ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_26_revised.pdf_-_kms.pdf

PDF 75 KB Posted

Attached to
Construction of a Instrument Development Facility Federal contract opportunity
Solicitation number
NNG17607163R
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

ATTACHMENT 1 NASA IDF FINAL Specifications Vol 2 Section 23 22 26 revised

View the file

Other files for this federal contract opportunity

Other files attached to Construction of a Instrument Development Facility, newest first.
File Type Posted
IDF_Selection_Statement_Signed.pdf PDF
IDF_Amendment_0007.pdf PDF
20171214_Perf_Drain_System_and_Waterproofing.pdf_--_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_MH-101_-_FIRST_FLOOR_MECHANICAL_HVAC_PLAN_revised.pdf_kms2.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_M-801_-_MECHANICAL_SCHEDULES_revised.pdf_-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_13_revised.pdf_-_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_MH-101_-_FIRST_FLOOR_MECHANICAL_HVAC_PLAN_revised-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_00_00_revised.pdf_-_kms.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_22_25_revised.pdf_-_kms.pdf PDF
NASA_GSFC_IDF_Amendment_0006.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_Section_23_05_93_revised.pdf_-_kms.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_NASA_-_Sheet_-_M-801_-_MECHANICAL_SCHEDULES_revised.pdf_-_kms.pdf PDF
IDF_RFP_No._80GSFC17R0009_-__Amendment_0005.pdf PDF
NASA_IDF_Duct_Tables.pdf PDF
IDF_RFP_Amendment_0004.pdf PDF
IDF_RFP_No._80GSFC17R0009_Amendment_0003.pdf PDF
QL_drawings_Showing_Furniture_for_Installation_TS.pdf PDF
Section_09_06_90_Attachment_A__Finish_Legend_Alternatives_Inspected_TS.pdf PDF
Attachment_2_Drawings_Informational_Purposes_Only.pdf PDF
Specification_Section_01_33_29_Attachment_2_TPC_Checklist_Inspected_TS.pdf PDF
Specification_Section_01_33_29_Attachment_1_HPSB_Checklist_Inspected_TS.pdf PDF
IDF_Site_Visit_Sign_in_Sheet.pdf PDF
IDF_Site_Visit_Question_and_Answers-Clean.pdf PDF
RFP_No._80GSFC17R0009_IDF_Questions_and_Answers_1-73.pdf PDF
Question_Due_Date_Extension.pdf PDF
IDF_Amendment_0002.pdf PDF
ATTACHMENT_4_General_Wage_Decision_MD170058,_Modification_No._10.pdf PDF
RFP_No._80GSFC17R0009_Amendment_000001.pdf PDF
ATTACHMENT_2_NASA_IDF_FINAL_Drawings_COMPILED_-_final.pdf PDF
SF1442_final.pdf PDF
Goddard_IDF_Site_Visit_Registration_Form_final.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_1_COMPILED_final.pdf PDF
Enclosure_1_-_IDF_QASP-Scanned_-_final.pdf PDF
ATTACHMENT_3_BUILDING_INFORMATION_MODELING_SCOPE_OF_SERVICES_-_Final.pdf PDF
Exhibit_1-Pricing-Cleaned_-_final.pdf PDF
IDF_RFP_Cover_Letter_Scanned_final.pdf PDF
Exhibit_2-Subcontracting_Goals-_Cleaned_-_final.pdf PDF
ATTACHMENT_9_NASA_Instrument_Development_Facility_Geotechnical_Report_-_final.pdf PDF
ATTACHMENT_1_NASA_IDF_FINAL_Specifications_Vol_2_COMPILED_-_final.pdf PDF
IDF_RFP_No._80GSFC17R0009_-_Sections_B-M_FINAL.pdf PDF
ATTACHMENT_8_MDE_Permit_-_Final.pdf PDF
ATTACHMENT_7_PIV_Attachment-Cleaned_-_final.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Goddar d Space Fl i ght Cent er Fi nal Submi ssi on I nst r ument Devel opment Faci l i t y December 8, 2016

SECTI ON 23 22 26

STEAM SYSTEM AND TERMI NAL UNI TS

11/15

PART 1 GENERAL

1. 1 RELATED DOCUMENTS

Dr awi ngs and gener al pr ovi s i ons of t he Cont r act , i ncl udi ng Gener al and Suppl ement ar y Condi t i ons and ot her Di v i s i on 01 Speci f i cat i on Sect i ons, appl y t o t hi s Sect i on.

1. 2 SUMMARY

Thi s Sect i on i nc l udes r equi r ement s and ot her cr i t er i a f or st eam and condensat e pi pi ng, conver t or s, and condensat e r et ur n uni t s used f or heat i ng wi t hi n t he bui l di ng.

1. 3 RELATED SECTI ONS

Rel at ed Sect i ons i ncl ude t he f ol l owi ng:

1. Di v i s i on 23 Sect i on 23 03 00 " Basi c Mechani cal Mat er i al s and Methods."

2. Di v i s i on 23 Sect i on 23 05 15 " Common Pi pi ng For HVAC. "

3. Di v i s i on 23 Sect i on 23 05 93 " Test i ng, Adj ust i ng and Bal anci ng f or

HVAC."

4. Di v i s i on 23 Sect i on 23 21 13 " Low Temper at ur e Wat er ( LTW) Heat i ng System."

5. Di v i s i on 23 Sect i on 23 22 13 " St eam Tr aps. "

6. Di v i s i on 23 Sect i on 23 22 23 " St eam Condensat e Pumps. "

1. 4 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS Z49. 1 ( 2005) Saf et y i n Wel di ng and Cut t i ng and Al l i ed Pr ocesses

ASME I NTERNATI ONAL ( ASME)

ASME A13. 1 ( 2015) Scheme f or t he I dent i f i cat i on of Pi pi ng Syst ems

ASME B1. 1 ( 2003; R 2008) Uni f i ed I nch Scr ew Thr eads ( UN and UNR Thr ead For m)

SECTI ON 23 22 26 Page 1

ASME B1. 20. 1 ( 2013) Pi pe Thr eads, Gener al Pur pose ( I nch)

ASME B16. 3 ( 2011) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300

ASME B16. 5 ( 2013) Pi pe Fl anges and Fl anged Fi t t i ngs:

NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d

ASME B16. 9 ( 2012) St andar d f or Fact or y- Made Wr ought St eel But t wel di ng Fi t t i ngs

ASME B16. 11 ( 2011) For ged Fi t t i ngs, Socket - Wel di ng and Threaded

ASME B16. 20 ( 2007) Met al l i c Gasket s f or Pi pe Fl anges - Ri ng- Joi nt , Spi r al Wound, and Jacket ed

ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges

ASME B16. 24 ( 2011) Cast Copper Al l oy Pi pe Fl anges and Fl anged Fi t t i ngs: Cl asses 150, 300, 600, 900, 1500, and 2500

