This document is an extensive technical attachment (J-1502000) for a Base Operations Support (BOS) contract at Marine Corps Support Facility - Blount Island (MCSF-BI), detailing comprehensive facility systems inventory and maintenance requirements. The 28-part attachment provides detailed inventories and maintenance specifications for critical infrastructure systems including auxiliary generator systems, cathodic protection systems, compressed air systems, crane and railroad trackage, fire protection systems, HVAC and refrigeration systems, lighting systems, lift stations, backflow prevention devices, and fuel storage tanks across multiple buildings and facilities.
The attachment meticulously catalogs equipment specifications, locations, quantities, and maintenance protocols for each system, requiring an integrated maintenance program (IMP) that encompasses reactive, preventive, predictive, and proactive maintenance approaches. Key systems include over 50 air compressors, numerous generator systems, multiple fire protection and backflow prevention devices, lift stations, and specialized equipment like paint and blast booths. The document emphasizes comprehensive maintenance to ensure operational readiness, covering everything from routine inspections to complex system repairs across the Marine Corps Support Facility - Blount Island complex.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Table of Contents
| Attachment Number | Attachment Title |
| J-1502000-01 (MCSF-BI) | Definitions and Acronyms |
| J-1502000-02 (MCSF-BI) | References and Technical Documents |
| J-1502000-03 (MCSF-BI) | Sample of Historical E/U/R Work Orders |
| J-1502000-04 (MCSF-BI) | Sample of Historical Project Work Orders |
| J-1502000-05 (MCSF-BI) | Auxiliary Generator Systems |
| J-1502000-06 (MCSF-BI) | Cathodic Protection System Inventory |
| J-1502000-07 (MCSF-BI) | Compressed Air Systems |
| J-1502000-08 (MCSF-BI) | Crane and Railroad Trackage Inventory |
| J-1502000-09 (MCSF-BI) | Facilities Systems and Equipment |
| J-1502000-10 (MCSF-BI) | Fire Protection Systems Inventory |
| J-1502000-11 (MCSF-BI) | Irrigation Equipment and Systems Inventory |
| J-1502000-12 (MCSF-BI) | Unfired Pressure Vessels (UPV) |
| J-1502000-13 (MCSF-BI) | Vertical Transportation Equipment (VTE) Systems |
| J-1502000-14 (MCSF-BI) | Blast, Paint and Drying Systems |
| J-1502000-15 (MCSF-BI) | Boiler Systems |
| J-1502000-16 (MCSF-BI) | HVAC and Refrigeration Systems |
| J-1502000-17 (MCSF-BI) | Temperature Standards for HVAC and Refrigeration Systems |
| J-1502000-18 (MCSF-BI) | Railroad Signal and Battery House Systems and Equipment |
| J-1502000-19 (MCSF-BI) | Backflow Prevention Devices |
| J-1502000-20 (MCSF-BI) | Drop Door Inventory |
| J-1502000-21 (MCSF-BI) | Lighting Systems |
| J-1502000-22 (MCSF-BI) | Roofing Systems |
| J-1502000-23 (MCSF-BI) | Lift Stations |
| J-1502000-24 (MCSF-BI) | Portalets |
| J-1502000-25 (MCSF-BI) | Holding Tanks |
| J-1502000-26 (MCSF-BI) | Oily Water Separators |
| J-1502000-27 (MCSF-BI) | Direct Digital Control (DDC) System Inventory |
| J-1502000-28 (MCSF-BI) | Fuel Storage Tank and Berm Inventory |
01-Definitions and Acronyms
| Attachment J-1502000-01 |
| Definitions and Acronyms – MCSF-BI |
| Definition | Description |
| Crane, Category 1 | Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes. |
| Crane, Category 2 & 3 | Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds. |
| Crane, Category 4 | Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes. |
| Equipment, Collateral | Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. |
| Equipment, Installed | Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. |
| Equipment, Personal Property | Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed. |
| Facilities Life Cycle | A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. |
| Facilities Maintenance Management | The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| Integrated Maintenance Program (IMP) | IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP. |
| Life-Cycle Costs | A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| Maintenance, Preventive | Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements. |
| Management Information Systems-Maintenance | A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance. |
| Repair | Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| Replacement | Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| Restoration | Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| Sustainment | Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| Weight Handling Equipment (WHE) | Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE. |
| Acronym | Title |
| ACO | Administrative Contracting Officer |
| BPVC | Boiler and Pressure Vessel Code |
| BW | Biweekly |
| CDR | Contract Discrepancy Report |
| CIA | Controlled Industrial Area |
| CMMS | Computerized Maintenance Management System |
| COR | Condition of Readiness |
| DBH | Diameter at Breast Height |
| DoD | Department of Defense |
| DoN | Department of Navy |
| DRMO | Defense Reutilization Management Office |
| EPA | Environmental Protection Agency |
| EPCRA | Emergency Planning and Community Right-to-Know Act |
| FAR | Federal Acquisition Regulation |
| FFP | Firm Fixed Price |
| FIFRA | Federal Insecticide, Fungicide, and Rodenticide Act |
| FSC | Facility Support Contract |
| GFE | Government-furnished Equipment |
| GFF | Government-furnished Facilities |
| GFM | Government-furnished Materials |
| GPWS | Guide Performance Work Statements |
| HCA | Head Contracting Agency |
| HVAC | Heating, Ventilation, and Air Conditioning |
| ICAP | Infrastructure Condition Assessment Program |
| ICP | Integrated Contingency Plan |
| IDIQ | Indefinite Delivery Indefinite Quantity |
| IFLOLS | Improved Fresnel Lens Optical Landing System |
| IPM | Integrated Pest Management |
| IPMIS | Integrated Pest Management Information System |
| IPMP | Integrated Pest Management Plan |
| KO | Contracting Officer |
| LAN | Local Area Network |
| M | Monthly |
| MSDS | Material Safety Data Sheets |
| NFPA | National Fire Protection Association |
| NAVFAC | Naval Facilities Engineering Command |
| NMCI | Navy Marine Corps Intranet |
| NOSC | Navy-On-Scene Coordinator |
| PAP | Performance Assessment Plan |
| PAR | Performance Assessment Representative |
| PAW | Performance Assessment Worksheet |
| PEO | Program Executive Officer |
| PM | Project Manager |
| PRCSP | Permit Required Confined Space Program |
| PWS | Performance Work Statement |
| Q | Quarterly |
| QC | Quality Control |
| RPIE | Real Property Inventory Equipment |
| SC | Security Clearances |
| SCADA | Supervisory Control And Data Acquisition |
