J.1(b)3_-_SOFIA_DRFP_Cost_Template_Workbook_-_DRAFT.xlsx

XLSX spreadsheet 316 KB Posted

Attached to
SOFIA Science and Mission Operations Federal contract opportunity
Solicitation number
NNA16579196R
Issued by
National Aeronautics and Space Administration Ames Research Center

About this file

Attachment J.1(b)3 - Draft Cost Template Workbook

View the file

Other files for this federal contract opportunity

Other files attached to SOFIA Science and Mission Operations, newest first.
File Type Posted
NNA16579196R_Amendment_2.pdf PDF
NNA16579196R_Amendment_1_08_31_16.pdf PDF
NNA16579196R_Amendment_1_-_Attachment_1_08_31_16.pdf PDF
SOFIA_Final_RFP_Questions_Vol_1_08_31_16.pdf PDF
J_1(b)10_-_SOFIA_Sample_IDIQ_Tasks_072216_final.pdf PDF
J_1(b)3_-_SOFIA_RFP_Cost_Template_Workbook__072216_Final.xlsx XLSX spreadsheet
J.1(a)11_Higher-Level_Contract_Quality_Requirements_List_072216_final.pdf PDF
J_1(b)6_-_Past_Performance_Questionnaire_072016_final.docx DOCX document
NNA16579196_RFP_A-M_072216_Final.pdf PDF
J_1(b)9_-_SOFIA_Tech_Ref_Docs__07-15-2016.pdf PDF
J_1(b)8_-_SLC_06_21_16_final.pdf PDF
J_1(a)13_-_SOFIA_IDIQ_Task_Final.pdf PDF
Highlights_Final_RFP_072216.pdf PDF
Highlights_Final_RFP_072216.pdf PDF
J_1(a)1_SMO_SOW_072216_final.pdf PDF
J.1(b)4-Form_CASB-CMF.pdf PDF
J.1(b)5_-_DD_Form_1861.pdf PDF
J_1(a)2_-_CDRL_List_072216_final.pdf PDF
J_1(a)4_-_SOFIA_GFE_072216_final.pdf PDF
NNA16579196_RFP_A-M_072216_Final.pdf PDF
J_1(a)12_-_SOFIA_GFCS_072216_Final.pdf PDF
J_1(a)1_SMO_SOW_072216_final.pdf PDF
J.1(b)1_-_Labor_Distribution_and_Qualification_Mapping_072216_Final.xlsx XLSX spreadsheet
J.1(b)2_Proposal_Cover_Sheet_JA_Form_038.docx DOCX document
DRFP_Questions_Vol_2.pdf PDF
SOFIA_Solicitation_Industry_Day_Attendees.pdf PDF
J_1(b)8_-_SLC_rev_1_06_06_16.pdf PDF
SOFIA_AFRC_Industry_Day_Presentation_050416.pdf PDF
SOFIA_ARC_Industry_Day_Presentation_052516.pdf PDF
Solicitation_Questions_Vol_1.pdf PDF
ARC_ID_Info_Update_05-24-16.pdf PDF
NNA16579196R_DRFP_A-M_052016.pdf PDF
ARC_ID_info_update_052016.pdf PDF
J.1(a)11_Higher-Level_Contract_Quality_Requirements_List_-_DRAFT.pdf PDF
J.1(b)6_-_Past_Performance_Questionnaire_05-20-16_-_DRAFT_(002).docx DOCX document
J.1(a)2_-_CDRL_List_05_13_16_-_DRAFT.pdf PDF
J.1(b)1_-_Labor_Distribution_and_Qualification_Mapping_05_18_16_-_DRAFT.xlsx XLSX spreadsheet
JA_Form_038.docx DOCX document
J_1(b)8_-_SLC_05_18_16_-_DRAFT.pdf PDF
J.1(b)5_-_DD_Form_1861.pdf PDF
DRAFT_SMO_SOW_4_26_16v1_R1.pdf PDF
J.1(a)4_-_SOFIA_GFE_05_13_16_-_DRAFT.pdf PDF
Highlights_of_the_Acquisition_Rev_1.pdf PDF
Industry_Day_Information.pdf PDF
DRAFT_SMO_SOW_4_26_16v1_R1.pdf PDF
ARC_ID_May_25_2016.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract form