ASME B16. 34 ( 2013) Val ves - Fl anged, Thr eaded and Wel di ng End

ASME B16. 39 ( 2014) St andar d f or Mal l eabl e I r on Thr eaded Pi pe Uni ons; Cl asses 150, 250, and 300

ASME B18. 2. 1 ( 2012; Er r at a 2013) Squar e and Hex Bol t s and Scr ews ( I nch Ser i es)

ASME B18. 2. 2 ( 2010) Nut s f or Gener al Appl i cat i ons:

Machi ne Scr ew Nut s, Hex, Squar e, Hex Fl ange, and Coupl i ng Nut s ( I nch Ser i es)

ASME B31. 1 ( 2014; I NT 1- 47) Power Pi pi ng

ASME B40. 100 ( 2013) Pr essur e Gauges and Gauge Attachments

ASME BPVC SEC VI I I D1 ( 2015) BPVC Sect i on VI I I - Rul es f or Const r uct i on of Pr essur e Vessel s Di v i s i on 1

ASME BPVC SEC I X ( 2015) BPVC Qual i f i cat i on St andar d f or Wel di ng, Br azi ng, and Fusi ng Pr ocedur es;

Wel der s; Br azer s; and Wel di ng, Br azi ng, and Fusi ng Oper at or s

ASTM I NTERNATI ONAL ( ASTM)

ASTM A 106/ A 106M ( 2010) St andar d Speci f i cat i on f or Seaml ess Car bon St eel Pi pe f or Hi gh- Temper at ur e Service

ASTM A 194/ A 194M ( 2010) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Nut s f or Bol t s f or

SECTI ON 23 22 26 Page 2

Hi gh- Pr essur e or Hi gh- Temper at ur e Ser vi ce, or Bot h

ASTM A 307 ( 2007b) St andar d Speci f i cat i on f or Car bon St eel Bol t s and St uds, 60 000 PSI Tensi l e Strength

ASTM A 53/ A 53M ( 2010) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS

I NDUSTRY ( MSS)

MSS SP- 45 ( 2003; R 2008) Bypass and Dr ai n Connect i ons

MSS SP- 58 ( 2009) Pi pe Hanger s and Suppor t s - Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and I nst al l at i on

MSS SP- 69 ( 2003; Not i ce 2012) Pi pe Hanger s and Suppor t s - Sel ect i on and Appl i cat i on ( ANSI Appr oved Amer i can Nat i onal St andar d)

MSS SP- 80 ( 2013) Br onze Gat e, Gl obe, Angl e and Check Valves

U. S. GENERAL SERVI CES ADMI NI STRATI ON ( GSA)

CI D A- A- 1689 ( Rev B) Tape, Pr essur e- Sensi t i ve Adhesi ve, ( Pl ast i c Fi l m)

U. S. GREEN BUI LDI NG COUNCI L ( USGBC)

LEED NC ( 2009; R2014) Leader shi p i n Ener gy and Envi r onment al Desi gn( t m) New Const r uct i on Rat i ng Syst em

1. 5 GENERAL REQUI REMENTS

1. 5. 1 Cl asses and Maxi mum Wor ki ng Pr essur es

Equi pment , pi pi ng, and pi pi ng component s shal l be sui t abl e f or use under t he maxi mum wor ki ng pr essur e i ndi cat ed. Except as modi f i ed her ei n, t he pr essur e t emper at ur e l i mi t at i ons shal l be as speci f i ed i n t he r ef er enced st andar ds and speci f i cat i ons.

1. 5. 2 Wel di ng Saf et y

AWS Z49. 1.

1. 5. 3 Definitions

Hi gh Pr essur e Pi pi ng Syst em: A syst em whose pr essur e i s gr eat er t han 15 psi g and shal l conf or m t o ASME B31. 1.

Low Pr essur e Pi pi ng Syst em: A syst em whose pr essur e i s 15 psi g or l ess.

Ter mi nal Uni t : An encl osed uni t t hat pr ovi des heat ed ai r f r om a st eam coi l

SECTI ON 23 22 26 Page 3 and i ncl udes nat ur al convect i on uni t s, r adi at i on, and f or ced ai r uni t s.

Pi pi ng and Pi pi ng Syst em: I ncl udes pi pe, t ubi ng, f l anges, bol t i ng, gasket s, val ves, saf et y val ves, f i t t i ngs, and pr essur e cont ai ni ng par t s of ot her pi pi ng component s, hanger s, suppor t s, gui des, expansi on j oi nt s, anchor s, and ot her equi pment i t ems necessar y t o pr event over st r essi ng t he pr essur e cont ai ni ng par t s.

1. 6 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Di v i s i on 01 Sect i on 01 33 00 " Submi t t al Procedures":

SD- 03 Pr oduct Dat a

Val ves; G, AE

Val ve Oper at i ng Mechani sm; G, AE

I nst r ument at i on; G, AE

St eam Met er s; G, AE

St r ai ner s; G, AE

Fl ash Tanks; G, AE

SD- 05 Desi gn Dat a

Rel i ef Devi ce Si z i ng Cal cul at i ons; G

Pi pi ng Fl exi bi l i t y and Suppor t Anal ysi s; G

SD- 06 Test Repor t s

St eam Pi pi ng t est s; G, AE

Val ves t est s; G, AE

I nst r ument at i on t est s; G, AE

Pi pe and Pi pe Syst em; G, AE

I nspect i on Repor t s as Requi r ed by ASME B31. 1 Tabl e 136. 4; G

SD- 07 Cer t i f i cat es

Wel di ng Pr ocedur e; G

Wel der ' s Per f or mance Qual i f i cat i on Recor d; G

Li st of Wel der s and Wel der ' s Symbol s; G

SD- 11 Cl oseout Submi t t al s

SECTI ON 23 22 26 Page 4

Fi nal Sust ai nabi l i t y Not ebook Submi t t al ; G

LEED Document at i on Not ebook; G

1. 7 QUALI TY ASSURANCE

1. 7. 1 Wel di ng Pr ocedur e

Submi t wel di ng pr ocedur e speci f i cat i on f or met al s i ncl uded i n t he wor k, t oget her wi t h pr oof of t he pr ocedur e' s qual i f i cat i ons as out l i ned i n

ASME B31. 1.

1. 7. 2 Wel der ' s Per f or mance Qual i f i cat i on Recor d

Submi t t o t he Gover nment t he Wel der ' s Per f or mance Qual i f i cat i on Recor d i n conf or mance wi t h ASME B31. 1 f or each wel der , showi ng t hat t he wel der was t est ed under t he appr oved pr ocedur e speci f i cat i on submi t t ed by t he Cont r act or . I n addi t i on, t he Cont r act or shal l submi t l i s t of wel der s and wel der ' s symbol s, assi gned number , or l et t er whi ch shal l be used t o i dent i f y t he wor k of t he wel der whi ch shal l be af f i xed i mmedi at el y upon compl et i on of t he wel d. Wel der s maki ng def ect i ve wel ds af t er passi ng a qual i f i cat i on t est shal l be r equi r ed t o t ake a r equal i f i cat i on t est .

