About this file

The file is an Excel spreadsheet (Attachment J-0600000-04) containing 81 historical port operations work orders from Naval Station Mayport, documenting a comprehensive range of maintenance and repair activities. Work orders cover critical infrastructure and equipment issues, including shore power cable repairs, fuel pump maintenance, vessel power systems, facility electrical and mechanical repairs, and miscellaneous infrastructure support. The work orders are categorized by work types and groups, with specific locations like various piers (A-2, B-4, F-1, C-Tractors), small boat docks, and building 2078, involving multiple departments such as Port Operations, Facility Mechanics, HVAC, Electrical, and Energy/Environmental teams.

The work orders detail specific technical issues like fuel pump malfunctions, shore power cable damages, junction box repairs, security lock installations, and equipment relocation tasks. Many work orders involve urgent maintenance of mission-critical infrastructure, such as repairing fuel pumps near small boat docks, replacing faulty electrical components, addressing environmental hazards, and ensuring operational readiness of port facilities. The document provides granular insight into the maintenance complexity and ongoing operational support requirements at Naval Station Mayport, which aligns with the broader Base Operations Support (BOS) Services solicitation (N6945025R0003) for Naval Station Mayport and Marine Corps Support Facility - Blount Island.

View the file

Other files

File Type Posted
N6945025R0003-0007.pdf PDF
JL-1_Labor_Hours_Spreadsheet_0007.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0007.xlsx XLSX spreadsheet
JL-11_N6945025R0003_GPI Responses_0007.pdf PDF
J-0200000-17_ELINs_0006.xlsx XLSX spreadsheet
N6945025R0003-0006.pdf PDF
J-0200000-18 CAT Call Request_0005.pdf PDF
J-1606000-07 Historical Water Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003_SectionJ_0005.pdf PDF
J-0200000-02-01_N6945025R0003 CBA-2025-439_0005.pdf PDF
N6945025R0003_SectionC_0005.pdf PDF
N6945025R0003-0005.pdf PDF
J-1502000-24 FRCS Roles and Responsiblities_0005.xlsx XLSX spreadsheet
J-0200000-02-02_N6945025R0003 CBA-2025-440_0005.pdf PDF
JL-11_N6945025R0003_GPI Responses_0005.pdf PDF
J-1503010-05 Custodial Inventory_0005.xlsx XLSX spreadsheet
J-1502000 (MCSF-BI) Facility Investment_0005.xlsx XLSX spreadsheet
J-0200000-17 ELINs_0005.xlsx XLSX spreadsheet
J-1502000 Facility Asset Inventories_0005.xlsx XLSX spreadsheet
J-0600000-04 Historical Port Ops Work Orders_0005.xlsx XLSX spreadsheet
N6945025R0003-0004.pdf PDF
N6945025R0003-0003.pdf PDF
JL-9_N6945025R0003_Site_Visit_Brief_0002.pdf PDF
JL-10_N6945025R0003_Site_Visit_Sign-In_Sheets_0002.pdf PDF
N6945025R0003-0002.pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE_0001.pdf PDF
N6945025R0003-0001.pdf PDF
J-1503050-09 (MCSF-BI) Paved Roadways and Lots Map.pdf PDF
JL-6_N6945025R0003_MBOS SITE VISIT Directions.pdf PDF
J-0200000-22 NAVFACINST 11230.1.pdf PDF
JM-2_N6945025R0003_Historical_Small_Business_Utilization.docx DOCX document
J-1502000-07 (MCSF-BI) Compressed Air Systems.pdf PDF
J-0200000-07 Utility Asset Condition Report.xlsx XLSX spreadsheet
J-0600000-03 Maps and Locations.pdf PDF
J-1502000-23 FRCS Cybersecurity Program.pdf PDF
J-1503030-04 (MCSF-BI) Solid Waste and Recycle Containers.pdf PDF
J-1800000-06 Mayport SWPPP.pdf PDF
N6945025R0003_SectionF.pdf PDF
N6945025R0003_2015-4539 (Rev.-28).pdf PDF
JL-7_N6945025R0003_MBOS SITE VISIT ROUTE.pdf PDF
J-1502000-19 NAVSTA Cross Connection Control Program.pdf PDF
N6945025R0003_SectionC.pdf PDF
J-0200000-04 Partnering Agreement.pdf PDF
J-1503050-07 (MCSF-BI) Shoreline Cleanup Map.pdf PDF
J-1502000-08 (MCSF-BI) Crane and Railroad Inventory.pdf PDF
JM-1_N6945025R0003_Corporate_Experience.docx DOCX document
J-0200000-20 USMCmaxUserGuide.docx DOCX document
J-1800000-12 (MCSF-BI) Stormwater System Map.pdf PDF
J-1502000-21 (MCSF-BI) Lighting Systems.pdf PDF
J-1601000-05-01 Service Desk Guide for Reporting Utility System Outages.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Row LabelsCount of Task
A013AA2
A013AB5
A013AC8
B013AA3
B013AB8
B013AC25
C013AA5
C013AB6
C013AC6
D013AA2
D013AB2
D013AC7
E013AA2
Grand Total81