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

&"Times New Roman,Bold"&11IDIQ CONTRACT RATES FORM

Exhibit 1 Summary of Proposed Cost Plus Award Fee

Proposing Entity: _____________________

BASE PERIODOPTION 1OPTION 2OPTION 3
(10 months)
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Contract Year 6Contract Year 7Contract Year 8Contract Year 9Contract Year 10Contract Year 11
Contract Management and Admin:
Total Cost through G&A (from Exhibit 2)$0$0$0$0$0$0$0$0$0$0$0
Facilities Capital Cost of Money
Award Fee Pool
Total Cost Plus Award Fee$0$0$0$0$0$0$0$0$0$0$0
Mission Operations:
Total Cost through G&A (from Exhibit 3)$0$0$0$0$0$0$0$0$0$0$0
Facilities Capital Cost of Money
Award Fee Pool
Total Cost Plus Award Fee$0$0$0$0$0$0$0$0$0$0$0
CLIN 01ACLIN 02ACLIN 03ACLIN 04A
Total Estimated Cost$0$0$0$0
Total Award Fee Pool- 0$0$0$0
Total Estimated Cost Plus Award Fee$0$0$0$0
OPTION 4OPTION 5OPTION 6OPTION 7Total
Excluding(From Exhibit 13)
Contract Year 12Contract Year 13Contract Year 14Contract Year 15Contract Year 16Contract Year 17Contract Year 18Phase-inPhase-inGrand Total
Contract Management and Admin:
Total Cost through G&A (from Exhibit 2)$0$0$0$0$0$0$0$0$0$0
Facilities Capital Cost of Money- 0- 0- 0
Award Fee Pool- 0- 0- 0
Total Cost Plus Award Fee$0$0$0$0$0$0$0$0$0$0
Mission Operations:
Total Cost through G&A (from Exhibit 3)$0$0$0$0$0$0$0$0$0
Facilities Capital Cost of Money- 0- 0
Award Fee Pool- 0- 0
Total Cost Plus Award Fee$0$0$0$0$0$0$0$0$0
CLIN 05ACLIN 06ACLIN 07ACLIN 08ACLIN 01
Total Estimated Cost$0$0$0$0$0$0$0
Total Award Fee Pool$0$0$0- 0- 0- 0- 0
Total Estimated Cost Plus Award Fee$0$0$0$0$0$0$0

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 1

Page &P of &N

Exhibit 2 Summary of Elements of Cost - Contract Management and Administration (Prime Offeror only)

Proposing Entity: _____________________

(10 months)
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Contract Year 6Contract Year 7Contract Year 8Contract Year 9
Productive Labor Hours
Prime- 0- 0- 0- 0- 0- 0- 0- 0- 0
Subcontractor #1
Subcontractor #2
Total Productive Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0
Direct Labor Costs (Prime only)$0$0$0$0$0$0$0$0$0
Fringe Benefits on Prime Labor
Overhead on Prime Labor
Subcontractor Total Cost and Fee:
Subcontractor #1
Subcontractor #2
Other Direct Costs:
Travel
Supplies/Equipment
Shipping
Other
Total Other Direct Costs- 0- 0- 0- 0- 0- 0- 0- 0- 0
Material and/or Subcontract Handling
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense
Total Cost$0$0$0$0$0$0$0$0$0

Contract Year 10 Contract Year 11 Contract Year 12 Contract Year 13 Contract Year 14 Contract Year 15 Contract Year 16 Contract Year 17 Contract Year 18 Grand Total