Wel der s f ai l i ng t he r equal i f i cat i on t est s wi l l not be per mi t t ed t o wor k under t hi s Cont r act .

1. 7. 3 Pr evi ous Qual i f i cat i ons

Wel di ng pr ocedur es, wel der s, and wel di ng oper at or s pr evi ousl y qual i f i ed by t est may be accept ed f or t hi s cont r act wi t hout r equal i f i cat i on subj ect t o appr oval i f t he condi t i ons speci f i ed i n ASME B31. 1 ar e met bef or e a pr ocedur e can be used.

1. 8 SUSTAI NABLE DESI GN REQUI REMENTS

1. 8. 1 Fi nal Sust ai nabi l i t y Not ebook Submi t t al

Ref er t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG f or f eder al sust ai nabi l i t y pr oduct and document at i on r equi r ement s.

1. 8. 2 LEED Document at i on Not ebook

Ref er t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG f or LEED NC pr er equi s i t es and cr edi t s r equi r ed t o be ear ned f or t hi s pr oj ect ( r ef er t o LEED scor ecar d at t ached t o 01 33 29 SUSTAI NABI LI TY REPORTI NG f or t hose cr edi t s and r equi r ed poi nt s i n t hose cr edi t s) . Ref er t o t he LEED NC v2009 r ef er ence gui de and addi t i onal onl i ne gui dance at www. usgbc. or g f or document at i on r equi r ement s.

PART 2 PRODUCTS

2. 1 PI PE AND PI PE SYSTEM

Al l st eam syst em component s shal l be as descr i bed i n t he f ol l owi ng par agr aphs except t hat , f or c l ean st eam syst em, al l wet t ed par t s shal l be 304 st ai nl ess st eel .

2. 1. 1 Hi gh Pr essur e St eam Pi pi ng Syst em ( Over 15 psi g)

ASME B31. 1 f or a st eam wor ki ng pr essur e of 100 psi g and a t emper at ur e of

SECTI ON 23 22 26 Page 5

350 degr ees F, a condensat e pr essur e of 30 psi g, and a t emper at ur e of 212 degr ees F.

2. 1. 1. 1 Hi gh Pr essur e St eam Pi pi ng

ASTM A 106/ A 106M or ASTM A 53/ A 53M, Gr ade B, Schedul e 40, bl ack st eel , el ect r i c- r esi st ance wel ded or seaml ess. Use ASTM A 53/ A 53M pi pe f or bending.

2. 1. 2 Low Pr essur e St eam Pi pi ng Syst em

ASME B31. 1 f or a st eam wor ki ng pr essur e of 15 psi g or l ess, a condensat e pr essur e of 15 psi g, and a t emper at ur e of 212 degr ees F.

2. 1. 2. 1 Low Pr essur e St eam Pi pi ng

St eel Pi pi ng: ASTM A 53/ A 53M, Schedul e 40, bl ack, el ect r i c- r esi st ance wel ded or seaml ess. Use ASTM A 53/ A 53M pi pe f or bendi ng.

2. 1. 3 Condensat e Ret ur n Pi pi ng ( 100 psi g or Less)

St eel Pi pi ng: ASTM A 106/ A 106M or ASTM A 53/ A 53M, Gr ade B, Schedul e 80, bl ack, el ect r i c- r esi st ance wel ded or seaml ess.

2. 1. 4 Fittings

Pr ovi de f i t t i ngs compat i bl e i n al l r espect s ( mat er i al , s i ze, pr essur e, and t emper at ur e l i mi t at i ons) wi t h t he pi pe bei ng used and wi t hi n any f ur t her l i mi t at i ons of ASME B31. 1.

2. 1. 4. 1 Fi t t i ngs f or St eel Pi pe

a. Si zes 1/ 8 i nch t o 2 i nches:

( 1) St eel Fi t t i ngs: ASME B16. 11, socket wel di ng or t hr eaded.

Wher e pr essur e exceeds 15 psi g, pr ovi de socket - wel di ng t ype onl y.

( 2) Mal l eabl e I r on Fi t t i ngs: ASME B16. 3, t hr eaded.

b. Si zes 2- 1/ 2 i nches and l ar ger :

( 1) St eel Fi t t i ngs: ASME B16. 9, but t wel di ng or ASME B16. 5, flanged.

2. 1. 5 Unions

2. 1. 5. 1 Uni ons f or St eel Pi pe

ASME B16. 39, t hr eaded.

2. 1. 6 Flanges

Remove t he r ai sed f aces on f l anges when used wi t h f l anges havi ng a f l at face.

2. 1. 6. 1 St eel Fl anges

ASME B16. 5, f or ged st eel , wel di ng t ype.

SECTI ON 23 22 26 Page 6

2. 1. 6. 2 Br onze Fl anges

ASME B16. 24, t hr eaded.

2. 1. 7 Valves

Compl y wi t h t he f ol l owi ng par agr aphs. End connect i ons shal l compl y wi t h par agr aph ent i t l ed " End Connect i ons. "

2. 1. 7. 1 Gat e Val ves

a. Br onze Gat e Val ves: MSS SP- 80, Type 1 ( sol i d wedge, non- r i s i ng st em) or Type 2 ( sol i d wedge, i ns i de scr ew, r i s i ng st em) , 3 i nches and smal l er , t hr eaded j oi nt ends, and not l ess t han Cl ass 150.

b. St eel Gat e Val ves: ASME B16. 34. Pr ovi de out s i de scr ew and yoke t ype wi t h sol i d wedge or f l exi bl e wedge di sc, and wi t h t r i m sui t abl e f or t he ser vi ce t emper at ur e and pr essur e.

2. 1. 7. 2 Gl obe and Angl e Val ves

a. Br onze Gl obe and Angl e Val ves: MSS SP- 80, Type 1 ( met al di sc, i nt egr al seat ) or Type 3 ( met al di sc, r enewabl e seat ) , 3 i nches and smal l er , t hr eaded j oi nt ends, Cl ass 200. Val ves shal l have r enewabl e seat s and di scs.

b. St eel Gl obe and Angl e Val ves: ASME B16. 34, wi t h t r i m sui t abl e f or t he ser vi ce t emper at ur e and pr essur e.

2. 1. 7. 3 Check Val ves

a. Br onze Check Val ves: MSS SP- 80, Type 3 ( swi ng check, met al di sc t o met al seat ) , 3 i nches and smal l er , t hr eaded j oi nt ends, Cl ass 200, r egr i ndi ng t ype.

2. 1. 7. 4 St eam Pr essur e Reduci ng Val ves

Type Pi l ot , Cl ass 150, Const r uct i on cast i r on, Load Char act er i st i cs percentage.

2. 1. 7. 5 Temper at ur e Regul at i ng Val ves

Type Pi l ot , Cl ass 150, cast i r on.