List of Work Orders

Attachment J-0600000-04, Sample Historical Port Ops Work Order Data
Work OrderDescriptionWork TypeWork GroupLocation
5236335CL4J76 - LOST SHORE POWER. CAME BACK UP. PLEASE CHECK OUT JUST IN CASE WATER IN LINES. NO GROUNDS. HAVE BOTH OPEN/CLOSED INDICATION LIGHTS. Long Desc: VESSELS AFFECTED USS COOPERSTOWN, MILWAUKEE AND DAUNTLESS. @ WHARF E. POC LT COX 619-857-7988SOMYP-PORT OPSMAYPOR-1562
5236285CL4J6Z- LOST SHORE POWER. CAME BACK UP. PLEASE CHECK OUT JUST IN CVASE WATER IN LINES. NO GROUNDS. HAVE BOTH OPEN/CLOSED INDICATION LIGHTS. Long Desc: VESSELS AFFECTED MASON AND DILBERT BLACK. WHARF-F-1SOMYP-PORT OPSMAYPOR-1973
3650011CHB6NK REQUEST TO HAVE THE FUEL TANK AT PORT OPS RESTORED BACK TO WORKING CONDITION DUE TO LOSS OF POWER TO THE FUEL TANK. POC BM1 COTTON (937) 818-9316FUEL TANK FOR PORT OPS ALONGSIDE SMALL BOAT PIER AT PORT OPSSOMYP-SUBCONTRACTOMAYPOR-2078
2701306CFCVRZ-REQUEST TO HAVE THE FUEL (GAS) PUMP ACROSS THE C-TRACTORS REPAIRED AND RETURNED TO WORKING CONDITION. WE ARE UNABLE TO REFUEL OUR SMALL BOATS AT ALL BECAUSE OF NO PRESSURE AT THE HAND PUMP.SOMYP-FAC-MECHMAYPOR-2078
1720629CC6FVS - REQUEST JACOBS TO REMOVE THE ICE MACHINE FROM BAY 1 AND TO TRANSPORT IT TO RECYCLING. ALL FREON AND HOSES HAVE BEEN REMOVED.SOMYP-HVACMAYPOR-2078
1649763CBZ94N - F-PIER REPAIR THE JUNCTION BOX ON THE BOOM REEL ON FOXTROT PIER APPEARS TO HAVE BEEN BROKEN. THE WIRING HARNESS/CONDUIT THAT LEADS FROM THE JUNCTION BOX HAS BEEN SNAPPED OFF AND HAS WIRING REQUEST TO FIX BOOM REEL JUNCTION BOX, REHARNESS AND ENSURE FULL OPERABILITY OF BOOM REEL AND ENSURE THE LIGHT FIXTURE THAT ACCOMPANIES THE BOOM REEL IS OPERATINGSOMYP-FAC-ELECTN60201
1470331CBSS3X - REQUEST TO HAVE ICE MACHINE FREON REMOVED AND PREPARED FOR DERMO IN BLDG 2078 IN BM BAY 1.SOMYP-HVACMAYPOR-2078
1238895CBCNXN - REQUEST TO HAVE PARKING SIGNS MADE TO READ "PORT OPERATIONS BOS'N" AND "PORT OPERATIONS SAILOR OF THE QUARTER" SIGNS SHOULD BE PREPARED IN THE SAME TEMPLATE AS THE PHOTO PROVIDED. BOS'N SIGN IS TO BE INSTALLED IN THE PARKING SPOT TO THE LEFT OF "SAILOR OF THE MONTH" SIGN AND THESOMYP-FAC-PAINTMAYPOR-2078
1131587C9WPX7 - UPON NORMAL OPERATION OF PUMP OPERATOR NOTICED DEFECT IN THE GAUGE ON THE UNLEADED FUEL PUMP. REQUEST TO HAVE GAUGE FIXED OR IF REQUIRED REPLACED. CONTACT POC UPON COMPLETION. UNLEADED FUEL PUMP, NEXT TO THE SMALL BOAT DOCKS IN THE TUG BASINSOMYP-ENERGYENVIRMAYPOR-2078
1126768C9VZ47 - FUEL PUMP IS ENERGIZING, BUT AS SOON AS THE LEVER ON THE NOZZLE IS SQUEEZED THE PUMP SHUTS OFF. REQUEST FOR PROBLEM TO BE INVESTEGATED AND FOR PUMP TO BE PLACED BACK INTO SERVICE. CONTACT POC UPON COMPLETION. REPAIR AS NEEDED. FUEL PUMP NEXT TO THE TUG BASING BY THE SMALL BOATS DOCK.SOMYP-ENERGYENVIRMAYPOR-2078
1066391C9LS9T - B-4 PIER PC SHORE POWER CABLE REPLACE 6 CAM LOCK CONNECTORS AND CRIMP ON SHIPS SUPPLIED LUGS ON SHORE POWER CABLE ON D-4/ PC SHORE POWER CABLE.SOMYP-PORT OPSN60201
929314C96XKJ-TEMP WO#0743-INV/RPR DIESEL FUEL PUMP ON FINGER PIER IS INOPERABLE AND IS MISSION CRITICAL FOR PORT OPERATIONS SMALL CRAFTS. REQUEST TO FIX SOURCE OF INOPERABILITY AND PLACE FUEL PUMP BACK INTO OPERATION.SOMYP-ENERGYENVIRMAYPOR-2078