Productive Labor Hours
Prime- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Subcontractor #1- 0
Subcontractor #2- 0
Total Productive Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Direct Labor Costs (Prime only)$0$0$0$0$0$0$0$0$0$0
Fringe Benefits on Prime Labor- 0
Overhead on Prime Labor- 0
Subcontractor Total Cost and Fee:
Subcontractor #1- 0
Subcontractor #2- 0
Other Direct Costs:
Travel- 0
Supplies/Equipment- 0
Shipping- 0
Other- 0
Total Other Direct Costs- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Material and/or Subcontract Handling- 0
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense- 0
Total Cost$0$0$0$0$0$0$0$0$0$0

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 2

Page &P of &N

Exhibit 2a Summary of Elements of Cost - Contract Management and Administration (Major Subcontractors only)

Proposing Entity: _____________________

(10 months)
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Contract Year 6Contract Year 7Contract Year 8Contract Year 9

Productive Labor Hours - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0

Direct Labor Costs$0$0$0$0$0$0$0$0$0
Fringe Benefits
Overhead
Other Direct Costs
Material and/or Subcontract Handling
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense
Total Cost$0$0$0$0$0$0$0$0$0

Contract Year 10 Contract Year 11 Contract Year 12 Contract Year 13 Contract Year 14 Contract Year 15 Contract Year 16 Contract Year 17 Contract Year 18 Grand Total

Productive Labor Hours - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0

Direct Labor Costs$0$0$0$0$0$0$0$0$0$0
Fringe Benefits- 0
Overhead- 0
Other Direct Costs- 0
Material and/or Subcontract Handling- 0
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense- 0
Total Cost$0$0$0$0$0$0$0$0$0$0

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 2a

Page &P of &N

Exhibit 3 Summary of Elements of Cost - Mission Operations (Prime Offeror only)

Proposing Entity: _____________________

(10 months)
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Contract Year 6Contract Year 7Contract Year 8Contract Year 9
Productive Labor Hours
Prime- 0- 0- 0- 0- 0- 0- 0- 0- 0
Subcontractor #1
Subcontractor #2
Total Productive Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0
Direct Labor Costs (Prime only)$0$0$0$0$0$0$0$0$0
Fringe Benefits on Prime Labor
Overhead on Prime Labor
Subcontractor Total Cost and Fee:
Subcontractor #1
Subcontractor #2
Other Direct Costs:
Travel
Supplies/Equipment
Shipping
Other
Total Other Direct Costs- 0- 0- 0- 0- 0- 0- 0- 0- 0
Material and/or Subcontract Handling
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense
Total Cost$0$0$0$0$0$0$0$0$0

Contract Year 10 Contract Year 11 Contract Year 12 Contract Year 13 Contract Year 14 Contract Year 15 Contract Year 16 Contract Year 17 Contract Year 18 Grand Total

Productive Labor Hours
Prime- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Subcontractor #1- 0
Subcontractor #2- 0
Total Productive Labor Hours- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Direct Labor Costs (Prime only)$0$0$0$0$0$0$0$0$0$0
Fringe Benefits on Prime Labor- 0
Overhead on Prime Labor- 0
Subcontractor Total Cost and Fee:
Subcontractor #1- 0
Subcontractor #2- 0
Other Direct Costs:
Travel- 0
Supplies/Equipment- 0
Shipping- 0
Other- 0
Total Other Direct Costs- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
Material and/or Subcontract Handling- 0
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense- 0
Total Cost$0$0$0$0$0$0$0$0$0$0

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 3

Page &P of &N

Exhibit 3a Summary of Elements of Cost - Mission Operations (Major Subcontractors only)

Proposing Entity: _____________________

(10 months)
Contract Year 1Contract Year 2Contract Year 3Contract Year 4Contract Year 5Contract Year 6Contract Year 7Contract Year 8Contract Year 9

Productive Labor Hours - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0

Direct Labor Costs$0$0$0$0$0$0$0$0$0
Fringe Benefits
Overhead
Other Direct Costs
Material and/or Subcontract Handling
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense
Total Cost$0$0$0$0$0$0$0$0$0

Contract Year 10 Contract Year 11 Contract Year 12 Contract Year 13 Contract Year 14 Contract Year 15 Contract Year 16 Contract Year 17 Contract Year 18 Grand Total