2. 1. 7. 6 Val ve Oper at i ng Mechani sm

Pr ovi de power oper at or s and ext ensi on st ems wher e i ndi cat ed and as specified.

a. Power Oper at or s: Shal l be el ect r i c . Power oper at ed val ves shal l open and cl ose at r at es no s l ower t han 10 i nches per mi nut e f or gat e val ves and 4 i nches per mi nut e f or gl obe and angl e val ves. Val ves shal l open f ul l y or c l ose t i ght l y wi t hout r equi r i ng f ur t her at t ent i on when t he act uat i ng cont r ol i s moved t o t he open or c l ose posi t i on. A pr edet er mi ned t hr ust exer t ed on t he st em dur i ng oper at i on r esul t i ng f r om an obst r uct i on i n t he val ve shal l cause t he mot or t o aut omat i cal l y st op. Power oper at or s shal l be compl et e wi t h al l gear i ng and cont r ol s necessar y f or t he s i ze of val ve bei ng pr ovi ded. Power oper at or s shal l be desi gned t o oper at e on t he el ect r i c power suppl y i ndi cat ed.

SECTI ON 23 22 26 Page 7

b. Ext ensi on St em: Shal l be cor r osi on r esi st i ng st eel desi gned f or r i s i ng and non- r i s i ng st ems, as appl i cabl e, and f or connect i on t o t he val ve st em by a s l eeve coupl i ng or uni ver sal j oi nt . Pr ovi de i n l engt h r equi r ed t o connect t he val ve st em and t he handwheel and of suf f i c i ent cr oss sect i on t o t r ansf er t he t or que r equi r ed t o oper at e t he val ve.

2. 1. 8 End Connect i ons

2. 1. 8. 1 St eel Pi pi ng

Si zes 2 i nches and smal l er t hr eaded or socket wel ded; s i zes 2- 1/ 2 i nches and l ar ger f l anged or but t wel ded.

a. Thr eaded Joi nt s: ASME B1. 20. 1.

b. Fl anged Joi nt s: Fl anges shal l conf or m t o par agr aph ent i t l ed " Fl anges. " Bol t i ng and gasket s shal l be as f ol l ows:

( 1) Bol t i ng: Mat er i al used f or bol t s and st uds shal l conf or m t o ASTM A 307, Gr ade B; and mat er i al f or nut s shal l conf or m t o ASTM A 194/ A 194M, Gr ade 2. Di mensi ons of bol t s, st uds, and nut s shal l conf or m t o ASME B18. 2. 1 and ASME B18. 2. 2 wi t h t hr eads conf or mi ng t o ASME B1. 1 coar se t ype, wi t h Cl ass 2A f i t f or bol t s and st uds, and Cl ass 2B f i t f or nut s. Bol t s or bol t - st uds shal l ext end compl et el y t hr ough t he nut s and may have r educed shanks of a di amet er not l ess t han t he di amet er at r oot of t hr eads. Car bon st eel bol t s shal l have Amer i can St andar d r egul ar squar e or heavy hexagon heads and shal l have Amer i can St andar d heavy semi f i ni shed hexagonal nut s, conf or mi ng t o ASME B18. 2. 1 and ASME B18. 2. 2.

( 2) Gasket s: Gasket s shal l be as f ol l ows:

Wor ki ng Condi t i ons Material

Sat ur at i on 100 psi g, 350 degr ees F Composi t i on

Gasket s shal l be as t hi n as t he f i ni sh of sur f aces wi l l per mi t .

Met al or met al - j acket ed non- asbest os gasket s shal l be used wi t h smal l mal e and f emal e or smal l t ongue- and- gr oove f l anges or f l anged f i t t i ngs; t hey may be used wi t h st eel f l anges wi t h l apped, l ar ge mal e and f emal e, l ar ge t ongue- and- gr oove, or r ai sed f aces.

Ful l f aced gasket s shal l be used wi t h f l at - f aced br onze f l anges.

Lapped st eel f l anges, or r ai sed- f ace st eel f l anges shal l have r i ng gasket s wi t h an out s i de di amet er ext endi ng t o t he i nsi de of t he bol t hol es. Wi dt hs of gasket s f or smal l mal e and f emal e and f or t ongue- and- gr oove j oi nt s shal l be equal t o t he wi dt hs of t he mal e f ace or t ongue. Gasket s shal l have an i nsi de di amet er equal t o or l ar ger t han t he por t openi ngs. Ri ngs f or r i ng j oi nt s shal l be i n accor dance wi t h di mensi ons i n ASME B16. 20, sui t abl e f or t he ser vi ce condi t i ons encount er ed, and shal l be sof t er t han t he f l anges. Di mensi ons f or non- met al l i c gasket s shal l be i n accor dance wi t h ASME B16. 21.

c. But t Wel d Joi nt s: ASME B31. 1. The use of backi ng r i ngs shal l conf or m t o ASME B31. 1. Fer r ous r i ngs shal l be of good wel dabl e qual i t y and shal l not exceed 0. 05 per cent sul f ur ; f or al l oy pi pe, backi ng r i ngs shal l be of mat er i al compat i bl e wi t h t he chemi cal composi t i on of t he par t s t o be wel ded and pr ef er abl y of t he same composi t i on. Backi ng

SECTI ON 23 22 26 Page 8 r i ngs shal l be cont i nuous machi ned or spl i t band t ype.

d. Socket Wel d Joi nt s: ASME B31. 1.

2. 1. 9 Instrumentation

2. 1. 9. 1 Pr essur e and Vacuum Gages

ASME B40. 100 wi t h r est r i c t or , l ocat e as i ndi cat ed. Pr ovi de scal e r ange f or i nt ended ser vi ce. Scal e r ange not t o exceed t wo t i mes ( 2X) t he i ndi cat ed pr essur e of pi pi ng.

2. 1. 9. 2 Tank Gages

Locat e as i ndi cat ed.

2. 1. 9. 3 I ndi cat i ng Ther momet er s

Ther momet er s shal l be di al t ype wi t h an adj ust abl e angl e sui t abl e f or t he ser vi ce. Pr ovi de t her mowel l s i zed f or each t her momet er i n accor dance wi t h t he t her mowel l speci f i cat i on. Fl ui d- f i l l ed t her momet er s ( mer cur y i s not accept abl e) shal l have a nomi nal scal e di amet er of 5 i nches. Const r uct i on shal l be st ai nl ess- st eel case wi t h mol ded gl ass cover , st ai nl ess- st eel st em, and bul b. St em shal l be st r ai ght , l engt h as r equi r ed t o f i t wel l .

Bi met al t her momet er s shal l have a scal e di amet er of 3- 1/ 2 i nches. Case shal l be her met i c. Case and st em shal l be const r uct ed of st ai nl ess st eel .

Bi met al st em shal l be st r ai ght and of a l engt h as r equi r ed t o f i t t he wel l .

2. 1. 10 Mi scel l aneous Pi pel i ne Component s

2. 1. 10. 1 St eam Met er s

Pr ovi de r ot ar y axi al - t ur bi ne t ype compl i ant wi t h t he f ol l owi ng:

1. Pr ovi de r ot ar y axi al - t ur bi ne t ot al i z i ng t ype desi gned f or mount i ng di r ect l y i n t he st eam l i ne ( f or s i zes up t o 4 i nches i ncl usi vel y) .

