IDF_RFP_No._80GSFC17R0009_-_Sections_B-M_FINAL.pdf
PDF 347 KB Posted
- Attached to
- Construction of a Instrument Development Facility Federal contract opportunity
- Solicitation number
- NNG17607163R
About this file
IDF RFP No. 80GSFC17R0009 - Sections B-M FINAL
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $ (TO BE PROPOSED).
(End of clause)
B.2 GSFC 52.211-90 Supplies and/or Services To Be Provided (SEP 2017) The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Specifications and Drawings, incorporated as Attachments 1 and 2.
Item Description Reference Schedule Delivery Method/Addressee(s)
Small Business Subcontracting Plan Reporting
Section H
GSFC 52.219-90
Section I
NFS 1852.219-75
ISR–Semi-Annual (April 30th and October 30th) and Final SSR–Annual
(October 30th)
Electronic Format/ Electronic Subcontract
Reporting System (eSRS) http://www.esrs.gov
2 Safety & Health Plan Section H
FAR 52.236-13--
Alternate I
30 Days After Notice of Contract Award
Electronic Format/ Contracting Officer (CO)
3 Safety & Health Reporting
Section H
NFS 1852.223-70
Section H
NFS 1852.223-75
Section H
GSFC 52.223-91
Monthly/Quarterly Reports and As Required
NASA Mishap Information System (NMIS)
Personal Identity Verification (PIV) Documentation and Reporting
Section H
GSFC 52.204-99
Attachment 7
10th Day of the Month and As Required
Electronic Format and Hard Copy/ COR & Code 240
5 Equal Opportunity Reports
Section I
FAR 52.222-26
As Specified by
FAR 52.222-26
Electronic Format/(CO)& Code 120
6 Certificate of Insurance
Section I
FAR 52.228-5
Section I
NFS 1852.228-75
14 days after notice of award and annual updates as necessary
Electronic Format/ (CO)
Affirmative Procurement of Biobased Products
Section I
FAR 52.223-2
Annually by October 31 and Final Report https://www.sam.gov and copy to the (CO) http://www.esrs.gov/ https://www.sam.gov/
Standard Form 25A – Payment Bond or Irrevocable Letter of Credit
Section I
FAR 52.228-15
Within 5 days after notice of award
Original with Seal
Hard copy to the (CO)
SF 1413, Statement and Acknowledgement
Section I
FAR 52.222-11
Within 14 days of award of contract and subsequent awarded subcontracts
Electronic or Hard Copy to the (CO)
10 Certified Payrolls Section I
FAR 52.222-8
Weekly (within 7 days after the regular payment date of the payroll week covered)
Electronic or Hard Copy to the CO)
11 List of Proposed Subcontractors
Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award
Electronic Format/ COR and
CO
12 Submittals Register Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award COR
13 Construction Progress Schedule
Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award COR and CO
14 Network Analysis Schedule
Attachment 1 – Specifications, Section 01 33 00
42 Calendar Days after NTP COR and CO
15 Schedule of Prices Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award COR and CO
16 Work Plan Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award
COR
17 Quality Control Plan Attachment 1 – Specifications, Section 01 33 00
Within 10 days after contract award COR and CO
18 Environmental Protection Plan
Attachment 1 – Specifications, Section 01 33 00
30 Days after contract award COR
Estimate of Percentage of Recovered Material Content for EPA- Designated Items
FAR 52.223-9 Upon Contract Completion
Electronic Format to the
(CO)/ COR
20 Real Property Maintenance Plan NFS 1852.245-83 30 Days After
Contract Award (CO)/ COR
NOTE: Unless otherwise specified, “day” means “calendar day”.
(End of text)
B.3 LINE ITEM PRICING
Contract Line Item
Number
Description Qty Unit Total Price
Basic Requirement - Provide all personnel, materials, and equipment necessary for the construction of the Instrument Development Facility (IDF)
1 JOB $ TBD
In accordance with FAR clause 52.217-7, "Option For Increased Quantity—Separately Priced Line Item" of this contract, the Contracting Officer may exercise the following options by issuance of a unilateral contract modification. Options exercised shall be in accordance with the following:
Contract Line Item
Number
Description Qty Unit Total Price
Date of Option Exercise
02 Option 1 - Provide Lighting System Controller per Detail 1, Sheet E800 1 JOB $
On or before 30
DAYS AFTER
NTP
Option 2 - Provide Alternative Installation for Bio-Retention #9 per Sheets CG110 and CG117
1 JOB $
On or before 60
DAYS AFTER
NTP
C.1 SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The principle purpose of this contract is to construct a state of the art facility for development of instruments and new technology for space flight mass spectroscopic scientific measurements to support in situ analysis of extraterrestrial organic and mineral molecular chemistries. The facility will be a mixture of laboratory and offices to support research and development of new technology and new instruments manufacturing.
