20171214_Perf_Drain_System_and_Waterproofing.pdf_--_kms.pdf
PDF 510 KB Posted
- Attached to
- Construction of a Instrument Development Facility Federal contract opportunity
- Solicitation number
- NNG17607163R
About this file
20171214 Perf Drain System and Waterproofing
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
230' - 0"
3C
1/
TYPICAL FOUNDATION
WATERPROOFING
SYSTEM
DRAINAGE BOARD
PROTECTION BOARD
BENTONITE
WATERPROOFING
FIN. GRADE
BEYOND
217'-0"
STEAM PIT
224'-0"
LOWER
STEAM PIT
TYPICAL FOUNDATION DRAINAGE SYSTEM
FILTER FABRIC
GRAVEL
PERFORATED DRAINAGE PIPE
TYPICAL FOUNDATION DRAINAGE SYSTEM
FILTER FABRIC
GRAVEL
PERFORATED DRAINAGE PIPE
1/2" = 1'-0"
WALL SECTION - SOUTHWEST
A-305
CG101
A
9' -0
9'
-0
3' -8
7'-6" 3'-8"
TOC EL 224'-0"
TOC EL 217'-0"
A1
S-303
A1
S-303
A1
S-303
A1
S-303
COLUMN FOOTING, SEE
PLAN AND SCHEDULE
A2
S-303
2'x2'x2' SUMP PIT, SEE D4/S-303
1/4" = 1'-0"2
STEAM PIT FOUNDATION PLAN
PLAN NOTES
1. BACKFILL AND COMPACT PRIOR TO POURING CONCRETE
FOR COLUMN SPREAD FOOTING NEAR STEAM PIT
S-101
Perforated Fdn.
Drain.
INV 224.0
Flat or sloped to outlet
Outlet Tie into storm drain system at Elev 223.0 (maximum)
Fdn Drain.
See Below
BENTONITE