Pr ovi de st r ai ght eni ng vanes as r equi r ed f or met er pl acement i n pi pe.

2. The met er shal l be sel f - cont ai ned and sel f - oper at i ng r equi r i ng no mer cur y, pr essur e pi pi ng or el ect r i cal connect i ons except f or oper at i on of accessor y cont act s wher e r equi r ed or desi r ed. The met er shal l i ncl ude a dampened f an shaf t assembl y, f i xed i nt er nal or i f i ce, and magnet i cal l y dr i ven count er of di al and poi nt er t ype. St uf f i ng box shal l not be al l owed.

3. Mat er i al s of const r uct i on shal l be cast i r on body wi t h 250 pounds f l anged ends f or pr essur es up t o 250 psi g and t emper at ur es up t o 450 degr ees F. Wear par t s shal l be of monel or st ai nl ess st eel wi t h gr aphi t e t op bear i ng and j ewel l ed bot t om bear i ng.

4. Met er shal l be di r ect r eadi ng i n pounds of st eam over a 10 t o 1 r ange, wi t h cont i nuous over l oad capabi l i t y up t o 150 per cent of r at ed capaci t y and t empor ar y over l oad capabi l i t y up t o 200 per cent of r at ed capacity.

5. Accur acy shal l be wi t hi n pl us or mi nus 2 per cent of act ual f l ow over t he ent i r e 10 t o 1 r ange at f l ow r at es and pr essur es wi t hi n t he l i mi t s set f or t h i n t he capaci t y t abl es.

SECTI ON 23 22 26 Page 9

6. Met er shal l be equi pped wi t h pr essur e compensat i ng count er f or aut omat i cal l y and cont i nuousl y cor r ect i ng met er r eadi ngs t o compensat e f or l i ne pr essur e var i at i ons. The count er shal l be sel f - cont ai ned and sel f - oper at i ng and r equi r e no connect i ons ot her t han a s i ngl e t ap t o t he st eam mai n.

7. Met er count er shal l be equi pped wi t h el ect r i c cont act or t o oper at e a r emot e t ot al i zer , or f or pr ovi di ng i mpul ses f or i nt er f aci ng wi t h an ener gy moni t or i ng syst em. Cont act s or i mpul ses t o be pr opor t i onal t o pr essur e compensat ed st eam f l ow.

2. 1. 10. 2 Ai r Tr aps

For f l oat - oper at ed st eam t r aps ( non- t her most at i c) , except t hat t he val ve mechani sm shal l be i nver t ed so as t o be c l osed, not opened, by r i s i ng wat er . Ar r ange f l oat - cont r ol l ed val ves t o c l ose pr ompt l y when wat er ent er s t he t r aps. Locat e t r aps as i ndi cat ed.

2. 1. 10. 3 Strainers

St yl e Y ( Y pat t er n) f or Cl ass 125 and 250 pi pi ng i n s i zes 1/ 2 t o 8 i nches, i ncl usi ve, l ocat e as i ndi cat ed, cast i r on pr ohi bi t ed.

2. 1. 10. 4 Hanger s, Suppor t s, Spaci ng Requi r ement s, and At t achment s

MSS SP- 58 and ASME B31. 1 f or mat er i al s, desi gn, and manuf act ur e. MSS SP- 69 f or sel ect i on and appl i cat i on.

2. 1. 10. 5 Fl ash Tanks

Const r uct of st eel f or a mi ni mum wor ki ng pr essur e of 125 psi g. Pr ovi de t he t ank wi t h a vent and val ved dr ai n.

PART 3 EXECUTI ON

3. 1 INSTALLATION

Wor k mat er i al and equi pment i nt o a compl et e, conveni ent , and economi cal syst em or syst ems; and pr ovi de appar at us, par t s, mat er i al s, and accessor i es whi ch ar e necessar y t o accompl i sh t hi s r esul t .

3. 1. 1 Piping

Fabr i cat e, assembl e, wel d, br aze, and i nst al l pi pi ng and pi pe syst em i n accor dance wi t h ASME B31. 1 and as f ur t her qual i f i ed her ei n. Pi pi ng shal l f ol l ow t he gener al ar r angement shown. Cut pi pi ng accur at el y t o measur ement s est abl i shed, f or t he wor k shown, by t he Cont r act or , and wor k i nt o pl ace wi t hout spr i ngi ng or f or c i ng, except wher e col d- spr i ngi ng i s i ndi cat ed. Locat e pi pi ng and equi pment wi t hi n bui l di ngs ent i r el y out of t he way of l i ght i ng f i x t ur es, condui t , and door s, wi ndows, and ot her openi ngs. Run over head pi pi ng i n bui l di ngs i n t he most i nconspi cuous posi t i ons. Pr ovi de adequat e c l ear ances f r om wal l s , cei l i ngs, and f l oor s t o per mi t t he wel di ng of j oi nt s; at l east 6 i nches f or pi pe s i zes 4 i nches and smal l er , 10 i nches f or pi pe s i zes l ar ger t han 4 i nches, and i n cor ner s pr ovi de suf f i c i ent c l ear ance t o per mi t t he wel der t o wor k bet ween t he pi pe and one wal l . Make pr ovi s i on f or expansi on and cont r act i on of pi pe l i nes.

Do not bur y, conceal , or i nsul at e pi pi ng unt i l i t has been i nspect ed, t est ed, and appr oved. Do not conceal pi pi ng i n wal l s, par t i t i ons, under gr ound, or under t he f l oor except as i ndi cat ed. Wher e pi pe passes

SECTI ON 23 22 26 Page 10 t hr ough bui l di ng st r uct ur e, do not conceal pi pe j oi nt s, but l ocat e wher e t hey may be r eadi l y i nspect ed and not weaken bui l di ng st r uct ur e. Run i nsul at ed pi pe as shown and as r equi r ed wi t h suf f i c i ent c l ear ance t o per mi t appl i cat i on of i nsul at i on. Use f l anged j oi nt s onl y wher e necessar y f or nor mal mai nt enance and wher e r equi r ed t o mat ch val ves and equi pment .

Gasket s, packi ng, and t hr ead compounds shal l be sui t abl e f or t he ser vi ce.