| SM | Semimonthly |
| SOP | Standard Operating Procedures |
| SPAR | Senior Performance Assessment Representative |
| SRM | Sustainment, Restoration and Modernization |
| TE | Technical Evaluation |
| UFC | Unified Facilities Criteria |
| UPV | Unfired Pressure Vessel |
| VIQ | Variation in Quantity |
| WBS | Work Breakdown Structure |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
02-References
| Attachment J-1502000-02 |
| References |
| NAVFAC P-307 | Management of Weight Handling Equipment |
| UG-2029-ENV | Cross-Connection Control and Backflow Prevention Program |
| NAVFAC MO-118 | Inspection of Vertical Transportation Equipment |
| OPNAVINST 5090.1D | Environmental. Readiness Program |
| NAVSEA OP-5 | Ammunition and Explosives Ashore: Safety Regulations for Handling, Storing, Production, Renovation and Shipping |
| UFC 3-601-02 | Inspection, Testing, and Maintenance of Fire Protection Systems |
| UFC 3-570-06 | Cathodic Protection Systems |
03-Sample of Hist. Work Orders
| Attachment J-1502000-03 Sample of Historical Service Orders - MCSF-BI | ||
| Facility # | SO# | Description |
| 100 | 6653466 | Covert existing solid (1) piece door (Left side only) into a (2) piece Dutch door, match hardware used on B100 door 122A (Contracts) |
| 104 | 6938903 | Install 120v/20amp dedicated duplex outlet with all wires, conduit and breakers needed to provide power to coffee machine. |
| 110 | 3655183 | The paint is peeling off the walls at the control room window. Repair, prime and paint to match existing finish. Install (2) new 36"x48" cork boards, see attachment for locations. |
| 111 | 6591856 | (Inbound Gate Arms (2)) Replace all rusted hardware to include all chains, washers, bolts and nuts with stainless steel. Perform corrosion control on arm pedestal controllers (2) Prime and paint white. |
| 112 | 6864809 | Clean floors, walls, windows, vents, and countertops to include bathroom surfaces. |
| 113 | 3790019 | Panels FHA/FLA Finding 2807: Panel FHA breaker 13 is marked as SPARE, but the breaker is in the ON position. Panel FLA breakers 7, 11, 14, 15,16, 17, 18, 19, 20, 21, 22, 23, 24, 31, 33, and 36 positions are marked as SPARE, but breakers are in the on position |
| 150 | 6226716 | Entrance door to hvac/electrical room/ Request to corrosion control, removing any rust and treating the rusted area on door and frame. Prime, prep, and repaint door and frame, |
| 151 | 3735344 | Request to seal/caulk door thresholds on the east and north side of B151also re-caulk the expansion joints between sidewalks and building |
| 152 | 6112074 | (Various) See attached. Hang plaque shown on attached. Paint dark grey cubicle trim to match other section trim pieces, wipe w/ glass cleaner the two identified exterior windows on the north side (Heavy Pollen) |
| 200 | 7008987 | Men’s restroom 2nd floor sensor controlled faucet is not working. Ladies restroom 2nd floor, no water pressure on both faucets. Repair or replace. New if needed are to be sensor controlled. |
| 350 | 6892451 | office G9 west exterior/ Request to clean,prep and paint the west exterior wall of office G9, located inside B350. |
| 351 | 7038173 | Tire Bay (Overhead Door) Water is coming under the edge of the overhead door in the tire bay; remove and discard old threshold and install newheavy-duty weather tight threshold (Weather Defender XL) at overhead door. Note: Existing threshold was installed in the wrong location. |
| 354 | 5944300 | Finding 3661: The ground fault circuit interrupter (GFCI) outlet did not trip when tested. Repair/replace the GFCI outlet. |
| 355 | 4443604 | Replace/Repair damaged metal flashing above bay door. Repair/seal crack east side of OHD. Replace the rusted pipe strap with stainless steel to include bolts and replace or take apart and clean/degrease plastic pull handle cover |
| 356 | 4441084 | (Battery Admin) See attached. Replace all strut and fastening hardware with stainless steel |
| 360 | 1364685 | Piping inside B360 is marked as LP Gas when it is Natural Gas, remove label LP Gas and relabel with Natural Gas. (see photos) |
| 361 | 6938488 | (CRF Lobby)See attached. Investigate and repair water issue shown. Ensure sprinkler pipe is not leaking, ensure HVAC condensate is not an issue. Ensure roof is not leaking. Repair as required and replace ceiling tile |
| 364T | 2648961 | 364T (Lark Shelter) See attached. Repair door handle lockset on man door on west facing side of structure. Remove the equipment off-set tape shown in attached and replace with painted lines. Colors and dimensions shall match existing tape. |
| 368 | 6890543 | B368/Equipment Parking Lot Infill numerous potholes with government provided crushcrete. Verify with KBR on any additional potholes that might need filling in the lot |
| 369 | 5769576 | B369/ Request to make the two outlets on the countertop near the microwave separate circuits. |
| 389 | 4210837 | B389/EAF Skylight leak on 1st skylight on right when you come in east door. Also there is insulation that is hanging down from the ceiling in the northeast corner. Repair or Replace. |
| 390 | 5792232 | The sinks in the shop have the risk of cross contamination, please install hose bib anti-siphon/vacuum breakers on both sinks. |
| 392 | 5183016 | (Clean Room) The shower in the clean room behind our Paint Booth (Bldg.392) has low pressure |
| 394 | 3270261 | Damaged Outlet Safety Finding 2658Electrical Outlet shows signs of burning/short circuit; Replace Outlet. |
| 396 | 2542168 | Prep, prime and Paint service door on the eastside. |
| 397 | 6998635 | Request to add a hose bibb to an existing water line in the south side of B397 |
| 400 | 2706301 | Procure and Install FLT730 oily water filter bucket. It should replace the existing air compressor blowdown tote with the new pass through system |
| 420 | 4485001 | Safety Finding #3000- Per the attached finding provide and install metal angle toe board painted yellow as shown on 2nd attachment to prevent items falling off deck onto personnel below |
| 450 | 6404773 | 450 Low Bay See attached- Remove cobwebs and wipe down insulation batting between columns A8 and D8 Highlighted on the attached |
| 451 | 6656423 | (Haz Forklift Storage Building) Per the attached Disconnect existing defective charger and connect KBR provided charger. |
| 452 | 5233484 | (HAZ Mat Transfer Fac.) Replace defective scale at HAZ MAT transfer facility. Move old scale to connex until we can verify property account status. |
| 453 | 2534821 | 453 (High Bay Lights) Inspect light fixtures per DON Tracker 2022-290 1.1.1.1: Advisory for High Bay Facility Luminaire Suspension Supports for proper support configuration (Attached at B453). There are (12) fixtures . Take photos of fixture supports. |