Productive Labor Hours - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0

Direct Labor Costs$0$0$0$0$0$0$0$0$0$0
Fringe Benefits- 0
Overhead- 0
Other Direct Costs- 0
Material and/or Subcontract Handling- 0
Subtotal- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
G&A Expense- 0
Total Cost$0$0$0$0$0$0$0$0$0$0

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 3a

Page &P of &N

Exhibit 4 Proposed Direct Labor Rates

[ ] Prime Contractor:
[ ] Major Subcontractor:
Year 1
Base Period Proposed Labor RateWYEs
LABOR CATEGORY
Proposed Direct Labor Rates
NASA Standard Labor CategoryOfferor's CategoryYr2Yr3Yr4Yr5Yr6Yr7Yr8Yr9Yr10Yr11Yr12Yr13Yr14Yr15Yr16Yr17Yr18SourceStaffing
Example:
Proposed Escalation Percentage (%)3.2%3.0%2.9%2.9%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%2.8%
Engineer IIMechanical Engineer II$ 15.002ActualIncumbent
Integration Engineer II$ 16.001Salary SurveyOfferor's employee
Manufacturing Engineer II$ 17.002DOL2005-2516New hire

Engineer II $ 16.00 $ 16.51 $ 17.01 $ 17.50 $ 18.01 $ 18.51 $ 19.03 $ 19.56 $ 20.11 $ 20.67 $ 21.25 $ 21.85 $ 22.46 $ 23.09 $ 23.74 $ 24.40 $ 25.08 $ 25.78 n/a

Proposed Escalation Percentage (%)

Contract Management & Admin - CORE

Mission Operations - CORE

Offeror shall remove examples when submitting its proposal.
The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such.

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 4

Exhibit 5 Key Personnel Direct Labor Rates

[ ] Prime Contractor:
[ ] Major Subcontractor:
Actual Rates Projected
CurrentPhase-in
Labor CategoryNames of Key PersonnelRates*PeriodYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9
SMO
Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 18
SMO
0
0
0
0
0
0
0
0
0
0

* Date of current rates is payroll of:

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 5

Exhibit 6

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION

Labor CategoryFirst Year (10 months)Second YearThird YearLabor CategoryTenth YearEleventh YearTwelth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed, and where overtime premium is charged.

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION

Labor CategoryFourth YearFifth YearSixth YearLabor CategoryThirteenth YearFourteenth YearFifteenth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION DIRECT LABOR COST SUMMARY - CONTRACT MANAGEMENT AND ADMINISTRATION

Labor CategorySeventh YearEighth YearNinth YearLabor CategorySixteenth YearSeventeenth YearEighteenth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 6

Page &P of &N

Exhibit 7

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - MISSION OPERATIONS DIRECT LABOR COST SUMMARY - MISSION OPERATIONS

Labor CategoryFirst Year (10 months)Second YearThird YearLabor CategoryTenth YearEleventh YearTwelth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - MISSION OPERATIONS DIRECT LABOR COST SUMMARY - MISSION OPERATIONS

Labor CategoryFourth YearFifth YearSixth YearLabor CategoryThirteenth YearFourteenth YearFifteenth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

[ ] Prime Contractor:[ ] Prime Contractor:
[ ] Major Subcontractor:[ ] Major Subcontractor:

DIRECT LABOR COST SUMMARY - MISSION OPERATIONS DIRECT LABOR COST SUMMARY - MISSION OPERATIONS

Labor CategorySeventh YearEighth YearNinth YearLabor CategorySixteenth YearSeventeenth YearEighteenth Year
# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost# of WYETotal Labor HoursLabor RateTotal Labor Cost
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Subtotal00$000$000$0Subtotal00$000$000$0
Overtime Labor*$0$0$0Overtime Labor*$0$0$0
Total Labor Hours and Costs00$000$000$0Total Labor Hours and Costs00$000$000$0
*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime
labor rate was computed, and where overtime premium is charged.*Overtime labor represents total overtime for all labor categories. Explanations should be provided on how the overtime

labor rate was computed and where the overtime premium is charged. labor rate was computed and where the overtime premium is charged.