For clarification, below are items that are excluded from this contract.
1. All telecommunication sheets (ET) show location of devices for purposes of indicating where the contractor is to rough in the devices. All devices and wiring shall be accomplished by others. Contractor is to provide labor and material to rough in the devices.
2. All security sheets (EY) indicate device locations for purposes of indicating where the contractor is to rough in the devices. All devices and wiring shall be accomplished by others.
3. All office furniture is shown for illustrative purposes only. The contractor is not required to provide office furniture under this contract.
4. Loose Laboratory furniture shown in the equipment sheets (QL) are depicted for clarification only. They include the following:
4.1. Loose Laboratory Tables
4.2. Adaptable Bench Frame/Shelving – Single
4.3. File Cabinets 4 drawers
4.4. PPE Cabinet
4.5. Tall Cabinets –Mobile- Solid doors
4.6. Mobile Base Cabinets
4.7. Locked Cage Storage
4.8. SS Storage Shelving (Metro style)
The following item is included in this contract
1. Sheet CV101-Provide and install the storm drain shown as existing in grid areas B1, B2, and B3.
SECTION D - PACKAGING AND MARKING
THERE ARE NO CLAUSES IN THIS SECTION
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 GSFC 52.246-93 ACCEPTANCE -- LOCATION(S) (SEP 2013)
The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):
Deliverable Item No. Location Authorized Representative
All items NASA Goddard Space Flight Center COR Greenbelt, MD 20771
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively—for the sole purpose of computing an interest penalty that might be due the Contractor under the Prompt Payment Act—on the 7th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.
E.3 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
SECTION F - DELIVERIES OR PERFORMANCE
F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work (options included) ready for use not later than 503 days after receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
F.2 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the
Contractor shall pay liquidated damages to the Government in the amount of $2,569 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
F.3 52.211-13 TIME EXTENSIONS (SEP 2000)
F.4 GSFC 52.237-92 PLACE OF PERFORMANCE - SERVICES (NOV 2013)
The services to be performed under this contact shall be performed at the following location(s):
Goddard Space Flight Center, Greenbelt, MD.
F.5 52.242-14 SUSPENSION OF WORK (APR 1984)
F.6 52.247-34 F.O.B. DESTINATION (NOV 1991)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
G.2 GSFC 52.232-90 INVOICES FOR CONSTRUCTION CONTRACTS (AUG 2016)
(a) Invoices shall be prepared in accordance with the Prompt Payment for Construction Contracts clause of this contract. Invoices shall be submitted to the following “Designated Billing Office”:
NASA Shared Service Center (NSSC) Financial Management Division (FMD) – Accounts Payable Building 1111, Jerry Hlass Road Stennis Space Center, MS 39529
Note: Invoices must contain an invoice date in order for an invoice to be considered “Proper.” Invoices without an invoice date will be deemed to be “Improper” and will be rejected by the NSSC.
(b) At the time of submittal to the billing office, an information copy of each invoice shall be submitted to:
Contracting Officer, Michelle D. McIntyre Code 210.I Email: Michelle.D.McIntyre@nasa.gov
Contracting Officer Representative, Charles Wellington Jr.
Code 224 Email: Charles.H.Wellington@nasa.gov
(c) For purposes of the Prompt Payment for Construction Contracts clause, the “Designated
Payment Office” is:
NASA Shared Service Center (NSSC) Financial Management Division (FMD) – Accounts Payable Building 1111, Jerry Hlass Road Stennis Space Center, MS 39529 mailto:Michelle.D.McIntyre@nasa.gov mailto:Charles.H.Wellington@nasa.gov
G.3 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (JAN 2011)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Property Management.
(2) NPR 8831.2, Facility Maintenance Management.