Appl y j oi nt compound or t ape on mal e t hr ead onl y. Use l ong r adi us el l s wher ever possi bl e t o r educe pr essur e dr ops. Pi pe bends may be used i n l i eu of wel di ng f i t t i ngs wher e space per mi t s. Pi pe bends shal l have a uni f or m r adi us of at l east f i ve t i mes t he pi pe di amet er and shal l be f r ee f r om any appr eci abl e f l at t eni ng, wr i nkl i ng, or t hi nni ng of t he pi pe. Mi t er i ng of pi pe t o f or m el bows, not chi ng st r ai ght r uns t o f or m f ul l s i zed t ees, or any s i mi l ar const r uct i on shal l not be used. Make br anch connect i ons wi t h wel di ng t ees except f act or y made f or ged wel di ng br anch out l et s or nozzl es havi ng i nt egr al r ei nf or cement s conf or mi ng t o ASME B31. 1 may be used, pr ovi ded t he nomi nal di amet er of t he br anch i s at l east one pi pe s i ze l ess t han t he nomi nal di amet er of t he r un. Run pi pi ng as i ndi cat ed, and avoi d i nt er f er ence wi t h ot her pi pi ng, condui t , or equi pment . Run ver t i cal pi pi ng pl umb and st r ai ght and par al l el t o wal l s, except wher e speci f i cal l y shown ot her wi se. Do not t r ap l i nes, except wher e i ndi cat ed. Use r educi ng f i t t i ngs f or changes i n pi pe s i zes. The use of bushi ngs i s pr ohi bi t ed. I n hor i zont al l i nes 2- 1/ 2 i nches and l ar ger , use r educi ng f i t t i ngs of t he eccent r i c t ype t o mai nt ai n t he bot t om of t he l i nes i n t he same pl ane f or st eam l i nes and t o mai nt ai n t he t op of t he l i nes i n t he same pl ane f or condensat e l i nes except wher e a t r ap or pocket woul d r esul t . Pr ovi de sui t abl e s i ze s l eeves f or l i nes passi ng t hr ough bui l di ng st r uct ur e.

I nst al l pi pi ng connect ed t o equi pment t o pr ovi de f l exi bi l i t y f or t her mal st r esses and f or v i br at i on. Suppor t and anchor pi pe so t hat st r ai n f r om wei ght and t her mal movement of pi pi ng i s not i mposed on t he equi pment .

Thor oughl y c l ean each sect i on of pi pe, f i t t i ngs, and val ves of f or ei gn mat t er bef or e er ect i on. Bef or e pl aci ng i n posi t i on, c l ean t he i nsi de of bl ack st eel pi pe by r appi ng al ong i t s f ul l l engt h t o l oosen sand, mi l l scal e, and ot her f or ei gn mat t er ; pi pe 2 i nches and l ar ger shal l have a wi r e br ush of a di amet er l ar ger t han t hat of t he i nsi de of t he pi pe dr awn t hr ough i t s ent i r e l engt h sever al t i mes. Bef or e f i nal connect i ons ar e made t o t he appar at us, t hor oughl y wash out t he pi pi ng i nt er i or wi t h wat er . Bl ow out st eam pi pi ng wi t h hi gh- pr essur e st eam, i f avai l abl e, r emovi ng r ust , oi l , chi ps, sand, and ot her mat er i al . Pl ug or cap open ends of mai ns dur i ng shut down per i ods. Do not l eave l i nes open at any pl ace wher e any f or ei gn mat t er mi ght acci dent al l y ent er pi pe.

3. 1. 1. 1 Welding

a. Wel di ng of Pi pi ng: Wel di ng of j oi nt s i n pi pi ng, but t wel ds, f i l l et wel ds, bends, l oops, of f set s, and pr epar at i on and cl eani ng of pi pe shal l compl y wi t h ASME B31. 1. Wel ds shal l be exami ned i n accor dance wi t h t he mandat or y mi ni mum nondest r uct i ve exami nat i ons f or pr essur e wel ds Tabl e 136. 4 as i ndi cat ed i n Chapt er VI of ASME B31. 1.

b. Qual i t y of Wel ds: Qual i t y of wel ds, cor r ect i on of def ect s, st r ess r el i evi ng, and pr eheat i ng shal l compl y wi t h ASME B31. 1.

c. Ar c Wel di ng and Gas Wel di ng: Compl y wi t h ASME BPVC SEC I X.

3. 1. 1. 2 Hanger s and Suppor t s

Unl ess ot her wi se i ndi cat ed, hor i zont al and ver t i cal pi pi ng at t achment s shal l compl y wi t h MSS SP- 58. Cont i nuous i nser t s and expansi on bol t s may be used.

SECTI ON 23 22 26 Page 11

3. 1. 1. 3 Gr adi ng and Vent i ng of Pi pe Li nes

Unl ess ot her wi se i ndi cat ed, i nst al l hor i zont al l i nes of st eam and r et ur n pi pi ng t o gr ade down i n t he di r ect i on of f l ow wi t h a pi t ch of not l ess t han 1 i nch i n 30 f eet , except i n l oop mai ns and mai n header s wher e t he f l ow may be i n ei t her di r ect i on. When count er f l ow of condensat e wi t hi n t he st eam pi pe occur s i n a por t i on of a pi pel i ne, pi t ch up i n t he di r ect i on of st eam f l ow a mi ni mum of 6 i nches per 100 f eet and i ncr ease pi pe di amet er s by one st andar d pi pe s i ze. Ai r vent s shal l be pr ovi ded at t he hi ghest poi nt of any ver t i cal r i ser .

3. 1. 1. 4 Pi pe Sl eeves

Pr ovi de pi pe s l eeves wher e pi pes and t ubi ng pass t hr ough masonr y or concr et e wal l s, f l oor s, r oof s, and par t i t i ons. Use Schedul e 40 gal vani zed st eel pi pe s l eeves i n out s i de wal l s bel ow and above gr ade, i n f l oor , and i n r oof s l abs. Sl eeves i n par t i t i ons shal l be z i nc- coat ed sheet st eel havi ng a wei ght of not l ess t han 0. 907 psf . Space bet ween pi pe, t ubi ng, or i nsul at i on and t he s l eeve shal l be not l ess t han 1 i nch. Hol d s l eeves secur el y i n pr oper posi t i on and l ocat i on bef or e and dur i ng const r uct i on.

Sl eeves shal l be of suf f i c i ent l engt h t o pass t hr ough ent i r e t hi ckness of wal l s, par t i t i ons, or s l abs. Sl eeves i n f l oor s l abs shal l ext end 2 i nches above t he f i ni shed f l oor . Pack space bet ween t he pi pe or t ubi ng and t he s l eeve f i r ml y wi t h oakum and caul k bot h ends of t he s l eeve wi t h el ast i c cement . Fur ni sh s l eeves i n wat er pr oof ed const r uct i on wi t h f l anges and cl ampi ng r i ngs.

3. 1. 1. 5 Fl oor , Wal l , and Cei l i ng Pl at es

Secur e pl at es t o t he pi pe wi t h enough cl ear ance f or t her mal expansi on of pi pe. Use chr omi um- pl at ed st eel or ni ckel - pl at ed cast i r on pl at es on pi pes passi ng t hr ough f l oor s and par t i t i ons of t oi l et r ooms and wher e i ndi cat ed;

use pai nt ed cast i r on, mal l eabl e i r on, or st eel f or al l ot her pl at es.

3. 1. 1. 6 Fl ashi ng f or Bui l di ngs

Pr ovi de t i ght wat er pr oof f l ashi ng wher e pi pes pass t hr ough bui l di ng r oof s and out s i de wal l s.