852122C7WSMB - BLDG 2078 FUEL NOZZLE ON DIESEL FUEL PUMP IS NOT STOPPING THE FLOW OF FUEL. FUEL IS FLOWING OUT OF NOZZLE AS SOON AS PUMP GETS TURNED ON AND IS STUCK OPEN. REQUEST TO REPLACE FAULTY FUEL NOZZLE WITH FULLY FUNCTIONAL ONE. **ENVIRONMENTAL HAZARD**SOMYP-ENERGYENVIRMAYPOR-2078
592949C6TXSJ - ROOM 229INSTALL #3- INSWING DOOR STRIKE TYPE SECURITY LOCK ON ROOM 229 DOOR (LOCK IS ALREADY PURCHASED AND ON HAND. SEE POC FOR LOCK)SOMYP-FAC-CARPMAYPOR-2078
520972C6KKKT-25' SHORE POWER CABLE (PIG TAIL) #114 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520964C6KKJY-25' SHORE POWER CABLE (PIG TAIL) #118 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520955C6KKJV-125' SHORE POWER CABLE 143 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520947C6KKJL-25' SHORE POWER CABLE (PIG TAIL) #117 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520939C6KKJD-25' SHORE POWER CABLE (PIG TAIL) #116 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520930C6KK9N-PIER 25' SHORE POWER CABLE (PIG TAIL) #123 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520920C6KKFY-PIER 25' SHORE POWER CABLE (PIG TAIL) #124 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520912C6KKGN-PIER 25' SHORE POWER CABLE (PIG TAIL) #125 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520902C6KKHM-PIER 25' SHORE POWER CABLE (PIG TAIL) #65 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520892C6KKHP-PIER 25' SHORE POWER CABLE (PIG TAIL) #120 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520878C6KKHS-PIER 25' SHORE POWER CABLE (PIG TAIL) #122 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520870C6KJXV-PIER 125' SHORE POWER CABLE #144 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520860C6KJZS-PIER 125' SHORE POWER CABLE #145 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520852C6KK47-PIER 125' SHORE POWER CABLE #146 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520844C6KK63-PIER 125' SHORE POWER CABLE #147 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520835C6KK74-PIER 125' SHORE POWER CABLE #148 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520827C6KK97-PIER 125' SHORE POWER CABLE #149 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520817C6KKCD-PIER 125' SHORE POWER CABLE #141 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520805C6KKFN-PIER 125' SHORE POWER CABLE #140 NEEDS TO BE REPAIRED FOR PROPER OPERATIONSOMYP-PORT OPSMAYPOR-2078
520794C6KKFT-PIER 125' SHORE POWER CABLE #142 NEEDS TO BE REPAIRED FOR PROPER OPERATION.SOMYP-PORT OPSMAYPOR-2078
284801C3VLCP - REQUEST TO REPLACE FUEL HOSE ON DIESEL FUEL PUMPSOMYP-ENERGYENVIRMAYPOR-2078
283380C3T3WW - REQUEST TO REPLACE HOSE ON GASOLINE PUMP. FUEL HOSE FOR GASOLINE PUMP DOWN BY SMALL BOAT DOCKS HAS A PUNCTURE/HOLE IN IT CAUSING FUEL TO FLOW OUT OF THE HOSE AND ONTO THE GROUND.SOMYP-ENERGYENVIRMAYPOR-2078
174679C336R6 NEED TO RELOCATE CHT HOSE AT PIER A-2 FOR USS THOMAS HUDNER 0800 3/JULY/19 CONTRACTOR IS QEDSOMYP-PORT OPSN60201
173011BZYZMH THE FUEL TANK ON THE FINGER PIERS ( WHEN FUEL IS LOW) REQUEST TO HAVE THE FUEL TANK CLEANED DUE TO SEDIMENT AND WATER AT THE BOTTOM OF THE TANKSOJACENVMAYPOR-2078
36056BYSRN3 3RD DECK DISPATCH THE SAFE WILL NOT OPENSOMYP-PORT OPSMAYPOR-2078
33125BYMGDW 3/JAN/2019 VIKING PLUG CONNECT AT 10:00 F-1 FOR NASSCOSOMYP-PORT OPSMAYPOR-1488