| 454 | 6855847 | (Skylight between D13 and D14) Repair leaking skylight between columns D13 and D14. |
| 457 | 6413889 | Clean broken glass front entrance to 457. Remove/ensure glass shards are removed from existing door frame and safety issue is abated. Replace broken glass matching existing tinting as close as posssible. |
| 550 | 7009342 | Request to replace backflow preventer (Febco PVB 1.5” 765 SN: AB6710) with new Wilkins RP 1.5” Model 975XL2 lead free and raise inlet riser, support outlet with 4x4 wood post, reuse current shut off valves and piping outlet. Includes certification. |
| 551 | 2703541 | Procure and install (6) bollard sleeves on the bollards shown. Pressure wash building front face outlines in red on the attached |
| 552 | 4140387 | Safety Finding 2877 (See attached) Provide and install self- closing hardware for the (2) man doors at building 552 |
| 554 | 2648949 | MBOS Joint Inspection Building 554 (3/10/2022) See attached. Install new doors sweeps on both man doors. Exterior siding- Remove rust to bare metal on area shown on the attached. Treat and prime with corrosion inhibitor, seal hole with appropriate bondo for surface and paint |
| 555 | 4489011 | (Cast in Place restroom by 364T) Please replace existing broken porcelain sink with wall mounted single drain stainless steel sink. Overall length shall be a minimum of 18" bowl length 14" width 10" goosneck faucet. |
| 686 | 3012615 | Request to replace the 5 ignitor tubes on the gas grill located at B686/ picnic shelter. Bottoms of ignitor tubes are worn and will not allow ignitors to light grill. |
| 687 | 6594833 | Tennis court/ Request to repair fence post at the tennis court that were damaged during high wind event |
| 810T | 3382719 | ( Clam 4 ) Safety issue- Replace missing ground box cover next to transformer on north-side of clamshell. Replace existing 60 amp Disconnect shown in the attached. To include support strut with stainless steel. |
| 811T | 5351681 | Replace stop sign at 811T entrance apron. Replace shall include sign, post with new breakaway round post, and all mounting hardware with either stainless steel or aluminum. |
| 815 | 2249576 | (Armory) Install asphalt under fence and raise berm to within 2 inches of fence along the entire perimeter of fenced in area. Secure area will require coordination for access. |
| 825 | 7041805 | (Scale House) Replace existing traffic Light fixture at the scale house with new KBR provided fixture. New fixture is located in the scale house. |
| 860T | 2605878 | crossmember trust up high in the highway at 860 T that the bolt came out of it |
| 861T | 1002889 | pressure wash the exterior slab and sidewalk at 861T SITF Sprung Shelter |
| 930 | 152724 | PERFORM MAGNETIC SWEEP OF LITERAGE YARD |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
04-Sample of Hist. Projects
| 1502000 J-04 Sample Of Historical Project WO's | ||||
| CAT/TO | IDIV REF# | WO# | Location | WO Description |
| CAT III U | #2021-11-001 | 1885244 | B100 | Provide camera and video of sanitary sewer line on the firstfloor of building 100 from room 118 (womens bathroom) to the manhole south side of building to determine existing conditions of the line. Provide report of findings to IDIV |
| TO | #2021-01-008 | 1106458 | B104 | Remove 6 Ton HVAC and replace with (2) 2.5 ton Heat Pumps |
| TO | #2021-04-002 | 1290054 | B152 | Install fixed type 72" x 48" picture window and pervious gravel surfaced parking area capable of parking 13 vehicles includes paver edging and concrete parking bumpers |
| CAT III R | #2022-11-002 | 3892201 | 870 Overflow Parking Shoreline | Repair washed out areas around the perimeter of the Security Jigsaw Camera concrete pedestal. Repairs should include forming and shoring around the existing pedestal using ½” rebar and filling with flowable concrete. |
| TO | #2023-01-014 | 4145190 | 450 | Project remodels two restroom/locker rooms male and female on the lower South-side of facility B450. replace ceiling grid and tiles, Replace sink, Replace shower valves, Paint walls, Clean and seal tiled floor, regrout, replace escutcheon plates for fire sprinkler heads, replace lockers, HVAC registers, replace lighting with LED, Provide and install pedestal benches. |
| CAT II R | #2023-06-005 | 4831277 | 200 | Request to procure and install aprox. 40ft of aluminum safety yellowhandrail between the stormdrain culvert and gazebo 641 near B 200 |
| CAT IV R | #2023-05-001 | 4669558 | 554 | Procure and install to include electrically (2) 30in, 120V, swivel mount Aireye fans. Power Panel shall be updated to include fan circuits. Fans shall be mounted at general areas shown on the attached floor plan. Fans shall be mounted minimum 10' from floor. Occupancy sensors are not required. Attached: Fan Spec sheet and floor plan |
| CAT IV U | #2024-06-002 | 6592394 | TR001 | O&A IMP LOL Remove discard existing Bard 3T unit and replace with new and ensure proper operation. |
| CAT IV E | #2020-04-008 | 486968 | 361 | O&A IMP LOL Cure Booth the touch screen is burnt and needs to be replaced and programmed. |
| TO | #2024-01-011 | 6117153 | Berth 3 | Make needed repairs to the Unifloat floating dock system Items included. Remove and replace 3 corroded pile guide assemblies to include all rollers and mounting hardware, Assemblies can be galvanized or 316 stainless steel. Remove and replace 1 damaged 10ftx3ft float module. Re-level three(3) finger pier sections removing all pressure treated cover boards and plastic fender material Installing new stainless steel (Type 316 ¾”) tie rodsnew pressure treated cover boards and installing new rubber fender material on cover boards. |
| TO | #2024-05-002 | 6428035 | 454 | O&A PM LOL Replace saftey edge on high speed roll-up door #8 |
| CAT II E | #2020-07-013 | 701551 | 112 | O&A PM Replace grinder pumps (2) at lift station |
| TO | #2022-07-002 | 3219431 | ARMAG | Provide a 29' x 46' monolithic concrete slab with perimiter footing, reinforcing, slope, and control joints capable of supporting (1) double wide 53, 700 LB armory. |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
05-Auxiliary Generator Systems
| Attachment J 1502000-05 |
| Auxiliary Generator Systems- MCSF-BI |
Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement an IMP program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. Fuel tanks shall be inspected and maintained in accordance with Federal, State, Local statutes and regulations, in accordance with DoD, DoN and USMC policies, instructions, orders and guidance.
tc={8472FC62-58BD-4A4F-9C87-5150FF3C3342}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
@Lizasuain CIV Ricardo D added info in red.