3. 1. 1. 7 Uni ons and Fl anges

Pr ovi de uni ons and f l anges wher e necessar y t o per mi t easy di sconnect i on of pi pi ng and appar at us, and as i ndi cat ed. Pr ovi de a uni on f or each t hr eaded end val ve. Pl ace uni ons or f l anges no f ar t her apar t t han 100 f eet . Use uni ons on pi pi ng smal l er t han 2 i nches i n di amet er , and use f l anges on pi pi ng 2 i nches and l ar ger i n di amet er . Pr ovi de di el ect r i c uni ons or f l anges bet ween f er r ous and non- f er r ous pi pi ng, equi pment , and f i t t i ngs;

except t hat br onze val ves and f i t t i ngs may be used wi t hout di el ect r i c coupl i ngs f or f er r ous- t o- f er r ous or non- f er r ous t o non- f er r ous connect i ons. Di el ect r i c f i t t i ngs shal l ut i l i ze a non- met al l i c f i l l er whi ch wi l l pr event cur r ent f l ow. The spacer shal l be sui t abl e f or t he pr essur e and t emper at ur e of t he ser vi ce. The f i t t i ngs shal l ot her wi se conf or m t o t he r equi r ement s of par agr aph ent i t l ed " Fi t t i ngs. "

3. 1. 1. 8 Connect i ons f or Fut ur e Equi pment

Locat e capped or pl ugged out l et s f or connect i ons t o f ut ur e equi pment as indicated.

SECTI ON 23 22 26 Page 12

3. 1. 2 Valves

3. 1. 2. 1 General

I nst al l val ves i n conf or mance wi t h ASME B31. 1, ASME BPVC SEC VI I I D1, and as r equi r ed her ei n, at t he l ocat i ons i ndi cat ed and el sewher e as r equi r ed f or t he pr oper f unct i oni ng of t he syst em. Use gat e val ves unl ess ot her wi se di r ect ed. I nst al l s t op val ves i n t he suppl y l i nes equi pped or l ocat ed so as t o per mi t oper at i on f r om f l oor l evel , or pr ovi ded wi t h saf e access i n t he f or m of wal kways or l adder s. I nst al l val ves i n posi t i ons accessi bl e f or oper at i on and r epai r . Pr ovi de gat e val ves 8 i nches and l ar ger wi t h gl obe- val ved bypass compl i ant wi t h MSS SP- 45.

3. 1. 2. 2 Gl obe Val ves

I nst al l gl obe val ves so t hat t he pr essur e shal l be bel ow t he di sk. I nst al l gl obe val ves wi t h t he st ems hor i zont al on st eam and exhaust l i nes.

3. 1. 2. 3 St eam Pr essur e- Reduci ng Val ves

Pr ovi de t he st eam l i ne ent er i ng each pr essur e- r educi ng val ve wi t h a st r ai ner . Pr ovi de each pr essur e- r educi ng val ve uni t wi t h t wo cut out val ves and wi t h a gl obe or angl e bypass val ve and bypass pi pi ng. Pr ovi de each pr essur e- r educi ng val ve uni t wi t h an i ndi cat i ng st eam gauge t o show t he r educed pr essur e, and a saf et y val ve on t he l ow pr essur e s i de wi t h suf f i c i ent capaci t y t o r el i eve t he hi gh pr essur e st eam.

3. 1. 2. 4 Saf et y Val ves

Pr ovi de wi t h dr i p pan el bows.

3. 1. 3 Pr essur e Gauges

I nst al l a shut of f val ve or pet cock bet ween each pr essur e gauge and t he l i ne, and gages on st eam l i nes shal l have a syphon i nst al l ed ahead of t he gauge.

3. 1. 4 Thermometers

Pr ovi de t her momet er s and t her mal sensi ng el ement s of cont r ol val ves wi t h a separ abl e socket . I nst al l separ abl e socket s i n pi pe l i nes i n such a manner t o sense t he t emper at ur e of t he f l owi ng f l ui d and mi ni mi ze obst r uct i on t o flow.

3. 1. 5 St eam Met er s

Pr ovi de st eam met er s wi t h a sui t abl e t hr ee- val ve bypass t o per mi t di smant l i ng and i nspect i on wi t hout i nt er f er ence wi t h t he ser vi ce.

3. 1. 6 Strainers

Pr ovi de st r ai ner s wi t h meshes sui t abl e f or t he ser vi ces wher e i ndi cat ed, and wher e di r t mi ght i nt er f er e wi t h t he pr oper oper at i on of val ve par t s, or i f i ces, and movi ng par t s of equi pment .

3. 1. 7 Equi pment Foundat i ons

Desi gn equi pment f oundat i ons of suf f i c i ent s i ze and wei ght t o pr ovi de

SECTI ON 23 22 26 Page 13 i sol at i on and t o pr ecl ude shi f t i ng of equi pment under oper at i ng condi t i ons.

Foundat i ons shal l meet t he r equi r ement s of t he equi pment manuf act ur er . When r equi r ed by t he Gover nment , t he equi pment manuf act ur er ' s appr oval of t he f oundat i on desi gn and const r uct i on f or t he equi pment i nvol ved shal l be obtained.

3. 1. 8 Equi pment I nst al l at i on

I nst al l equi pment as speci f i ed and i n accor dance wi t h t he manuf act ur er ' s i nst al l at i on i nst r uct i ons. Gr out equi pment mount ed on concr et e f oundat i ons bef or e pi pi ng i s i nst al l ed. I nst al l pi pi ng i n such a manner as not t o pl ace a st r ai n on any of t he equi pment . Do not bol t f l anged j oi nt s t i ght unl ess t hey mat ch. Adequat el y ext end expansi on bends bef or e i nst al l at i on.

Gr ade, anchor , gui de, and suppor t pi pi ng wi t hout l ow pocket s.

3. 1. 9 Cl eani ng of Syst em

As i nst al l at i ons of t he var i ous syst em component s ar e compl et ed, c l ean bef or e f i nal c l osi ng. Remove f or ei gn mat t er f r om equi pment and sur r oundi ng ar eas. Pr el i mi nar y or f i nal t est s shal l not be per f or med unt i l t he c l eani ng i s appr oved.

3. 1. 10 Cl eani ng and Pai nt i ng of Pi pi ng and Equi pment

Compl y wi t h t he r equi r ement s of Di v i s i on 09 Sect i on " Pai nt s and Coat i ngs. "

3. 1. 11 I dent i f i cat i on of Pi pi ng

Label s f or pi pes 3/ 4 i nch di amet er and l ar ger shal l bear pr i nt ed l egends t o i dent i f y cont ent s of pi pes and ar r ows t o shown di r ect i on of f l ow. Label s shal l have col or coded backgr ound t o s i gni f y l evel s of hazar d i n accor dance with ASME A13. 1. Legends and t ype and si ze of char act er s shal l al so conf or m as ASME A13. 1. Make l abel s of pl ast i c sheet CI D A- A- 1689 wi t h pr essur e sensi t i v i t y sui t abl e f or t he i nt ended appl i cat i ons, or t hey may be pr emol ded of pl ast i c t o f i t over pi pe. For pi pe smal l er t han 3/ 4 i nch di amet er , pr ovi de br ass i dent i f i cat i on t ags 1- 1/ 2 i nches i n di amet er wi t h l egends i n depr essed bl ack f i l l ed char act er s.