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 7

Page &P of &N

Exhibit 8 Summary of Indirect Cost Rates

[ ] Prime Contractor: __________________________
[ ] Major Subcontractor: __________________________
Fringe Benefits*OverheadG&A
Example:
Portion of Contractor FY 13 From: _11/1/12_ to _4/30/13_46.00%4.50%7.00%
Portion of Contractor FY 14 From: _5/1/13_ to _10/31/1344.00%3.50%5.00%
Base Period Weighted Average45.00%4.00%6.00%
Phase-in:
Contractor FY Ending: ____________
Contract Year 1:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 1 Average
Contract Year 2:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 2 Average
Contract Year 3:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 3 Average
Contract Year 4:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 4 Average
Contract Year 5:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 5 Average
Contract Year 6:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 6 Average
Contract Year 7:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 7 Average
Contract Year 8:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 8 Average
* Disregard if it is your normal accounting practice to
include fringe benefits with overhead.
Offeror shall remove examples when submitting its proposal.
The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such.
Summary of Indirect Cost Rates
[ ] Prime Contractor: __________________________
[ ] Major Subcontractor: __________________________
Fringe Benefits*OverheadG&A
Contract Year 9:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 19 Average
Contract Year 10:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 10 Average
Contract Year 11:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 11 Average
Contract Year 12:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 12 Average
Contract Year 13:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 13 Average
Contract Year 14:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 14 Average
Contract Year 15:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 15 Average
Contract Year 16:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 16 Average
Contract Year 17:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 17 Average
Contract Year 18:
Portion of Contractor FY __ From: ________ to ________
Portion of Contractor FY __ From: ________ to ________
Year 18 Average
* Disregard if it is your normal accounting practice to
include fringe benefits with overhead.

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 8

Page &P of &N

Exhibit 9 Overhead and/or Fringe Benefits Template (Composition of Burden Pool)

[ ] Prime Contractor:
[ ] Major Subcontractor:Overhead or Service Center Pool* = ___________________
Base of Application = __________________________

* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ActualForecast
Prior Yr 3Prior Year 2Prior Yr 1
Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx
Payroll Taxes
FICA (Social Security)
HIT (Medicare)
FUI (Federal Unemployment)
SUI (State Unemployment)
WC (Workers Comp)
Fringes:
Retirement
Health/Life Insurance
Paid Leave
Other
Other (Identify)
Facilities
Depreciation
Total Overhead Pool Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Application Base ($)
Contractor FY Rate (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Overhead and/or Fringe Benefits Template (Composition of Burden Pool)
[ ] Prime Contractor:
[ ] Major Subcontractor:Overhead or Service Center Pool* = ___________________
Base of Application = __________________________

* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Forecast

Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx
Payroll Taxes
FICA (Social Security)
HIT (Medicare)
FUI (Federal Unemployment)
SUI (State Unemployment)
WC (Workers Comp)
Fringes:
Retirement
Health/Life Insurance
Paid Leave
Other
Other (Identify)
Facilities
Depreciation
Total Overhead Pool Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Application Base ($)
Contractor FY Rate (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Overhead and/or Fringe Benefits Template (Composition of Burden Pool)
[ ] Prime Contractor:
[ ] Major Subcontractor:Overhead or Service Center Pool* = ___________________
Base of Application = __________________________

* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Forecast

Cost Elements withinContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx
Payroll Taxes
FICA (Social Security)
HIT (Medicare)
FUI (Federal Unemployment)
SUI (State Unemployment)
WC (Workers Comp)
Fringes:
Retirement
Health/Life Insurance
Paid Leave
Other
Other (Identify)
Facilities
Depreciation
Total Overhead Pool Expenses$ - 0$ - 0$ - 0$ - 0$ - 0
Application Base ($)
Contractor FY Rate (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 9

Exhibit 10 General and Administrative Expense (G&A) Template

[ ] Prime Contractor:
[ ] Major Subcontractor:Base of Application = __________________________

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

ActualForecast
Prior Yr 3Prior Year 2Prior Yr 1
Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx

Labor: (Identify)

Labor Related Cost: (Taxes & Fringes Etc.)