| Asset Number | Asset Location | Facility Number | Description | Transfer Switch | UPS System |
| Westside 109 | 109G | 2021 Generac, Model SD400, Diesel, 208/240V, 400KW | Y | N | |
| D4D00856 | 340 | Portable | 2010 Caterpillar, Model XQ80-4, Diesel, 208/240 v, 80 kw | N | N |
| C44LD4D00855 | 340 | Portable | 2010 Caterpillar, Model XQ80-4, Diesel, 208/240 v, 80 kw | N | N |
| 340 | Portable | 2016 Perkins, Model TP30E-60T4iFGT. | N | N | |
| Diesel 277/480 25.6 kw | |||||
| 2090869 | Southside 100 | 100G | 2006 Generac, Diesel, Model 7192580400, 277/480 v, 400 kw | Y | |
| 2090534 | Westside 104 | 104G | 2006 Generac, Diesel, Model 7147820100, 277/480 v, 130 kw | Y | |
| 2114348 | Northside 200 | 220G | 2013 Generac, Diesel, Model 13817330200, 277/480 v, 560 kw | N | |
| 14504 | Eastside 350 | 350G | 1986 Kohler, Propane, Model CSG-6491-600F-F, 208 v, 33 kw | N | |
| Fuel Station 359 | 359A | Generac SD100 100KW 277/140 | Y |
| 4446908 | South End on Pad 450 | 450G | Generac, Propane, Model QT03524KVAN, 277/480 v, 30 kw | Y |
| L080227435 | Front Gate Security 710 | 710G | 2009 Cummins, Diesel, Model 0SL9-G2NR3, 277/480 v, 175 kw | Y |
| L080227438 | Back Gate Security 711 | 714G | 2009 Cummins, Diesel, Model DSGAB-7556068, 277/480 v, 175 kw | Y |
@Lizasuain CIV Ricardo D added info in red.
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
06-Cathodic Protection
| Attachment J-1502000-06 |
| Cathodic Protection Systems – MCSF-BI |
| The Contractor shall develop and implement a Cathodic Protection Systems maintenance and repair program for Catodic Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Cathodic Protection Systems, such as: Anodes, Cathodes, DC power sources, solar panels, generators, tranformers, rectifiers, cabling, connections, test meters, test posts, tanks ect. | |||
| Asset Number | Asset Location | Facility Number | Description |
| small craft Boat ramp | B-224 | Cathodic corrosion protection for steel sheet pile at small craft boat ramp. Test point on northwest corner of ramp. See map. | |
| Berth 4 Retaining wall | 210 | Cothodic corrosion protection for steel sheet pile portion of berth 4 retaining wall. 2 test points located on west section of 210 retaining wall. See map. | |
| Berth 2 | 202 | Cathodic corrosion protection for encased, repaired piles.1 test point located on East mooring structure of facility 202. See map. | |
| Berth 3 Quay wall | 209 | Cathodic corrosion protection for steel sheet pile portion of Berth 3 Quay wall. 2 test points located along quay wall 209 | |
| Berth 3 Finger pier | 205 | cathodic corrosion protection for encased, repaired pile located at north end of Berth 3 finger pier 205, 1 test point north west side of pier. See map. | |
| Berth 3 finger pier Lighterage piles | 205 | Cathodic corrosion protection for 6 steel encased, concrete filled piles located on west side of facility 205. Each of the 6 piles is a test point. See map. | |
| Berth 5 | 216 | Cathodic corrosion protection for encased , repaired piles located at Berth 5 facility 216. 2 test points, 1 on west side and 1 on east side. See map. |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
07-Compressed Air Systems
| Attachment J-1502000-07 |
| Compressed Air Systems – MCSF-BI |
| Compressed Air Systems commence at and include the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. | ||||
| Asset Number | Asset Location | Facility Number | Description | Quantity |
| Inside Building | 343 | Air Compressor | 1 | |
| East side at Door 14B | 350 | Ingersoll Rand Rotary Screw Air Compressor 40HP | 1 | |
| East side at Door 14B | 350 | Ingersoll Rand Rotary Screw Air Compressor 40HP | 1 | |
| Machine Shop | 350 | Baldor Reliance Air Compressor 5HP | 1 | |
| West side Oil Lube Annex | 350 | FS Curtis dual 25HP ML Series Air Compressor | 1 | |
| Mechanic Bay Westside | 351 | Air Compressor | 1 | |
| Inside Building | 353 | Air Compressor | 1 | |
| Inside Building | 353 | Air Dryer | 1 | |
| Northside of Building | 354 | Air Compressor | 1 | |
| Northside of Building | 354 | Air Dryer | 1 | |
| Lark Shelter | 364T | Air Compressor Rotary Screw Sullair 1800E 15-25 hp | 1 | |
| Inside Building | 360 | Air Compressors, Filters | 2 | |
| Inside Westside | 389 | Air Compressor | 1 | |
| Inside Westside | 389 | Air Dryer | 1 | |
| Eastside on Pad | 390 | Air Compressor | 1 | |
| Eastside of Building | 390 | Air Dryer | 1 | |
| Outside South | 400 | Air Compressor | 1 | |
| South | 450 | Air Compressor | 1 | |
| Eastside | 450 | Air Compressor | 1 | |
| Eastside | 450 | Air Dryer | 1 | |
| Southwest | 550 | Air Compressor 2 hp | 1 | |
| Canopy | 614 | Air Compressor Rotary Screw Campbell-Hausfeld 5hp | 1 |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
08- Crane and Railroad Trackage
| Attachment J-1502000-08 |
| Crane and Railroad Trackage – MCSF-BI |
| Map Callout | Asset Number | Asset Location | Description | Size | Quantity |
| A | Front Gate | 10+28 | Railroad Crossing Light (North American Signal) | N/A | 1 |
| B | S1 | 51+00 - 0+00 | Switch, Rail, (115RE) Main - Spur 1 | 10 | 1 |
| C | S2 | 01+66 - 0+00 | Switch, Rail, (115RE) Spur 1 - Spur 2 | 10 | 1 |
| D | S3 | 33+44 - 84+24 | Switch, Rail, (115RE) Spur 1 - Main | 10 | 1 |
| E | S4 | 35+83 - 87+91 | Switch, Rail, (115RE) Spur 2 - Main | 10 | 1 |
| F | Main | 09+71 - 94+47 | Track, Class 2, Tangent (130PS), Curves (115RE) | 130/115 | 1 |
| G | Spur 1 | 0+00 - 33+44 | Track, Class 2, Tangent (130PS), Curves (115RE) | 130/115 | 1 |
| H | Spur 2 | 0+00 - 35+83 | Track, Class 2, Tangent (130PS), Curves (115RE) | 130/115 | 1 |
| I | Main | 10+28 - 10+89 | Crossing, Rubber, Full Depth (Channel View) | 115RE | 1 |
| J | Main | 11+62 - 13+06 | Crossing, Rubber, Full Depth (Old Entrance) | 115RE | 1 |
| K | Main | 22+03 - 22+39 | Crossing, Rubber, Full Depth (Reef Run Road) | 115RE | 1 |
| L | Main | 46+05 - 46+29 | Crossing, Rubber, Full Depth (Police Training Bldg) | 115RE | 1 |
| M | Main | 52+26 - 52+81 | Crossing, Rubber, Full Depth (Fairleads Blvd) | 115RE | 1 |
| N | Spur 1 | 01+15 - 01+64 | Crossing, Rubber, Full Depth (Fairleads Blvd) | 115RE | 1 |
| O | Main | 60+57 - 60+85 | Crossing, Rubber, Full Depth (Intermodal N.) | 115RE | 1 |
| P | Main | 70+90 - 71+21 | Crossing, Rubber, Full Depth (Intermodal S.) | 115RE | 1 |
| Q | Main | 94+12 - 94+37 | Crossing, Rubber, Full Depth (Back Gate) | 115RE | 1 |