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor’s expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
G.4 1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS (JAN 2011)
(a) In addition to the requirements of the FAR Government Property Clause incorporated in this contract (FAR 52.245-1), the Contractor shall comply with the following in performance of any maintenance, construction, modification, demolition, or management activities of any Government real property:
(1) NPD 8800.14, Policy for Real Property Management.
(2) NPR 8831.2, Facility Maintenance Management.
(b) Within 30 calendar days following award, the Contractor shall provide a plan for maintenance of Government real property provided for use under this contract. The Contractor’s maintenance program shall enable the identification, disclosure, and performance of normal and routine preventative maintenance and repair. The Contractor shall disclose and report to the Contracting Officer the need for replacement and/or capital rehabilitation. Upon acceptance by the Contracting Officer, the program shall become a requirement under this contract.
(c) Title to parts replaced by the Contractor in carrying out its normal maintenance obligations shall pass to and vest in the Government upon completion of their installation in the facilities.
The Contractor shall keep the property free and clear of all liens and encumbrances.
(d) The Contractor shall keep records of all work done to real property, including plans, drawings, charts, warranties, and manuals. Records shall be complete and current. Record of all transactions shall be auditable. The Government shall have access to these records at all reasonable times, for the purposes of reviewing, inspecting, and evaluating the Contractor’s real property management effectiveness. When real property is disposed of under this contract, the Contractor shall deliver the related records to the Government.
(e) The Contracting Officer may direct the Contractor in writing to reduce the work required by the maintenance program authorized in paragraph (b) of this clause at any time.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND
REPORTS (NOV 2016)
a. Subcontracting Plan (Contractor)
FAR clause 52.219-9, “Small Business Subcontracting Plan” is included in this contract. The agreed to Subcontracting Plan required by the clause is included as an attachment to the contract.
b. Subcontracting Plan (Subcontractors)
In accordance with FAR clause 52.219-9 Small Business Subcontracting Plan (Deviation), the Contractor must require that certain subcontractors adopt a plan similar to the Plan agreed to between the Contractor and the Government.
c. Individual Subcontract Reports (ISRs)
The Contractor shall prepare and submit their Individual Subcontract Reports (ISRs) (formerly known as the Standard Form 294), in accordance with the instructions listed in the Electronic Subcontract Reporting System (eSRS), available at http://esrs.gov.
ISRs must be submitted electronically in eSRS on a semi-annual basis. This report must be received no later than April 30 and October 30 each year for the reporting periods ending March 31 and September 30, respectively. Reports are required when due, regardless of whether there has been any subcontracting activity since the inception of the contract or since the last reporting period.
A final ISR must be submitted after contract completion. The final ISR submittal must be received no later than the due date for what would have been the next semi-annual report.
d. Summary Subcontract Reports (SSRs)
The Contractor shall prepare and submit Summary Subcontract Reports (SSRs)(formerly known as the Standard Form 295), in accordance with the instructions listed in the Electronic Subcontract Reporting System (eSRS), available at http://esrs.gov and in accordance with FAR clause 52.219-9 Small Business Subcontracting Plan (Deviation) of this contract.
The SSRs must be submitted electronically in eSRS on an annual basis. This report must be submitted no later than October 30 each year for the twelve month period ending September 30.
e. Subcontractor Reporting
FAR clause 52.219-9 Small Business Subcontracting Plan (Deviation) requires that the Contractor ensure that ISR and SSR reports are submitted by those subcontractors that have been required to adopt a Subcontracting Plan under the terms of the clause. These subcontractor reports must be submitted as required by paragraphs (c) and (d) above. The reports may be submitted through the Contractor or submitted directly. Regardless, the Contractor is responsible for ensuring proper and timely submittal of the required reports.
H.2 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING
(DEC 2015)
(a) Safety is the freedom from those conditions that can cause death, injury, occupational illness, damage to or loss of equipment or property, or damage to the environment. NASA’s safety priority is to protect: (1) the public, (2) astronauts and pilots, (3) the NASA workforce (including contractor employees working on NASA contracts), and (4) high-value equipment and property.