B&P
IR&D
Corporate Allocations:
Other (Specify):
Facilities
Depreciation
Total G&A Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Distribution Base Dollars:
Existing Business Base
This Contract Base
Forecasted Business Base
Total Distribution Base $$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Calculated G&A Rates (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
General and Administrative Expense (G&A) Template
[ ] Prime Contractor:
[ ] Major Subcontractor:Base of Application = __________________________

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Forecast

Cost Elements withinContractorContractorContractorContractorContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx20xx20xx20xx20xx

Labor: (Identify)

Labor Related Cost: (Taxes & Fringes Etc.)

B&P
IR&D
Corporate Allocations:
Other (Specify):
Facilities
Depreciation
Total G&A Expenses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Distribution Base Dollars:
Existing Business Base
This Contract Base
Forecasted Business Base
Total Distribution Base $$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Calculated G&A Rates (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
General and Administrative Expense (G&A) Template
[ ] Prime Contractor:
[ ] Major Subcontractor:Base of Application = __________________________

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Forecast

Cost Elements withinContractorContractorContractorContractorContractor
the Overhead Burden PoolFiscal YearFiscal YearFiscal YearFiscal YearFiscal Year
20xx20xx20xx20xx20xx

Labor: (Identify)

Labor Related Cost: (Taxes & Fringes Etc.)

B&P
IR&D
Corporate Allocations:
Other (Specify):
Facilities
Depreciation
Total G&A Expenses$ - 0$ - 0$ - 0$ - 0$ - 0
Distribution Base Dollars:
Existing Business Base
This Contract Base
Forecasted Business Base
Total Distribution Base $$ - 0$ - 0$ - 0$ - 0$ - 0
Calculated G&A Rates (%)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 10

Page &P of &N

Exhibit 11 Prime Contractor:

MINOR SUBCONTRACTOR TEMPLATE

Minor SubcontractorSLCContractContractContractContractContract
Year 1Year 2Year 3Year 4Year 5
HoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotal
Examples:
XYZ CompanyEngineer 31,395$85.00$118,5751,395$86.70$120,9471,395$88.43$123,3651,395$90.20$125,8331,395$92.01$128,349
Technician 21,395$56.00$78,1201,395$57.12$79,6821,395$58.26$81,2761,395$59.43$82,9021,395$60.62$84,560
Safety Manager930$79.00$73,470450$80.58$36,261- 0$82.19$0- 0$83.84$0- 0$85.51$0
Technician 33,720$58.00$215,7601,500$59.16$88,740- 0$60.34$0- 0$61.55$0- 0$62.78$212,909
Total XYZ:7,440$485,9254,740$325,6302,790$204,6412,790$208,7342,790$425,818
ABC Tool & DieEngineer 11,860$85.00$158,1001,860$86.70$161,2621,860$88.43$164,4871,860$90.20$167,7771,860$92.01$171,133
Technician 33,720$56.00$208,3201,395$57.12$79,682- 0$58.26$0- 0$59.43$0- 0$60.62$0
Safety Manager930$79.00$73,470450$80.58$36,261- 0$82.19$0- 0$83.84$0- 0$85.51$0
Total ABC:6,510$439,8903,705$277,2051,860$164,4871,860$167,7771,860$171,133
$328,974
Offeror shall remove examples when submitting its proposal.
The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such.
Prime Contractor:

MINOR SUBCONTRACTOR TEMPLATE

Minor SubcontractorSLCContractContractContractContractContract
Year 6Year 7Year 8Year 9Year 10
HoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotal
Minor SubcontractorSLCContractContractContractContractContract
Year 11Year 12Year 13Year 14Year 15
HoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotalHoursSFBRTotal

Prime Contractor:

MINOR SUBCONTRACTOR TEMPLATE

Minor SubcontractorSLCContractContractContract
Year 16Year 17Year 18
HoursSFBRTotalHoursSFBRTotalHoursSFBRTotal

NNA16579196R DRAFT J.1(b) Attachment 3 Exhibit 11

Page &P of &N

Exhibit 12 Incumbency Assumptions

[ ] Prime Contractor: ________________________
[ ] Major Subcontractor: _____________________

This exhibit provides the Government visibility into the Offeror's intentions regarding the hiring of incumbent contractor employees.