| R | Berth 1 | Pier Side | Gantry Crane, Track 900LF | 175RE | 1 |
| 350 | 350 | Indoor Elevated Rail | 10 Ton Crane | 1 | |
| 350 | 350 | Indoor Elevated Rail | 25 Ton Crane | 1 | |
| 350 | 350 | Indoor Elevated Rail | 50/15 Ton Crane | 1 | |
| 351 | 351 | Indoor Elevated Rail | 10 Ton Crane | 1 | |
| 361 | 361 | Indoor Elevated Rail | 7.5 Ton Crane | 1 | |
| 390 | 390 | Indoor Elevated Rail | 10 Ton Crane | 1 | |
| 400 | 400 | Indoor Elevated Rail | 1 Ton Crane | 1 | |
| 450 | 450 | Indoor Elevated Rail | 50/15 Ton Crane | 1 |
&"Calibri"&14&K0B0000 CUI&1#_x000D_
_x000D_&1#&"Calibri"&14&K0B0000 CUI
09-Facilities Systems and Equip
| Attachment J-1502000-09 |
| Facilities Systems and Equipment – MCSF-BI |
| Facilities Systems and Equipment commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Facilities Systems and Equipment and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Facilities Systems and Equipment. | |||
| Asset Number | Asset Location | Facility Number | Description |
| Front Gate Security Complex | BI | Electric Roll Gate (Entramce) | |
| Front Gate Security Complex | BI | Electric Roll Gate (Exit) | |
| Front Gate Security Complex | BI | Electric Roll Gate (Railroad) | |
| Harbor Basin Entry | BI | Port Security Barrier | |
| Room 132 | 100 | Domestic Water Heater | |
| Room 145 | 100 | Domestic Water Heater | |
| Room 146 | 100 | Domestic Water Heater | |
| 1st Floor Rest Room | 100 | Exhaust Fan | |
| 1st Floor Rest Room E-End | 100 | Exhaust Fan | |
| 2nd Floor, W/S Rest Room | 100 | Exhaust Fan | |
| 2nd Floor, Rest Room | 100 | Exhaust Fan | |
| North East Room 207 | 100 | Exhaust Fan | |
| South East Room 234 | 100 | Exhaust Fan | |
| ON Door equipment # 24201 | 100 | Panic Hardware Device | |
| First Floor Break Room | 100 | Ice Machine | |
| 1st Floor East side | 100 | Drinking Fountain | |
| 1st Floor West side | 100 | Drinking Fountain | |
| 2nd Floor East side | 100 | Drinking Fountain | |
| 2nd Floor West side | 100 | Drinking Fountain | |
| (2) Manual Rollup Doors | 101 | Manual Rollup Door | |
| Equipment Room | 104 | Natural Gas Water Heater 5 gal | |
| Ladies Room | 104 | Exhaust Fan | |
| Men's Room | 104 | Exhaust Fan | |
| Lift Station | 104 | Control Panel | |
| Lift Station | 104 | Control Panel | |
| Lift Station | 104 | Grinder Pump | |
| Lift Station | 104 | Grinder Pump | |
| Lift Station | 104 | Grinder Pump | |
| Southwest Corner | 104 | Lift Station #711 | |
| By ATM | 104 | Lift Station#704 |
tc={A80D4DD8-40AB-47A7-BDA8-E470B36AE003}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Lift Station has been deactivated, I do not believe there is any maintenance being done on it
| Air Handler Room South | 104 | Dehumidifier |
| Sandwich Shop | 104 | Ice Machine |
| Hallway | 104 | Drinking Fountain |
| Kitchen | 104 | Exhaust Vent Hood |
| Eastside Roof | 104 | Two Exhaust Fans |
| Eastside Roof | 104 | Fresh Air Supply Fan |
| Kitchen | 104 | Griddle |
| Kitchen | 104 | Deep Fryer |
| Kitchen | 104 | Walk-in Freezer |
| Kitchen | 104 | Walk-in Refrigerator |
| 1ST Floor Restrooms | 109 | Exhaust Fan (EF-1) |
| Lobby Restroom | 109 | Exhaust Fan (EF-2) |
| 2nd Floor Restrooms/Showers | 109 | Exhaust Fan (EF-3) |
| Northside storage | 109 | Roll-up Door Manual |
| 1st Floor | 109 | Drinking Fountain |
| 1st Floor | 109 | Drinking Fountain |
| 2nd Floor | 109 | Drinking Fountain |
| 2nd Floor | 109 | Drinking Fountain |
| Breakroom | 109 | Ice Machine |
| Vault | 109 | Vault Door Class 5-A |
| Exterior | 109 | Electric Gate |
| Lobby | 109 | Reception Roll up window/Annual drop test |
| Lift Station | 109 | Control Panel #1 |
| Lift Station | 109 | Grinder Pump #1 |
| Lift Station | 109 | Grinder Pump #2 |
| East Entrance | 109 | Lift Station #707 |
| 2nd Floor | 109 | Water Heater 100 Gal Natural Gas |
| Janitorial Closet | 110 | Exhaust Fan |
| 110 | Drinking Fountain | |
| Ladies Room | 110 | Exhaust Fan |
| Men's Room | 110 | Exhaust Fan |
| Lift Station, Front Gate | 110 | Control Panel |
| Lift Station, Front Gate | 110 | Grinder Pump |
| Southside Building | 110 | Lift Station #732 |
| Front Gate Security Complex | 110A | Active Vehicle Barrier |
| West side | 111 | Small Lift Station |
| Restroom | 111 | Exhaust Fan |
| South side | 111 | Exhaust Fan |
| Lift Station, Front Gate | 111 | Control Panel |
| Lift Station, Front Gate | 111 | Grinder Pump |
| 112 | Gate Arm | |
| 112 | Gate Arm | |
| 112 | Exhaust Fan | |
| 112 | Exhaust Fan | |
| 113 | Exhaust Fan | |
| 113 | Exhaust Fan | |
| North Wall | 113 | Wall Louver |
| Elect. Room | 113 | Exhaust Fan |
| South Wall | 113 | Wall Louver |
| 114 | Exhaust Fan | |
| Back Gate Security Complex | 114A | Pop Up Barrier |
| Electrical Room | 115 | Exhaust Fan |
| East Wall | 115 | Wall Louver |
| West Wall | 115 | Wall Louver |
| Roof Top | 150 | Exhaust Fan |
| Mechanical Room | 150 | Water Heater 20 Gallon |
| Loading Dock Outback | 150 | Ice Machine |
| Inside Bldg | 150 | Drinking Fountain |
| Inside Bldg | 150 | Drinking Fountain |
| NorthWest side | 150 | Control Panel Liftstation #736 |
| NorthWest side | 150 | Grinder Pump Liftstation #736 |
| NorthWest side | 150 | Grinder Pump Liftstation#736 |
| Northwest side Bldg | 150 | Lift Station #736 |
| Roof | 150 | (2) Exhaust Fan |
| North side B151 | 151 | Liftstation #709 |
| North side B151 | 151 | Liftstation #709 Control panel |
| North side B151 | 151 | Liftstation #709 Grinder pump |
| North side B151 | 151 | Liftstation #709 Grinder pump |
| Access Control Room | 151 | Exhaust Fan |
| Nurse's Station | 151 | Ice Machine |
| Men &Women Restroom | 151 | Exhaust Fan |
| Janitorial Closet | 152 | Exhaust Fan |
| Access Control Room | 152 | Exhaust Fan |
| Men &Women Restroom | 152 | Exhaust Fans |
| Eastside | 152 | Grinder Pump |
| Northwest side | 200 | Lift Station #749 |
| Northwest side | 200 | Liftstation #749 control panel |
| Northwest side | 200 | Liftstation #749 Grinder Pump |
| Northwest side | 200 | Liftstation#749 Grinder Pump |
| Break Room/Longshoreman | 200 | Ice Machine |
| Roof | 200 | Solar Panel Hot Water Heater |
| Roof | 200 | EF-(4) |
| 1st floor hallway | 200 | Drinking fountain/Bi level/filtered/w Bottle filler |
tc={7269FA10-6C1B-4097-9820-9572FDA0602F}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
B200 Drinking fountains need to be added, were never in old contract. These are Bi-level fountains, they come as a set.