(b) The Contractor shall take all reasonable safety and occupational health measures in performing this contract. The Contractor shall maintain an effective worksite safety and health program with organized and systematic methods to—
(1) Comply with Federal, State, and local safety and occupational health laws and with the safety and occupational health requirements of this contract;
(2) Describe and assign the responsibilities of managers, supervisors, and employees;
(3) Inspect regularly for and identify, evaluate, prevent, and control hazards;
(4) Orient and train employees to eliminate or avoid hazards; and
(5) Periodically review the program’s effectiveness.
Authorized Government representatives shall have access to and the right to examine the work site and related records under this Contract in order to determine the adequacy of the Contractor’s safety and occupational health measures.
(c) The Contractor shall take, or cause to be taken, any other safety, and occupational health measures the Contracting Officer may reasonably direct. To the extent that the Contractor may be entitled to an equitable adjustment for those measures under the terms and conditions of this contract, the equitable adjustment shall be determined pursuant to the procedures of the changes clause of this contract; provided, that no adjustment shall be made under this Safety and Health clause for any change for which an equitable adjustment is expressly provided under any other clause of the contract.
(d) The Contractor shall immediately notify the Contracting Officer or a designee any Type A, B, C, or D Mishap, or close calls as defined in NASA Procedural Requirement (NPR) 8621.1, Mishap and Close Call Reporting, Investigating, and Recordkeeping. In addition, service contractors (excluding construction contracts) shall provide quarterly reports specifying lost-time frequency rate, number of lost-time injuries, exposure, and accident/incident dollar losses as specified in the contract Schedule.
(e) The Contractor shall cooperate with any Government-authorized investigation of Type A, B, C, or D Mishaps, or Close Calls reported pursuant to paragraph (d) of this clause by providing access to employees; and relevant information in the possession of the Contractor regarding the mishap or close call.
(f)(1) The Contracting Officer may notify the Contractor of any noncompliance with this clause and specify corrective actions to be taken. When the Contracting Officer becomes aware of noncompliance that may pose a serious or imminent danger to safety and health of the public, astronauts and pilots, the NASA workforce (including contractor employees working on NASA contracts), or high value mission critical equipment or property, the Contracting Officer will notify the Contractor orally, with written confirmation. The Contractor shall promptly take any necessary corrective action.
(2) If the Contractor fails or refuses to institute prompt corrective action in accordance with subparagraph (f)(1) of this clause, the Contracting Officer may—
(i) Invoke the stop-work order clause in this contract;
(ii) Require the Contractor to remove and replace Contractor or subcontractor personnel who fail to comply with or violate applicable requirements of this clause;
(iii) Record the Contractor’s failure to comply in the appropriate databases of past performance; and
(iv) Consider the Contractor’s failure to comply in any responsibility determination or evaluation of past performance.
(g) The Contractor shall insert the substance of this clause, including this paragraph (g) in all subcontracts above the simplified acquisition threshold when the work will be conducted completely or partly on federally-controlled facilities.
H.3 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
H.4 1852.225-70 EXPORT LICENSES (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Goddard Space Flight Center, Greenbelt, MD, where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
H.5 1852.236-75 PARTNERING FOR CONSTRUCTION CONTRACTS (AUG 1998)
(a) The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.
(b) Partnering will be a voluntary commitment mutually agreed upon by at least NASA and the prime contractor, and preferably the subcontractors and the A&E design contractor, if applicable. Sustained commitment to the process is essential to assure success of the relationship.
(c) NASA intends to facilitate contract management by encouraging the foundation of a cohesive partnership with the Contractor, its subcontractors, the A&E design contractor, and NASA’s contract management staff. This partnership will be structured to draw on the strengths of each organization to identify and achieve mutual objectives. The objectives are intended to complete the contract requirements within budget, on schedule, and in accordance with the plans and specifications.
(d) To implement the partnership, it is anticipated that within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subcontractors, the A&E design contractor, and NASA personnel will attend a partnership development and team building workshop. Follow-up team building workshops will be held periodically throughout the duration of the contract as agreed to by the Government and the Contractor.
(e) Any cost with effectuating the partnership will be agreed to in advance by both parties and will be shared with no change in the contract price. The contractor’s share of the costs are not recoverable under any other Government award.
H.6 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)
(a)(1) The performance of this contract requires contractor employees of the prime contractor or any subcontractor, affiliate, partner, joint venture, or team member with which the contractor is associated, including consultants engaged by any of these entities, to have access to, physical entry into, and to the extent authorized, mobility within, a NASA facility.