3. 2 FI ELD TESTS AND I NSPECTI ONS

Fi el d i nspect i ons, f i el d t est s, and t r i al oper at i ons speci f i ed i n t hi s sect i on shal l be per f or med by t he Cont r act or . The Cont r act or shal l pr ovi de gas, oi l , l abor , equi pment , and i nci dent al s r equi r ed f or t est i ng, except t hat i n accor dance wi t h Di v i s i on 1 t he Gover nment wi l l pr ovi de wat er or el ect r i c power r equi r ed f or t est s. The Cont r act or shal l gi ve t he Gover nment 14 days' advance wr i t t en not i ce of t he dat es and t i mes schedul ed f or t est s and t r i al oper at i ons.

3. 2. 1 Fi el d I nspect i ons

I nspect pi pi ng syst em pr i or t o i ni t i al oper at i on, f or conf or mance t o dr awi ngs, speci f i cat i ons, and ASME B31. 1. Equi pment , mat er i al , or wor k r ej ect ed because of def ect s or non- conf or mance wi t h dr awi ngs, speci f i cat i ons, and ASME B31. 1 shal l be r epl aced or cor r ect ed by t he Cont r act or , as di r ect ed by t he Gover nment .

3. 2. 2 Fi el d Test s

Conduct t he f ol l owi ng t est s af t er compl et i on of t he pi pi ng i nst al l at i on and

SECTI ON 23 22 26 Page 14 pr i or t o i ni t i al oper at i on.

3. 2. 2. 1 Pi pi ng Syst em

Test pi pi ng syst em hydr ost at i cal l y usi ng wat er not exceedi ng 100 degr ees F.

Conduct t est s i n accor dance wi t h t he r equi r ement s of ASME B31. 1 and as f ol l ows. Test t he pi pi ng syst em af t er t he l i nes have been cl eaned as her ei n speci f i ed and bef or e any i nsul at i on cover i ng has been appl i ed. Test pi pi ng syst em at 1 1/ 2 t i mes t he syst em pr essur e or 50 psi g whi chever i s gr eat er . Bef or e per f or mi ng t est s, r emove or val ve of f f r om t he syst em, gages, t r aps, and ot her appar at us whi ch may be damaged by t he t est pr essur e. I nst al l a cal i br at ed t est pr essur e gauge i n t he syst em t o obser ve any l oss i n pr essur e. Mai nt ai n t he r equi r ed t est pr essur e f or a suf f i c i ent l engt h of t i me t o enabl e an i nspect i on t o be made of j oi nt s and connect i ons. Per f or m t est s af t er i nst al l at i on and pr i or t o accept ance.

3. 2. 2. 2 St ar t - Up and Oper at i onal Test

St ar t - up t he syst em and i ni t i al l y oper at e wi t h component s oper at i ng. Dur i ng t he t est , per i odi cal l y c l ean t he var i ous st r ai ner s unt i l no f ur t her accumul at i on of f or ei gn mat er i al occur s. Exer ci se car e so t hat mi ni mum l oss of st eam occur when st r ai ner s ar e c l eaned. Adj ust saf et y and aut omat i c cont r ol i nst r ument s as necessar y t o pl ace t hem i n pr oper oper at i on and sequence.

3. 2. 2. 3 Ext ent of Fi el d Test s

Af t er i nst al l at i on and bef or e accept ance, subj ect t he wor k of t hi s sect i on t o necessar y f i el d t est s, i ncl udi ng t hose her ei n speci f i ed, and i n Di v i s i on 23 Sect i on " Test i ng, Adj ust i ng and Bal anci ng. "

- - End of Sect i on - -

SECTI ON 23 22 26 Page 15

23 22 26 - STEAM SYSTEM AND TERMINAL UNITS
PART 1 GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
1.3 RELATED SECTIONS
1.4 REFERENCES
1.5 GENERAL REQUIREMENTS
1.5.1 Classes and Maximum Working Pressures
1.5.2 Welding Safety
1.5.3 Definitions
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Welding Procedure
1.7.2 Welder's Performance Qualification Record
1.7.3 Previous Qualifications
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Final Sustainability Notebook Submittal
1.8.2 LEED Documentation Notebook
PART 2 PRODUCTS
2.1 PIPE AND PIPE SYSTEM
2.1.1 High Pressure Steam Piping System Over 15 psig
2.1.1.1 High Pressure Steam Piping
2.1.2 Low Pressure Steam Piping System
2.1.2.1 Low Pressure Steam Piping
2.1.3 Condensate Return Piping 100 psig or Less
2.1.4 Fittings
2.1.4.1 Fittings for Steel Pipe
2.1.5 Unions
2.1.5.1 Unions for Steel Pipe
2.1.6 Flanges
2.1.6.1 Steel Flanges
2.1.6.2 Bronze Flanges
2.1.7 Valves
2.1.7.1 Gate Valves
2.1.7.2 Globe and Angle Valves
2.1.7.3 Check Valves
2.1.7.4 Steam Pressure Reducing Valves
2.1.7.5 Temperature Regulating Valves
2.1.7.6 Valve Operating Mechanism
2.1.8 End Connections
2.1.8.1 Steel Piping
2.1.9 Instrumentation
2.1.9.1 Pressure and Vacuum Gages
2.1.9.2 Tank Gages
2.1.9.3 Indicating Thermometers
2.1.10 Miscellaneous Pipeline Components
2.1.10.1 Steam Meters
2.1.10.2 Air Traps
2.1.10.3 Strainers
2.1.10.4 Hangers, Supports, Spacing Requirements, and Attachments
2.1.10.5 Flash Tanks
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Piping
3.1.1.1 Welding
3.1.1.2 Hangers and Supports
3.1.1.3 Grading and Venting of Pipe Lines
3.1.1.4 Pipe Sleeves
3.1.1.5 Floor, Wall, and Ceiling Plates
3.1.1.6 Flashing for Buildings
3.1.1.7 Unions and Flanges
3.1.1.8 Connections for Future Equipment
3.1.2 Valves
3.1.2.1 General
3.1.2.2 Globe Valves
3.1.2.3 Steam Pressure-Reducing Valves
3.1.2.4 Safety Valves
3.1.3 Pressure Gauges
3.1.4 Thermometers
3.1.5 Steam Meters
3.1.6 Strainers
3.1.7 Equipment Foundations
3.1.8 Equipment Installation
3.1.9 Cleaning of System
3.1.10 Cleaning and Painting of Piping and Equipment
3.1.11 Identification of Piping
3.2 FIELD TESTS AND INSPECTIONS
3.2.1 Field Inspections
3.2.2 Field Tests
3.2.2.1 Piping System
3.2.2.2 Start-Up and Operational Test
3.2.2.3 Extent of Field Tests

File details come from the government source that posted it.