tc={A80D4DD8-40AB-47A7-BDA8-E470B36AE003}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Lift Station has been deactivated, I do not believe there is any maintenance being done on it | 1st floor /Room 100 | 200 | Drinking fountain/Bi level/filtered/w Bottle filler | |||
| 2nd floor hallway/West end | 200 | Drinking fountain/Bi level/filtered/w Bottle filler | ||||
| Tent on Eastside | 321 | Rollup Door | ||||
| Warehouse | 340 | Ice Machine | ||||
| Warehouse | 340 | Ice Machine | ||||
| Westside | 340 | Rollup Door Electric | ||||
| East Wall | 340 | Rollup Door Manual | ||||
| 340 | Rollup Door Electric | |||||
| North | 341 | Exhaust Fan | ||||
| Southside | 341 | Rollup Door Manual | ||||
| North Wall | 342 | Rollup Door Manual | ||||
| South Wall | 342 | Fan Wall | ||||
| (3) Electric Rollup Door | 343 | Electric Rollup Door | ||||
| Inside Building | 343 | Exhaust Fan | ||||
| Southside | 343 | Three Rollup Doors Electric | ||||
| Northside | 343 | Three Wall Fans | ||||
| Inside Building | 343 | Air Compressor | ||||
| Electric Rollup Door | 350 | Electric Rollup Door | ||||
| ROOF-COL #D-4 N.W | 350 | Exhaust Fan | ||||
| ROOF-COL #B-6 N.W | 350 | Exhaust Fan | ||||
| ROOF-COL #B-10 N.W | 350 | Exhaust Fan | ||||
| Next to Roof Hatch | 350 | Exhaust Fan | ||||
| ROOF-COL D-7 , N.W | 350 | Exhaust Fan | ||||
| ROOF-COL D-12 , N.W | 350 | Exhaust Fan | ||||
| ROOF-COL #F/G-2, NE | 350 | Exhaust Fan | ||||
| ROOF-COL #F/G-6, NE. | 350 | Exhaust Fan | ||||
| ROOF-COL #H/J-8, NE | 350 | Exhaust Fan | ||||
| ROOF-COL #H/J-11, NE | 350 | Exhaust Fan | ||||
| ROOF-COL #F/G-10, NE | 350 | Exhaust Fan | ||||
| ROOF-COL #H/J-4, NE | 350 | Exhaust Fan | ||||
| ROOF-COL # E/D-23, S.W. | 350 | Exhaust Fan | ||||
| ROOF-COL # D-15, S.W | 350 | Exhaust Fan | ||||
| ROOF-COL # D-20, S.W | 350 | Exhaust Fan | ||||
| ROOF-COL # E/D-18, S.W. | 350 | Exhaust Fan | ||||
| ROOF-COL # F/G-18, S.E | 350 | Exhaust Fan | ||||
| ROOF-COL # H/J-15, S.E | 350 | Exhaust Fan | ||||
| ROOF-COL # H/J-23, S.E. | 350 | Exhaust Fan | ||||
| ROOF-COL # F/G-23, S.E | 350 | Exhaust Fan | ||||
| ROOF-COL # H/J-20, S.E | 350 | Exhaust Fan | ||||
| Motor T Lite Near Door G4 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite Near Door G4 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite Near Column E4 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite Near Column E4 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite West Door of Breakroom | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite Near Column E9 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Motor T Lite Near Column E9 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO Near Column F10 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO Near Women’s Restroom | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO Near Men’s Restroom | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO Breakroom Eastside | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO RM. Near G6A | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO RM. Near G6A | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO RM Near G6 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| MMO RM Near G5 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column G2 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column G2 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column H2 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column H2 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column G3 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column G3 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column H3 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column H3 | 350 | Unit Heater (Natural Gas Infrared) | ||||
| Engineers Column G4 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column G4 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column H4 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column G5 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column G6 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Office Westside | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J10 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J7 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J5 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J5 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J3 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J3 | 350 | Unit Heater (Natural Gas Infrared | ||||
| Engineers Column J2 | 350 | Unit Heater (Natural Gas Infrared | ||||
| East Wall Automotive Exhaust Fumes | 350 | Exhaust Fan | ||||
| East Wall Automotive Exhaust Fumes | 350 | Exhaust Fan | ||||
| East Wall Automotive Exhaust Fumes | 350 | Exhaust Fan | ||||
| South Restroom | 350 | Exhaust Fan | ||||
| South Restroom Roof | 350 | Water Heater | ||||
| NorthEast side of B350 | 350 | Liftstation #723 Grinder Pump | ||||
| Northeast side of B350 | 350 | Liftstation #723 Grinder Pump | ||||
| Northeast side B350 | 350 | Lift Station #723 | ||||
| Northeast side of B350 | 350 | Liftstation #723 Control Panel | ||||
| East side B350 | 350 | Liftstation # 738 | ||||
| East side B350 | 350 | Liftstation #738 Pump | ||||
| East side B350 | 350 | Liftstation #738 Simplex control Panel A-BPI009, 230V, 1 PH | ||||
| southeast side B350 | 350 | Liftstation #728 | ||||
| southeast side B350 | 350 | Liftstation #728 control panel | ||||
| southeast side B350 | 350 | liftstation #728 Grinder pump | ||||
| southeast side B350 | 350 | liftstation #728 Grinder pump | ||||
| SOUTH WALL | 350 | Make Up Air Unit | ||||
| Southeast exterior Breakroom | 350 | Ice Machine | ||||
| North end Breakroom | 350 | Ice Machine | ||||