(2) NASA may close and or deny contractor access to a NASA facility for a portion of a business day or longer due to any one of the following events:
(i) Federal public holidays for federal employees in accordance with 5 U.S.C. 6103.
(ii) Fires, floods, earthquakes, unusually severe weather to include snow storms, tornadoes and hurricanes.
(iii) Occupational safety or health hazards.
(iv) Non-appropriation of funds by Congress.
(v) Any other reason.
(3) In such events, the contractor employees may be denied access to a NASA facility, in part or in whole, to perform work required by the contract. Contractor personnel already present at a NASA facility during such events may be required to leave the facility.
(b) In all instances where contractor employees are denied access or required to vacate a NASA facility, in part or in whole, the contractor shall be responsible to ensure contractor personnel working under the contract comply. If the circumstances permit, the contracting officer will provide direction to the contractor, which could include continuing on-site performance during the NASA facility closure period. In the absence of such direction, the contractor shall exercise sound judgment to minimize unnecessary contract costs and performance impacts by, for example, performing required work off-site if possible or reassigning personnel to other activities if appropriate.
(c) The contractor shall be responsible for monitoring the local radio, television stations, NASA
Web sites, other communications channels, for example contracting officer notification, that the NASA facility is accessible. Once accessible the contractor shall resume contract performance as required by the contract.
(d) For the period that NASA facilities were not accessible to contractor employees, the contracting officer may—
(1) Adjust the contract performance or delivery schedule for a period equivalent to the period the NASA facility was not accessible;
(2) Forego the work;
(3) Reschedule the work by mutual agreement of the parties; or
(4) Consider properly documented requests for equitable adjustment, claim, or any other remedy pursuant to the terms and conditions of the contract.
(e) Notification procedures of a NASA facility closure, including contractor denial of access, as follows:
(1) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, for announcement of a NASA facility closure to include denial of access to the NASA facility.
The contractor shall be responsible for notification of its employees of the NASA facility closure to include denial of access to the NASA facility. The dismissal of NASA employees in accordance with statute and regulations providing for such dismissals shall not, in itself, equate to a NASA facility closure in which contractor employees are denied access.
Moreover, the leave status of NASA employees shall not be conveyed or imputed to contractor personnel. Accordingly, unless a NASA facility is closed and the contractor is denied access to the facility, the contractor shall continue performance in accordance with the contract.
(2) NASA’s Emergency Notification System (ENS). ENS is a NASA-wide Emergency
Notification and Accountability System that provides NASA the ability to send messages, both Agency-related and/or Center-related, in the event of an emergency or emerging situation at a NASA facility. Notification is provided via multiple communication devices, e.g. Email, text, cellular, home/office numbers. The ENS provides the capability to respond to notifications and provide the safety status. Contractor employees may register for these notifications at the ENS Web site:
http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html.
H.7 1852.243-72 EQUITABLE ADJUSTMENTS (APR 1998)
(a) The provisions of all other clauses contained in this contract which provide for an equitable adjustment, including those clauses incorporated by reference with the exception of the “Suspension of Work” clause (FAR 52.242-14), are supplemented as follows:
Upon written request, the Contractor shall submit a proposal for review by the Government.
The proposal shall be submitted to the contracting officer within the time limit indicated in the request or any extension thereto subsequently granted. The proposal shall provide an itemized breakdown of all increases and decreases in the contract for the Contractor and each subcontractor in at least the following detail: material quantities and costs; direct labor hours and rates for each trade; the associated FICA, FUTA, SUTA, and Workmen’s Compensation Insurance; and equipment hours and rates.
(b) The overhead percentage cited below shall be considered to include all indirect costs including, but not limited to, field and office supervisors and assistants, incidental job burdens, small tools, and general overhead allocations. “Commission” is defined as profit on work performed by others. The percentages for overhead, profit, and commission are negotiable according to the nature, extent, and complexity of the work involved, but in no case shall they exceed the following ceilings:
Overhead (percent)
Profit (percent)
Commission (percent)
To Contractor on work performed by other than its own forces
— — 10
To first tier subcontractor on work performed by its subcontractors
— — 10
To Contractor and/or subcontractors on work performed with their own forces
10 10 —
(c) Not more than four percentages for overhead, profit, and commission shall be allowed regardless of the number of subcontractor tiers.
