 Possible Points 35 1 Credit 1.4 Innovation Green Purchase/ Sustainable Waste Mgmt 1

Y L U N 1 Credit 1.5 Innovation LEED-HC MRc4.1 Low Hg Lighting 1

Y Prereq 1 Fundamental Commissioning of the Building Energy Systems 1 Credit 2 LEED Accredited Professional 1

Y Prereq 2 Minimum Energy Performance

Y Prereq 3 Fundamental Refrigerant Management 2 2 Regional Priority Credits Possible Points 4

9 10 Credit 1 E Optimize Energy Performance, % beyond ASHRAE 90.1-2007 19 Y L U N

7 Credit 2 R E On-Site Renewable Energy, 1% to 13% of total building demand 7 1 Credit 1.1 MRc2 - Construction Waste Mgmt (50%) 1

2 Credit 3 E Enhanced Commissioning 2 1 Credit 1.2 SSc6.1 - Stormwater Quantity 1

2 Credit 4 2 1 Credit 1.3 EAc2 - On-site Renewable Energy (1%) 1

3 Credit 5 3 1 Credit 1.4 WEc2 - Innovative Wastewater Technologies 1

2 Credit 6 E 2

60 4 3 43 TOTAL Possible Points 110

7 7 Possible Points 14 Y L U N

Y L U N

Y Prereq 1

3 Credit 1.1 R Building Reuse, Maintain 55-95% of Existing Walls, Floors & Roof 3 R = Regional Priority Eligible Credits = Zip Code 20771

1 Credit 1.2 Building Reuse, Maintain 50% of Interior Non-structural Elements 1

2 Credit 2 R E Construction Waste Management, Divert 50 or 75% from Disposal 2

2 Credit 3 E Materials Reuse: Reuse 5% or 10% 2

2 Credit 4 E Recycled Content 10% or 20% 2

2 Credit 5 E Regional Materials 2

1 Credit 6 E Rapidly Renewable Materials 1

1 Credit 7 E 1

Materials & Resources

Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points

Storage & Collection of Recyclables

E = Exemplary Performance possible for an Innovation & Design credit

This Scorecard is based on HDR’s analysis of potential LEED credit attainment given the current proposed design and information provided by the owner.

HDR will perform its services with the degree of sk ll and care normally exercised by similarly situated members of the profession performing similar services at the same time and in the same locale as the Project. Credits and points may move from Yes to Likely or Unlikely or No throughout the design and construction process. Credit attainment is ultimately decided by Green Business Certification Inc. (GBCI) and is beyond HDR’s control.

Enhanced Refrigerant Management

Measurement & Verification

Green Power

Gold

Innovative Wastewater Technologies

Energy & Atmosphere

Certified Wood

Sustainable Sites

Light Pollution Reduction

Water Efficient Landscaping

File details come from the government source that posted it. Updated .