State the percentage of incumbents intended/expected to be retained: ________

Labor RatesThe Government understands that a non-incumbent Offeror may only be able to estimate the salary cost of current incumbents; however, the Government must evaluate the Offeror’s intentions regarding pay for these employees if retained.
Notwithstanding the rates estimated and proposed by the Offeror, upon receiving contract award, do you intend to pay retained incumbents at their current salaries/wages? Offerors shall select only one of the options below.
[ ] Yes. No further response required.
[ ] No. If you check this box, explain (in the space below) what salaries/wages you intend to offer to incumbents and how this will allow you to achieve the intended/expected incumbent retention percentage stated above.
Length of ServiceDo you intend to recognize incumbent employees' service time under predecessor contracts, in the performance of similar work, for purposes of fringe benefits computations (such as the amount of paid-time-off received)? Offerors shall select only one of the options below.
[ ] Yes. No further response required.
[ ] No. If you check this box, explain (in the space below) your policy regarding length of service of incumbents, as it relates to fringe benefits computations (such as the amount of paid-time-off received), and how this will allow you to achieve the intended/expected incumbent retention percentage stated above.

NNA16579196R DRAFT Attachment J.1(b)3 Exhibit 12

Page &P of &N

Exhibit 13

PHASE-IN TEMPLATE
Prime Offeror Company Name:
Cost ElementHoursRateCost
Direct Labor (DL):
Skill mix: (identify labor category)
*Example: Technician 1100$ 10.00$1,000
1.$0
2.
3.
4.
Total Prime Direct Labor cost- 0$0
Prime Fringe and/or Overhead on Labor:
*Example: Overhead10%$100
1.
2.
Total Fringe/Overhead$0
Major Subcontractor Total Cost (list)
1.
2.
3.
4.
Total Major Subcontractor Cost$0
Minor Subcontractor Total Cost
1.
2.
3.
Total Minor Subcontractor Costs$0
Prime Non-Labor Resources (NLR):
Material/Supplies/Equipment
Travel/Training
Service Agreements, Outsourcing & Consultant Fees
Other
Total Non-Labor Cost$0
Subtotal DL$, Major & Minor Subs$, OH$ & NLR$$0
Prime Total G&A Cost
Subtotal Estimated Cost$0
Profit/Fee
Prime Facilities Capital Cost of Money

Total Phase-in Cost $0

*Remove example from official submission, it is provided to demonstrate formatting and how the
data is to be submitted. The data in the example is not real and should not be interpreted as such.

NNA16579196R DRAFT Attachment J.1(b)3 Exhibit 13

Exhibit 14 Schedule of Subcontracts

[ ] Prime Contractor: ___________________________

Description of Work:

Number of quotes solicted/received
Subcontractor selected:Subcontract (1) Name and AddressSubcontract (2) Name and AddressSubcontract (3) Name and AddressSubcontract (4) Name and Address

Basis of Selection:*

Type of Subcontract:**

Cost
Fee/Profit
Amount Proposed$ - 0$ - 0$ - 0$ - 0
Affiliation with Prime:***

Cost/Price Analysis Performed by Prime:****

* Lowest price, teaming partner, technical qualifications, etc.
** FFP, CPAF, CPFF, T&M, etc.
*** Subcontractor, subsidiary, interdivisional, etc.
**** FAR 15.404-3(b) requires that contractors conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices
and include the results of these analyses in the price proposal. If response above is "No", explain why cost or price analyis was not performed and how
the Offeror determined that the proposed subcontract price was reasonable.

NNA16579196R DRAFT Attachment J.1(b)3 Exhibit 14

Page &P of &N