| Men’s Restroom | 350 | Water Heater | ||||
| #6 Machine Shop Westside | 350 | Manual Rollup Door | ||||
| #7 Machine Shop Westside | 350 | Manual Rollup Door | ||||
| #8 Machine Shop Westside | 350 | Manual Rollup Door | ||||
| #9 Machine Shop Westside | 350 | Manual Rollup Door | ||||
| #10 Southside | 350 | Manual Rollup Door | ||||
| North west | 350 | Refrigerated Air Dryer | ||||
| 3 Fountains in Motor T | 350 | Drinking Fountain | ||||
| 3 Fountains in Ordnance S/S | 350 | Drinking Fountain | ||||
| Northwest of Ordinance | 350 | Drinking Fountain | ||||
| I/S Machine Shop | 350 | Drinking Fountain | ||||
| O/S Machine Shop | 350 | Drinking Fountain | ||||
| Engineers | 350 | Drinking Fountain | ||||
| Mobile Load Area | 350 | Drinking Fountain | ||||
| I/S Behind MIP Desk | 350 | Drinking Fountain | ||||
| Between Doors 1 & 2 | 350 | Drinking Fountain | ||||
| Inside Building | 351 | Exhaust Fan | ||||
| Battery Shop | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Wall | 351 | Exhaust Fan | ||||
| Eastside | 351 | Door, Roll Up | ||||
| Westside | 351 | Door, Roll Up | ||||
| Westside | 351 | Door, Roll Up | ||||
| Eastside | 351 | Door, Roll Up | ||||
| Westside Office Area | 351 | Door, Roll Up | ||||
| Office Area | 351 | Door, Roll Up | ||||
| Organic Bay | 351 | Door, Roll Up | ||||
| Engineers Bay | 351 | Door, Roll Up | ||||
| Engineers Bay | 351 | Door, Roll Up, Electric and Manual | ||||
| Engineers Bay | 351 | Door, Roll Up, Electric and Manual | ||||
| Battery Shop | 351 | Fresh Air Supply | ||||
| Mechanic Bay Westside | 351 | Air Compressor | ||||
| Lift Station | 351 | Grinder Pump | ||||
| Lift Station | 351 | Grinder Pump | ||||
| Lift Station | 351 | Control Panel | ||||
| Southside | 351 | Lift Station #719 | ||||
| Comm./Elect by Door-2 | 351 | Ice Machine | ||||
| Comm./Elect by Door-2 | 351 | Ice Machine | ||||
| Eastside Above Restrooms | 351 | Make Up Air Unit | ||||
| Inside 1st Bay | 351 | Drinking Fountain | ||||
| Next to Restroom | 351 | Drinking Fountain | ||||
| Next to Restroom | 351 | Drinking Fountain | ||||
| Medical Trailer | 351 | Drinking Fountain | ||||
| Test Benches | 351 | Ground Fault Circuit Interrupter | ||||
| Column B8 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C1 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C3 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C4 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C5 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C6 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column C9 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Column D9 | 351 | Unit Heater (Natural Gas Infrared) | ||||
| Inside Building | 353 | Air Compressor | ||||
| Inside Building | 353 | Air Dryer | ||||
| North Wall | 354 | Exhaust Fan | ||||
| North Wall | 354 | Exhaust Fan | ||||
| North Wall | 354 | Exhaust Fan | ||||
| Bay | 354 | Door, Roll Up | ||||
| Bay | 354 | Door, Roll Up | ||||
| Bay | 354 | Door, Roll Up | ||||
| Bay | 354 | Door, Roll Up | ||||
| Bay | 354 | Door, Electric Roll up | ||||
| Northside | 354 | Air Compressor | ||||
| Northside | 354 | Air Dryer | ||||
| Far East Bay | 354 | Drinking Fountain | ||||
| Fuel Station | 354 | Cathodic Protection | ||||
| Northside | 355 | Door, Roll Up (Electric) | ||||
| Southside | 355 | Exhaust Fan | ||||
| Southside | 355 | Exhaust Fan | ||||
| Restroom Hall Way | 360 | Exhaust Fan | ||||
| Janitorial Closet | 360 | Exhaust Fan | ||||
| Fire Pump Room | 360 | Exhaust Fan | ||||
| Inside | 360 | Drinking Fountain | ||||
| Inside | 360 | Air compressors(two) | ||||
| Northside | 360 | Exhaust Fan | ||||
| Southeast Side | 360 | Exhaust Fan | ||||
| Southside Middle | 360 | Exhaust Fan | ||||
| Southwest Side | 360 | Exhaust Fan | ||||
| East Inside Building | 360 | Pressure Washer's (8) | ||||
| East Inside Building | 360 | Flushing Pump's (3) | ||||
| East Inside Building | 360 | Effluent Pump's (6) | ||||
| East Inside Building | 360 | De-mucking Pump's(4) | ||||
| East Inside Building | 360 | Centrifugal Pump's(5) | ||||
| East Inside Building | 360 | Transfer Tank's (3) | ||||
| East Inside Building | 360 | De-mucking Tank's(1) 20,000 gal | ||||
| East Inside Building | 360 | Water Storage (1) 20,000 gal | ||||
| East Inside Building | 360 | Flushing Tank's (3)20,000 gal | ||||
| East Inside Building | 360 | Maintenance Tank 60,000 gal | ||||
| East Inside Building | 360 | Propane Tank's (2) 2,000 | ||||
| Inside Building | 360 | Water Cannon's (4) | ||||
| Southside of Building | 360 | Water Oil Separator 550 gals | ||||
| Inside Building | 360 | Vacuum Cleaner (2) | ||||
| Southside | 360 | Lift Station #748 | ||||
| Northwest End | 361 | Manual Rollup Door | ||||
| Southside | 361 | Electric Rollup Door | ||||
| Northside of Bldg | 361 | Electric Rollup Door | ||||
| Northside of Paint Storage | 361 | Electric Rollup Door | ||||
| Northside of Paint Storage | 361 | Electric Rollup Door | ||||
| Southside | 361 | Electric Rollup Door (Mega) | ||||
| Northside | 361 | Electric Rollup Door (Mega) | ||||
| North inside Paint Storage | 361 | Manual Rollup Door | ||||
| North inside Paint Storage | 361 | Manual Rollup Door | ||||
| Boiler Room--Fire Equip Room | 361 | EUH 15&16 6.5 MBH | ||||
| Hallway by Restroom | 361 | Drinking Fountain | ||||
| Outside Office | 361 | Drinking Fountain | ||||
| Break Room | 361 | Ice Machine | ||||
| Temp Shelter | 363T | Exhaust Fan | ||||
| Temp Shelter | 363T | Wall Louver | ||||
| Roof Top | 364T | Exhaust Fan | ||||
| Temp Shelter | 364T | Wall Louver | ||||
| Janitor Room | 368 | Exhaust Fan | ||||
| Motor Pool | 368 | Ice Machine | ||||
| Motor Pool | 368 | Ice Machine | ||||
| Wall | 368 | Drinking Fountain | ||||