(d) The Contractor or subcontractor shall not be allowed overhead or commission on the overhead, profit, and/or commission received by its subcontractors.
(e) Equitable adjustments for deleted work shall include credits, limited to the same percentages for overhead, profit, and commission in paragraph (b) of this clause.
(f) On proposals covering both increases and decreases in the amount of the contract, the application of the overhead, profit, and commission shall be on the net change in direct costs for the Contractor or the subcontractor performing the work.
(g) After receipt of the Contractor’s proposal, the contracting officer shall act within a reasonable period, provided that when the necessity to proceed with a change does not permit time to properly check the proposal, or in the event of a failure to reach an agreement on a proposal, the contracting officer may order the Contractor to proceed on the basis of the price being determined at the earliest practicable date. In such a case, the price shall not be more than the increase or less than the decrease proposed.
H.8 GSFC 52.204-99 CONTRACTOR PERSONNEL-IDENTIFICATION,
REPORTING, AND CHECKOUT PROCEDURES (APR 2013)
(a) In accordance with FAR 52.204-9, Personal Identity Verification of Contractor Personnel, the
Contractor shall follow Steps 1 through 7 described in Attachment 7, Personal Identity Verification (PIV) Card Issuance Procedures, for each contract employee (prime and subcontractor) who will have physical access to a NASA-controlled facility (also referred to as “onsite”). The Contractor must apply for permanent NASA/GSFC PIV cards for those contract employees who will be employed by the Contractor onsite for at least six months.
The GSFC Security Division will consider permanent PIV cards for other employees of the Contractor on a case-by-case basis, such as employees that are not resident onsite, but must frequently visit. In the future, upon written notice from the Contracting Officer, the Contractor shall follow Steps 1 through 7 in Attachment 6 for each offsite contract employee (prime and subcontractor) who require remote access to a NASA information system for contract performance.
(b) The Contractor shall notify the GSFC Security Division, Code 240, Attention: PIV Manager, and the Contracting Officer’s Representative (COR) of the contractor’s designated PIV Requester within 15 calendar days after award of this contract. The NASA maintained PIV system contains work and home location and contact information for personnel that have permanent NASA PIV cards. The Contractor may contact the PIV Manager, Tel 301-286- 2306 for assistance regarding the PIV system.
(c) Each contract employee shall provide to the Contractor’s designated PIV Requester the basic identifying information required for a PIV Request to be initiated in the PIV System. The PIV Request must be approved by the PIV Sponsor (COR or the Contracting Officer). The COR will resolve any housing or access issues, and review the request for accuracy and completeness. Requests that are approved by the PIV Sponsor will be forwarded to the GSFC Security Division, Code 240, PIV Authorization, Badge enrollment, and Badge issuance.
(d) The Contractor shall submit an annotated PIV Report each month. The GSFC PIV Manager will furnish a PIV print-out to the Contractor no later than the end of each month. The Contractor shall annotate this provided report monthly to correct and update the information as follows:
(1) Draw a line through the names of employees who are no longer employed by the contractor or that no longer work onsite under the contract, and;
(2) Make handwritten changes to any other incorrect data.
The annotated PIV Report shall be separately submitted to the GSFC Security Division, Code 240, Attention: PIV Manager, and to the COR by the 10th calendar day of the month.
For the final PIV Report under the contract, the GSFC PIV Manager will furnish a PIV print-out to the Contractor no later than two weeks prior to the end of the contract. The
Contractor shall submit its annotated final PIV Report no later than 3 days prior to the end of the contract.
If this is a follow-on contract, at the end of the phase-in period (if any)/start of the basic contract period, the GSFC Security Division will provide the Contractor a copy of the final PIV Report from the previous contract. The Contractor shall review the list and redline it as necessary to reflect its employees requiring PIV cards. The redlined list shall be provided the GSFC Security Division within 30 days after the start of the contract.
(e) The Contractor shall ensure that all personnel who have NASA/GSFC issued PIV cards, keys or other property who leave its employment or that no longer work onsite, process out through the GSFC Security Division, Code 240. Employees must return all GSFC issued identification and any Government property no later than the last day of their employment or the last day they work onsite under this contract. The Contractor shall establish appropriate procedures and controls to ensure this is accomplished. Failure to comply may result in the exercise of Government rights to limit and control access to Government premises, including denial of access and invalidation of NASA issued PIV cards and identification.
H.9 GSFC 52.211-95 GOVERNMENT PREMISES—PHYSICAL ACCESS AND
COMPLIANCE WITH PROCEDURES (FEB 2016)
(a)(1) The Contractor must apply for permanent NASA/GSFC Personal Identity Verification (PIV) cards (badges) for those employees that will be employed by the Contractor and subcontractors and that will be resident for at least six months at GSFC or at locations controlled by GSFC, such as GSFC leased space. Other personnel may be issued a temporary badge. All personnel must conspicuously display the GSFC PIV card at, or above, the waistline. Refer to GSFC clause 52.204-99, “Contractor Personnel – Identification, Onsite Reporting, and Checkout Procedures” for permanent PIV card issuance procedures.
(2) Visits by foreign nationals are restricted and must be necessary for the performance of the contract and concurred with by the Contracting Officer or by the Contracting Officer’s Representative. Approval of such visits must be approved in advance in accordance with Goddard Procedural Requirement (GPR) 1600.1.
(3) Access to the GSFC may be changed or adjusted in response to threat conditions or special situations.
(b) While on Government premises, the Contractor shall comply with all requirements governing the conduct of personnel and the operation of the facility. These requirements are set forth in NASA Procedural Requirements (NPR), NASA Policy Directives (NPD), GPRs, GSFC Policy Directives (GPD), handbooks and announcements. The following cover many of the requirements:
(1) Harassment and Discrimination Announcements http://eeo.gsfc.nasa.gov/policy.html
(2) GSFC Workplace Violence Announcement https://gs279gdmsias.gsfc.nasa.gov/srv/GDMSNEWDatabaseObject?document_id=21144
(3) GPR 1600.1, GSFC Security Requirements
(4) NPD 1600.3, Policy on Prevention of and Response to Workplace Violence
(5) GPR 1700.1, Occupational Safety Program at GSFC
(6) GPR 1700.2, Chemical Hygiene Program
(7) GPR 1700.5, Control of Hazardous Energy (Lockout/Tagout)
(8) GPR 1700.6, Confined Space Program at GSFC
(9) GPR 1700.7, Electrical Safety
(10) GPR 1700.8, GSFC Hazard Communication Program
(11) GPR 1800.1, GSFC Smoking and Other Tobacco Use Requirements
(12) GPR 1800.6, Occupational Health, Medicine and Employee Assistance Programs
(13) GPR 1840.2, Industrial Hygiene Program
(14) GPR 1860.1, Ionizing Radiation Protection
(15) GPR 1860.2, Laser Radiation Protection
(16) GPR 1860.3, Radio Frequency Radiation Protection
(17) GPR 1860.4, Ultraviolet and High Intensity Light Radiation Protection
(18) NPD 2540.1, Personal Use of Government Office Equipment Including Information Technology
(19) GPR 2570.1, Spectrum Management and Radio Frequency (RF) Equipment Licensing
(20) NPR 3713.3, Anti-Harassment Procedures
(21) GPD 8500.1, Environmental Policy and Program Management
(22) GPR 8621.4, GSFC Mishap Preparedness and Contingency Plan
(23) GPR 8710.2, GSFC Emergency Management Program Plan
(24) GPR 8710.7, Cryogenic Safety
(25) GPR 8710.8, GSFC Safety Program Management
(26) GPD 8715.1, GSFC Safety Policy
(27) GPR 8715.1, Processing of NASA Safety Reporting System (NSRS) Incident Reports
(28) GPR 8715.8, Fall Protection Requirements for GSFC
Copies of the current issuances of the GPD/GPRs may be obtained at http://gdms.gsfc.nasa.gov from a computer onsite (GSFC Government Facility) or from the Contracting Officer. Copies of the current issuances of the NPD/NPRs may be obtained at http://nodis3.gsfc.nasa.gov or from the Contracting Officer. The above list may be modified by the Contracting Officer to include additional issuances pertaining to the conduct of personnel and the operation of the facility.
(c) The Contractor may not use official Government mail (indicia or “eagle” mail). Contractors found in violation could be liable for a fine of $300 per piece of indicia mail used. However, the Contractor is allowed to use internal GSFC mail to the extent necessary for purposes of the contract.
H.10 GSFC 52.223-91 SAFETY AND HEALTH ADDITIONAL REQUIREMENTS
(SEP 2017)
In addition to compliance with all Federal, state, and local laws as required by paragraph (b) of NFS clause 1852.223-70, the Contractor shall comply with the following:
(a) Incident Reporting: The immediate notification and prompt reporting requirement included in paragraph (d) of NFS clause 1852.223-70 shall be to Goddard Space Flight Center Safety Division, Code 360, Telephone 301-356-3224 and to the Contracting Officer (CO). This verbal notification should be confirmed in writing via E-Mail to the CO and GSFC-OccSafetyOffice@nasa.gov and entered into the NASA Mishap Information System (NMIS) within 24 hours. This notification is also required for any unsafe or environmentally hazardous condition associated with Government-owned property that is provided or made available for the performance of the contract.
(b) Submit a monthly safety and health report using NMIS. Specify incidents (mishaps and close calls) and man-hours worked/month. Access to NMIS must be requested through the NASA Access Management System (NAMS) within 30 days of the contract effective date at https://idmax.nasa.gov. Until access is approved, use the Contractor Monthly Statistics Report Template available at http://safety1st.gsfc.nasa.gov under Contractor Safety and e-mail the completed form to krystal.a.kennedy@nasa.gov.
H.11 52.236-13 ACCIDENT PREVENTION (NOV 1991) ALTERNATE I (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR part 1926 and
29 CFR part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
mailto:krystal.a.kennedy@nasa.gov
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(f) Before commencing the work, the Contractor shall—
(1) Submit a written proposed plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards; and
(2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
H.12 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR SERVICE
The following items have been identified to be obtained from a mandatory source in compliance with FAR clause 52.208-9, Contractor Use of Mandatory Sources of Supply or Services:
None known at this time
Additional items may be available from the mandatory source. The contractor is responsible for determining whether an item is available. AbilityOne’s procurement products’ list can be searched at:
http://pl.abilityone.gov/procurement_search/procurement_product_search.aspx
(End of text) http://pl.abilityone.gov/procurement_search/procurement_product_search.aspx
SECTION I - CONTRACT CLAUSES
I.1 52.202-1 DEFINITIONS (NOV 2013)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEP 2006)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010)
I.9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT
(OCT 2015)
I.10 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites—
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
https://oig.nasa.gov/hotline.html, Inspector General Hotline Posters may be obtained from NASA Office of Inspector General, Code W, Washington, DC 20546-0001
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed $5.5 million, except when the subcontract—
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
I.11 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
I.12 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
I.13 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011)
I.14 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
I.15 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
I.16 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (JUL 2016)
I.17 52.208-9 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR
SERVICES (MAY 2014)
I.18 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (OCT 2015)
I.19 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (JUL 2013)
https://oig.nasa.gov/hotline.html
I.20 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.21 52.210-1 MARKET RESEARCH (APR 2011)
I.22 52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)
I.23 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT
(OCT 1997)
I.24 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
PRICING DATA—MODIFICATIONS (AUG 2011)
I.25 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—
MODIFICATIONS (OCT 2010)
I.26 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY (OCT 1997)
I.27 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND
DATA OTHER THAN CERTIFIED COST OR PRICING DATA--
MODIFICATIONS (OCT 2010)
I.28 52.217-7 OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE
ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days after notice to proceed for Option 1 and 60 days after notice to proceed for Option 2. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
I.29 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE
SMALL BUSINESS CONCERNS (OCT 2014)
(a) Definitions. See 13 CFR 125.6(e) for definitions of terms used in paragraph (d).
(b) Evaluation preference.
(1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except—
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise successful offers from small business concerns.
(2) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation shall be applied before application of the factor.
(3) When the two highest rated offerors are a HUBZone small business concern and a large business, and the evaluated offer of the HUBZone small business concern is equal to the evaluated offer of the large business after considering the price evaluation preference, award will be made to the HUBZone small business concern.
(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraphs (d) and (e) of this clause do not apply if the offeror has waived the evaluation preference.
[_]Offeror elects to waive the evaluation preference.
(d) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for
(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;
(2) Supplies (other than procurement…