| Wall | 368 | Drinking Fountain | ||||
| Ladies Room | 368 | Exhaust Fan | ||||
| Men's Room | 368 | Exhaust Fan | ||||
| Lift Station | 368 | Grinder Pump | ||||
| Lift Station | 368 | Grinder Pump | ||||
| Lift Station | 368 | Control Panel | ||||
| Southeast Corner | 368 | Lift Station #717 | ||||
| Excess Control Room | 369 | Exhaust Fan | ||||
| Janitorial Room | 369 | Exhaust Fan | ||||
| Motor T | 369 | Ice Machine | ||||
| Motor T | 369 | Ice Machine | ||||
| Wall | 369 | Drinking Fountain | ||||
| Wall | 369 | Drinking Fountain | ||||
| Ladies Room | 369 | Exhaust Fan | ||||
| Men's Room | 369 | Exhaust Fan | ||||
| Lift Station | 369 | Grinder Pump | ||||
| South | 369 | Lift Station #746 | ||||
| Lift Station | 369 | Control Panel | ||||
| Fire Pump Room | 378 | Exhaust Fan | ||||
| Fire Pump Room | 378 | Wall Louver | ||||
| East Wall | 389 | Electric Rollup Door | ||||
| West Wall | 389 | Electric Rollup Door | ||||
| N/A | 389-A | Lift Station and pump | ||||
| Eastside Wall | 389-A | (2) Exhaust Fan | ||||
| Eastside | 389 | Rollup Electric Door | ||||
| Westside | 389 | Rollup Electric Door | ||||
| Inside west side | 389 | Air Compressor- Air Dryer | ||||
| South Side of Bldg | 390 | Exhaust Fan | ||||
| Low Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| High Bay | 390 | Exhaust Fan | ||||
| Breezeway Fans | 390 | (12) Wall Fans | ||||
| South West End Panel | 390 | Door, Electric Roll up | ||||
| South End East Side | 390 | Door Roll Up, Manual | ||||
| North Wall | 390 | Door Roll Up, Manual | ||||
| South Wall | 390 | Door Roll Up, Manual | ||||
| East Wall | 390 | Door Roll Up, Manual | ||||
| West Wall | 390 | Door Roll Up, Manual | ||||
| East Side on Pad | 390 | Air Compressor | ||||
| East Side of Bldg | 390 | Air Dryer | ||||
| East Side by Road | 390 | Control Panel | ||||
| Lift Station | 390 | Grinder Pump | ||||
| Lift Station | 390 | Grinder Pump | ||||
| Southside | 390 | Lift Station #721 | ||||
| West Wall | 390 | Exhaust Fan | ||||
| Connex Room Outside | 390 | Ice Machine | ||||
| Connex Room Outside | 390 | Ice Machine | ||||
| Near Ice Machine | 390 | Drinking Fountain | ||||
| South Wall Center | 390 | Drinking Fountain | ||||
| West End Near Bay Door | 390 | Drinking Fountain | ||||
| Inside BLDG | 390 | Paint Blast Maintenance | ||||
| Inside BLDG | 390 | Paint Blast Maintenance | ||||
| Inside Building | 390 | Monometers (2ea) | ||||
| Column A15 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column A14 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column A9 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column A8 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column A7 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column A5 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column AS | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B16 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B15 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B14 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B12 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B10 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B7 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B6 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B5 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B3 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Column B2 | 390 | Unit Heater (Natural Gas Infrared) | ||||
| Eastside | 391 | Rollup Door | ||||
| South Wall | 391 | Fan | ||||
| Blast Room | 391 | Dryer | ||||
| Roof Top | 392 | Exhaust Fan | ||||
| Roof Top | 392 | Intake Fan | ||||
| Westside | 392 | (2) Swing Doors | ||||
| East | 392 | Roll Up Door | ||||
| Roof Top | 392 | Exhaust Fan | ||||
| North Wall | 394 | Manual Rollup Door | ||||
| South Wall | 394 | Manual Rollup Door | ||||
| North Wall | 394 | Exhaust Fan | ||||
| North Wall | 394 | Exhaust Fan | ||||
| South Wall | 394 | Exhaust Fan | ||||
| South Wall | 394 | Exhaust Fan | ||||
| West Wall | 395 | Exhaust Fan | ||||
| West Wall | 395 | Exhaust Fan | ||||
| East Wall | 395 | Exhaust Fan | ||||
| East Wall | 395 | Exhaust Fan | ||||
| East Wall | 396 | Manual Rollup Door | ||||
| West Wall | 396 | Manual Rollup Door | ||||
| South Wall | 397 | Exhaust Fan | ||||
| South Wall | 398 | Electric Rollup Door | ||||
| Southside | 398 | Rollup Door Manual | ||||
| Northside | 399 | Rollup Door Manual | ||||
| Southside | 399 | Rollup Door Manual | ||||
| Near Restroom | 400 | Ice Machine | ||||
| Near Restroom | 400 | Ice Machine | ||||
| Bay, Overhead | 400 | Unit Heater | ||||
| Bay, Overhead | 400 | Unit Heater | ||||
| Bay, Overhead | 400 | Unit Heater | ||||
| Bay, Overhead | 400 | Unit Heater | ||||
| Bay, Overhead | 400 | Unit Heater | ||||
| Ladies Room | 400 | Exhaust Fan | ||||
| Men's Room | 400 | Exhaust Fan | ||||
| Shop Bay, East End | 400 | Exhaust Fan | ||||
| Shop Bay, West End | 400 | Intake Louver | ||||
| Lift Station | 400 | Grinder Pump | ||||
| Lift Station | 400 | Grinder Pump | ||||
| Lift Station | 400 | Control Panel | ||||
| Eastside | 400 | Lift Station #745 | ||||
| South Wall | 400 | Door, Roll Up, Electric and Manual | ||||
| West Wall | 400 | Door, Roll Up, Electric and Manual | ||||
| Janitorial Closet | 400 | Exhaust Fan | ||||
| East Wall | 400S | Exhaust Fan | ||||
| West Wall | 400S | Wall Louver | ||||
| Westside | 411 | Manual Rollup Door | ||||
| Westside | 411 | Manual Rollup Door | ||||
| Westside | 411 | Manual Rollup Door | ||||
| Westside | 411 | Manual Rollup Door | ||||
| West Wall | 420 | Rollup Door Electric | ||||
| East Wall | 420S | (2) Rollup Doors Manual | ||||
| North Wall | 420S | Exhaust Fan |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .